ODOT - Widen Greenburg Road Across Hall ,- A.
a
Department of Transportation
regon p Transportation Building
g9 John A.Kitzhaber,M.D.,Governor Salem,OR 97310
FILE CODE:
September 30, 1998
Washington County
Attn: Barbara Hejtmanek
Recording Secretary
155 N First Ave.#350-1'8
Hillsboro OR :97124
City of Tigard
Attn: Catherine Wheatley
City Recorder
13125 SW Hall Blvd
Tigard OR 97223
AGR
Enclosed for your records is a fully executed copy of Supplement No. 2 to an
agreement covering Greenburg Road O'xing.
We have retained a fully executed copy, of this supplement for the Department
of Transportation's files.
Fran Neavoll, Agreement Specialist
Construction Contracts Unit
Roadway Engineering Section.
Enclosure
FN:sI.
Form 734-3122(5/97)
Misc. Contracts &Agreements
- No. 13,489
SUPPLEMENT NO. 2
Greenburg Road O'xing
THE STATE OF OREGON, acting by and through its Department of Transportation,
hereinafter referred to as "ODOT"; WASHINGTON COUNTY, a political subdivision of
the State of Oregon, acting by and through its Board of County Commissioners,
hereinafter referred to as "COUNTY"; and the CITY OF TIGARD, also a municipal
corporation of the State of Oregon, acting by and through its Elected Officials,
hereinafter referred to as "CITY" entered into Preliminary Engineering Agreement No.
13,489 on September 21,1995 and Supplement No. 1 on September 22, 1997. Said
agreements cover design of certain roadway improvements on Greenburg Road at the
Highway 217 interchange, hereinafter referred to as"PROJECT".
It has now been determined by ODOT, COUNTY, and CITY that the agreements
referenced above, although remaining in full force and effect, shall be amended by this
supplement No., 2 in order to redistribute the existing funding to provide for higher
design costs as required in paragraph No. 4. Therefore the above mentioned
agreements shall be amended as follows:
ODOT OBLIGATIONS, SUPPLEMENT NO.1
Supplemented Paragraph No. 2 which reads as follows:
"2. ODOT shall, upon execution of this agreement, request COUNTY to
forward an advance deposit for the full estimated cost ($250,000) to
design this PROJECT. ODOT will request the advance of remaining
funds from COUNTY and CITY prior to, the advertisement of the
PROJECT. Said remaining funds are to be used to finance the
construction and final, monumentation of the PROJECT (with the
exception of Right-of--way acquisition estimated at $50,000 which will be
conducted by COUNTY at PROJECT expense). When the actual total
cost of the project has been computed, ODOT shall furnish CITY and
COUNTY with itemized statements of final costs. CITY and COUNTY
shall pay any amount which, when added to said advance deposit, will
equal 100% of the final total actual cost. Any portion of deposits made
in excess of the final total costs of project shall be released to CITY and
COUNTY accordingly. PROJECT costs are not to exceed a total of
$2,395,000 without prior approval from both COUNTY and CITY and a
fully executed supplement to this agreement."
Key#08675
M. C. &A. NO. 13489
SUPPLEMENT NO. 2
WASHINGTON COUNTY
CITY OF TIGARD
Shall be amended to read:
"2. ODOT shall, upon execution of this agreement, request COUNTY to
forward an advance deposit for the full estimated cost ($285,000) to
design this PROJECT. ODOT will request the advance of remaining
funds from COUNTY and CITY prior to the advertisement of the
PROJECT. Said remaining funds are to be used to finance the
construction and final monumentation of the PROJECT (with the
exception of Right-of-way acquisition estimated at $50,000 which will be
conducted by COUNTY at PROJECT expense). When the actual total
cost of the project has been computed, ODOT shall furnish CITY and
COUNTY with itemized statements of final costs. CITY and COUNTY
shall pay any amount which, when added to said advance deposit, will
equal 100% of the final total actual cost. Any portion of deposits made
in excess of the final total costs of project shall be released to CITY and
COUNTY accordingly. PROJECT costs are not to exceed a total of
$2,395,000 without prior approval from both COUNTY and CITY and a
fully executed supplement to this agreement."
