Loading...
Permit CITY OF TI BUILDING PERMIT PE RMIT #: BUP2005 -00312 I DEVELOPMENT O gr So -639 -4171 SERVICES DATE ISSUED: 1/26/2006 c,:l PARCEL: 2S113BA-00400 SITE ADDRESS: 07632 SW DURHAM RD 125 ZONING: I -P SUBDIVISION: SW CENTER SDR1999 -00020 LOT: JURISDICTION: TIG Project Description: Construction of a remote bank teller transaction canopy. REISSUE: �-(!� FLOOR AREAS EXTERIOR WALL CONSTRUCTION CLASS OF WORK: FIRST: sf N: S: E: W: TYPE OF USE: COM SECOND: sf PROJECT OPENINGS? TYPE OF CONST: 5N : sf N: S: E: W: OCCUPANCY GRP: U1 TOTAL AREA: 0 sf ROOF CONST: FIRE RET? OCCUPANCY LOAD: BASEMENT: sf AREA SEP. RATED: STOR: HT: 12 ft GARAGE: sf OCCU SEP. RATED: BSMT ?: MEZZ ?: REQD SETBACKS REQUIRED FLOOR LOAD: psf LEFT: ft RGHT: ft FIR SPKL: SMOK DET: DWELLING UNITS: FRNT: ft REAR: ft FIR ALRM : HNDICP ACC: BEDRMS: BATHS: IMP SURFACE: PRO CORR: PARKING: VALUE: $ 35,000.00 Owner: Contractor: OPUS REAL ESTATE OREGON IV LLC R & H CONSTRUCTION 1000 SW BROADWAY 1530 SW TAYLOR 1130 PORTLAND, OR 97219 PORTLAND, OR 97205 Phone: 503 - 916 -8963 Contact #: FAX 503 - 224 -3638 PRI 503 - 228 -7177 FEES Reg #: LIC 38304 Description Date Amount REQUIRED ITEMS AND REPORTS [BUPPLN] Pln Rv 6/30/2005 $232.90 [FLS] FLS Pln Rv 6/30/2005 $143.32 [BUILD] Permit Fee 1/26/2006 $358.30 [TAX] 8% State Surchan 1/26/2006 $28.66 Total $763.18 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more than 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952 - 001 -0010 through OAR 952 - 001 -0100. You may obtain a copy of these r es or direct questions to OUNC by calling 503-246-6699 or 1- 800 - 332 -2344. Issued By:2 ��� P��� , � Permittee Signature:, / 64,"-- y � Call 503 - 639 -4175 by 7:00 a.m. for an inspection that business day. This permit card shall be kept in a conspicuous place on the job site until completion o the project. Approved plans are required on the job site at the time of each inspection. /'! i H t-t 1 - B 1 � ng hermit Applicat O r t` > a "; FOR OF FICE � USEONLY .e ∎ :: ',' ; _ t ? II 71 I I -, \l_l 1 V L C vd' • • =4. 4 t . , Tr e ., z }.r,t `.*!Vc, f. r 'r t y .,'' 4 f. , ... s.,t`., City of Tigard Receivs { � 1 +125 SW Hall Blvd., Tigard, OR 97223 II m 3 200 _Date,7s;. y/��( ? Q I " Permit No.. ! U <� ....CO-31i .1 U' LV Pl an Revie(v ) Phone: 503.639.4171 Fax: 503.598.1960 ' J• tO ' I4 y. / �� Other Pe 't: E,l,e t '� . Inspection Line: 503.639.4175 ■ 1' ii ,.• D ate Rea Ready/ By: �•'�t °?�I_ I ::'� Y Y: � ris. See Attached Checklist for Inte .et: www.ci.ti:ard.or.us CITY T , s N oti edfMethod: / � C i�� ! OF "AM.) Supplemental Information l % ' r .i U ► ' e' . DI \ 1, i )Zsio_. ` A f , •� / - 1 ' �, TYPE OF WORK ` z RE QUIR E D D AT A 1 A'ND 2 F�I D 4'New construction ❑ Demolition Permit fees* are based on the value of the work performed. .) Indicate the value (rounded to the nearest dollar) of all t ❑ Addition/alteration/replacement ❑ Other: equipment, materials, labor, overhead, and the profit for the p ', ` CATEGORY CO a work indicated on this application. ❑ 1- and 2- family dwelling R Commercial /industrial Valuation: $ ❑ Accessory building ❑ Multi - family Number of bedrooms: —p — o ❑ Master builder ❑ Other: Number of bathrooms: Z JOB SITE,JNFORMATION AND LOCATION '' r Total number of floors: l% fi Job site address: 7632 94 w l n New dwelling area: square feet Z City/ State/ZIP: -*ago e oA) q 7124 Garage/carport area: square feet -v Suite/bldg. /apt. no.: I ,;1,G) Project name: CralViA C % Covered porch area: square feet 2 Cross ,, street/directions � to ` job j site: r � `,^ n ' &) 1' IMP Deck area: square feet 7c/1 Cc j' 2 e 76 AVM' &1k-I, )O Other structure area: square feet S E E