Loading...
Correspondence �, J Main Office UP 2 — 2 Carlson Tes Inc. 8130 1 �.�OHvdmrt9.NE 6hryRdNll Nan( OR 97121 4060 a 97301 Bend OR 97701 OR Phone: (303) 68J -3060 Phone. (503)589-1252 Photo: (5113 330 -9155 Construction Materials Testing & Inspection Far 603) 661-0951 For (5031589-1309 Far (5411330-9163 Special Inspection FINAL SUMMARY LETTER January 8, 2010 T0909732C City of Tigard J q—1 13125 SW Hall Tigard, OR 97223 -8199 GROUP) , 3 2��� Attn: Building Department �406 Re: Oregon Business Park I — Building 10 (Tenant Improvement) 16600 SW 72 Avenue — Tigard, OR Permit# BUP2009 -00211 Dear Sir or Madam: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Installation of Adhesive Anchors All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and - applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. �v Mark R. Powlison Special Project Dept Manager MRP /ks cc: Pacific Realty Associates LP — Dick Krippaehne Group Mackenzie — Tim Schweitzer Group Mackenzie — Rob Kirkman Emerick Construction Co — Larry Sitz 6 2.t0 j - 0021 GROUP ACKENZIE CELEBRATING ®YEARS January 21, 2010 City of Tigard Attention: Building Department 13125 SW Hall Blvd. Tigard, OR 97223 -8199 Re: Final Summary Report Oregon Business Park 1 — Building 10 /Permit Number BUP2009 -00211 _ Project Number 2080421.00 • ao N N N r` o To Whom It May Concern: o C 111 The purpose of this letter is to certify that periodic structural observation of the above- o E captioned project was performed in accordance with Section 1709 of the International o Building Code. To the best of my knowledge, no unresolved discrepancies remain, and the — u work is in acceptable general conformance with the plans and specifications. M o E a a Sincerely, o //vol 00 A d a 3 Timothy L. Schweitzer, S.E. U • ro • N 3 Enclosure: Carlson Testing Inc. Final Summary Letter dated January 8, 2010 � W M • Ln 4 c: Rob Kirkman — Group Mackenzie Group FS a- t Mackenzie, •} C A `> Incorporated Architecture ' Cv I 14 F- .....' Interiors 1 16,88 Structural a Engineering Civil Engineering Land Use Planning Transportation $ ` x Planning Landscape ^•-- •w- - =.- ",..a Architecture °' t�PiWtEN: !da;; >;:i • Locations: Portland, Oregon Seattle, Washington Vancouver, Washington H: \PROJECTS \208042100 \W P \LTR \100121 - FSR.doc a) q - z1 63025 Maim Salem Carls Testi g, Inc. 8 (503)684-3460 7 Phone: (5589 - 2 Bad07 3309155 F . (5031684 -0954 Fax: (503) 589 -1309 Far /5411330 -9163 Construction Materials Testing & Inspection Special Inspection FINAL SUMMARY LETTER January 8, 2010 T0909732C City of Tigard 13125 SW Hall Blvd Tigard, OR 97223 -8199 Attn: Building Department Re: Oregon Business Park I — Building 10 (Tenant Improvement) 16600 SW 72 Avenue — Tigard, OR Permit# BUP2009 -00211 Dear Sir or Madam: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Installation of Adhesive Anchors All inspections and tests were performed and reported according to the requirements of Project Documents and, to the __best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders_ and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. Mark R. Powlison Special Project Dept Manager MRP /ks cc: Pacific Realty Associates LP — Dick Krippaehne Group Mackenzie — Tim Schweitzer Group Mackenzie — Rob Kirkman Emerick Construction Co — Larry Sitz 01/11/10 MON 10:43 FAX 503 670 9147 CARLSON TESTING Z002 �a ,,!l----�� . _ _ Cray rwwr���r;; ® Il.. n. > saa,,. a3o is Tes 'A�'+ r aeoxaz .rdAa'nxarsn! 1a�40ROffnx g Phan= plk7) a8'sa ca PhImr: (SO SP - las9 phone. 0.0 1,?0 - 015S r eSgl6.c.msr Ar rfR +1Sftw1srs r`ar -ytw Construction Materials Testing & Inspection Special Inspection FINAL SUMMARY LETTER January 8, 2010 T0909732C City of Tigard 13125 SW Hall Blvd Tigard; OR 97223 -8199 Attn: Building Department Re: Oregon Business Park 1-- Building 10 (Tenant Improvement) 16600 SW 72" Avenue — Tigard, OR Permit# BUP2009 - 00211 Dear Sir or Madam: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Installation of Adhesive Anchors All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineers design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. Mark R. Powlison Special Project Dept Manager MRP /ks cc: Pacific Realty Associates LP — Dick Krippaehne Group Mackenzie — Tim Schweitzer Group Mackenzie — Rob Kirkman Emerick Construction Co -- Larry Sitz p Main Office Salon Office Bend Office r 1 s ® gyp ' e s ti � 9 Inc. 8430 SW Nnn-iker 4060 Nml0 5 12 63025 OB Ri /ev Rd 411 Ben NE ((. ® ®�7 �l■ 'IV.�7� lA 1IlI �1■ ] d, OR 97 ? ?3 Salem, OR 973Bend, OR 97702 Phone: (5031 h84 -3460 Phone. (503) SS9 -125? Phone: (540 330 -9155 1 15031684 -0954 Far: (503 589 -1309 Fax 95411 330 -9163 Construction Materials Testing & Inspection Special Inspection FINAL SUMMARY LETTER December 23, 2009 T0901581 City of Tigard 13125 SW Hall Blvd Tigard, OR 97223 -8199 Attn: Building Department Re: Comcast — Remodel (Pallet Racking) 10831 SW Cascade Avenue — Tigard, OR Permit No.: BUP2009 -00212 Dear Sir or Madam: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Installation of Expansion Anchors All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformahce with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. Kei R. Gauvin Project Manager KRG /rb cc: Comcast — Steve Chambers City of Tigard Building Division Norlift of Oregon Inc — Ben Riehl