ODOT OBLIGATIONS, SUPPLEMENT No. 1
Supplemented Paragraph No. 4 which reads as follows:
"4. ODOT shall, upon execution of this agreement, provide a schedule for
preliminary engineering and design work. The schedule will be reviewed
and approved by COUNTY and CITY prior to commencing Work on the
PROJECT. The $250,000 cost for PROJECT preliminary engineering
and design work is fixed. Any changes to the schedule or cost estimate
identified by any party to this agreement must be reviewed and
approved by the other parties to this agreement. A new schedule and
cost estimate, as needed, will be provided by ODOT. A supplement to
this agreement will be required for any PROJECT preliminary
engineering or design cost increase above $250,000."
2
M. C. &A. NO. 13489
SUPPLEMENT NO. 2
WASHINGTON COUNTY
CITY OF TIGARD
Shall be amended to read:
"4. ODOT shall, upon execution of this agreement, provide a schedule for
preliminary engineering and design work. The schedule will be reviewed
and approved by COUNTY and CITY prior to commencing work on the
PROJECT. The $285,000 cost for PROJECT preliminary engineering
and design work is fixed. Any changes to the schedule or cost estimate
identified by any party to this agreement must be reviewed and
approved by the other parties to this agreement. A new schedule and
cost estimate, as needed, will be provided by ODOT. A supplement to
this agreement will be required for any PROJECT preliminary
engineering or design cost increase above $285,000."
COUNTY OBLIGATIONS, Supplement No. 1
Supplemented Paragraph No. 2 which reads as follows:
"2. The COUNTY shall, upon execution of this agreement and notification
from ODOT, forward to ODOT a maximum of$250,000 for the estimated
costs of preliminary engineering and design of the PROJECT. COUNTY
will forward an advance of remaining COUNTY funds prior to the
scheduled advertisement of the PROJECT. Said remaining funds are to
be used to finance the construction and final monumentation of the
PROJECT (with the exception of Right-of-way acquisition estimated at
$50,000 which will be conducted by COUNTY at PROJECT expense).
No contracts shall be awarded until said deposits have been received by
ODOT. .A supplement to this agreement will be required if the total cost
for design, construction, right-of-way acquisition, and monumentation of
this PROJECT is to exceed $2,395,000. COUNTY agrees to re-
negotiate funding responsibilities with CITY if the contractor bids come
in higher than estimated and push the project costs above $2,395,000 or
if the contract overruns beyond the contract amount. COUNTY agrees
to make additional deposits as needed upon request from ODOT."
3
M. C. &A..NO. 13489
SUPPLEMENT NO. 2
WASHINGTON COUNTY
CITY OF TIGARD
Shall be amended to read as follows:
"2. The COUNTY shall, upon execution. of this agreement and notification
from ODOT, forward to ODOT a maximum of$285,0.00 for the estimated
costs of preliminary engineering and design of the PROJECT. If the
costs for preliminary engineering and design are less than the $285,000,
the funds will be applied toward the construction of the . project.
COUNTY will forward an advance of remaining COUNTY funds prior to
the scheduled advertisement of the PROJECT. Said remaining funds
are to be used to finance the construction and final monumentation of
the PROJECT (with the exception of Right-of-way acquisition estimated
at $50,000 which will be conducted by COUNTY at PROJECT expense).
No contracts,shall be awarded until said deposits have been received: by
ODOT. A supplement to this agreement will be required if the total cost
for design, construction, right-of-way acquisition, and monumentation of
this PROJECT is to exceed $2,395,000. COUNTY agrees to re-
negotiate funding responsibilities with CITY if the contractor bids come
in higher than estimated and push the project costs above $2,3.95,000 or
if the contract overruns beyond the contract amount. COUNTY agrees
.to make additional deposits as needed upon request from ODOT."
COUNTY shall enter into and execute this supplemental agreement during a duly
authorized session of its Board of Commissioners.
CITY shall enter into and execute this agreement during an official meeting
of its City Council.
IN WITNESS WHEREOF, the parties hereto have set their hands and affixed their seals
as of the day and year hereinafter written.
4
M. C. &A. NO. 13489
SUPPLEMENT NO. 2
WASHINGTON COUNTY
CITY OF TIGARD
This PROJECT was approved by the Oregon Transportation Commission as a part of the
1996-1998 Transportation Improvement Program on page 47 (City's use of STP funds)
and on page 49.
On December 17, 1997 the Oregon Transportation Commission adopted Subdelegation
Order No. 2, in which the Director grants authority to the Region Manager to approve
and execute agreements for projects included in the current Statewide Transportation
Improvement Program.
APPROVAL RECOMMENDED STATE OF OREGON, by and through its
Department of Transportation
By ,
Region Project Delivery Mgr. By
egion 1 Manager
By
,.,State Traffic Engineer Date
WASHINGTON COUNTY, by and through its
Elected Officials
- APPROVED AS TO LEGA UFFICIENCY By ���
Chairman
By .