e; tk -• le a REQUIRED;DATA ;COMMERCIAL. -,USE CIJECKLISTw Subdivision: Lot no.: i Permit fees* are based on the value of the work performed. /if , ' .. v � i> gull Indicate the value (rounded to the nearest dollar) of all Tax map /parcel no �f V. , equipment, materials, labor, overhead, and the profit for the DESCRIPT,.1ON OF WORK t- e . ' r `" work indicated on this application. rr6 m ir e�(�IDA {'2 (, 11) (,q 1C/19j�' 00 74E / � �/,IP Q�� t�/ Valuation: $ j � � / f' I" r '' i . �'�"f t /( � �tV Existing building area: square feet New building area: ,ii/ j square feet 132— 1 : •> ,PROPERTY , OWNER::: , ' ,- - , 1. - e - 1=' t.. ® TENANT 4 £ Number of stories: Name: Qp05 j/,n k A44%60611; a- Type of construction: B 9 9,4 ' Address: /00 '1.(,� , lr h Oc cupancy groups: / L i City/State /ZIP: p f vel diA)0, I'// AN q.72.65" (,� ��fY e ) l Phone: ( ) ll�o . �'I ��J Fax: (2) W • v l New: J CO l / i ; g APPLICANT =� s - ® CONT P ERSON R ' 5 t., .... � �` r •,!, NOT E Business name: l Ml./1 pe_. All contractors and subcontractors are required to be Contact name: D licensed with the Oregon Construction Contractors Board Address: �D ,t 4) ieN under ORS 701 and be required be licensed in the 1 V work i jurisdiction in which work s being performed. If the City/State/ZIP: PO�/ e�? )A.1 9 applicant is exempt ram licensin2he llo 0 reasons `"'��ll /� -1 --- -�h- -- n�� • n � • /� / apply: % Phone: (503) 226 • 0622 Fax:: (5Q3j 06266, ri /,./ 3.3 .1- E -mail: 1 CONTRACTOR (4' ' Business name: 1 ''t LrlO� • ��'' :BUILDING PERMIT FEES' Address: 152 � S City /State/ZIP: Peet 1.940, q72 2 14a") '17?� Please refer to fee schedule. �� lI Fees due upon application Phone: (5 22$ • 7/7 Fax: (50) 224-• gav CCB lie.: eff 5435, - Amount received l ,_ Date received: Authorized signature: /!, This permit application expires if a permit is not obtained P cam I ,'-� — _' /�/ within 180 days after it has been accepted as lcte. Print name: Danied Ph Date: & • Zg. Fee methodology set by Tri- County Building Industry -- Service Board . i. It nildin PermilApp doe 12 03 440 - 41 n' ( om,w1'13I f c® A 00'e to June 28, 2005 G N EG� S ' CI OF T G: . '�' N`�P aA O REGON Dan Gates MCA Architects, PC 30 Northwest First Avenue Portland, OR 97209 RE: Minor Modification Request, Case File No. MMD2005 -00012 Dear Mr. Gates: This letter is in response to your request for a Minor Modification (MMD2005- 00012) of the approved Columbia Community Bank site development located at 7632 SW Durham Road, WCTM 2S113BA, Tax Lot 00400. You have requested altering the parking lot by removing four existing parking spaces and installing a one way drive thru remote teller transaction stand. Analysis of Modification Request: Section 18.360.060 of the Tigard Development Code Site Development Review chapter, states; "any modification which is not within the description of a major modification as provided in section 18.360.050 shall be considered a minor modification." Section 18.360.050 states that the Director shall determine that a major modification(s) has resulted if one (1) or more of the changes listed below have been proposed: 1. An increase in dwelling unit density or lot coverage for residential development. The proposal does not involve residential property. Therefore, this standard does not apply. Y 2. A change in the ratio or number of different types of dwelling units. This request does not involve a residential development. Therefore, this criterion does not apply. 3. A change that requires additional on -site parking in accordance with Chapter 18.765. The proposed drive through provides added convenience to an existing customer base. By definition, the drive through would not increase the need for additional parking. 