Loading...
ODOT - Traffic Signal (Durham/Upper Boones Ferry) i Approved. L. E. George MCH:pf 3/10/82 Misc. Contracts & Agreements No. 7546 CONSTRUCTION-FINANCE AGREEMENT TRAFFIC SIGNAL INSTALLATION THIS AGREEMENT is made and entered into by and between the STATE OF OREGON, acting by and through its Department of Transportation, Highway Division, hereinafter referred to as "State and the CITY OF TIGARD, a municipal corporation of the State of Oregon, acting by and through its City Officials , hereinafter referred to as "City". 1.1 I T IN E S S E T HL 'r'1 1 I f Y � J J ,.. I f1 RECITALS 1 . The Beaverton-Tualatin Highway, State Secondary Highway No. 141 , is a part of the state highway system under the jurisdiction and control of the Oregon Transportation Commission, and Upper Boones Ferry Road is a part of the city street system under the jurisdiction and control of the ' /411.. vl yli.,.. 41t.J street Luh.. ��—/�L��� under l.��a.. Jy111 ..rV 1�..�..�V11 41.V control Va vi 1.11... City of Tigard. 2. State and City, in their judgement, have deemed it necessary and desirable in order to maintain a safer and more expeditious flow of traffic, to install traffic control signal equipment on the Beaverton-Tualatin High- way (Durham Road at Upper Boones Ferry Road) , hereinafter referred to as Hproject" . 3. By the authority granted in ORS 366.770 and 366.775, State may enter into cooperative agreements with the various counties and cities for he performance of work on certain types of improvement projects with t he allocation of costs on terms and conditions mutually agreeable to the contracting parties. Traffic signal work on the project shall conform to the current state standards and specifications. 4. By the authority granted in ORS 487.850, State is authorized to determine the character or type of traffic control signals to be used, and to place or erect them upon state highways at places where state deems vV place v1 erect yliLill urV11 state 11 �y11v.u�..r MV places where L .J VU I.L deems .J necessary for the safe and expeditious control of traffic. No traffic con- trol signals shall be erected or maintained upon any state highway by any authority other than State, except with its written approval . NOW, THEREFORE, the premises being in general as stated in the foregoing RECITALS, it is agreed by and between the parties hereto as follows : STATE OBLIGATIONS 1 . State shall , at City expense, assign a liaison engineer to monitor all work performed by City, or its contractor, on the Beaverton-Tualatin Highway, and to provide intermittent inspection services during the con- struction phase of the project to assure conformance with State standards and specifications for highway construction. 2. State shall issue the necessary permits for work by others to be performed within state highway right-of-way, and shall review and approve all plans and specifications prepared by City, or its Consultant, prior to any work proceeding within state highway .jurisdiction. 3. State shall , upon completion of the project, perform all necessary maintenance for operation of the traffic signal equipment installed on the Beaverton-Tualatin Highway, retain complete jurisdiction and control of the timing established for said traffic signals and maintain that portion of the roadway lying within state highway jurisdiction, at its own cost and no expense to City. CITY OBLIGATIONS 1 . City shall , at its sole cost and no expense to State, conduct the necessary field surveys and traffic investigations , identify and obtain all required permits , right-of-way and easements, perform all preliminary engi- neering and design work required to produce plans and contract documents , advertise for bid proposals, award all contracts, and furnish all construction engineering, field testing of materials , technical inspection and resident engineer services for administration of the contract. No work shall proceed on the state highway portion of the project until City has obtained State approval of the plans and specifications , and the required State permits . 2. City shall , upon request by State, reimburse State for 100 percent of the actual costs incurred by State on behalf of the project. 