Loading...
ODOT - Traffic Signal (Scholls Ferry/121st) Department of Transportation IN REPLY REFER TO FILE NO: ROBERT W. STRAUS TRANSPORTATION BUILDING, SALEM, OREGON 97310 WVEtM(M January 25, 1979 ✓City of Tigard Mr. William M, Fink City .Hall Project Superintendent Tigard', OR 97223 L. B. Nelson Construction Corp. 10255 Conestoga Drive Attn: Doris Hartig Beaverton, OR 97005 City Recorder Mr. Cy Penn RECEIVi;-' Portland Fixture Company 338 N.W. 5th Avenue . JAN 2 9 "iy/y Portland, OR 97209 01 o- TIGAR Gentlemen: Attached for your files is a fully executed copy of an agreement between the State of Oregon, Department of Trans- portation, Highway Division; the City of Tigard; the Portland Fixture Company; and L. B. Nelson"Construction Corporation. This agreement---c9vers installation of traffic signals on the �l holls Highway at S.W 121st^A.,venue to accommodate a new eve opme We are retaining a fully executed copy of this agreement for the Transportation Commission's files. Very truly yours, Is"W. C. W. Head COMMISSION SERVICES kkr Attachment FORM 731-0027 z ` RECEIVE® � DEC 2 Department of Transportation 4 1979 HIGHWAY DIVISION CITY OF TIGARD VICTOR ATIVEH TRANSPORTATION BUILDING, SALEM, OREGON 97310 00VEIIIIOR December 20, 1979 In Reply Refer to File No.: L. B. Nelson Construction Corp. Portland Fixture Company 10255 S.W. Conestoga Drive 338 N.W. 5th Avenue Beaverton, Oregon 97005 Portland, Oregon 97209 Attn: Mr. Tom Hollenbeck Attn: Mr. Cy Penn Project Supervisor City of Tigard City Hall Tigard, Oregon 97223 Attn: Doris Hartig City Recorder Gentlemen: On December 20, 1979 a satisfactory bid was received from Grazle, W. R. , Co. , P.O. Box 4123, Portland, Oregon 97208 for installation ofGraff c signaYs on'"Scholls Highway at S--.V--12-1 t! (Tigard) Section. `-Tie advance-deposit"]Yased-bin e anticipated construction cost of their bid is as follows: Bid Items $36,996.00 Permanent Pavement Striping 700.00 State Furnished .Traffic Signal Equipment 17,200.00 Signal Controller Testing (Engineering) 1,080.00 Fire Pre-Emption Testing (Engineering;) 805.00 4 1/2% Contingencies 2,555.15 10% Engineering 5,678..10 .ESTIMATED TOTAL .COST $65,014.25 L. B. Nelson Construction'Corporation's Advance Deposit: 24� of $65,014.25 = $15,603..42 or say $15,.600.00 Portland Fixture Company's Advance Deposit: 76% of $65,014.25 = $49,410.83 or say $49,400.00 This project will be awarded upon receipt of your advance de- posit, which should be in this office no later than January 11, 1980. Form 734.3122 T L. B. Nelson Construction Corp. & Portland Fixture Company & .City.of Tigard December 20, 1979, Page 2 Please make your check payable to the Oregon State Highway Division. Send .the check to .Highway Accounting, Room 434, Trans- portation Building, Salem, .Oregon 97310. Very truly yours, D.Q. Swan OperationProgramming Engineer FFH:pf CITY OF -TIGARD, OREGON RESOLUTION No. 78�. A RESOLUTION AUTHORIZING THE MAYOR AND CITY RECORDER (pro-tem) TO SIGN 'A _ CONTRACT FOR COOPERATIVE CONSTRUCTION - FINANCE AGREEMENT TRAFFIC SIGNAL INSTALLATION AT 121ST AVENUE & SCHOLLS FERRY ROAD. WHEREAS, the Tigard City Council has determined that it is. necessary to sign a contract for Cooperative Construction - Finance Agreement for traffic signal installation at the intersection of S.W. .121st Avenue and Scholls Ferry NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF TIGARD THAT: . Section 1: The Mayor and City Recorder pro-tem are hereby authorized to enter into an agreement for the installation of traffic signal at the intersection of 121st Avenue and Scholls Ferry Road with the Department of Transportation Portland Fixture Company and L. B. Nelson Construction . Corporation. . DATED: This Ic day of xaa st , 1918. Mayor ATTEST: i / ecorder ro-Ter„ sl _RESOLUTION No. 78- r � • Approved: L. E. George MCH:pf 8/29/78 Misc. Contracts & Agreements No. 6738 COOPERATIVE CONSTRUCTION-FINANCE AGREEMENT TRAFFIC SIGNAL INSTALLATION THIS AGREEMENT is made and entered into by and between the STATE OF OREGON, acting by and through its Department of Transportation, Highway Division, hereinafter referred to as "State"; the CITY OF TIGARD, a municipal corporation, acting by and through its City Officials, hereinafter referred to as "City"; the PORTLAND FIXTURE COMPANY,, a firm authorized to conduct business in the State of Oregon, acting by and through its Company Officers, hereinafter referred to as "Company"; and L. B. NELSON CONSTRUCTION CORPORATION, an Oregon corporation, acting by and through its Corporate Officials, hereinafter referred to as "Corporation" WITNESSETH RECITALS 1 . For the purpose of providing adequate access -to a proposed development on property owned.or controlled by Company and Corporation, State, City, Company and Corporation plan and propose to install traffic control . signal equipment at the intersection of the Scholls Highway, State Secondary Highway No., 143, and S.W. 121st Avenue, lying within the corporate limits of the City of Tigard. .Hereinafter, all acts necessary to effectively accomplish said installation shall be referred to as "project".. 