Loading...
Report Uy / VI/ 2UUy THU 1,1: FAX 5U360/8254 621001/UU2 C arlson t c h n i c a 0 Bend Office (541) 330 -9155 �Q.% O Eugene Office (541) 345 -0289 !. A Division of Carlson Testing, Inc. Salem Office (503) 589 -1252 4oEo1ECHH,cA Phone: (503) 601 - 8250 Tigard Office (503) 684 -3460 Fax: (503)601- 8254 Field Report and Final Summary Letter September 24, 2009 Mr. Bob Smith Signature Landscape Care Ltd. 23275 SW 82 Avenue Tualatin, Oregon 97062 Re: Field Report and Final Letter Retaining Wall 9895. SW Inez Street Tigard, Oregon CGT Project: G0903408 Permit No. SIT2008 -00016 This letter confirms that Carlson Geotechnical (CGT) observed subgrade conditions for the planned wall and Carlson Testing, Inc. (CTI) performed compaction testing in the fill placed behind the wall. These services were performed as requested and authorized by Bob Smith of Signature Landscape Care Ltd. Subgrade Site Visit — September 2, 2009 When I arrived, a 4 to 6 inch compacted gravel foundation pad had already been placed along with the first course of masonry blocks for the wall. To evaluate subgrade conditions, 1 test pit was made using equipment and an operator provided by our client. The test pit was located in front of the wall, at approximate mid- length, and extended 2 feet below the bottom -of- footing elevation. Based on digging effort and numerous 1 /2 inch diameter foundation rod. probes, the moist, brown, silt to silty sand was considered medium stiff to stiff. Similar probes at various locations along the wall showed comparable subgrade soil conditions. The gravel pad was well keyed. I indicated to Bob Smith and Robert Scott (owner) that in my opinion, suitable•subgrade conditions were present to support the wall. • I obtained a sample of the % inch minus crushed rock backfill from a stockpile and submitted it to the laboratory for moisture density testing according to ASTM D 1557 (Modified Proctor). In - place Relative Compaction Testing of Backfill A total of 3 field density tests were conducted on September 2 and 3, 2009, as requested. The results of the tests showed relative compaction ranging from 97 percent to 103 percent compared to the Modified Proctor value determined in the laboratory. Results of the lab and field- testing have been previously issued. • • Summary Based on our observations and testing, it is my opinion that the subgrade soils encountered were suitable for wall support. Results of the compaction testing showed that the minimum relative compaction of 90 percent was exceeded at each test location. UY/ 44/ GUU, 1'MU 15: Ly LAX SU.SbUltlZ54 61JUO2/UO2 Field Report and Final Summary Letter September 24, 2009 9895 SW Inez, Tigard, Oregon G0903408 Permit No. SIT2008 -00016 Limitations and Closure CGT has not performed a geotechnical investigation of this site, other than the limited subgrade evaluation described above, and CGT is not aware of a geotechnical report by others for this project. Others designed the subject retaining wall. Our reports pertain to the locations and conditions observed at the time of our visit only Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Our services were provided on an on -call basis. We appreciated the opportunity to be of service to you on this project. If you have any questions or need additional information, please contact us. Sincerely, CARLSON GEOTECHNICAL . _ igge4 ,,, William M. Weyrauch, P.E. =�•' J' Principal Engineer and Department Manager . , t ATTACHMENTS: None - DISTRIBUTION: Signature Landscape Care Ltd - Bob Smith fax 503673 -0189 City of Tigard Building Division fax 503 624 -3681 Ogren Engineering LLC -Scott Ogren fax 503 331 -6226 Robert Scott (owner) email inerst @comcast.net G:IGEOTECHIPROJECTS12009 Projects19895 SW Inez - Ret Wall - G09034081FR and Final Letter.DOC Carlson Geotechnrca1 Page 2 of 2 SEP -24 -2009 THU 12:51 PM CARLSON TESTING INC. FAX N0, 5036840954 P. 02/02 Main Office Salem Office ice P0. Box 23814 4060 Hudson Ave., NE Pent! Off 91 Carlson l'estiiig, Tigard, Oregon 97281 Salem, OR 97301 P0. Bx 797 Inc . Phone (503) 684 -3460 Phone (503 Bend, OR 877p8 FAX (503) 684 -0954 p ) 589 -1252 Phone (541) 330-91: �_ AX (503) 569.1309 FAX (541) 330•B1Q Client: Signature Landsc Care LTD - Bob S @18t10f1Shlp Project: Retaining Wall at 9895 SW Inez Street -Goo Job Number: 9/9/2009 Consultation G0903408 Material Type: 3/4 "- Source: Tigard Sand and Gravel Sampled from: Stockpile Test Method: ASTM D•698 C, C -136, D -2216 Sample Method: ASTM 0-75 date Sampled: D9/02/09 Preparation Method: Moist Date Tasted: 09/08/09 Oversized Material: Removed • Compacting Method: Manual Hammer Type: Circular 125 124 11111111111111 111 11 123 1 111111111115111111111 >� 122 rrrr r Y gi 1W1IIli& no 012a • r 111 110 r�Ii111111 118 rr . 