Specifications (2) June 17, 2008 lIerracon Consulting Engineers & Scientists 12400 SE Freeman Way, Suite 102 Portland, Oregon 97222 WinCo Foods LLC Phone 650 North Armstrong Place www.terracon.com Boise, Idaho 83704 Attn: Mr. David Van Etten, Vice President Re: GeoPier Construction Observation WinCo Foods Store #23 Addition 7501 Dartmouth Avenue Tigard, Oregon Terracon Project No. 82081002 Permit # BUP- 2008 - 00169 Terracon Consultants, Inc. provided geotechnical observation during construction of Geopier elements below footings at the WinCo Foods Store addition project in Tigard, Oregon. A representative of Terracon was on -site continuously to observe the Geopier construction. Our site observations have been documented in daily field reports, and a brief summary follows. Geopier Observation Terracon prepared the geotechnical report dated May 11, 2007. The Geopier Plans were prepared by Geopier Foundation Company West and dated May 12, 2008. Geopier elements were observed during excavation for diameter, depth and for the presence of groundwater seepage and or caving of the sidewalls. The Geopier elements were typically constructed by filling the excavations with imported gravel fill that was placed and compacted in lifts that varied from about' to 2 feet thick. The imported gravel material consisted of either 2" to 3" clean gravel (low fines content) placed in the lower portion of the excavations. Within the upper 2 to 5 feet of the Geopier shaft, 1 -1/2" minus gravel material was typically placed in 1 /2 to 1 foot lifts and compacted using the tamper. The gravel fill lifts were observed to be compacted to firm and unyielding condition. Imported lime- treated silty sandy gravel was used for the fill lifts placed in the upper 2 to 3 feet of the Geopiers at column lines 11 -D.3, 11 -C.8, and 10 -C.5 (north and south) (denoted #'s 29, 30, 35 and 36, respectively). The imported lime- treated materials are considered suitable for Geopier construction. The Geopier excavation sidewalls at column lines 11 -0.5, 11 -C.8, 10 -C.8 and 10 -F.5 (south) (denoted #'s 29, 30, 38, and 43, respectively) experienced some caving or sloughing during excavation and the contractor temporarily backfilled these excavations with imported lime - treated silty sandy gravel fill to prevent additional sloughing. The lime- treated fill was used to reduce the caving and stabilize the sidewalls temporarily for excavation of the Geopiers to the Delivering Success for Clients and Employees Since 1965 More Than 95 Offices Nationwide WinCo Foods Store #23 rerraccn Tigard, Oregon Project No. 82081002 /Permit #BUP -2008 -00169 June 1T, 2008 design depth. At 11 -D.5, significant caving was observed between depths of about 9 to 16 feet bgs. The Time- treated fill was placed in lifts of about 1 to 2 feet and compacted with the tamper. At the other three locations noted, limited sloughing of the sidewalls was observed, and the Time- treated backfill was only loosely placed in the excavations by the contractor. These Geopier excavations were re- drilled through the lime- treated backfill and the