County Counsel By0160
Recording S cretary
Date
APPROVED AS TO LEGAL SUFFICIENCY
By CITY OF and through its Elected
ity Attorney 0c
By -
CyPresic7rt
By(IaA4��iyu W 1
City Recorder
Date 2/1 /a,0 -
5
.
5 APPROVED WASHINGTON COUNTY
BOARD OF COMMISSIONERS
MINUTE ORDER 0 .....9.6-1,9 7........
q Q
DATE .....................5g
....w.......
AV J r
I
\ l DEPARTMENT OF
C �S TRANSPORTATION
October 7, 1997
FILE CODE:
Washington County
Attn: Barbara Hejtmanek, Recording Secretary
155 North First Avenue, #350-18
/.. .
Hillsboro, OR 97124
!t OCT '?1
City of Tigard U 1 3 199?
Attn: Catherine Wheatley; City Recorder 1f
13125 SW Hall Boulevard
Tigard, OR 97223
AGR
Enclosed for your records is a fully executed copy of Supplement No. 1 to an
agreement for improvements on Greenburg Road at the Highway 217
interchange.
We have retained a fully executed copy of'this supplement for the Department
of Transportation's files.
Please note that pages 7 and 8 of the standard provisions, Attachment 2, have
been added since you signed. They were inadvertently omitted from the
attachment.
Fran Neavoll, Agreement Specialist
Contracts Unit
Project Support
Enclosure
FNArm
Transportation Building
Form 734-3122(1/93) Salem, OR 97310
Misc. Contracts&Agreements
No. 13489
SUPPLEMENT NO. 1
THE STATE OF OREGON, acting by and through its Department of Transportation,
hereinafter referred to as "ODOT"; WASHINGTON COUNTY, a political subdivision of
---the State of Oregon, acting by and through its Board of County Commissioners,
hereinafter referred to as "COUNTY"; and the CITY OF TIGARD, also a municipal
corporation of the State of Oregon, acting by and through its Elected Officials,
hereinafter referred to as "CITY" entered into Preliminary Engineering Agreement No.
13489 on September 21,1995. Said agreement covers design of certain roadway
improvements on Greenburg Road at the Highway 217 interchange, hereinafter referred
to as "PROJECT'.
It has now been determined by ODOT, COUNTY, and CITY that the agreement
referenced above;-although remaining in full force and effect, shall be amended by this
supplement No. 1 in order to.include.additional items of work and funding.
RECITALS - Paragraph No. 3 of original agreement which reads as follows:
"3. Under such authority and for the purpose of providing acceptable traffic
patterns on public highways, COUNTY and CITY have requested ODOT
to widen Greenburg Road where it crosses Beaverton - Tigard Hwy. to
two through lanes in each direction plus other associated improvements
necessary for the smooth flow of traffic, hereinafter referred to as
"PROJECT'. The location of the PROJECT is approximately as shown
on the map attached hereto, marked "Exhibit A", and by this reference
made a part hereof. This agreement covers only the preliminary
engineering and design portion of the PROJECT."
Shall be amended to read:
"3. Under such authority and for the purpose of providing acceptable traffic
patterns on public highways, COUNTY and CITY have requested ODOT
to widen Greenburg Road where it crosses Beaverton - Tigard Hwy. to
two through lanes in each direction plus other associated improvements
necessary for the smooth flow of traffic, hereinafter referred to as
"PROJECT'. The location of the PROJECT is approximately as shown
on the map attached hereto, marked "Exhibit A", and by this reference
made a part hereof. This agreement covers all phases of work including
Key 08675
M. C. &A. NO. 13489
SUPPLEMENT NO. 1
WASHINGTON COUNTY
CITY OF TIGARD
preliminary engineering, right-of-way acquisition, construction, and
maintenance."
RECITALS Paragraph No. 4 which reads as follows:
"4. The PROJECT preliminary engineering and design will be financed with
a maximum of $215,000 in MSTIP (Major Street .Transportation
Improvement Program) funds provided by COUNTY and at no cost to
ODOT or CITY."