3. City shall , upon completion of the project, accept all responsibility for, and pay all costs of, electrical energy consumed in operation of the traffic signal equipment installed on 'the Beaverton-Tualatin Highway. City shall 'provide State with reproducible Federal Aid size mylar sheets of the 'As Constructed' drawings of the project and wiring diagrams , operation manuals and all data pertinent to maintenance of the traffic signal system. -2- I 4. City shall adopt a resolution authorizing its designated City Officials to enter into and execute this agreement, and the same shall be attached hereto and become a part hereof. i IN WITNESS WHEREOF, the parties hereto have set their hands and affixed � their seals as of the day and year hereinafter written. City has acted in this natter pursuant toRday No. Jaz -3 d adopted by its City Council on the y of 1982. The Oregon Transportation Commission, by a duly authorized delegation order, authorized its Chairman or Vice Chairman to act in its behal# in approving this agreement. Approval was given for this agreement on r' ! �-� t q by CHAIRMAN ANTHONY YTURRi whi c approval is on file in the Commission records. The delegation order also authorizes the State Highway Engineer to execute the agreement on behalf of the Commission. APPRO ECOKIENDED STATE OF OREGON, by and through its Department of Transportation, Highway ivision Region Engineer �--=- By Statt Highway Engineer Date 4z--,= /?ti.— CITY OF TIGARD, by and through its City Officials By Mayor By i tLyyR e i i i I -3- • f ,,..Te•a Ta nawwe, j Ix. / O 14 w,••,. Is 1. uuj: J tiff O rl 1 At e + 7ZAL.fTL.V .� ; j �\t �'I 3 \ 1 Of O1 ��p � \\ 2 f .S �•1. ~U' QI C t + 31 A w. wewo T n ,ozw i • ' �____��_as' .- - - -,.�..-r w cn���n rr', x.r.— ! I - vrrRfow�..i....zgT:s + ti 44 J�a� llili�SJL11:-s u,.cou•[T.,.vcl :4 a. wwsw,rgTaR sr� ..i. C rte_ r I f IIRItT ' TU•LATIN i •oo^.i � I! � I I z ..ww•r w r. I 1 � •t.f[Ra R r � MYf R RO- ,.T 1 1•• I pldJ ` l—TCM TO ry•LwnM 1 S442NEG ROUTES LEGEND DURHAM 1 WASHINGTON.CO.. OREGON WTrwsT•T[ O ■ Mf1 011rtr Nblik atlq- ..,.• `•-City K.11 s<t.ol of[oaR rT•T[,.,t:I.w•T o[••wrrc••* R R p.ye• ,_2"°•T w.sw d..4�c�.R«K• -LihemT SR+.1 d.tl .d b.,1e,+G.R ►•M•:.. 711 I!r 1 --� fitly 4mn. kdf r le+• ml 19" CITY OF TIGARD, OREGON RESOLUTION NO. 82-2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TIGARD, OREGON, AUTHORIZING THE MAYOR AND CITY RECORDER TO EXECUTE A TRAFFIC SIGNALIZATION AGREEMENT. IMEREAS, it has been determined by the City Council that it is in the best interest of the public for the City to implement insrall.ation of a traffic con- trol signal on S.W. Durham Road at Upper Boones Ferry Road; and WHEREAS, the State of Oregon, acting by and through its Department of Transportation, Highway Division, and the City of Tigard, Oregon, can provide, , through an Agreement, the most efficient means of accomplishing said installa- tion. NO1,4 THEREFORE, BE IT RESOLVED BY THE CITY OF TIGARD THAT: The Mayor and City Recorder are hereby authorized to execute an agreement between the State of Oregon and the City to facilitate installation of said signal. APPI.OVED: This � � day of March, 1982. Mayor - City of Tigard ATTEST: City Recorder - C' of Tigard RESOLUTION No. 82- � A" 3-1 V- Department of Transportation METROPOLITAN BRANCH VICTOR ATIYEH OOVE/lllOn 5821 N.E. GLISAN, PORTLAND, OREGON 97213 - March 17, 1982 In Reply Refer to File No. Frank Curri,e:, 'Publi.c. Works Director 10068 City of Tigard P.O. Box 23397 Tigard, OR 97223 Subject: PROPOSED AGREEMENT Project Name: Beaverton-Tualatin fty...(Durham Rd...@,Upper Boones Fy. ) Funding: Local .City: Tigard Attached are three bound copies and one unbound information copy of a proposed agreement covering a traffic signal to be installed_ on Durham Road at Upper Boones Ferry Road. Would you please review this with your staff and with other affected City personnel , and if it is satisfactory, arrange for an ordinance or resolution .authorizing . execution by the proper City officials. The bound, signed copies should be returned to me at this office along :with a copy of the :authorizing -document. You :may retain the information copy. Following final action-.by the Highway .Division:, you will be sent -a fully executed copy for your records.. Remarks: I urge you to act on this as soon as possible to avoid delays in the project. If you have any questions, please call . S ON ROSE Federal Aid Specialist JR:po Attachments (4 copies, Agreement) cc: Region 