Loading...
Correspondence �j c) f2uc _bb l.7 s ��pg • p��pgg�� Inc. ra. Ofee sae. offs Bed Woe Carlson ® Testing, tin 9 Ill C P 13031681 -3460 Phone (303) 589 -1231 63025 Il 1 0-9133 / � 1 Far (303) 684-0954 Fa (303) 589 -1309 Fen 154111) 33 0 -9163 Construction Materials Testing & Inspection Special Inspection FINAL SUMMARY LETTER January 12, 2010 T0909732B R EC IVE® City of Tigard 13125 SW Hall Blvd JA N 1 4 201n Tigard, OR 97223 -8199 GROU MACKEEN Attn: Building Department Re: Oregon Business Park I — Building 10 (Exterior Upgrade) 16600 SW 72 Avenue — Tigard, OR Permit# BUP2009-00175 Dear Sir or Madam: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Installation of Adhesive Anchors Installation of HD Titen Screw Anchors All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. Mark R. Powlison Special Project Dept Manager MRP /ks cc: Pacific Realty Associates LP — Dick Krippaehne Group Mackenzie — Tim Schweitzer Group Mackenzie — Rob Kirkman Emerick Construction Co — Larry Sitz GROUP 1 ACKENZIE CELEBRATING50YEARS January 21, 2010 City of Tigard Attn: Building Department 13125 SW Hall Blvd. Tigard, OR 97223 -8199 Re: Final Summary Report Oregon Business Park 1 — Building 10 (Extension Upgrade) M n Permit Number BUP2009 -00175 N N Project Number 2080421.00 P N � N O 0 0 To Whom It May Concern: c o E The purpose of this letter is to certify that periodic structural observation of the above - o captioned project was performed in accordance with Section 1709 of the International ° — u Building Code. To the best of my knowledge, no unresolved discrepancies remain, and the a work is in acceptable general conformance with the plans and specifications. o °° Sincerely, O n 3 — t ' 3 /� /try ° iv u Timothy L. Schweitzer, S.E. N N Enclosure: Carlson Testing Inc. Final Summary Letter dated January 12, 2010 c: Rob Kirkman — Group Mackenzie Group M� $ ld Mackenzie, d Incorporated Architecture C, y Cv 1 4 R , ". • Interiors ® : . r , Structural -.- Engineering Civil Engineering - -,> - � sg Oy - - - Land Use Planning r / Transportation ',. Planning - d L §� Landscape Archhecture � Locations: Portland, Oregon Seattle, Washington Vancouver, Washington H: \PROJECTS \208042100 \W P \LTR \100121- FSR2.doc