Loading...
Permit Pj MECHANICAL PERMIT CITY OF TIGARD COMMUNITY DEVELOPMENT Permit #: MEC2010 -00139 GXitib 13125 SW Hall Blvd., Tigard OR 97223 503.639.4171 Date Issued: 04/02/2010 Parcel: 2S102DB08300 Jurisdiction: Tigard Site address: 9136 SW HILL ST Subdivision: Lot: 0 Project: Jamal Project Description: Owner: FEES JAMAL, MOUSSA AL Description Date Amount 9136 SW HILL ST TIGARD, OR 97223 Air Conditioning 04/02/2010 $46.75 12% State Surcharge - Mechanical 04/02/2010 $10.80 PHONE: Minimum Fee Adjustment - Mechanical 04/02/2010 $43.25 Contractor: ACTIVE AIR HEATING & COOLING 22415 NE SALMON DR GRESHAM, OR 97030 PHONE: 503 - 201 -8453 FAX: Type of Use: SF Class of Work: ALT Type of Const: Occupancy Grp: Stories: Fuel Fuel Types: Gas Pressue: Total $100.80 Required Items and Reports (Conditions) This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notifi on Cente . hose rules are set forth in OAR 952 - 001 -0010 through OAR 952 - 001 -0100. You may obtain a copy of the rules or direct uestions to OUNC • c- • 50.246.6699 or 1.800.332.2344. e cwAlki Issuec By: I /1f Permittee Signature: Call 503.639.4175 by 7:00 a.m. for an inspection that business day. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. ce' IM + f'r R awl a g k ?'x'R t 'P 4V4!: e .,r s .7t 4 t, 1` g � Iii " -t, * .� 1 OIZ Or l I( 1 1.,51 . + Mechanical Permit Application i 1 lieM LILY k-.toyZloteat; 4.,.r.NAr . v�+7�1 -, d4 ...I .d: �',.. ,. v.4.... ;: : :'1 i Received City W Tigar Date/By: �_� Permit No.: ��iGl ?/ j' 9 13125 SW Hall Blvd., Tigard, OR 9722 v� : ® Plan Review G �^ Phone: 503.639.4171 Fax: 503.598.1960 Other Permit: G, d�ld y ea 3 i . _ ',�, DateBy: 1 I E A1i Inspection Line: 503.639.417 Date Ready/By: Juris: ® See Page 2 for •- - Internet: www.tigard- or.gov Notified/Method: Supplemental Information ,, TYPE OF WORK : ' COMMERCIAL FEE* SCHEDULE -'USE CHECKLIST Mechanical permit fees* are based on the value of the work ❑ New construction 0 Addition/alteration/replacement performed. Indicate the value (rounded to the nearest dollar) of all ❑ Demolition ❑ Other: mechanical materials, equipment, labor, overhead, and profit. CATEGORY OF CONSTRUCTION Value: $ 42C4449!" - . RESIDENTIAL EQUIPMENT I SYSTEMS FEES* J 1- and 2- family dwelling ❑ Commercial /industrial ❑ Accessory building For special information use checklist. ❑ Multi- family ❑ Master builder ❑ Other: Description p Qty. Ea. I Total • JOB SITE "INFORMATION 'AND LOCATION Heating/cooling Job site address: C ; �c ..5 , r , i , t 1 ,_ � t Air conditioning (requires site plan showing placement) l 46.75 City/State/ZIP: ' o Furnace 100,000 BTU (ducts/vents) 46.75 OP • �) ✓ Furnace 100,000+ BTU (ducts /vents) 54.91 Suite/bldg. /apt. no.: Project name: Heat pump 61.06 Cross street/directions to job site: Duct work 23.32 Hydronic hot water system 23.32 Residential boiler (radiator or hydronic) 23.32 Unit heaters (fuel -type, not electric), in -wall, in -duct, suspended, etc. 46.75 Flue /vent for any of above 23.32 Subdivision: Lot no.: Other: 23.32 Tax map /parcel no.: Other fuel appliances DESCRIPTION OF WORK - . Water heater 23.32 A4,1 A- • (_,- , Gas fireplace 33.39 Flue vent for water heater or gas fireplace 23.32 Log lighter (gas) 23.32 Wood/pellet stove 33.39 Wood fireplace /insert 23.32 I Chimney /liner /flue /vent 23.32 0 PROPERTY OWNER 1 . . ❑ TENANT . Other 23.32 Name: e ✓ e, / 2 r n a i. Environmental exhaust and ventilation Address: 7 f3 . S F 1 4 ; •. 11 l S Range hood/ot kitchen A, equipment 33.39 City /State /ZIP: / i� O2 Clothes dryer exhaust 33.39 S /� / Single -duct exhaust (bathrooms, Phone: ( ) Fax: ( ) toilet compartments, utility rooms) 23.32 • • -0 APPLICANT ❑ CONTACT PERSON Attic /crawlspace fans 23.32 Other: 23.32 Business name: Fuel piping Contact name: $14.15 for first four; $4.03 for each additional Address: Furnace, etc. Gas heat pump City /State /ZIP: Wall /suspended/unit heater Phone: ( ) Fax: : ( ) Water heater Fireplace E -mail: Range CONTRACTOR i, Barbecue Business name: // tt � ) 1 / t Clothes dryer (gas) r77 d' E- /i t''Pv i ✓• ;/' C_l > (] � � GtC; Other: Address: `7 / c � ` . • MECHANICAL!PERMITFEES *' ,• City /State /ZIP: /�-, � � e ,, 0/2 , e �c, _� c __„.„-- Subtotal o _ �/ / Minimum permit fee ($90.00) AO • � • Phone: (`"';?) -3 Fax: ( ) �,D �G10 -�.S .) Plan review (25% of permit fee) lfir CCB lic.: /7 / -- ,// // Z State surcharge (12% of permit fee) /0, gC TOTAL PERMIT FEE 14 ' 0 . gleil This permit application expires if a permit is not obtain id within 180 Authorized signature: � days after it has been accepted as complete. Print name: (f,., . ,. y r o .' Date: L j 2 -- c ` - ) cl * Fee methodology set by Tri- County Building Industry Service Board 1:t Building \Permits\MEC- PermitApp.doc 10/01/09 440 -4617T (1 I /02/COM/WEB) Mechanical Permit Application - City of Tigard Page 2 - Supplemental Information Commercial & Multi- Family Fee Schedule: Total Valuation: Permit Fees $0.00 to $500.00 Minimum fee $69.06 $500.01 to $5,000.00 $69.06 for the first $500.00 and $3.07 for each additional $100.00 or fraction thereof, to and including $5,000.00. $5,000.01 to $10,000.00 $207.21 for the first $5,000.00 and $2.81 for each additional $100.00 or fraction thereof, to and including $10,000.00. $10,000.01 to $50,000.00 $347.71 for the first $10,000.00 and $2.54 for each additional $100.00 or fraction thereof, to and including $50,000.00. $50,000.01 to $100,000.00 $1,363.71 for the first $50,000.00 and $2.49 for each additional $100.00 or fraction thereof, to and including $100,000.00. $100,000.01 and up $2,608.71 for the first $100,000.00 and $2.92 for each additional $100.00 or fraction thereof. Note: All new commercial buildings require 2 sets of plans. I:\ Building \Permits\MEC - PermitApp.doc 10/01/09 2 A e 025 c _ st.,) h; a Hu do(d-00/3?