Loading...
Washington County - BCC 00-696 Street Improvements (Walnut/121st) INTERGOVERNMENTAL AGREEMENT MAJOR STREET TRANSPORTATION IMPROVEMENT PROGRAM WALNUT STREET AT 121 ST AVENUE Water, Sanitary Sewer, Storm Drain Improvements Sz Underground Electrical Conduit Installation CITY OF TIGARD This Agreement is made and entered into by and between Washington County, a political subdivision of the State of Oregon, acting by and through its Elected Officials, hereinafter referred to as COUNTY, and the City of Tigard, a municipal corporation of the State of Oregon, acting by and through its City Council, hereinafter referred to as CITY. WITNESSETH ARTICLEI - RECITALS WHEREAS, on May 16, 1995, the voters approved a Major Streets Transportation Improvement Program - Six Year Serial Levy for Roads (MSTIP 3); and WHEREAS, improvements to Walnut Street at the intersection with 121sT Avenue (PROJECT) is included within the list of projects approved by the voters; and WHEREAS, in May 1997, the voters approved Measure 50, which converted the MSTIP3 levy to a part of the COUNTY permanent rate; and WHEREAS, on June 23, 1998, the Board of County Commissioners (BCC) adopted a revised schedule for construction of the MSTIP 3 projects and indicated its intent to proceed with the MSTIP3 projects on a revised schedule in light of the fiscal impact of Measure 50; and WHEREAS, by the authority granted by said MSTIP 3, the COUNTY may enter into cooperative agreements with various cities within Washington County for the performance of work on improvement projects with the allocations of costs and terms and conditions mutually agreed to by the parties; and FA...\dschamp\TIGARD UTIL IGA2.doc ] WHEREAS, ORS 190.010 authorizes agencies to enter into intergovernmental agreements for the performance of any or all functions and activities that.a party to the agreement has the authority to perform; and WHEREAS, CITY desires to install a 24-inch diameter water line for a distance of approximately 550 feet and a 12-inch diameter water line for a distance of approximately 525 feet along 1215'Avenue, and a 24-inch diameter water line for a distance of approximately 400 feet and a 12-inch diameter water line for a distance of approximately 850 feet along Walnut Street, said CITY water lines are hereinafter referred to as "Water lines" and are shown generally on the attached Exhibit "A"; and, WHEREAS, CITY desires to install an 8-inch diameter sanitary sewer line for a distance of approximately 500 feet along 1211 Avenue, and an 8-inch diameter sanitary sewer line for a distance of approximately 1,400 feet along Walnut Street, said CITY sewer lines are hereinafter referred to as "Sewer lines" and are shown generally on the attached Exhibit "A'; and, WHEREAS, CITY desires to install an 24-inch diameter storm drain line downstream of the PROJECT for a distance of approximately 1,200 feet east along Walnut Street from 116°i Avenue, said CITY storm drain lines are hereinafter referred to as "Storm Drains" and are shown generally on the attached Exhibit "A"; and, WHEREAS, CITY desires to install underground electrical conduits and vaults. (for use by Portland General Electric, PGE, under their franchise agreement with CITY) for a distance of approximately 1,000 feet along 1211 Avenue, and for a distance of approximately 1,800 feet along Walnut Street, together with underground conduits for conversions of service lines, said CITY power conduits are hereinafter referred to as "PGE conduits" and are shown generally on the attached Exhibit"A"; and, WHEREAS, CITY has requested that the Water lines, Sewer lines, Storm Drains and PGE conduits be added to the PROJECT, and CITY agrees to pay for such requested work; and, WHEREAS, under the cited authority, it is the mutual desire of COUNTY and CITY to enter into such an Agreement to cooperate in the design and construction of the Water lines, Sewer lines, Storm Drains and PGE conduits. NOW, THEREFORE, the premises being in general as stated in the foregoing recitals, and in consideration of the-terms, conditions and covenants set forth below, the parties hereto agree as follows: FA...