Correspondence �, J
Main Office UP 2 — 2
Carlson Tes Inc. 8130 1 �.�OHvdmrt9.NE 6hryRdNll
Nan( OR 97121 4060 a 97301 Bend OR 97701 OR
Phone: (303) 68J -3060 Phone. (503)589-1252 Photo: (5113 330 -9155
Construction Materials Testing & Inspection Far 603) 661-0951 For (5031589-1309 Far (5411330-9163
Special Inspection
FINAL SUMMARY LETTER
January 8, 2010
T0909732C
City of Tigard J q—1
13125 SW Hall Tigard, OR 97223 -8199 GROUP) , 3 2���
Attn: Building Department �406
Re: Oregon Business Park I — Building 10 (Tenant Improvement)
16600 SW 72 Avenue — Tigard, OR
Permit# BUP2009 -00211
Dear Sir or Madam:
This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special
inspection of the following item(s) per our inspection reports only:
Installation of Adhesive Anchors
All inspections and tests were performed and reported according to the requirements of Project Documents and, to the
best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders
and - applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's
design changes, approvals and verbal instructions.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in
full, without prior authorization from this office. Under all circumstances, the information contained in this report is
provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No
party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information
contained in this document.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING, INC.
�v
Mark R. Powlison
Special Project Dept Manager
MRP /ks
cc: Pacific Realty Associates LP — Dick Krippaehne
Group Mackenzie — Tim Schweitzer
Group Mackenzie — Rob Kirkman
Emerick Construction Co — Larry Sitz
6 2.t0 j - 0021
GROUP
ACKENZIE
CELEBRATING ®YEARS
January 21, 2010
City of Tigard
Attention: Building Department
13125 SW Hall Blvd.
Tigard, OR 97223 -8199
Re: Final Summary Report
Oregon Business Park 1 — Building 10 /Permit Number BUP2009 -00211
_ Project Number 2080421.00
•
ao
N N N
r`
o
To Whom It May Concern:
o
C 111
The purpose of this letter is to certify that periodic structural observation of the above-
o E captioned project was performed in accordance with Section 1709 of the International
o Building Code. To the best of my knowledge, no unresolved discrepancies remain, and the
— u work is in acceptable general conformance with the plans and specifications.
M o E
a
a Sincerely,
o //vol 00
A
d
a 3
Timothy L. Schweitzer, S.E.
U • ro •
N 3 Enclosure: Carlson Testing Inc. Final Summary Letter dated January 8, 2010
� W M
• Ln 4 c: Rob Kirkman — Group Mackenzie
Group
FS a- t
Mackenzie, •} C A `>
Incorporated
Architecture ' Cv I 14 F- .....'
Interiors 1 16,88
Structural a
Engineering
Civil Engineering
Land Use Planning
Transportation $ ` x
Planning
Landscape ^•-- •w- - =.- ",..a
Architecture °'
t�PiWtEN: !da;; >;:i
•
Locations:
Portland, Oregon
Seattle, Washington
Vancouver, Washington
H: \PROJECTS \208042100 \W P \LTR \100121 - FSR.doc
a) q - z1 63025 Maim Salem Carls Testi g, Inc. 8 (503)684-3460 7 Phone: (5589 - 2 Bad07 3309155
F . (5031684 -0954 Fax: (503) 589 -1309 Far /5411330 -9163
Construction Materials Testing & Inspection
Special Inspection
FINAL SUMMARY LETTER
January 8, 2010
T0909732C
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223 -8199
Attn: Building Department
Re: Oregon Business Park I — Building 10 (Tenant Improvement)
16600 SW 72 Avenue — Tigard, OR
Permit# BUP2009 -00211
Dear Sir or Madam:
This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special
inspection of the following item(s) per our inspection reports only:
Installation of Adhesive Anchors
All inspections and tests were performed and reported according to the requirements of Project Documents and, to the
__best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders_
and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's
design changes, approvals and verbal instructions.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in
full, without prior authorization from this office. Under all circumstances, the information contained in this report is
provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No
party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information
contained in this document.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING, INC.
Mark R. Powlison
Special Project Dept Manager
MRP /ks
cc: Pacific Realty Associates LP — Dick Krippaehne
Group Mackenzie — Tim Schweitzer
Group Mackenzie — Rob Kirkman
Emerick Construction Co — Larry Sitz
01/11/10 MON 10:43 FAX 503 670 9147 CARLSON TESTING Z002
�a ,,!l----�� . _ _ Cray
rwwr���r;; ® Il.. n. > saa,,. a3o
is Tes 'A�'+ r aeoxaz .rdAa'nxarsn! 1a�40ROffnx
g Phan= plk7) a8'sa ca PhImr: (SO SP - las9 phone. 0.0 1,?0 - 015S
r eSgl6.c.msr Ar rfR +1Sftw1srs r`ar -ytw
Construction Materials Testing & Inspection
Special Inspection
FINAL SUMMARY LETTER
January 8, 2010
T0909732C
City of Tigard
13125 SW Hall Blvd
Tigard; OR 97223 -8199
Attn: Building Department
Re: Oregon Business Park 1-- Building 10 (Tenant Improvement)
16600 SW 72" Avenue — Tigard, OR
Permit# BUP2009 - 00211
Dear Sir or Madam:
This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special
inspection of the following item(s) per our inspection reports only:
Installation of Adhesive Anchors
All inspections and tests were performed and reported according to the requirements of Project Documents and, to the
best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders
and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineers
design changes, approvals and verbal instructions.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in
full, without prior authorization from this office. Under all circumstances, the information contained in this report is
provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No
party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information
contained in this document
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING, INC.
Mark R. Powlison
Special Project Dept Manager
MRP /ks
cc: Pacific Realty Associates LP — Dick Krippaehne
Group Mackenzie — Tim Schweitzer
Group Mackenzie — Rob Kirkman
Emerick Construction Co -- Larry Sitz
p Main Office Salon Office Bend Office
r 1 s ® gyp ' e s ti � 9 Inc. 8430 SW Nnn-iker 4060 Nml0 5 12 63025 OB Ri /ev Rd 411
Ben NE
((. ® ®�7 �l■ 'IV.�7� lA 1IlI �1■ ] d, OR 97 ? ?3 Salem, OR 973Bend, OR 97702
Phone: (5031 h84 -3460 Phone. (503) SS9 -125? Phone: (540 330 -9155
1 15031684 -0954 Far: (503 589 -1309 Fax 95411 330 -9163
Construction Materials Testing & Inspection
Special Inspection
FINAL SUMMARY LETTER
December 23, 2009
T0901581
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223 -8199
Attn: Building Department
Re: Comcast — Remodel (Pallet Racking)
10831 SW Cascade Avenue — Tigard, OR
Permit No.: BUP2009 -00212
Dear Sir or Madam:
This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special
inspection of the following item(s) per our inspection reports only:
Installation of Expansion Anchors
All inspections and tests were performed and reported according to the requirements of Project Documents and, to the
best of our knowledge, the work was in conformahce with the approved plans and specifications, approved change orders
and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's
design changes, approvals and verbal instructions.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in
full, without prior authorization from this office. Under all circumstances, the information contained in this report is
provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No
party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information
contained in this document.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING, INC.
Kei R. Gauvin
Project Manager
KRG /rb
cc: Comcast — Steve Chambers
City of Tigard Building Division
Norlift of Oregon Inc — Ben Riehl