Shall be amended to read:
"4. The CITY and COUNTY are financing 100 percent of this PROJECT at
no expense to ODOT. All phases of the PROJECT will be financed with
a maximum of $1,995,000 in MSTIP (Major Street Transportation
Improvement Program) funds provided by COUNTY and with a
maximum of $400,000 of STP (33D funds from 2040 Reserve) and
matching funds provided or authorized by CITY under Title 23, United
States Code (USC), and the Oregon Action Plan. All cost overruns
beyond the amount shown in contract contingencies are the _
responsibility of CITY and COUNTY and will require approval from both
City and County. Current contingencies estimate is $69,000. In no case
will the combined amount of $2,395,000 be exceeded without approval
from both COUNTY and CITY in the form of a supplement to this
agreement entered into as mutually agreed upon by all parties to this
agreement. CITY, COUNTY, and ODOT shall re-negotiate funding
responsibilities if the contractor bids come in higher than estimated and
push the project costs above $2,395,000 or if the contract overruns
beyond the contract amount. In no case shall any PROJECT costs be
funded with State Highway funds.
RECITAL Paragraphs No. 7 and 8 shall be added as follows:
"7. ODOT and. Washington County entered into agreement No. 6304 on
November 16, 1977 for the installation of traffic control signals at the
north and southbound ramp terminals of Beaverton-Tigard Highway and
Greenburg Road. Said agreement. shall be replaced by this agreement
2
M. C. &A. NO. 1'34:89
SUPPLEMENT NO. 1
WASHINGTON COUNTY
CITY OF TIGARD
and maintenance and power responsibilities are being revised with this
agreement.
8. The Standard Provisions attached hereto, marked Attachment 2, are by
this reference made a part hereof. The Standard Provisions apply to all
federal aid projects and may be modified only by the ODOT, COUNTY,
AND CITY OBLIGATIONS of this agreement and supplements to this
agreement. The parties hereto. mutually agree to the terms and
conditions set forth in Attachment 2. In the event of a conflict, this
agreement shall control over the attachment, and ODOT, COUNTY, and
CITY OBLIGATIONS shall control over Attachment 2. For the purpose
of this PROJECT only, references in Attachment 2 to "Agency" shall
pertain to CITY as this PROJECT is partially financed with CITY's
allocated federal funds."
ODOT OBLIGATIONS Paragraph No. 1 which reads as follows:
1. ODOT shall, at PROJECT expense, conduct the necessary field surveys
and traffic investigations; and perform all preliminary engineering and
design work required to produce plans, specifications and estimates."
Shall be amended to read:
1. ODOT shall, at PROJECT expense, conduct the necessary field surveys
and traffic investigations; perform all preliminary engineering and design
work required to produce plans, specifications and estimates; be
responsible for the monitoring of the acquisition of necessary right-of-
way (right-of-way issues are to be further addressed in a supplemental
Right-of-Way Services agreement); advertise for bid proposals, award
all contracts, pay all contractor costs, furnish all construction
engineering, materials testing and technical inspection, conduct all right-
of-way survey and monumentation, and provide PROJECT management
services for administration of the contract."
ODOT OBLIGATIONS Paragraph No. 2 which reads as follows:
3
M. C. &A. NO. 13489
SUPPLEMENT NO. 1
WASHINGTON COUNTY
CITY OF TIGARD
"2. ODOT shall, upon execution of this agreement, request COUNTY to
forward an advance deposit for the full estimated cost ($215,000) to
design this PROJECT."
Shall be amended to read:
"2. ODOT shall, upon .execution of this agreement, request COUNTY to
forward an advance deposit for the full estimated cost ($250,000) to
design this PROJECT. ODOT will request the advance of remaining
funds from COUNTY and CITY prior to the advertisement Iof the
PROJECT. Said remaining funds are to be used to finance the
construction and final monumentation of the PROJECT (with the
exception of Right-of-way acquisition estimated at $50,000 which will be
conducted by COUNTY at PROJECT expense). When the actual total
cost of the project has been computed, ODOT shall furnish CITY and .
COUNTY with itemized statements of final costs. CITY and COUNTY
shall pay any amount which, when added to said advance deposit, will
equal 100% of the final total actual cost. Any portion of deposits made
in excess of the final total costs of project shall be released to CITY and
COUNTY accordingly. PROJECT costs are not to exceed a total of
$2,395,000 without prior approval from both COUNTY and CITY and a
fully executed supplement to this agreement."
ODOT OBLIGATIONS Paragraph No. 3 which reads as follows
"3. ODOT shall compile accurate cost accounting records and furnish
COUNTY with monthly itemized statements of said preliminary
engineering and design costs."
Shall be amended to read:
."3. ODOT shall compile accurate cost accounting records and furnish
COUNTY and CITY with monthly itemized statements of said preliminary
engineering, design, right-of-way monitoring, and construction costs.