Geopiers were then constructed as described above. In our opinion, the lime- treated fill that remained on the sidewalls of the excavations would have been densified by the compactive effort of the tamper during placement of the gravel fill. In our opinion, the Geopier elements appeared to be constructed in general accordance with the project plans and the recommendations in the geotechnical report. We trust this letter meets your current needs. Please do not hesitate to contact us should you have any questions. • R -� PR Few'„ Sincerely, 40\ F %\ TERRACON CONSULTAN k C. 78792PE j 1 f LS� OI OREGON pQY Andrea F. Kuehnel, P. . ' i 1 :/�9. Thomas A. Jones Senior Engineer 4 '4 - 4 F. K S . Principal Distribution: Addressee (1; RENEWAL DATP 0 o WinCo Foods - . Stapley Engineers — Greg Leishman, PE Bruce W. Peterson, NCARB — Lee Lizama, AIA • City of Tigard — Building Permits — Walter Bennett IV (1) ESI Construction — Richard Brien (1) ESI Construction — Mike Tsu (e -mail only) • 2 . i June 17, 2008 lierracon Consulting Engineers & Scientists 12400 SE Freeman Way, Suite 102 Portland, Oregon 97222 503 659.3281 WinCo Foods LLC Phone Fax 503 659.1287 650 North Armstrong Place www.terracon.com Boise, Idaho 83704 Attn: Mr. David Van Etten, Vice President Re: GeoPier Construction Observation WinCo Foods Store #23 Addition 7501 Dartmouth Avenue Tigard, Oregon Terracon Project No. 82081002 Permit # BUP- 2008 -00169 Terracon Consultants, Inc. provided geotechnical observation during construction of Geopier elements below footings at the WinCo Foods Store addition project in Tigard, Oregon. A representative of Terracon was on -site continuously to observe the Geopier construction. Our site observations have been documented in daily field reports, and a brief summary follows. Geopier Observation Terracon prepared the geotechnical report dated May 11, 2007. The Geopier Plans were prepared by Geopier Foundation Company West and dated May 12, 2008. Geopier elements were observed during excavation for diameter, depth and for the presence of groundwater seepage and or caving of the sidewalis. The Geopier elements were typically constructed by filling the excavations with imported gravel fill that was placed and compacted in lifts that vaned from about % to 2 feet thick. The imported gravel material consisted of either 2" to 3' clean gravel (low fines content) placed in the lower portion of the excavations. Within the upper 2 to 5 feet of the Geopier shaft, 1 -1/2" minus gravel material was typically placed in % to 1 foot lifts and compacted using the tamper. The gravel fill lifts were observed to be compacted to firm and unyielding condition. Imported lime- treated silty sandy gravel was used for the fill lifts placed in the upper 2 to 3 feet of the Geopiers at column lines 11 -D.3, 11 -C.8, and 10 -C.5 (north and south) (denoted #'s 29, 30, 35 and 36, respectively). The imported lime- treated materials are considered suitable for Geopier construction. The Geopier excavation sidewalis at column lines 11 -D.5, 11 -C.8, 10 -C.8 and 10 -F.5 (south) (denoted #'s 29, 30, 38, and 