Correspondence �j c) f2uc _bb l.7 s
��pg • p��pgg�� Inc. ra. Ofee sae. offs Bed Woe
Carlson ® Testing, tin 9 Ill C P 13031681 -3460 Phone (303) 589 -1231 63025 Il 1 0-9133 /
� 1
Far (303) 684-0954 Fa (303) 589 -1309 Fen 154111) 33 0 -9163
Construction Materials Testing & Inspection
Special Inspection
FINAL SUMMARY LETTER
January 12, 2010
T0909732B
R EC IVE®
City of Tigard
13125 SW Hall Blvd JA N 1 4 201n
Tigard, OR 97223 -8199 GROU MACKEEN
Attn: Building Department
Re: Oregon Business Park I — Building 10 (Exterior Upgrade)
16600 SW 72 Avenue — Tigard, OR
Permit# BUP2009-00175
Dear Sir or Madam:
This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special
inspection of the following item(s) per our inspection reports only:
Installation of Adhesive Anchors
Installation of HD Titen Screw Anchors
All inspections and tests were performed and reported according to the requirements of Project Documents and, to the
best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders
and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's
design changes, approvals and verbal instructions.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in
full, without prior authorization from this office. Under all circumstances, the information contained in this report is
provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No
party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information
contained in this document.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING, INC.
Mark R. Powlison
Special Project Dept Manager
MRP /ks
cc: Pacific Realty Associates LP — Dick Krippaehne
Group Mackenzie — Tim Schweitzer
Group Mackenzie — Rob Kirkman
Emerick Construction Co — Larry Sitz
GROUP 1
ACKENZIE
CELEBRATING50YEARS
January 21, 2010
City of Tigard
Attn: Building Department
13125 SW Hall Blvd.
Tigard, OR 97223 -8199
Re: Final Summary Report
Oregon Business Park 1 — Building 10 (Extension Upgrade)
M n Permit Number BUP2009 -00175
N N Project Number 2080421.00
P
N
� N
O
0 0 To Whom It May Concern:
c
o E The purpose of this letter is to certify that periodic structural observation of the above -
o captioned project was performed in accordance with Section 1709 of the International
° — u Building Code. To the best of my knowledge, no unresolved discrepancies remain, and the
a work is in acceptable general conformance with the plans and specifications.
o
°° Sincerely,
O n 3
— t
' 3 /� /try
°
iv
u Timothy L. Schweitzer, S.E.
N N
Enclosure: Carlson Testing Inc. Final Summary Letter dated January 12, 2010
c: Rob Kirkman — Group Mackenzie
Group M� $ ld
Mackenzie,
d
Incorporated
Architecture C, y Cv 1 4 R , ".
•
Interiors ® : . r ,
Structural -.-
Engineering
Civil Engineering - -,> - �
sg Oy - - -
Land Use Planning r /
Transportation ',.
Planning - d L §�
Landscape Archhecture �
Locations:
Portland, Oregon
Seattle, Washington
Vancouver, Washington
H: \PROJECTS \208042100 \W P \LTR \100121- FSR2.doc