Special Inspection OCT 2.9 2009
FINAL SUMMARY LETTER GROUP MACKENZIE
October 27, 2009
T0909732
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223 -8199
• Attn: Building Department
Re: Oregon Business Park I — Building 10
16600 SW 72 Avenue — Tigard, OR
Permit# BUP2009 -00174
Dear Sir or Madam:
This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special
inspection of the following item(s) per our inspection reports only:
Installation of Titen HD Screw Anchors
All inspections and tests were performed and reported according to the requirements of Project Documents and, to the
best of our knowledge the work wasiin conformance with the approved plans and specifications, approved change orders
and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's
design changes, approvals and verbal instructions.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in
full, without prior authorization from this office. Under all circumstances, the information contained in this report is
provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No
party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information
contained in this document.
If there are an urther questions regarding this matter, please do not hesitate to contact this office.
Respectfu11' ubmitted;
CARLSO , ESTING, INC.
Jam: . Hietpas
Pro - t Manager
i /ks
i : Pacific Realty Associates LP — Dick Krippaehne
Group Mackenzie — Tim Schweitzer
Group Mackenzie — Rob Kirkman
Emerick Construction Co — Larry Sitz
15 p, cry 6.6j `f
GR UP
MACKENZIE
•
November 4, 2009
'City of Tigard
Attention: Building Department
13125 SW Hall Blvd.
Tigard, OR 97223 -00174
Re: Final Summary Report
Oregon Business Park 1— Building 10 / Permit Number BUP2009 -00174
7t Project Number 2080421.00
co
� N
Dear Sir or Madam:
o 0
o.
• x The purpose of this letter is to certify that periodic structural observation of the above-
• `" captioned project was performed in accordance with Section 1709 of the International
3 Building Code. To the best of our knowledge, no unresolved discrepancies remain, and the
work is in acceptable general conformance with the plans and specifications.
• O
- o. a
x . m Sincerely,
o 3
3
O rn 3
a
imothy L. Schweitzer, S.E.
• —
U •
Enclosure: Final Summary Report — Carlson Testing, Inc. (October 27, 2009)
lL • rn O
c: Rob Kirkman — Group Mackenzie
Group Q-
Mackenzie,. ;'ti ,! I N..
Incorporated 4 ,. \
18,; ;.0
Architecture ~
Interiors
Structural
Engineering \ ;. T y Oti
Civil Engineering
J " 21 ' � z "
Land Use; Planning . °,, ,
Transportation
Planning } r . +; t (J (
Landscape l
Architecture - •
Locations:
Portland,.Oregon
Seattle,.Washington
Vancotiver,, Washington
H:\PROJECTS\208042100\WP\LTR\091104-FSR.doc