Loading...
Washington County - CA 10-0262 CDBG Grant - Garrett Street Sidewalks CONTRACT AMENDMENT NO. 1 This amendment is made and entered into by and between, City of Tigard (Contractor") and Washington County, a political subdivision of the State of Oregon ("County"). This amendment modifies that certain contract between the parties,the original contract number being 09-0721. The contract is amended as follows: Part V. A. Project Description, Scope of Activities and Anticipated Accomplishments is revised as attached. Effective Date of Amendment: 04/06/10 , or upon final signature,whichever is later. All other terms and conditions of the original contract shall remain in full force and effect. WASH TON COUNTY: Rob Mawar Signature Printed Name -� 1 p AM,County Administrator Date Title CONTRA TOR: Signa tu Printed ' e Date Title TAO I3 I � � ztv� 3 Address 503 Lq39 4V� 1 Telephone Number Revised 4/9/07 ey •`^fit PROJECT DESCRIPTION, SCOPE OF ACTIVITIES AND ANTICIPATED ACCOMPLISHMENTS 2009-2010 CDBG Program Year I. Proiect Number and Title: CDBG Project#1123, Tigard, Garrett Street Sidewalks lt. Description of: Project, Activities, Anticipated Accomplishments, Low and Moderate or Other Target Group Beneficiaries. A. Nature and Purpose of the Project: Design and construction of sidewalks and associated storm drainage facilities on the west side of Garrett Street to current city standards. This section of the street contains many "gaps" along the street creating hazards for both pedestrians and drivers. The project also includes an asphalt overlay of the both sides of Garrett Street between Highway 99W and SW Ash Avenue. B. Proposed Location or Impact Area(s): Garrett Street between Highway 99W and SW Ash Avenue, Tigard, OR C. Duration/Timing of the Proiect: August 4, 2009—August 3, 2010 D. Number of Low and Moderate Income or Target Group Beneficiaries: 193 Low to Moderate-income persons will be served. E. Component Activities (CDBG vs. Others): CDBG = $141,790 City = $24,770 F. Quantitative Projections-for CDBG Component Activities (in units, linear feet, square feet, etc.) for all acquisitions, construction, reconstruction, rehabilitation, etc.: Undertake design and engineering in front of one residence; and construct 795 lineal feet of new in-fill sidewalks, upgrade to storm drainage catch basins and associated storm drainage facilities along the west-side of Garrett Street. Construct an asphalt overlay covering both sides of Garrett Street from Highway 99W to SW Ash Avenue. EXHIBIT A S/con08/0102 KC scope City of Tigard CITY ADMINISTRATION—RECORDS New Records Transmittal _ l Department: �`I J Account: Dat' Prepared By: /CG / �fExtension: Dept. Box No.: Description FkA-bates '0//j Retention Code b - z. * * * TO BE COMPLETED BY RECORDS STAFF Received by: Date Received: Medium: Clerk's Index: ❑ Yes ❑ No access Index: ❑ Yes ❑ No Date of Entry: I/OFS/Records/New Records Tran—ttal(10 22 07) WASHINGTON COUNTY o p OREGON April 13, 2010 Ron Bunch City of Tigard Community Development Director 13125 SW Hall Blvd. Tigard, OR 97223 Subject: CDBG Project: #1123, City of Tigard, Garrett Street Sidewalks Dear Ron: Enclosed is the City of Tigard's copy of the executed First Amendment between the County and the City for the above project. Please make sure that the document is retained in your files. If you have any questions, please contact Ben Sturtz at 503-846-8615. Sincerely, Peggy A. Linden, Program Manager Office of Community Development Enclosure cc: Duane Roberts ,i Office of Community Development 328 West Main Street, Suite 100, MS 7, Hillsboro, OR 97123-3967 phone: (503) 846-8814 • fax: (503) 846-2882