2. By the authority granted in ORS 487.850, State is authorized to determine the character or type of traffic control signals to be used, and to place or erect them upon state highways at places where state deems necessary for the safe and expeditious control of traffic. No traffic control signals shall be erected or maintained upon any state highway by any authority other than State, except with its written approval . 3. By the authority granted in ORS 366.425, State may accept deposits of money from any person, firm or corporation for the purpose of locating, grading, surfacing or performing other work upon any public highway within the State. When the moneys are so deposited, the State shall -proceed with the proposed project.. 4. By the authority granted in ORS J75 and ORS 373.030, State and City may enter into agreements for the construction, reconstruction, improve- ment or repair of any street, highway or road; and State may, with the consent of City, change the grade of any highway or road over which state highway ,traffic is routed. NOW, THEREFORE, the premises being in general as stated in the fore- going RECITALS, it is agreed by and between the parties hereto as follows: THINGS TO BE DONE BY STATE 1 . State shall , at Company and Corporation expense, perform all preliminary engineering, prepare the plans andcontract documents, advertise . forbids, award .all contracts, and surpervise construction of the project. 2. . Upon completion of the project, State shall , at its own expense, thereafter perform all necessary ma'intenance',operations for the traffic control signal equipment, 3. The work may be accomplished by the use of state forces, by. contract or by a combination of these methods, as State shall elect. 4. State shall compile accurate cost accounting records .and, upon completion of the project submit to Company and Corporation, an itemized statement of the actual total cost of the traffic signal installation, including preliminary and construction engineering, design work., contractor payments and all contingency items. THINGS TO BE DONE BY CITY 1 .. City shall , upon completion of the project, assume the responsibility for, and pay all costs of electrical energy consumed by operation of the traffic control signals. 2. City shall make no changes in the timing program established fore operation of the traffic signals without prior approval of State. 3. City shall adopt a resolution authorizing its Mayor and City'Recorder to enter into this agreement and the same shall be attached hereto and become a . part hereof. THINGS TO BE DONE BY COMPANY 1 . Company shall , prior to commencement of any preliminary engineering work by State, deposit with State a sum of money equal to 76 percent of the total estimated cost of preliminary engineering and preparation of plans, specifications and estimates. 2. Company shall within 30 days following the opening of bids, deposit with State a sum of money -equal to 76. percent of the' total estimated cost of the project. No .contract, shall be. awarded or work commence until said advance deposit has been received by State. If the low; bld. is more than 10: percent. over the engineer's estimate, Company shall .have the-right to request State to reject all bids. Upon completion of the project and receipt from State of an itemized statement, Company shall pay any costs which, when added .to Company's advance (2) deposits, shall_ equal 76 percent of the total actual cost of the project, including preliminary and construction engineering, contractor payments and all contingency items. Any, portion of said advance deposits which is in excess of Company's agreed share shall be refunded to Company. THINGS TO BE DONE BY CORPORATION 1 . Corporation shall;, prior to commencement of any preliminary engineering work. by State,, deposit with State a sum of money equal to 24 per- cent of the total estimated cost of. preliminary engineering and preparation of plans, specifications anir estimates. 