43, respectively) experienced some caving or sloughing during excavation and the contractor temporarily backfilled these excavations with imported lime - treated silty sandy gravel fill to prevent additional sloughing. The lime- treated fill was used to reduce the caving and stabilize the sidewalis temporarily for excavation of the Geopiers to the Delivering Success for Clients and Employees Since 1965 More Than 95 Offices Nationwide • WinCo Foods Store #23 lierrae ®n Tigard, Oregon Project No. 82081002 /Permit #8UP- 2008 -00169 June 17, 2008 design depth. At 11 -D.5, significant caving was observed between depths of about 9 to 16 feet bgs. The Time- treated fill was placed in lifts of about 1 to 2 feet and compacted with the tamper. At the other three locations noted, limited sloughing of the sidewalls was observed, and the Time- treated backfill was only loosely placed in the excavations by the contractor. These Geopier excavations were re- drilled through the lime- treated backfill and the Geopiers were then constructed as described above. In our opinion, the Time- treated fill that remained on the sidewalls of the excavations would have been densified by the compactive effort of the tamper during placement of the gravel fill. In our opinion, the Geopier elements appeared to be constructed in general accordance with the project plans and the recommendations in the geotechnical report. We trust this letter meets your current needs. Please do not hesitate to contact us should you have any questions. . ,cfc9,0 PdR OFi'� Sincerely, ` ta . 0,1GINE Oj TERRACON CONSULTAN C. s 78792PE Z,4 ) 1 I I,' z 5' • - 1 / • Andrea F. Kuehnel, P. . 9 EA 1 rThomas A. Jones Senior Engineer ' �,� F. t<k3- Principal Distribution: Addressee (1; RENEWAL DA s F• b o - WinCo Foods - - • ' • -; • Stapley Engineers— Greg Leishman, PE Bruce W. Peterson, NCARB — Lee Lizama, AIA City of Tigard — Building Permits — Walter Bennett IV (1) ES1 Construction — Richard Brien (1) ES1 Construction — Mike Tsu (e -mail only) I I 2 geMer GEOPIER FOUNDATION COMPANY — WEST 214 SE Walnut Street Hillsboro, Oregon 97123 (503) 640 -1340 Phone (503) 648 -6706 Fax Transmittal Letter Date: June 10, 2008 To: Mr. Mike Tsu Company: ESI Address: Winco Jobsite Tigard, Oregon Tel: RE: WinCo Foods Store #23 Addition: As- Builts Attached is: Copies Description Notes 1 As -Built Report 3 pages 1 As -Built Plan 1 sheet I I Per Request O For Review O For Approval RI For Your Use O For Price O Comments Requested O Current Information CI Please Return O Other Sent By: O US Mail O Fed -X Standard Ovemight O Courier 0 Hand Delivery 0 Fed -X First Ovemight O Other: COMMENTS: Contact Jeremy Gray at 503.640.1340 with further questions. c State Licenses: AZ: /65389A- CA: 786540AHIC NM: 887/0GB98 NV:0057706 OR: 146399 WA: GEOPIFC980BZ geopier , GEOPIER Foundation Company — West 214 SE Walnut Street,'l Iillsboro, OR 97123 (503) 640 -1340 www.gfcwest.com (503) 648 -6706 fax June 10, 2008 Mr. Richard Brien Engineered Structures, Inc. 12400 W. Overland Road Boise, Idaho 83709 RE: As -Built Report GEOPIER Intermediate Foundation System WinCo