Permit CITY OF TIGARD BUILDING PERMIT
PE RMIT #: BUP2006 -00457
.
DEVELOPMENT r S o ER9 ICES -639 -4171 DATE ISSUED: 9/25/2006
PARCEL: 2S102BA -00303
SITE ADDRESS: 09800 SW TIGARD ST ZONING: I -P
SUBDIVISION: NO.TIGARDVILLE ADDITION AMEND. LOT: 021 JURISDICTION: TIG
Project Description: Tigard Industrial Park Bldg 4: Re -Roof.
REISSUE: FLOOR AREAS EXTERIOR WALL CONSTRUCTION
CLASS OF WORK:.( G- FIRST: sf N: S: E: W:
TYPE OF USE: COM SECOND: sf PROJECT OPENINGS?
TYPE OF CONST: : sf N: S: E: W:
OCCUPANCY GRP: TOTAL AREA: 0 sf ROOF CONST: FIRE RET?
OCCUPANCY LOAD: BASEMENT: sf AREA SEP. RATED:
STOR: HT: ft GARAGE: sf OCCU SEP. RATED:
BSMT ?: MEZZ ?: REQD SETBACKS REQUIRED
FLOOR LOAD: psf LEFT: ft RGHT: ft FIR SPKL: SMOK DET:
DWELLING UNITS: FRNT: ft REAR: ft FIR ALRM : HNDICP ACC:
BEDRMS: BATHS: IMP SURFACE: PRO CORR: PARKING:
VALUE: $ 74,473.00
Owner: Contractor:
TIGARD INDUSTRIAL LLC BOB CARLSON INC
11336 SW BULL MOUNTAIN RD #103 PO BOX 63
TIGARD, OR 97224 HILLSBORO, OR 97123
Phone: Contact #: PRI 503- 640 -3623
FAX 503 - 640 -4840
FEES Reg #: LIC 5113
Description Date Amount REQUIRED ITEMS AND REPORTS
[BUILD] Permit Fee 9/25/2006 $607.55
[TAX] 8% State Surchan 9/25/2006 $48.60
Total $656.15
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes
and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is
not started within 180 days of issuance, or if work is suspended for more than 180 days. ATTENTION: Oregon law
requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952 - 001 =00T0 - thCough OAR 952 - 001 -0100. You may obtain a copy of thes s or direct questions to OUNC by
calli g 503 - 246 -6 o - 00- 332 344. -
i
Iss d By: i' � - Permittee Signa re: ._i! _ ( 7 /---L_
Call 503 -639 -4175 by 7:00 a.m. for an inspection that business day.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
09/22/2006 07 : 41 BOB CARLSON INC 4 5035981960 NO . 523 1;
Re-Roof
Buildhig Permit Apulication t•(),: ( H •ri( 1. 1 si: ON I.
City of Tigard
13125 Sw Ball Blvd., Tigard, oR 97223 LaialleffligNMEI Parma' No.: ) '"*".... " 4 . - oy I
' . , Plan Review
Phone: 503.639.4171 Fax 503.598.1960 . 1 • Date/B . Other Penney
Inspection Line: 503.639.4175 A i , .,11
Date Ready/By: NI BI See Page 2 in
Internet: www.citigatd.or.ua Notifiecl/4ed2nd:
. .
. , . .
. .
TYPE OP WORK • ' ' : .. ; : ;•`: % iREQGGGID DATA: 1- AND 2-FAMILY DWELLING
0 New construction 0 Demolition Permit fees* are based on the value of the work performed.
Indicate the value (rounded to the nearest dollar) of all
Ea Addition/alteration/replacement El Other equipment, materials. labor, overhead, and the profit for the
: • •.: . : . : : • CATEGORY Or CCeinilltircritok .; : : • : work indicated on this application.
--
Valuation: $
01- and 2-family dwelling Eg Commercial/industrial _____
—
Number of bedrooms:
CI Accessory building 0 Multi-family —
— _
0 Master builder in Other. Number of bathrooms:
j'' • : • i " 40a SITE INFORMATION Ain) LocSzoir ,r;.):: • :, .. :.. ' Total number of floors:
lob site address: 9800 Tigard Street New dwelling area: square feet
City/State/ZIP: Tigard, OR Garage/carport area: mime feet
Suite/bldg./apt. no.: Building 4 Project name: Tigard Industrial Park Building 4 Covered porch area: square feet
Cross street/directions to job site: Deck arca: square feet
Other structure area square feet
• - 101.401.1lai DA* CONOAER04-U8E 60:ECialiST
Subdivision: _1 Lot no.: Permit fees* are based on the value of work performed.