2. Corporation shall .within 30 days following the opening of bids, deposit with State a'sum of money equal to 24 percent of the total estimated cost of the project. No contract shall be awarded or work commence until said advance deposit has been received by State. If the low bid is more than 10 percent over the engineer's estimate, Corporation shall have the right to, request State to reject .all bids. Upon completion of the project and receipt from State of an itemized statement, Corporation shall pay any costs which, when added to Corporation's advance deposits, shall equal 24 percent of the total actual cost of the project, including preliminary and construction engineering, contractor payments and all contingency items. Any portion of said advance deposits which is in excess of Corporation agreed share shall be refunded to Corporation. GENERAL PROVISIONS 1 . Provisions of State. and Federal laws governing public contracts and agreements of this type are hereby incorporated by reference as if fully set forth herein. (3) 2. The parties hereto agree and understand that a. mutual review of the plans, specifications and estimates shall be conducted to the satisfaction of all parties prior to advertisement for bads on the project. IN WITNESS WHEREOF, the parties have set their hands and affixed their seals as of the day and year. hereinafter written. City Officials have acted in this matter pursuant to Resolution No, ►7 '17 adopted by its City Council on the o2„5- day of �� — 979 "8— The Oregon Transportation Commission,. by a duly adopted delegation order, authorized its Chairman or 'Vice-Chairman to act in itsi behalf in approving this agreement. Approval was given for this agreement on aanu m% 7-2v !4_7_2_ by CHAIRMAN JACKSON ., whith approval is on file in the Comm ss on record s. e delegation order also authorized the State Highway Engineer to execute the agreement on .behalf of the Commission. APPROVED STATE OF OREGON, by and through its d Department of Transportation, Highway 'Division Ma ager, Office of Technical Services Stat . Highway Engineer_ PORTLAND FIXTURE COMPANY, by fnd through ij�s4ompany Officers CITY OF TIGARD, by and through its its City Officials ByJW By yd6� Title Mayor L.B. NELSON CONSTRUCTION CORP. , by and through its Corporate Officals By City ecor er By 67 Ti e APPRO ECOMMENDED Region Engineer (4) k ----_ BEAVERTON /s y a 1 aE as O M1.0. / Tr TL NMI 1. ,Y I i w llD.w 1LL�pr R!S!'RYO/ q _ lAl. 1 - AVE. --p4IWMLNITA6IJ ---r----./ w IT. -- R!d!'RYWR t B.W.DAKOTA IT. N S.W. 16NT{ 6 i -- B.W.{IAW / j• ; \� 9JQ' �Et4 qO T .. S.w.L MANt RIYl1R 34 KATN/ NF ST. C• i ; I �. �E. �R 11 / WILtL7,Y-D-EB/D�AL! a qR d/ ■ 5 F� _1 � 1 — w T ii �gEi1 � 1 cr ,j' �jr• tw.ERROI sr. 1I1 er. sJ1.PATNFINOER NRv Y S.W.FERN ST. L--J B.W. O {.W.A L. ! — CHARLIB. 99 .W.FONME BT �1 l E� —APO SIV LEGEND cW. '4.RyF0 �• __ F 9� FED AL AID INTERSTATE SYSTEM FEDERAL AIO PRIMARY SYSTEM FEDERAL AID SECONDARY SYSTEM.STATE OTHER FEDERAL PSECONDARY LOCAL {. I PARR T. FEDERAL AIO SECONDARY SYSTEM COUNTY R!SlRYO1R TERMINATION OF A SYSTEM f P 0 G f.W. N ,'Z 9p;s `w• 'i" =TERMINATION OF ROUTE Q DIVIDED HIGHWAY x i._UNDIVIDED HIGHWAFORY-NO.OF LANES OPE CZ= STREET N TRAVEL STREET DEDICATED BUT NOT OPEN I R S.W. FRIRVIEN .ICY A pe B.w.! INTERSTATE NUMBERED ROUTE 1 / „nT S.W. FAIT DR U.S.NUMBERED ROUTE LVIEw CT. CSC 1 � rtf� t' STATE NUMBERED ROUTE2 111 AA!F'q ETT Ej ^t' 6' A POST OFFICE O PUBLIC BLDG. -+ SCHOOL Cy CITY HALL •j d / < ^ < F-- - .w. O CITY CENTER CT COURT HOUSE 11 / ^ g A G 1 ■ R.R.DEPOT A ARMORY E FW ---CITY LIMITS L LIBRARY 4N ®pn/ ' lISn,\D .� e ^ C6Fy cw ERRACE i i �I'' ;j.� 5 6.w. IMER BT WASHINGTON COUNTY,OREGON 8 I. OREGON 57AIE WGNRAI(1RSDK 6.M.BULL MTN.ROAD U-. [HURT ARNANO[M[NT _ A� Yl:10.18 0.1Y. MURDOCK US DEER IMENT OFTAIIDN 1 IIOEAAL NIDHIIAY ADMINSTR IDN t POW0,720 IeRa1 8.720 1-- MART YN .. ii Sc.N in fen no. - 99 T 12 s n e w w.MDT. BMSITE Rs/MR Dusambw 1674 6> KING CITY aw, BATTLER [UT 1 OP U■X ti MDI 1RCURY -DEVELOPML IT, Inc. Development • Management Phone (503) 223.2108 . 338 N.W. 5th Avenue . Portland, Oregon 97209 June 22, 1978 Mr. Ray Barker City Administrator City of Tigard 12420 S. W. Main Street Tigard, Oregon 97223 Re: Traffic Signal S. W. 121st Avenue and Scholls Ferry Road Dear Ray: To supplement our discussion with the entire group at your office yesterday concerning the traffic signalization at the above loca- tion, will you please use this letter to importune the City Council concerning Tigard's participation in the expense of engineering and installing this signal? We would suggest that a commitment on their part to apply an appropriate sum of money to this project from the "systems change" fund be committed as a future contribution if and when the courts uphold the collection and distribution of these funds. I would,-be available to attend such meetings of the council that might be required to consider this proposal . Very truly yours, MERCURY DEVELOPMENT, INC. Agents r he-owners Cy nn Vice President CP:pd Member,International Council of Shopping Centers �' ' REALTOR�`