1 Approved: L. E. George MCH:pf 3/10/82 Misc. Contracts & Agreements No.. 7646 CONSTRUCTION-FINANCE AGREEMENT TRAFFIC SIGNAL INSTALLATION THIS AGREEMENT is made and entered into by and between the STATE OF OREGON, acting by and through its Department of Transportation, Highway Division, hereinafter referred to as "State"; and the CITY OF TIGARD, a municipal corporation of the State of Oregon, acting by and through its City Officials, hereinafter referred to as "City". WITNESSETH RECITALS 1 . The Beaverton-Tualatin Highway, State Secondary Highway No. 141 , is a part of the state highway system under the jurisdiction and control of the Oregon Transportation Commission, and Upper Boones Ferry Road is a part of the city street system under the jurisdiction and control of the City of Tigard. 2. . State and City, in their judgement, have deemed it necessary and desirable in order to maintain a safer and more expeditious flow of traffic, to install traffic control signal equipment on the Beaverton-Tualatin High- way (Durham Road at Upper Boones Ferry Road), hereinafter referred to as "project" . 3. By the authority granted in ORS .366.770 'and 366.775, State may enter into cooperative agreements with the various counties and cities for the performance of work on certain types of improvement projects with the allocation of costs on terms and conditions mutually agreeable to the contracting parties. Traffic signal work on the project shall conform to the current state standards and specifications. 4. By the authority granted in ORS 487.850, State is authorized to determine the character or type of traffic control signals to be used, and to place or erect them upon state highways at places where state deems necessary for the safe and expeditious control of traffic. No traffic con- trol signals shall be erected or maintained upon any state highway by any authority other than State, except with its written approval .. NOW, THEREFORE, the premises being in general as stated in the foregoing RECITALS, it is agreed by and between the parties hereto as follows: STATE OBLIGATIONS 1 . State shall , at City expense, assign a liaison engineer to monitor all work performed by City, or its contractor, on the Beaverton-Tualatin Highway, and to provide intermittent inspection services during the con- struction phase of the project to assure conformance with State standards and specifications for highway construction. 2. State shall issue the necessary permits for work by others to be performed within state highway right-of-way, and shall review and approve all plans and specifications. prepared by City, or its Consultant, prior .to any work proceeding within state highway jurisdiction. 3. State shall ,. upon completion of the project, perform all necessary maintenance for operation of the traffic signal equipment installed on the Beaverton-Tualatin Highway, retain complete jurisdiction and control of the timing established for said traffic signals and maintain that portion of the roadway lying within state highway jurisdiction, at its own cost and no expense to City. CITY OBLIGATIONS 1 . City shall , at its sole cost and no expense to State, conduct the necessary field surveys and traffic investigations, identify and obtain all required permits, right-of-way and easements, perform all preliminary engi- neering and design work required to produce plans and contract documents , advertise for bid proposals, award all contracts, and furnish all construction engineering, field testing of materials, technical inspection and resident engineer services for administration of the contract. No work shall proceed on the state highway portion of the. project until City has obtained State approval of the plans .and specifications, and the required State permits. 2. City shall , upon request by State, reimburse State for 1.00 percent of the actual costs -_incurred by State on behalf of the project. 