Indicate the value (rounded to the nearest dollar) of all
Tax map/parcel no.: equipment, materials, labor, overhead, and the profit for the
. • ' . ingduproit OF WORK .' . : • : i .! . work indicated on this application
Valuation: 5574,473.00
Tear off existing roofing. Install new class A fire rated 4 Ay built up roof.
Existing building area square feet
New building area square feet
PROPERTY . GWNER : .: 1 ' ritikotT . :1: : : : • i ; : . ' - Number of stories:
Name: Andrews Management Ltd. Type of construction:
- _
Address: 5805 SW Jean Road Occupancy groups: .
City/State/ZIP: Lake Oswego, OR 97035 Existing:
Phone: (503)635-4433 Far ( ) New;
It ' '. 0 1 30*A0 1-: I*9/` 1 . : :: .• : !:..: • • 7NoTtc2
Business name: Same as contractor AR contractors and subcontractors are required to bc
Contact name: licensed with the Oregon Construction Contractors Board
under ORS 701 and may be required to be liceused in the
Address: jurisdiction in which work is being performed. Utile
applicant is exempt from licensing, the following reasons
City/State/ZIP: at
Phone: ( ) Fax: : (503)
E-mail:
• ''.' 4 -'•r• ::. : "...=•.;:•':. : : • - _ ' . . • C°N ' • ; .; '..•:•:.:: •:.: , . '- '
Business Dame: Bob Carbon, Inc. •
- • !' ' .:; ' 'MIMING: PERMIT FEES ° ' 3 ,:
Address: PO Box 63
Please refer to fee schedule.
City/State/ZIP: Hillsboro, OR 97123 - .
Fees due upon application
Phone: (503) 640-3623 Fax: (503) 640-4840 ,
Amount received • /-
CCB lie .. .: 5113 . Amis. 6 i /5
— Date received: V 6‘"
Authorized signature: , Tido permit application rspirea ff a permit is not obtained
a Illi 1.1 41 0 es withlin 180 days alter it has beca accepted as complete.
Print aame: John Mc ' , . . D a t a : a Pee methodology set by Tri-County Building Industry
v
-- - rr, -,
- '
09/22/2006 07:41 BOB CARLSON INC -* 5035981960 NO.523 1)04
CITY T, F / (L
BUILDING DIVISION PERMIT #:
13125 SW Hail Blvd., Tigard, OR 97223 DATE ISSUED:
Phone: (503) 639 -4171
Inspection Requests (24 Hrs.): (503) 639 -4175 -'
INSPECTION WORKSHEET FOR DATE: TIME: PAGE: •
SITE ADDRESS: / �L C) 1 CLASS OF WORK:
SUBDIVISION: LOT #: TYPE OF USE:
PROJECT NAME:
DESCRIPTION:
OWNER: 0 PHONE #: -
CONTRACTOR: PHONE #:
Inspection Request Scheduled For: Date: I "" 0 C Pour Time
Code # Inspection Description - . Confirm # Contact •# Message
/L/14 ' 7— iF5"D
1 OA-5j
Corrections /Comments /Instructions:
r
( Er 411
it
`
•
•
tr
❑ PASS ❑ PARTIAL APPROVAL ❑ CANCEL ❑ NO ACCESS
❑ FAIL El CALL FOR INSPECTION ❑ ADDITIONAL FEES ASSESSED
Tij
r. Date: q e A Phone #: (503) 71 8-x:-
�i
09/22/2006 07:41 BOB CARLSON INC 4 5035981960 N0.523 D05
City of Tigard Building Department ,, t c
13125 SW Hall Blvd., Tigard, OR 97223 Phone: (503) 639 -4171
e U .spection Report Form ' s n
Requested by t� Telephone ( 1 1
r
Job Address
Roof Access Location t'