\dschamp\TIGARD UTIL IGA2.doc 2 ARTICLE II -COUNTY OBLIGATIONS 1. COUNTY shall enter into and execute this Agreement during a duly authorized session of its Board of County Commissioners. 2. COUNTY shall, upon execution of this Agreement, assign a liaison person to be responsible for coordination of the PROJECT with CITY. 3. COUNTY shall perform or cause to be performed all actions necessary for design and construction of the above referenced water lines, sewer lines, storm drains and PGE conduits as part of the PROJECT, including design engineering, contract administration, construction engineering and inspection, and project management. COUNTY shall advertise for, award, and administer the construction contract. COUNTY shall be responsible for acceptance of contractor's work on behalf of CITY. 4. The COUNTY shall provide Water line, Sewer line, Storm Drains and PGE conduit plans to the CITY, and incorporate the Water line, Sewer line, Storm Drains and PGE conduits as specific bid item(s) in its bid documents for the PROJECT. The PROJECT, including Water lines, Sewer lines, Storm Drains shall be designed to meet City standards, and PGE conduits shall be designed to meet PGE standards. 5. COUNTY shall provide CITY with the opportunity for design review of 50%, 75% and final plans prior to bidding. 6. COUNTY shall, following bid opening, notify CITY of the amount the construction cost of the Water lines, Sewer lines, Storm Drains and PGE conduits as contained in the construction contract bid and provide CITY with the opportunity for review of the contract bid. 7. COUNTY shall provide inspection services for Water line, Sewer line, Storm Drain trench excavation and backfill, and CITY shall provide inspection services for Water line, Sewer line, Storm Drain and PGE conduit installation and acceptance testing. COUNTY shall notify CITY of Water line, Sewer line, Storm Drain and PGE conduit construction and be responsible for coordinating inspection and acceptance testing in accordance with Article III. 8. COUNTY shall perform actions regarding compensation as set forth in Article IV - Compensation. ARTICLE III - CITY OBLIGATIONS: 1. CITY shall enter into and execute this Agreement during a duly authorized session of the City Council. FA...\dschamp\TIGARD UTIL IGA2.doc 3 2. CITY shall, upon execution of this Agreement, assign a liaison person to be responsible for coordination of PROJECT with COUNTY. 3. CITY shall provide COUNTY with standard specifications for the construction of Water lines, Sewer lines, Storm Drains and PGE conduits. 4. CITY shall review plans and specifications for the Water lines, Sewer lines, Storm Drains and PGE conduits provided by the COUNTY. 5. CITY shall provide inspection and monitoring of the Water line, Sewer line, Storm Drain and PGE conduit installation in coordination with the COUNTY. CITY shall be responsible for all acceptance testing conducted by the contractor as specified. These services shall be provided at CITY expense. 6. CITY shall review plans and provide comments back to COUNTY within 10 workdays and review bids within 2 workdays. 7. CITY shall perform actions regarding compensation as set forth in Article IV - Compensation. ARTICLE IV— COMPENSATION 1. CITY shall pay to the. COUNTY the actual Water line, Sewer line, Storm Drain and PGE conduit construction cost, the additional construction cost to the PROJECT caused by inclusion of the Water lines, Sewer lines, Storm Drains and PGE conduits in the PROJECT, and the non- construction cost for the Water lines, Sewer lines, Storm Drains and PGE conduits. The Water line, Sewer line, Storm Drain and PGE conduit construction costs shall include the actual construction cost of applicable unit price contract items and an allocated share of the cost of applicable lump sum contract items (for example, traffic control, erosion control), and the cost for any extra work required for the Water line, Sewer line, Storm Drain and PGE conduit construction. The non-construction cost shall include the cost for design engineering, contract management, construction engineering and inspection, and project management, which shall be calculated as a fiat rate of ten (10) percent of the Water line, Sewer line, Storm Drain and PGE conduit construction cost (amount paid to the COUNTY's construction contractor for Water line, Sewer line, Storm Drain and PGE conduit work including extra work). FA...