3. City shall , upon comp Ietion of the project, accept all responsibility' for, and pay all costs of, electrical energy consumed- in operation. of the traffic signal equipment installed on the Beaverton-Tualatin Highway. City shall 'provide State with reproducible Federal Aid size mylar sheets of the 'As Constructed' drawings of the project and wiring diagrams, operation manuals and all data pertinent to maintenance of the traffic signal system. -2- 4. City shall adopt a resolution authorizing its designated City Officials to enter into and execute this agreement, .and the same shall be attached hereto and become a part hereof. IN WITNESS WHEREOF, the parties hereto have set their hands and affixed their seals as of the day and year hereinafter written. City has acted in this matter pursuant to Resolution No. ?,� •d o , adopted by its City Council on the a day of M a , 1982• The Oregon Transportation Commission, by a duly authorized delegation order, authorized its Chairman or Vice Chairman to act in its behalf in approving this agreement. Approval was given for this agreement on 1 Z L eL by CHAIRMM ANTHOBY VMR81 whic approval is on fie in t e Commission records. The delegation order-also authorizes the State Highway Engineer to execute the agreement on behalf of the Commission. APP RECO (ENDED STATE OF OREGON, by and through its Department of Transportation, Highway ivision egion Engineer By - - Sta Highway Engineer Date CITY OF TIGARD, by and through its City Officials By GC yor By My Recorder -3- I WATCH TO nCA■OI w a aI a x titi —101 1 11 i ■GAO{.y: q Is If r • {�. '�I If UIU w Z J : SAO Y v W p! { NA ■ • � I t e4P Z N jI W xu •\`• • Z j- ��Ar��S'_ r1 I � 00•I<ee{q w A A TI 110A0 -.12 w-ra„n 1 1____-__ss •- ?wT.Lw�murini �� I dPP a u— ee. I �S Y.►. N.W. 1 I 'a ■. s ORANT D OLN■T.N.WI_..,.. In - iyq� o WA■NINOTCNeT,' .� .N CE.... I R p = u I 1 ''�J a s rc■■r p TUALATIN 4 1 I Y C or N i NO. ,{NOIl I O� ■o P 1 MATCN r0 7UALAnN 1 SIGNED ROUTES LEGEND DURHAM WASHINGTON CO.. OREGON INsa■■TAT■ O + poo 011ie 6 Public Bldg. i 8cheol cr-City Mau CNEGON STATE HIGHWAY b{►ANTYENT uJ. 00 er-CeuN Ibuee ow[. moire-t S N.E.D{pw ,-A,.-y v -UbearP wuw w--.c SGe{1 open far hovel. ......:: Saeel dedlcald bul not open, papeMNYI j191fI..� -__ GIT Umn{ U.I. on No UAT 19" CITY OF TIGARD, OREGON RESOLUTION NO. 82- A RESOLUTION OF THE CITY COUNCIL OF THE CITY.OF 'TIGARD, OREGON, AUTHORIZING THE MAYOR AND CITY 'RECORDER TO EXECUTE A TRAFFIC SIGNALIZATION AGREEMENT. WHEREAS, it has -been determined by the City Council that it is in the best interest of the public for the. City to implement installation of a traffic con- trol signal on S.W. Durham. Road. at Upper Boones Ferry Road; and WHEREAS, the State of Oregon, acting by and through its Department of Transportation, Highway Division, and the City of Tigard, Oregon, can provide, through an Agreement,. the most efficient means of accomplishing said installa- tion. NOI, THEREFORE, BE IT RESOLVED BY THE CITY OF TIGARD THAT: The Mayor- and City Recorder are hereby authorized to execute an agreement between-the State of Oregon and the City to facilitate installation of said signal. APPROVED: This �2 r1 day of March, 1982. Mayor - City of Tigard ATTEST: �i - City Recorder - Cof Tigard RESOLUTION ..No., 82- RECEIVED Department of Transportation MAY 3 1982 VICTOQ.ATIVEH TRANSPORTATION BUILDING, SALEM, OREGON 97310 CITY OF TIGARD aOYBVbR April 29, :1982- IN REPLY REFER TO City of.Tigard FILE NO.: City Hall Tigard; OR 97223 AGR 4-1 Attentio.n: t Doris Hartig City Recorder Gentlemen or Ladies: Attached for your files is a fully .executed copy of an agreement -for installation-of traffic signals, on the Beaverton Tualatin Highway.. at Upper. Boones Ferry Road in Washington County. We are retaining a fully executed copy of this agreement for the Transportation Commission's files. Sincerely, _ .■C� s.or,,. Robert W. Go sen CONMISSIM-SERVICES - Attachment 4 . 731-0146 - - circ CITYOFTWARD WASHINGTON COUNTY,OREGON March 31, 1982 .Ton Rose, Federal Aid Specialist Department of Transportation 5821 N.E. Glisan Portland, Oregon 97213 Re: Durham Rd at Upper Boones Ferry Road traffic signal installation Dear Mr. Rose: Enclosed are three bound copies of a proposed agreement covering A traffic signal to be installed on Durham Road at Upper Boones Ferry Road; along with a copy of Resolution No. 82-30. Tigard City Council at their March 29, 1982, meeting authorized the signatures of the Mayor and City Recorder. After execution on behalf of Department of Transportation, Highway Division, please return a fully executed copy for our records. Thank you for your assistance in this matter. Sincerely yours, Doris Hartig City Recorder/Finance Director DH:lm Enc. 12755 S.W.ASH P.O. BOX 23397 TIGARD,OREGON 97223 PH:639-4171