Date Requested q P, CYO Time Requested
Type of Existing Roof r: 1L $
r
1. Slope of roof deck _ (ratio) %
2. Roo f/Penetrations/General Conditions •‘> ❑ Poor
3. Are there blisters? es ❑ No 4
4. Are there tracks? '--' ' "s 0 No i
5. Is there evidence of water pondrng? ❑Yes
"ft3❑ Na
o
6. Is moisture present under roofing (leak)? ❑ Yes o
7. Is roof insulation existing? ❑ Yes EK
8. Is roof insulation wet? _ . ❑ Yes ' No -
Pro line setbacks on all sides > 10 feet ❑ Yes No
9. PAY > 6000 sq. ft.
10. Roof Area 2900 SQ- ft
h < 2 Stories ❑ >.2 Stories
11: Building ❑ N led l��►' ❑ B. ❑ C•
12. Class of roof required
13. Type roof deck Combustible ❑ Non - Combustible
14. Roof drains
ed ❑ ReqUired ❑ Adequate
rovided ❑ Required to
15. Overflew drains Adequate
16. Attic ventilation ❑ Provided Cl R
17. Roof listing ❑ Pro ided Required
18. Scope
of work after off ❑ Overlay
To re -roof this structure the following conditions must be met
0 _ u • ( 1 . ,,e • 7
he re -roof proposal is C • proved for permit issuance if the conditions listed above are met. After obtaining your permit y ou must contact the
, Building Division for an Inspection when the roof dedc is ready for the first inspection. The first inspection for a complete tear off is the deck
inspection_ For a bur -up roofing system overlay), the first inspection is at the start of the job. After the re -roof Is complete, a final inspection is
` required. AP" 1 L� Z
-ii I . k /bate _4
. inspector
CITY TIGA:=; BUILDING PERMIT
•
PERMIT #: BUP2006 -00457
m � l� l DEVELOPMENT SERVICES DATE ISSUED: 9/25/2006
`' 13125 SW Hall Blvd., Tigard, OR 97223 503 - 639 -4171
PARCEL: 2S102BA -00303
- SITE ADDRESS: 09800 SW TIGARD ST ZONING: I -P
- SUBDIVISION: NO.TIGARDVILLE ADDITION AMEND. LOT: 021 JURISDICTION: TIG
Project Description: Tigard Industrial Park Bldg 4: Re -Roof.
REISSUE: FLOOR AREAS EXTERIOR WALL CONSTRUCTION
CLASS OF WORK: ALT FIRST: sf N: S: E: W:
TYPE OF USE: COM SECOND: sf PROJECT OPENINGS?
TYPE OF CONST: : sf N: S: E: W:
OCCUPANCY GRP: TOTAL AREA: 0 sf ROOF CONST: FIRE RET?
OCCUPANCY LOAD: BASEMENT: sf AREA SEP. RATED:
STOR: HT: ft GARAGE: sf OCCU SEP. RATED:
BSMT ?: MEZZ ?: REQD SETBACKS REQUIRED
FLOOR LOAD: psf LEFT: ft RGHT: ft FIR SPKL: SMOK DET:
DWELLING UNITS: FRNT: ft REAR: ft FIR ALRM : HNDICP ACC:
BEDRMS: BATHS: IMP SURFACE: PRO CORR: PARKING:
VALUE: $ 74,473.00
Owner: Contractor:
TIGARD INDUSTRIAL LLC BOB CARLSON INC
11336 SW BULL MOUNTAIN RD #103 PO BOX 63
TIGARD, OR 97224 HILLSBORO, OR 97123
Phone: Contact #: PRI 503- 640 -3623
FAX 503 - 640 -4840
FEES Reg #: LIC 5113
Description Date Amount REQUIRED ITEMS AND REPORTS •
[BUILD] Permit Fee 9/25/2006 $607.55
[TAX] 8% State Surchan 9/25/2006 $48.60
Total $656.15
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes
and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is
not started within 180 days of issuance, or if work is suspended for more than 180 days. ATTENTION: Oregon law
requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952 - 001 - 0010 - through OAR 952- 001 -0100. You may obtain a copy of these.w,es or direct questions to OUNC by
calliyig 503 - 246 -66. of 00- 332 -2344.