\dschamp\TIGARD UTIL IGA2.doc 4 The estimated construction cost of the Water lines is $580,760, the estimated construction cost of the Sewer lines is $482,690, the estimated construction cost of the Storm .Drains is $146,720, the estimated construction cost of the PGE conduits is $135,000, the additional construction cost to the PROJECT caused by inclusion.of the Water lines, Sewer lines, Storm Drains and PGE conduits in the PROJECT is estimated to be $1,045,170, and the .estimated non-construction cost for the Water lines, Sewer lines, Storm Drains and PGE conduits is $104,520 ($1,045,170 x 1:0 percent), for a total estimated cost for the Water lines, Sewer lines, Storm Drains and PGE conduits of $1,149,690. It is understood that the estimated costs are used to determine PROJECT budget and deposit amounts used within this Agreement. Final costs will be based on the actual bid amount of the schedule of prices and quantities used and installed. Final payments made by the CITY to the COUNTY related to this PROJECT shall be based on actual bids and construction costs. 2. CITY shall, no later than 7 days prior to bidding letting, deposit with the COUNTY an amount equal to 10 percent of the estimated cost of the Water lines, Sewer lines, Storm Drains and PGE conduits or $114,970 ($1,149,690 x 10 percent). 3. COUNTY shall, at least once each calendar quarter,. prepare and submit invoices to the CITY in sufficient detail and in a form acceptable to the CITY for the cost of Water lines, Sewer lines, Storm Drains and PGE conduits work in excess of the CITY deposit. COUNTY shall, within 90 days after completion of the PROJECT, prepare and submit a final statement of expenditures to the CITY. Final payment will be based on actual quantities determined as provided by the specifications. 4. CITY shall pay COUNTY for Water line, Sewer line, Storm Drain and PGE conduit costs as billed within thirty (30) days after receipt of COUNTY billing. ARTICLE V -GENERAL PROVISIONS 1. Laws of Oregon The parties agree to abide by all applicable laws and regulations regarding the handling and expenditure of public funds. This Agreement shall be governed by the laws of the State of Oregon. All provisions required by ORS Chapter 279 to be included in public contracts are hereby incorporated by reference and made a part of this Agreement as if fully set forth herein. FA...\dschamp\TIGARD UTIL IGA2.doc 5 2. Default Either party shall be deemed to be in default if it fails to comply with any provision of this Agreement. City and County agree time is of the essence in the performance of any of the obligations within this Agreement. Complaining party shall provide the other party with written. notice of default and allow thirty (30) days within which to cure the defect, City shall pay the County for costs'incurred for satisfactorily completed and authorized work up to the time of default. Each party shall be liable for all costs and damages arising from default by the other party. 3. Indemnification This Agreement is for the benefit of the parties only. Each party agrees to indemnify and hold the other harmless, to include their respective officers, employees, agents and representatives, from and against all claims, demands and causes of actions and suits of any kind or nature for personal injury, death or damage to property on account of or rising out of services performed, the omission of services or inany way resulting from the acts or omissions of the parties so indemnifying and/or its officers, employees, agents or representatives. Indemnification is subject to and shall not exceed the limits of liability of the Oregon Tort Claims Act (ORS 30.260 through 30.300). In addition, each party shall be responsible for any contract claims, delay damages or similar items caused by the action or inaction of the party. 4. Documents are Public Property All records, reports, data, documents, systems, and concepts, whether in the form of writings, figures, graphs, or models which are prepared or developed in connection with this PROJECT shall become public property. 