Permit CITY OF TIGARD REROOF PERMIT
COMMUNITY DEVELOPMENT Permit RER2010 -00004
T t ,R.O 13125 SW Hall Blvd., Tigard OR 97223 503.639.4171
Date issued: 04/08/2010
Parcel: 1S135DD05106
Jurisdiction: Tigard
Site address: 11995 SW PACIFIC HWY
Subdivision: Lot: 0
Project: Bank of America
Project Description: Remove existing metal mansard roof and gutter, install new 24 gauge metal roof and gutter. No
work to done on the flat roof.
Owner: FEES
CCC PROPERTY MANAGEMENT LLC Description Date Amount
PO BOX 337 Permit Fee 04/08/2010 $652.31
WILLAMINA, OR 97396 12% State Surcharge - Building 04/08/2010 $78.28
PHONE: 503 - 876 -3086
Contractor:
BLAND CONSTRUCTION CO INC
PO BOX 1010
CANBY, OR 97013
PHONE: 503 - 266 -9492
FAX: 503 - 266 -9482
Specifics:
Type of Use: COM
Class of Work: OTR Type of Const:
Occupancy Load:
Stories: Height: 0 ft
General Information
Building Area: 0
Re -Roof Area: 0
Roof Class:
Tear Off:
Overlay:
Existing Roof Layers:
Parapets:
Total $730.59
Required Items and Reports (Conditions)
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done i - • •anc- • . •proved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
days. • TENTION: Oregon la -qui - ou to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952 101 -0010 through OAR 952-0 -0111. Y•- ay obtain a copy of the rules or direct questions to OUNC by calling 50 .246.6699 or 1.800. 344.
/
Iss ed By: e � P ermittee Signature: �
Call 503.639.4175 by 7:00 a.m. for an inspection that busihess day.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
Building Permit Application
Re -Roof For OFFICE USF. ONLY
City of Tigard Date /Bea •- / /O Permit No.: I
IN -
q 13125 SW Hall Blvd., Tigard, OR 97223 Plan Review OfO-
Phone: 503.639.4171 Fax: 503.598.1960 Date/ : Other Permit:
T I G A R D Inspection Line: 503.639.4175 Date Ready/By: la See Page 2 for
Internet: www.tigard - or.gov Notified/Method: gin Supplemental Information
TYPE OF WORK REQUIRED DATA: l- AND 2- FAMILY DWELLING
❑ New construction ❑ Demolition Permit fees* are based on the value of the work performed.
Indicate the value (rounded to the nearest dollar) of all
® Addition/alteration/replacement ❑ Other: equipment, materials, labor, overhead, and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
❑ I- and 2- family dwelling ® Commercial /industrial Valuation: $
❑ Accessory building ❑ Multi - family Number of bedrooms:
❑ Master builder ❑ Other: Number of bathrooms:
JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site address: 11995 SW Pacific Hwy New dwelling area: square feet
City /State /ZIP: Tigard, OR. Garage /carport area: square feet
Suite/bldg. /apt. no.: Project name: Bank of America Covered porch area: square feet
Cross street/directions to job site: SW Greenberg Rd. Deck area: square feet
Other structure area: square feet
REQUIRED DATA: COMMERCIAL -USE CHECKLIST
Subdivision: Lot no.: Permit fees* are based on the value of the work performed.
Tax map /parcel no.: 1S135DD05106 Indicate the value (rounded to the nearest dollar) of all
equipment, materials, labor, overhead, and the profit for the
DESCRIPTION OF WORK work indicated on this application.
Remove the existing metal mansard roof and gutter. Install new 24 gauge metal Valuation: $$42,650.00
roof and gutter. No work being done on the flat roof. Existing building area: square feet
New building area: square feet
® PROPERTY OWNER ❑ TENANT Number of stories:
Name: CCC LLC. Type of construction:
Address: PO BOX 337 Occupancy groups:
City/State /ZIP: Willamina, OR. 97396 Existing:
Phone: (503 )876 -3086 Fax: ( ) New:
❑ APPLICANT ►5 CONTACT PERSON NOTICE
Business name: Bland Construction Co. Inc. All contractors and subcontractors are required to be
Contact name: Bill Bland licensed with the Oregon Construction Contractors Board
under ORS 701 and may be required to be licensed in the
Address: PO Box 1010 jurisdiction in which work is being performed. If the
City /State /ZIP: Canby, OR. 97013 applicant is exempt from licensing, the following reasons
apply:
Phone: (503) 266 -9492 Fax: : (503) 266-9482
E -mail: bbland @canby.com
CONTRACTOR
Business name: Bland Construction Co. Inc. BUILDING PERMIT FEES*
Address: PO Box 1010 (Please refer to fee schedale)b ��
Structural plan review fee (or deposit): 175
City/State /ZIP: Canby, OR. 97013
Phone: (503) 266 -9492 Fax: (503) 266 -9482 FLS plan review fee (if applicable):
CCB lic.: 153898 0/11 Total fees due upon application: G}
Amount received: 0730 I
Authorized signature: This permit application expires if a permit is not obtained
within 180 days after it has been accepted as complete.
Print name: Bill Bland I Date: April 8, 2010 1 * Fee methodology set by Tri- County Ruilding Industry
City of Tigard: Re- Roofing Permit Checklist
Page 2 - Supplemental Information
RESIDENTIAL (One- & Two - Family Dwelling)
❑ REPAIR (major) plan review required by plans examiner:
building permit is required when structural changes are made or the space sheathing is
removed or replaced.
SUBMIT TWO (2) SETS OF PLANS SPECIFYING:
A. Roof area and nearest street.
B. Attic vents: Provide 1 sq. ft. for each 150 sq. ft. of attic space. Vents shall be
located in the upper 1/3 of the roof. Provide 1 sq. ft. for each 300 sq. ft. when
eave and attic venting is provided.
Note: No permit is required for residential re -roof if not more than two (2) layers of
roofing will exist upon completion of the re- roofing.
COMMERCIAL (includes multi- family and condominiums)
® RE -ROOF: Pre - inspection is required for all roofs sloped 2:12 and less. Please make
an appointment by calling the Building Division at (503) 718 -2439.
❑ PLAN REVIEW:
Note: Depending on the conditions noted at the pre- inspection, plans may be required
to address any non - conforming items.
VALUATION OF PROJECT: $ 42,650.00
sq. ft. 5500 of roof area
Permit Fee based on valuation: $
(see Building Permit Fees chart)
12% State Surcharge: $
65% Plan Review Fee: $
(Required for major repairs of residential and
special purpose roofing of commercial projects.)
TOTAL: $
C:\ Users \bill \Documents \ROOF- PermitApp.doc 2
I-4 vv "7 a c..)• 1, i‘ / ___
I [ / v .,/
7.=
i 4 /I
.
iti! /'
, 0 .
/
, .
. ,--
. :
G\
(r)
. .
. 1
0 ,....0,..._,............ , . _______...
• 2......._....,,, il ,r,
vl 1 1,
, ( ••
. 1
1 7Y-4,
. 1 4
A
\
___ _, -----------------
//) — - -
1
I (r , , tiv.,...„,..,,AL pA1,11. kAd 1 .
. ,
... , y
......_ 1.-I 1
,..,-.
Tc?;...t ,r — 77 . NJ .
' ■
. ,
4 • ! •
!
1 ,
70 ' fl
_ .. . . .
i
;
. 1
O A : NI ter.. Q r 1 ;`-,1 t C. iN ,/
I- 9 c ' -- ) S u_i! ••.4:-...(1..vc-' lc_ A „/ ....)
— 1
S.; 1
FrIci