Loading...
Report (2) • FROM : DR. SEPP FAX NO. : 5b36205336 Feb. 12 2004 02:54PM P1 • s rr a erna_- 0 ( Permit 0: 1 11. f ..e_ 62.‘2. 67 I _Address: _Le Issued hy: Date: _Z..1/5-71.:5_,. _ __... _ . ......__. . . • Statement: Information Notice to Property Owners - About Construction Responsibilities Note: Oregon Law, ORS 701.055(4), rec rEsideritial constrliction permit appli- eaAIS wk. 'Are not regIsrered with the Constri:Llion Contractors Board to sign the fC)ilowings;atemenr b2fore a in4isVing permit can be is..;ued. This staiement is regvired fi.?? .-eside bviirling. eiect? mechau;cal, and plumbing ,...?e,-mirs. Licensed arcl?Ue., arid engineer applicaa,c, exempt from i-cl.c under C.ER'.5' 701.010(7), need nor submit this statement. This statement -tvii'l be filed with the r,rrnit. in. fee :appropriate blanks and initial box c,s 1 an.d 2, and :tither 'box 3A or 313: • L'?..... 1, I Own, rciide in, or will reside in the completed. structure. E . , T 2 understidnd Thai 1 rnust rcg .s - f3ter ?.. a construction con * the structure is sold or offered re 1 salt before er upon eorobletion. • p 3 4;._ My gencral contractor is • ..... ,._-_-_. - (N ame) Coraracwr regis. i '0v instruct my general cr:niracte that all s).tbcontracto•;'s wilo woik CM T.' strIcture...rnust be regi with The- Constrt:crlioa Con tr.actors Boax4i. OR .. • Xr 3R. 1 will bc my own general contractor. If I. hire subcontraci:ors, 1 will hire only ;:;ubeorttractor rcE,krered viith the Construction Contractors Board. If I change nay mind arcs hire a aen:xal cottractor, I will cmitv.act...vitil a boti"lactor who is registered with the C-Cf3 anci will irrizni•:.(iiately notify the office issuinc this building t ofthe name of the contractor. 1 hereby certify that the above information is correct and !tat) have read and Jo understand the Information Notice to Propert" Owners about Construction Responsibilities on the reverse side of this form_ l$----cr.-± . (Signatu: of yi: . 4pplicant) (Date) (Piliie copy to issu ing agency permit file, pink copy to tipp14_•ant) TOo :2f . /lac L; E GNW)11... AJJ i -- - Jeanne Temple - Re: BUP2003-00369 Page 1 to 2-- 0-5 k From: Hap Watkins To: Dianna Howse; Jeanne Temple Date: 2/10/04 12:44PM Subject: Re: BUP2003 -00369 Call the owner and see if he is going to be the general contractor on the BUP, MEC, etc hap hap @ci.tigard.or.us »> Dianna Howse 02/10/04 09:36AM »> Jeanne said that she needs to take care of this because we need to know who the new contractor will be to enter into the cases, check licenses, get signatures, etc. for the BUP and SIT where Roloff is listed. Thanks. Dianna »> Hap Watkins 02/10/04 07:59AM »> Mike Roloff, General Contractor, called Monday and requested that his name and firm be removed from all permits regarding the Sepp Office project, the above permit particularly, and any others. He is no longer associated with Dr Sepp. hap(c�ci.tigard.or.us 666.70 3 \p °-)3 IT -� add z1