4. A change in the type of commercial or industrial structures as defined by the Uniform Building Code. The proposed transaction canopy and remote transaction stand are accessory to the existing building. No modification or change in type of commercial structure is proposed. 5. An increase in the height of the building(s) by more than 20 percent. The proposed canopy over the drive through transaction stand is 12 feet in height, but is not part of the existing building and would not exceed the height of the existing building. 6. A change in the type and location of accessways and parking areas where off -site traffic would be affected. The proposed 150 -foot stacking lane is provided for in the existing parking lot. This stacking area is removed from the main access and egress lanes connecting the parking lot to Durham Road and, therefore, should not affect off -site traffic. 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 Page 1 of 2 Gad � 7. An increase in vehicular traffic to and from the site and the increase can be expected to exceed 100 vehicles per day. The proposed drive through is to serve existing customers that the bank currently serves, and is not expected to result in a significant increase in vehicular traffic. Any marginal increase in patronage for the convenience of the service is not expected to exceed 100 vehicles per day. 8. An increase in the floor areas proposed for a non - residential use by more than ten percent excluding expansions under 5,000 square feet. The proposed canopy footprint is approximately 100 square feet in size and will not increase the square footage of the existing building. 9. A reduction in the area reserved for common open space and /or usable open space that reduces the open space area below the minimum required by the code or reduces the open space areas by more than ten percent. The minimum required landscaping is 25%, and the 10.5 -acre site provides 61%. The Toss of 100 square feet to the drive through canopy will not reduce the landscaping /open space percentage below the minimum required or by more than 10 %. 10. A reduction of project amenities (recreational facilities, screening; and /or, landscaping provisions) below the minimum established by the code or by more than ten percent where specified in the site plan. The proposed canopy would replace approximately 100 square feet of landscaping. However, 61% of the site is landscaped, which is well in excess of the required landscaping of 25 %. In addition, approximately 20 feet of the existing screening will still remain between the parking lot and Durham Road. Therefore, the relevant project amenities have not been reduced below the minimum established by the code or by more than 10 %. 11. A modification to the conditions imposed at the time of Site Development Review approval that is not the subject of criteria (B). 1 through 10 above. The site was reviewed and approved through case file number SDR1999- 00020. No modifications to the conditions of approval are required by the proposed development. THIS REQUEST HAS BEEN APPROVED BY THE PLANNING DEPARTMENT. PLEASE SUBMIT A COPY OF THIS LETTER WITH YOUR BUILDING PERMIT APPLICATION. This request is determined to be a minor modification to an existing site. The Director's designee has determined that the proposed minor modification of this existing site will continue to promote the general welfare of the City and will not be significantly detrimental or injurious to surrounding properties provided that, development which occurs after this decision complies with all applicable