Foods Store #23 Addition Tigard, Oregon Dear Mr. Brien, All Geopier elements for the WinCo Foods Store #23 Addition in Tigard, Oregon have been installed and approved by our firm for support of the design loads. The design called for 30 -inch diameter Geopier elements drilled to 20 feet below construction grade or to tag the underlying firm silty clay identified at depths of 17' to 20' in the geotechnical explorations by ZZA/Terracon. The piers as -built were at least 30" diameter and were drilled to the design pier length. The dynamic penetration test conducted during Geopier element construction exceeded the specified penetration of 15 blows. Each lift was stabilized by essential refusal of the tamper. The piers were installed at locations staked by your surveyor. The attached Daily Aggregate Pier Progress Report documents as -built information for each of the piers installed. Very truly yours, • GEOPIER FOUNDATION COMPANY -WEST, INC. Jeremy J. Gray Project Manager Attachments: Daily Aggregate Pier Progress Report (2 pages) Plan (Geopier As- Built, dated 6/10/2008) State Licenses: AZ: 165389A- CA: 786540AHIC NM: 88710GB98 NV:0057706 OR: 146399 WA: GEOPIFC980BZ ,, geopier Daily Aggregate Pier Progress Report m Project: WinCo Foods Store No. 23 Addition (Tigard, OR) � � T "" Job # / Permit #: 248W Daily QC: - Soil Condition: Firm/Soft:I SOFT •I Run Date: 6/10/08 (Compression/Tension) Piers Completed - • Feet Completed Feet Overdrilled Installation Day: 3 Number of Piers (as designed) 50 (50/0) 6/2/081 6/12/08 6/22/08 7/2/08 7/12/08 7/20/08 Geopier Diameter (in): 30 •(Average) 6/3/08 6/13/08 6/23/08 7/3/08 7/13/08 7/21/08 Completed: 50 6/4/08 6/14/08 6/24/08 7/4/08 7/14/08 7/22/08 To Be Completed: 0 6/5/08 6 - 96 - 6/15/08 6/25/08 7/5/08 7/15/08 7/23/08 Piers Added: 0 6/6/08 23 398 7 6/16/08 6/26/08 7/6/08 7/16/08 7/24/08 Average /Day: 16.7 6/7/08 6/17/08 6/27/08 7/7/08 7/17/08 7/25/08 Sheet G1.00 and G2.00 (Dated 5/12/2008) 6/8/08 6/18/08 6/28/08 7/8/08 7/18/08 7/26/08 6/9/08 21 - 349 - 6/19/08 6/29/08 7/9/08 7/19/08 7/27/08 _ Installation Notes: All Drill Depths to extend to the shallower of either 6/10/08 6/20/08 6/30/08 7/10/08 If QA inspector is present and has 20' below construction grade, or through the soft silt to tag the underlying 6/11/08 6/21/08 7/1/08 7/11/08 observed subsurface conditions, He/She firm silty clay identified at depths of 17' to 20' below ground surface in the has concluded that they ARE (Yes) geotechnical exploration. (See note 13 on print) or ARE NOT (No) in general agreement A B C D E Depth to w/ the geotechnical explorations. Design I.5xB (Sprd) BOF Existing Design Design I.5B (sprd) Planned As -Built As -Built As -Built As -Built QA QA Agrees? Pier Length 3.5xB (cont) Grade Grade Tip Elev. Tip Depth 3.5B (cont) Top Depth Geopier Measured Measured Measured Date Present (Yes / No As -Built Location (A) (B) (C ) - (D) (C - A) (D - E) (D - (C - B) (D - C - 1) , No. Tip Depth Top Depth Pier Length installed • (Yes / No) and initials) Notes K,10 14.83333 8 194.83 199.00 180.00 20.00 13.17 3.17 1 20 3 15.83 6/5/08 y y -me 0 -8'- brown