Construction Materials Testing & Inspection
Special Inspection
FINAL SUMMARY LETTER
January 13, 2010
T0901438
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223 -8199
Attn: Building Department
Re: MCA Building – Suite 100 (Tenant Improvement)
7450 SW Beveland Road – Tigard, OR
BUP2009 -00188
Dear Sir or Madam:
This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special
inspection of the following item(s) per our inspection reports only:
Structural Welding- Field Only
All inspections and tests were performed and reported according to the requirements of Project Documents and, to the
-- — best of our knowledge, - the work was in conformance with the`approved plans and specifications, approved change orders
and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's
design changes, approvals and verbal instructions.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in
full, without prior authorization from this office. Under all circumstances, the information contained in this report is
provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No
party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information
contained in this document.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING, INC.
Steven W. Leach
Project Manager
SWL /rb
cc: Wright Manufacturing – Brian Cayson
City of Tigard Building Division
Nicoli Engineering Inc – Pete Ketchum
Horizon Restoration Systems – Chris Rossi
JAN -13 -2010 WED 02:06 PM CARLSON TESTING INC. FAX NO. 5036840954 P. 02
kd
Testing, Alain Wire Salrm Oka B, OI1ke
Carlson Inc. BJJU YII' N 97.1 S,�r lUdO Sly. N
flWlsall NI: d7fIJ f7B klh7• All
• l T/k,llJ, UN V777.1
Salem. (3 3158 6102 °R PM.?
FW Py.�m (SUL aL.h1JAU Ramp (IL31 SNV -f_']` Nom (54I) 33(14/35
Ma- 13031 64441954 Par (Mil ,i404,30 r '(i411110.9/d5
Construction Materials Testing & Inspection
Special Inspection
FINAL SUMMARY LETTER
January 13, 2010
T0901438
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223 -8199
Attn: Building Department
Re: MCA Building — Suite 100 (Tenant Improvement)
7450 SW Beveland Road — Tigard, OR
BUP2009 -00188
Dear Sir or Madam:
This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special
inspection of the following item(s) per our inspection reports only:
Structural Welding- Field Only
All inspections and tests were performed and reported according to the requirements of Project Documents and, to the
best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders
and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's
design changes, approvals and verbal instructions.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in
full, without prior authorization from this office. Under all circumstances, the information contained in this report is
provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No
party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information
contained in this document.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING, INC.
e< 1 "( Steven W. Leach
Project Manager
SWL /rb
cc: Wright Manufacturing — Brian Cayson
City of Tigard Building Division
Nicoll Engineering Inc — Pete Ketchum