•
Issaed By: L . . i b6: _44,,'L L' Permittee Signatgre: I �'t
Call 503 - 639 -4175 by 7:00 a.m. for an inspection that business day.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
. t
INSPECTOR'S SIGNATURES ARE NOT
Inspections Required for — at.t f o€OOIP•DD S REQUIRED ON GREEN INSPECTION CARD.
✓ Code Inspection Description PASS Date By ✓ Code Inspection Description PASS Date By
BUP - Building Permit ELC - Electrical Permit
405 Excavation 105 Underground/slab cover
410 Fill 110 Temporary electrical service
415 Grading 115 Electrical service
205 Footing 120 Electrical rough -in
805 MFG - Structure grading/footing 125 Wall cover
210 Foundation walls 130 Ceiling cover
215 Footing drain 135 Low voltage
220 Slab 140 Sign installation
310 Crawl drain 145 A/C or heating unit circuit
225 Post/beam structural 150 Hot tub /spa/pool
230 Underfloor insulation 195 Misc. inspection:
235 Shear walls /anchors 199 Electrical final
240 Exterior sheathing
245 Firewall
250 Roof nailing ELR - Restricted Energy Permit
255 Wtr proofing basement walls 135 Low voltage
260 Tilt -up panel 195 Misc. inspection:
265 Masonry 199 Electrical final
270 Reinforcing steel (rebar)
275 Framing
. 810 _ MFG - Structure set -up MEC - Mechanical Permit
280 Insulation 605 Post/beam mechanical
285 Drywall nailing 610 Gas line
287 Suspended ceiling 615 Mechanical rough -in
295 Misc. inspection: 620 Hydronic piping
899 MFG- Structure final 625 Duct work
498 Grading final 630 Fire damper
299 Final inspection 635 Smoke detector shutdown
640 Exhaust hood
695 Misc. inspection:
699 Mechanical final
BUP - Fire Protection System Permit
905 Sprinkler underfloor /slab PLM - Plumbing Permit
910 Sprinkler rough -in 305 Plumbing underslab
915 Fire alarm rough -in 310 Crawl drain
920 Suppression trip test 315 Post/beam plumbing
995 Misc. inspection: 320 Plumbing rough -in.
998 Alarm final 322 Shower pan
999 Sprinkler final 330 Water service
335 Rain drain
340 Storm drain
SIT - Site Work Permit 505 Sanitary sewer
405 Excavation • 345 Culvert/catch basin
410 Fill 350 Septic tank
415 Grading 395 Misc. inspection:
205 Footing 399 Plumbing final
210 Foundation walls
215 Footing drain
420 Sprinkler supply lines SWR - Sewer Permit
495 Misc. inspection: 505 Sanitary sewer
498 Grading final 595 Misc. inspection:
499 Final inspection 599 Final inspection
I:\Building\Inspection Cards \Forms\AOP- InspCard- Blank.doc 12/09/2005
CITY OF TIGARD -
BUILDING DIVISION PERMIT #: - `OQ(�, 7
13125 SW Hall Blvd., Tigard, OR 97223 DATE ISSUED:
Phone: (503) 639 -4171 p ��b4p��� u ll
Inspection Requests (24 Hrs.): (503) 639 -4175 A ' �..
INSPECTION WORKSHEET FOR DATE: �� @A TIME: PAGE:
SITE ADDRESS: Le2-O T�'� CLASS OF WORK:
SUBDIVISION: LOT #: TYPE OF USE:
PROJECT NAME:
DESCRIPTION:
PHONE #:
CONTRACTOR: � 39 A PHONE #:
Inspection Request Scheduled For: Date: Pour Time:
Code # Inspection Description Confirm # Contact # Message
Z— fit Oqe—ttL--
Corrections /Comments /Instructions:
,' ___ . �'
A " sue. .= dpi l! ►. I � ° Q'
A/ , a ! ,1 0
i
ASS ❑ PARTIAL APPROVAL ❑ CANCEL ❑ NO ACCESS
n FAIL H CALL FO' INSPECTION ❑ ADDITI•NAL F -ES ASSESSED
Inspector: ��l �/L G
Date: ' 6• Phone #: (503) 718- � _