local, state, and federal laws. If you need additional information or have any questions, please feel free to call me at 503- 639 -4171 ext. 2434. Sincerely, Gary Pagenstecher Associate Planner Original Material to: SDR1999 -00020 Copy to: MMD2005 -00012 is \curpin \gar\minor modification \mmd2005 -00012 (mca architects).doc Page 2 of 2 , . CITY OF TIGARD _ . .. BUILDING DIVISION • " PERMIT #: BUP2005-00312 13125 SW Hall Blvd., Tigard, OR 97223 DATE ISSUED: 1/26i200 6 Phone: (503) 639-4171 kAa ,,,... ag Inspection Requests (24 Hrs.): (503) 639-4175 L. INSPECTION WORKSHEET FOR DATE: 5/26/2006 TIME: 7:00AM PAGE: 65 SITE ADDRESS: 07632 SW DURHAM RD 125 - CLASS OF WORK: SUBDIVISION: SW CENTER SDR 1999 LOT #: TYPE OF USE: PROJECT NAME: COLUMBIA COMMUNITY BANK DESCRIPTION: Construction of a remote hank teller transaction canopy. OWNER: OPUS REAL ESTATE OREGON IV LLC, . PHONE #: 503-916-8963 CONTRACTOR: R & H CONSTRUCTION PHONE #: 503-228-71T7 Inspection Request Scheduled For: Date: 5/26/2006 Pour Time: Code # Inspection Description Confirm # Contact # Message 299 Final inspection 03064601 503-972-5558 Y Corrections/Comments/Instructions: C—cyry L-oiocz__- sh 51bYle_ci a k'' Pr s 4 - - 1 0 7; 00 0 1 ` A-1 e'r A/O0v■-• 4 1 G / /in pi' 1 o r vi o . i 404 / -- ,„1 . ‘ .. Arii v v I V ., PASS ri. PARTIAL APPROVAL E] CANCEL 0 NO ACCESS FAIL • CALL FOR INSPECTION El ADDITIONAL FEES ASSESSED voA Inspector: AlliiIrL Date: _5P. 6 i() Co Phone #: (503) 718- e2 9 a3 op- t t CITY OF TIGARD _ BUILDING DIVISION PERMIT #: BUP200S.00312 13125 SW Hall Blvd., Tigard, OR 97223 DATE ISSUED: 112612006 Phone: (503) 639 -4171 tiii li Inspection Requests (24 Hrs.): (503) 639 -4175 INSPECTION WORKSHEET FOR DATE: 5/3/2006 TIME: 7 :08AM PAGE: 95 SITE ADDRESS: 07632 SW DURHAM RD 125 CLASS OF WORK: SUBDIVISION: SW CENTER SDR1999 00020 LOT #: TYPE OF USE: PROJECT NAME: C.•OLUMMMBIA COMMUNITY BANK DESCRIPTION: Construction of a remote bank teller tranr>action canopy. OWNER: OPUS REAL ESTATE OREGON IV L.LC, PHONE #: 503- 915 -t963 CONTRACTOR: R & H CONSTRUCTION PHONE #: 503-228-7177 Inspection Request Scheduled For: Date: 5/3/2006 Pour Time: Code # Inspection Description Confirm # Contact # Message 29,9 Final inbpection /^ > 029130-01 971-221-3985 \ Y' Corrections /Comments /Instructions: c� J \ I/" f �� " c et I( or m c 4 - G e * c a t ors p e c \-t r a h h 1 0 0 / 4 - . af.c_ aoo (0 - 0v1 I PASS I PARTIAL APPROVAL ' CANCEL NO ACCESS FAIL I I CALL F• INSPECTION ❑ ADDITIONAL FEES ASSESSED Inspector: Date: 3 , .i Phone #: (503) 718- , CITY OF TIGARD k I. • BUILDING DIVISION ,. - PERMIT # : BtiP2.005-00312 13125 SW Hall Blvd., Tigard, OR 97223 DATE ISSUED: . 1/261200 6 Phone: (503) 639-4171 . Pa Inspection Requests (24 Hrs.): (503) 639-4175 Aill.- AL INSPECTION WORKSHEET FOR DATE: 2P712006 TIME: 7:01Alvt PAGE: 107 SITE ADDRESS: 07632 SW DURHAM RD 125 CLASS OF WORK: SUBDIVISION: SW CENTER 3DR1999-00020 LOT #: TYPE OF USE: PROJECT NAME: COLUMBIA COMMUNITY BANK DESCRIPTION: Construction of a remote bank teller trarmaction canopy. OWNER: OPUS REAL ESTATE OREGON IV LLC, PHONE #: 5 0 3 ,9 1 er CONTRACTOR: R & H CONSTRUCTION PHONE #: f Inspection Request Scheduled For: Date: 2/27/2006 Pour Time: Code # Inspection Description Confirm # Contact # Message 275 Framing 027652-01 603-780-8385 N Corrections/Comments/Instructions: i ■ .0. . . A hiliPli ii • ,• (I —0\L — 411 • 4ffliffi iffallicu‘__- LO-k(1 Ai ..1 110 al.