5. Modification of Agreement No waiver, consent, modification or change of terms of this Agreement shall bind either party unless in writing, signed by both parties. Such waiver, consent, modification or change, if made, shall be effective only in specific instances and for the specific purpose given. 6. Dispute Resolution The parties agree to use their best efforts to resolve any dispute arising out of this Agreement by mediation. If mediation is not successful, the dispute.shall be settled by binding arbitration conducted by the Arbitration Service of Portland, Inc., and judgment upon the award rendered by the arbitrator may be entered in any court having jurisdiction thereof. The arbitration shall be before a single arbitrator. The cost of arbitration shall be shared equally; provided, however, FA...\dschamp\TIGARD UTIL IGA2.doc that the arbitrator may award costs and fees to the prevailing party. The arbitration shall be held within 60 days of selection of .the arbitrator unless otherwise agreed to by the parties. 7. Severability The parties agree that if any term of provision of this agreement is declared by a court to be. illegal or in conflict with .any law, the validity of the remaining terms and provisions shall not be affected, so long as this agreement continues to reflect the intent of the parties. In the event the intent of the parties is not carried out by the severed agreement, the parties shall negotiate an equitable adjustment of this agreement so that purposes of this agreement are given effect. 8. Nondiscrimination No person shall be denied or subjected to discrimination in receipt of the benefits of any services or activities made possible by or resulting from this Agreement on the grounds of race, color, religion, gender, sexual orientation, national origin, disability, age or marital status. Any violation of this provision shall be considered a material defect and shall be grounds for cancellation, termination or suspension in whole or in part by the County. 9. Integration This Agreement includes the entire agreement of the parties and supersedes any prior discussions or agreements regarding the same subject. There are not understandings, agreements, or representations, oral or written, not specified herein regarding this contract. ARTICLE VI -TERM OF AGREEMENT 1. The term of this Agreement shall be.from the date of execution for three years or until completion of all obligations, whichever is later. 2. This Agreement may be amended or extended for periods of up to one year by consent of the parties, subject to provisions of this Agreement. Except for breach, it may be canceled or terminated for any reason beyond the control of the parties. IN WITNESS WHEREOF, the parties hereto have set their hands and affixed their seals as of the day and year hereinafter written. F:\...\dschamp\TIGARD UTIL IGA2.doc 7 j DONE AND DATED this day of , 2000. WASHINGTON COUNTY, OREGON CITY OF TIGARD Chair, Board.of Commissioners ity Manager. Recordin Secr a APPROVED L^ ASHINGTC)N'COU10y' g ry BOARD OF C;omMISSION[/F�RS IZNUTE ORDER 6 ...��.. .�D je leleel111eFtett 1L ................... ... .:..-�.. ......... DATEeeueu�euxttnttt APPROY913,AS TO FO M: Loretta . SkurdNi Senior Assistant County Counsel F:\...\dschamp\TIGARD UTIL IGA2.doc 8 100 50 0 100 200 UNITS IN METERS SCALE: 1 : 4000 "- -.... _......... w....._.. , , r . ' f .....:.... Y ;l [. Jr•. z - r .............. ....„ S.W. ANN ? ? _.. _.... _..._. _ . _. ...... ........._.. f ..SIR.. . ? ELECTRI ` _.._.._. ; CONDUITS f r ' s f ; : • t. n. ..-......... 1 f "-f3........�...�: �. ST. 41i.' .. .._... ELECTRIC 1 r cf CONDUIT J „ NATER-f OFFSI _ f _-... �f LINE TORM � 1...... ...............r..,-.... ' ,r . fy, , -WATER _._._.........� r „.. µ.SI ._....__._. f h-' LINE ...._ . j' vf£ t r� F Li� y ! ........ # � t2 -�3f # 1 „ �. f J � i ' ANITARY ` r ' SEWER „„„... r a i S.W. TIFf�I'fT ; CARM _._. S.W. EN ST. „_„M..... __._... m, _... i S.W. WALNUT STREET SHEET PROPOSED UTILITY LOCATIONS 1 EXHIBIT "A” DRAWING OF PROJECT s , NM � WPWXEX WPWXOOT3 1 : 4000 0.0 DRANK BY DESIGN BY APPROYm BY DATE DEM KRW KRW 6-12-00