m1; 8' -20'- gray ml K,10.5 15 - 195.00 199.00 180.00 20.00 - 3.00 2 20 3 16.00 6/5/08 y , Dyed 3" west; Increased timer to 12 sec . refusal at 10 .ec 30 "Piers 15 - 195.00 199.00 180.00 20.00 - 3.00 3 20 3 16.00 6/5/08 y 1" electrical conduit 4 2 typ 6; water in hole /5 - 195.00 199.00 180.00 20.00 - 3.00 4 20 3 16.00 6/5/08 y " PVC piper 3'; dead per contractor; tp 6 15 - 195.00 199.00 180.00 20.00 - 3.00 5 20 3 16.00 6/5/08 y 3 6 30 "Piers 15 - 195.00 199.00 180.00 20.00 - 3.00 6 20 3 16.00 6/5/08 -I'- gravel: t I timer brown l 8 T -18'- gray ml; 18' -20'- y y, me .ray cVml; timer slotted W 8 sec - 15 - 195.00 199.00 180.00 20.00 - 3.00 7 20 3 16.00 6/6/08 y p 8 -2'- gray brown silt' gw; 2' -8'- brown sandy silt; net r. 15 - 195.00 199.00 180.00 20.00 - 3.00 8 21 2 17.00 6/6/08 Y me 7'; 8'- gray silt /sand and clay 30 "Piers 15 - 195.00 199.00 180.00 20.00 - 3.00 9 15 3 11.00 6/6/08 y .'P 10; firm auger behavior CM 1T-18' 1 -3'- gray brown silt' gw; 3'- brown sandy silt, wet r} 8'; 15 - 195.00 199.00 180.00 20.00 - 3.00 10 21 3 17.00 6/6/08 y me ' - 21' - gray silt w /sand 15 - 195.00 199.00 180.00 20.00 - 3.00 11 21 1.5 17.00 6/6/08 y .p 12 30 "Piers 15 - 195.00 199.00 180.00 20.00 - 3.00 12 21 1 17.00 6/6/08 1-3 brown silty gravel: 3' -9'- brown sandy silt; wet 8'; y '- gray silt w /sand and clay 15 • - 195.00 199.00 180.00 20.00 - 3.00 13 20 2 16.00 6/6/08 y yp 12 15 - 195.00 199.00 180.00 20.00 - 3.00 14 21 1 17.00 6/6/08 y . P 12 H.5,11 / 7 - 197.00 199.00 180.00 20.00 - 1.00 15 20 1 18.00 6/6/08 y me 1.2'- si gw; r -9'- brown sandy silt to fine w /sand; wet u� 8', gray silt w /sand and clay 30 "Piers 17 - 197.00 199.00 180.00 20.00 - 1.00 16 20 1 18.00 6/9/08 y .p 15 17 - 197.00 199.00 180.00 20.00 - 1.00 17 21 1 19.00 6/6/08 y .p 12; DPT 19 blows Gi 35' 2' -gray brown silty gw; 2' -10'- brown sandy silt, wet G- C.8,11 17 - 197.00 199.00 180.00 20.00 - 1.00 18 20 1 18.00 6/6/08 y me d very soft r T -8'; 10' -20'- gray silt w /fine sand and lay 30 "Piers 17 - 197.00 199.00 180.00 20.00 - 1.00 19 22 1 20.00 6/6/08 y p 18 ,p 18; very soft and wet below 15': sloughing 6" all 17 - 197.00 199.00 180.00 20.00 - 1.00 20 21 1 19.00 6/6/08 y ound: drilled to 22'- cleaned to 21'; refusal on 2' lift 30 "Piers 17 - 197.00 199.00 180.00 20.00 - 1.00 21 20 1 18.00 6/6/08 y 3 25 Page 1 of 2 // GeopierSchedule (tmplt 2008- 02 -15) - Winco 2008 -06 -10 As- Built.xls A B C D E Depth to 4 l w/ the geotechnical explorations. Design 1.5xB (Sprd) BOF Existing Design Design I.5B (sprd) Planned As -Built As -Built As -Built As -Built QA QA Agrees? Pier Length 3.5xB (cont) Grade Grade Tip Elev. Tip Depth 3.5B (cont) Top Depth Geopier Measured Measured Measured Date Present (Yes / No As -Built Location (A) _ (B) (C) (D) (C - A) ( D - E) ( D - (C - B) (D - C - 1) No. Tip Depth Top Depth Pier Length Installed (Yes / No) and initials) Notes 17 - 197.00 199.00 180.00 20.00 - 1.00 22 21 1 19.00 6/6/08 y p25 30 "Piers 17 - 197.00 /99.00 180.00 20.00 - 1.00 23 20 1 18.00 6/6/08 y yp 25 17 - 197.00 199.00 180.00 20.00 - 1.00 24 20 1 18.00 6/6/08 y 3 25 -2'- gray brown silty gravel: 