— : _1_10../1 r •■•-- MIIIIIIMP" ,--- •••-••••----- (0 'I1F ilr I PASS 0 PARTIAL APPROVAL 0 CANCEL pi NO ACCESS I I FAIL I I CALL FOR INSPECTION pi ADD IT ONAL FEES ASSESSED 11111k IF Inspector: 4111, . I Date: 2. ' /331 Phone #: (503) 718- 7 CI - IGARD - '- A BUILD G DIVISION PERMIT #: 3( 6)o 13125 SW Hall Blvd., Tigard, OR 97223 DATE ISSUED: Phone: (503) 639- 4171MI■ Inspection Requests (24 Hrs.): (503) 639 -4175 I 11. INSPECTION WORKSHEET FOR DATE: '/, (Cr" TIME: PAGE: SITE ADDRESS: 7 U•F, '- cZ CLASS OF WORK: SUBDIVISION: LOT #: TYPE OF USE: PROJECT NAME: DESCRIPTION: OWNER: PHONE #: CONTRACTOR: . )9-- PHONE #: 5O 780 85 : 95-- Inspection Request Scheduled For: Date: Pour Time: Code # Inspection Description Confirm # Contact # Message Corrections /Comments /Instructions: riff- EL fir PASS I I PARTIAL APPROVAL ❑ CANCEL n NO ACCESS I FAIL I I CALL FOR INSPECTION ❑ ADDITIcNAL FEES ASSESSED p X11 ( ) Inspector Date , IF F 'Phone # : 503 718- 26t- I CIT, :. TIGARD 3 u P BUILDING DIVISION PERMIT #: 9 &OS - o 0 3/ a 13125 SW Hall Blvd., Tigard, OR 97223 DATE ISSUED: Phone: (503) 639- 4171 @�i�p1�l Inspection Requests (24 Hrs.): (503) 639 -4175 _ _.. INSPECTION WORKSHEET FOR DATE: — 3/2 , 76 - TIME: PAGE: r - SITE ADDRESS: 76, 3D. / D 1 f ') CLASS OF WORK: SUBDIVISION: LOT #: TYPE OF USE: PROJECT NAME: DESCRIPTION: OWNER: . PHONE #: CONTRACTOR: PHONE #: Inspection Request Scheduled For: Date: 3- .A " el (0 Pour Time: Code # Inspection Description Confirm # Contact # Message 2 Z 0 c k , . k----- — Y 0 9 $ - S ? T Corrections /Comments /Instructions: t C . f , / c-/-e,,,e_.2 C A , 4 10, „.. Ifr-iv!" DU\cc PASS I I PARTIAL APPROVAL ❑ CANCEL ❑ NO ACCESS Li FAIL n CALL FOR INSPECTION I I ADDITIONAL EES ASSESSED ‘v_12........._ Inspector: 411, V Date: Phone #: (503) 71 - CITY! Of TIGARD • BUILbiNGINVISION PERMIT #: 13up2005.00312 13125 SW Hall Blvd., Tigard, OR 97223 DATE ISSUED: 1/26.12006 Phone: (503) 639-4171 Inspection Requests (24 Hrs.): (503) 639-4175 INSPECTION WORKSHEET FOR DATE: 212/2006 TIME: 7:02AM PAGE: 22 SITE ADDRESS: 07632 SW DURHAM RD 12 CLASS OF WORK: SUBDIVISION: SW CENTER SDR1999-00020 LOT #: TYPE OF USE: PROJECT NAME: COLUMBIA COMMUNITY E3ANK DESCRIPTION: Construction of a remote bank teller transaction canopy. OWNER: OPUS REAL ESTATE OREGON IV LLC, PHONE #: 5(p,916-8963 • CONTRACTOR: R & H CONSTRUCTION PHONE #: 503-22B-7177 Inspection Request Scheduled For: Date: 2012006 Pour Time: 12:00 Code # Inspection Description Confirm # Contact # Message 205 Footing 0261713-01 503-700-13385 Corrections /Comments/ Instructions: Li II ,.'• pASS PARTIAL APPROVAL fl CANCEL n NO ACCESS ,r FAIL fl CALL FOR INSPECTION 111 ADDITIO L FE S ASSESSED IVA, _ Date: Inspector: p hone #: (503) 718- MAY -01 -2006 MON 03:25 PM CARLSON TESTING INC. FAX NO. 5036840954 P. 02 Main Office Salem Office Bend Office P.O. Box 23814 4060 Hudson Ave., NE P.O. Box 7918 y Phone ne ( 0 03 ) 684-3460 Phone (503 589 -1252 Phone (541) 330-9155 Carlson 'Testing, Inc. FAX (503) 684 -0954 FAX (503) 589-1309 FAX (541) 330 -8163 Special Inspection FINAL SUMMARY LETTER May 1, 2006 T0601150 City of Tigard 13125 SW Hall Blvd_, Tigard, OR 97223 -8199 Attn: Building Department Re: Columbia Community Bank Addition 7632 SW Durham Rd- Tigard, OR /a/c Permit# BUP2005 -00312 Dear Sir or Madam: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Structural Concrete Structural Steel All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineers design changes, approvals and verbal instructions. Our reports pertain to the material testedfinspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If th r re are any further questions regarding this matter, please do not hesitate to contact this office, R : �pectfully submitted, C �I T - ING, INC. .! F. Hietpas • .erations Manager Wks : R&H Construction- Gary Lopez Alpha Community Development- Steve Entenman MCA Architects- Dan Gates