117 I1111IIi � e 0 10 11 12 13 14 15 18 17 Moisture Content ( %) Zero Air Voids Line a 2.700 Optimum Moisture: L_ Max. Dry Density =KIM !be/ft' Percent Passing 3/4" Sieve: 95.7% cn CC: Signature Landscape Care LTD - Sob Smith - s i Fax: 5 - 673 -0189 City of Tigard Building Division Ogren Engineering LLC - Scott Ogren Robert Scott - inerst@comcast.net - Reviewed 8y. V V Our wens pertain to the met William M. Weyrauch, P,E,, eotechnical Dept. Mgr. authorization from this office, Under Bu ch circumstances. he Information contained In Oils re ort e� prod sublet( except ( t of crrs .Generai Condlllons M offe�t atlho limo this ro In full, without prior bo entitled 10 use or re u pin is document. petty other th9n mole o CTl dlevlbuted rhlee po shell I Y poi the i t the ti contained in isis ed. N The remaining sample material will be discarded two weeks after the date the test was completed, 09/24/2009 THU 13:30 FAX 5036018254 0001 /002 C arlson Geotechnical Bend Office (541) 330 -9155 p..%LSO Eugene Office (541) 345 -0289 1 Ti A Division of Carlson Testing, Inc. Salem Office (503) 589 -1252 G i E ALA- Phone: (503) 601 -8250 Tigard Office (503) 684 -3460 Fax: (503) 601 -8254 Field Report and Final Summary Letter September 24, 2009 Mr. Bob Smith Signature Landscape Care Ltd. 23275 SW 82 Avenue Tualatin, Oregon 97062 Re: Field Report and Final Letter Retaining Wall 9895 SW Inez Street Tigard, Oregon CGT Project: G0903408 Permit No. SIT2008 -00016 This letter confirms that Carlson Geotechnical (CGT) observed subgrade conditions for the planned wall and Carlson Testing, Inc. (CTI) performed compaction testing in the fill placed behind the wall. These services were performed as requested and authorized by Bob Smith of Signature Landscape Care Ltd. Subgrade Site Visit - September 2, 2009 When I arrived, a 4 to 6 inch compacted gravel foundation pad had already been placed along with the first course of masonry blocks for the wall. To evaluate subgrade conditions, 1 test pit was made using equipment and an operator provided by our client. The test pit was located in front of the wall, at approximate mid - length, and extended 2 feet below the bottom -of- footing elevation. Based on digging effort and numerous Y2 inch diameter foundation rod probes, the moist, brown, silt to silty sand was considered medium stiff to stiff. Similar probes at various locations along the wall showed comparable subgrade soil conditions. The gravel pad was well keyed. I indicated to Bob Smith and Robert Scott (owner) that in my opinion, suitable subgrade conditions were present to support the wall. I obtained a sample of the 'A inch minus crushed rock backfill from a stockpile and submitted it to the laboratory for moisture density testing according to ASTM D 1557 (Modified Proctor). In- place Relative Compaction Testing of Backfill , A total of - 3 field density tests were conducted on September 2 and 3, 2009, as requested. The results of f )the tests showed relative compaction ranging from 97 percent to 103 percent compared to the Modified Proctor valuedetermined in the laboratory. Results of the lab and field- testing have been previously \issued. Sunary- ;� 1 ni? Based on our observations and testing, it is my opinion that the subgrade soils encountered were suitable for wall support. Results of the compaction testing showed that the minimum relative compaction of 90 percent was exceeded at each test location. 09/24/2009 THU 13: 30 FAX 5036018254 12002/002 Field Report and Final Summary Letter September 24, 2009 9895 SW Inez, Tigard, Oregon G0903408 Permit No. S1T2008 -00016 Limitations and Closure CGT has not performed a geotechnical investigation of this site, other than the limited subgrade evaluation described above, and CGT is not aware of a geotechnical report by others for this project. Others designed the subject retaining wall. Our reports pertain to the locations and conditions observed at the time of our visit only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Our services were provided on an on -call basis. We appreciated the opportunity to be of service to you on this project. If you have any questions or need additional information, please contact us. 5 Sincerely, , CARLSON GEOTECHNICAL William M. Weyrauch, P.E. • *� z' Principal Engineer and Department Manager 40 ATTACHMENTS: None. 519. io DISTRIBUTION: Signature Landscape Care Ltd - Bob Smith fax 503 673 -0189 City of Tigard Building Division fax 503 624 -3681 Ogren Engineering LLC -Scott Ogren fax 503 331 -6226 Robert Scott (owner) email inerst @comcast.net G: \GEOTECH\PROJECTS\2009 Projects \9895 SW Inez - Ret Wall - G0903408 \FR and Final Letter.DOC • Carlson Geotechnical Page 2 of 2