2' -12'- brown sandy ml; wet 30 "Piers 17 - 197.00 199.00 180.00 20.00 - 1.00 25 20 1 18.00 6/6/08 y me 3': l2' -20'- wet gray sat w /sand and clay -4'- gray -bm silty gw: 4' -14'- brown sandy silt; wet !ii; 17 - 197.00 199.00 180.00 20.00 - 1.00 26 20 1.5 18.00 6/6/08 y 8,14' -20'- wet gray silt w /sand and clay 30 "Piers 17 - 197.00 199.00 180.00 20.00 - 1.00 27 20 1 18.00 6/9/08 y 1, .16- Rp 26; slurry below 18'; caving 9' -16'- backfilled 17 - 197.00 199.00 180.00 20.00 - 1.00 28 20 1 18.00 6/9/08 y me " d moped w /s.t.b.; 6/9: redrilled- built 30 "Piers 17 - 197.00 /99.00 180.00 20.00 - 1.00 29 20 1 18.00 6/9/08 y ,p25 17 - 197.00 199.00 180.00 20.00 - 1.00 30 20 1 18.00 6/9/08 y p 25 B.1,10 15 - 195.00 199.00 180.00 20.00 - 3.00 31 20 3 16.00 6/9/08 y 3 33 30 "Piers 15 - 195.00 199.00 180.00 20.00 - 3.00 32 20 3 16.00 6/9/08 y 3 33 15 - 195.00 199.00 180.00 20.00 - 3.00 33 20 3 16.00 6/9/08 y me '- ex; 2'-15'- brown m1; 15' -gray fine, l m silt with 30 "Piers 15 - 195.00 /99.00 180.00 20.00 - 3.00 34 20 3 16.00 6/9/08 y -p 33 C.5, I 0 15.33333 6 195.33 199.00 1 80.00 20.00 10.67 2.67 35 20 2.5 16.33 6/9/08 y me 0 -2'- excavated: 2' -15'- brown ml; 15' -20'- fine gray silt with sand 30 "Piers 15.33333 6 195.33 199.00 180.00 20.00 10.67 2.67 36 20 2.5 16.33 6/9/08 y Rp 35 ,p 38 C.8,10 15.33333 6 195.33 /99.00 180.00 20.00 10.67 2.67 37 20 2.5 16.33 6/9/08 y /6: 0-2'. excavated: 2'- brown sandy sift: wet n 8'- 18'- 30 "Piers 15.33333 6 195.33 199.00 180.00 20.00 10.67 2.67 38 20 2.5 16.33 6/9/08 me I'- wet gray sill w /sand; slum to base, tamper plunged, y .ackfill; redrill wis. t. b.: 6/9: redrilled and built E,10 15.33333 6 195.33 199.00 180.00 20.00 10.67 2.67 39 20 2.5 16.33 6/9/08 y 6/6: RI) 38; 6/9: redrill- built 30 "Piers 15.33333 6 195.33 199.00 180.00 20.00 10.67 2.67 40 20 2.5 16.33 6/9/08 y me typ 38 F,10 15.33333 6 195.33 199.00 180.00 20.00 10.67 2.67 41 20 2.5 16.33 6/9/08 y t p 42 excavated 2: 2' -17'- brown sandy silt ml: 17' -21'- gray 30 "Piers 15.33333 6 195.33 199.00 180.00 20.00 10.67 2.67 42 21 2.5 17.33 6/6/08 y me sill w /sand and clay; wet and soft below 7' -8' ' ,/6.0 -2'- excavated; 2'- (10' -12')- brown sandy silt; wet • d very soft below 8'; gray,we4 very soft silt w /sand and F.5,10 15.33333 6 /95.33 /99.00 180.00 20.00 10.67 2.67 43 20 2.5 16.33 6/9/08 y me lay: slum below 15'; backfilled- redrill; 6/9: redrilled • d built 30 "Piers 15.33333 6 195.33 /99.00 180.00 20.00 10.67 2.67 44 20 2.5 16.33 6/9/08 y ,p 43 G,10 15.33333 6 /95.33 199.00 180.00 20.00 10.67 2.67 45 20 2.5 16.33 6/9/08 y Rp 50 30 "Piers 15.33333 6 195.33 199.00 180.00 20.00 10.67 2.67 46 20 2.5 16.33 6/6/08 y wp 50 H,10 15 - 195.00 199.00 180.00 20.00 - 3.00 47 20 3 16.00 6/9/08 y 3 50 30 "Piers 15 - 195.00 /99.00 180.00 20.00 - 3.00 48 21 3 17.00 6/6/08 y 3 50 15 - 195.00 199.00 180.00 20.00 - 3.00 49 20 3 16.00 6/9/08 y 3 50 15 - 195.00 199.00 180.00 20.00 - 3.00 50 20 3 16.00 6/6/08 me -3'- excavated: and cl- wet brown sandy silt; 10' -20'- wet y ay silt wlsand and c{ac_ 'age 2 of 2 // GeopierSchedule (tmplt 2008- 02 -15) - Winco 2'008 -06 -10 As- 3uilt.xls