COUNTY and/or CITY may request a statement of costs to date at any
time by submitting a written request."
ODOT OBLIGATIONS Paragraph No. 4 which reads as follows:
4
M. C. &A. NO. 13489
SUPPLEMENT NO. 1
WASHINGTON COUNTY
CITY OF TIGARD
"4. ODOT shall, upon execution of this agreement, provide a schedule for
preliminary engineering and design work. _The schedule will be reviewed
and approved by COUNTY and CITY prior to commencing work on the
PROJECT. The $215,000 cost for PROJECT preliminary engineering
and design work is fixed. Any changes to the schedule or cost estimate
identified by any party to this agreement must be reviewed and
approved by the other parties to this agreement.. A new schedule and
cost estimate, as needed, will be prov._ided by ODOT. A supplement to
this-agreement will be required for any PROJECT cost increase above
$215,000."
Shall be amended to read:
"4. ODOT shall, upon execution of this agreement, provide a schedule for
preliminary engineering and design work. The schedule will be reviewed
and approved by COUNTY and CITY prior to commencing work on the
PROJECT. The $250;000 cost for PROJECT preliminary engineering
and design work is fixed. Any changes to the schedule or cost estimate
identified by any party to this agreement must be reviewed and
approved by the other parties to this agreement. A new schedule and
cost estimate, as needed, will be provided by ODOT. A supplement to
this agreement will be required for any PROJECT preliminary
engineering or design cost increase above $250,000."
ODOT OBLIGATIONS Paragraphs No..5, 6, 7, & 8 shall be added as follows:
"5. ODOT shall name COUNTY and CITY in the construction contract and
performance bond as a beneficiary of said documents, expressly entitled
to independently enforce their terms directly against the contractor and
surety. ODOT shall specify that COUNTY, its Commissioners, employees
and agents; and the CITY its elected officials, employees, and,agents
shall be named as 'additionally insured' in all insurance documents.
6. ODOT shall provide COUNTY and CITY with a,minimum of three weeks
to review and comment on the design and estimates, at completion of
preliminary engineering and prior to completion of final design.
5
M. C. &A. NO. 13489
SUPPLEMENT NO. 1
WASHINGTON COUNTY
CITY OF TIGARD
7. ODOT shall, upon PROJECT completion and at its own expense, remain
responsible for maintaining the structural- integrity of the Greenburg
Road structure crossing over- Beaverton_. Tigard Hwy. ODOT shall
perform signal and ramp meter maintenance and operation of the north
and southbound ramp terminals, all illumination installed within the
interchange access control limits and any traffic signal interties related to
the PROJECT. ODOT shall retain complete control of the timing
established for operation of the PROJECT traffic signals. Any requests
for. changes in the traffic signal timing will be subject to review and
approval by ODOT.
8. ODOT shall bill COUNTY annually for 50 percent of power and
maintenance costs associated with the traffic signals and related
illumination at the north and southbound ramp terminals."
COUNTY OBLIGATIONS Paragraph No. 1 which reads as follows:
1. The COUNTY hereby grants ODOT the exclusive right to enter onto and
occupy COUNTY right-of-way for the performance of the preliminary
engineering and surveying, associated with the PROJECT. "
Shall be amended to read:
"1. COUNTY hereby grants ODOT the exclusive right to enter onto and
occupy its COUNTY right-of-way for the performance of the preliminary
engineering, surveying, inspection, construction, monumentation and
installation of the improvements as outlined herein associated with the
PROJECT."
COUNTY OBLIGATIONS Paragraph No. 2 which reads as follows:
"2. The COUNTY shall, upon execution of this agreement and notification
from ODOT, forward to ODOT a maximum of$215,000 for the estimated
costs of preliminary engineering and design of the PROJECT.
Additional advance deposit requests will not be made without a
supplement to this agreement."
Shall be amended to read as follows:
6
M. C. &A. NO. 13489
SUPPLEMENT NO. 1
WASHINGTON COUNTY
CITY OF TIGARD
"2. The COUNTY shall, upon execution of this agreement and notification
from ODOT, forward to ODOT a maximum of$250,000 for the estimated
costs of preliminary engineering and design of the PROJECT. COUNTY
will forward an advance of remaining COUNTY funds prior to the
scheduled advertisement of the PROJECT. Said remaining funds are to
be used to finance the construction and final monumentation of the
PROJECT (with the exception of Right-of-way acquisition estimated at
$50,000 which will be conducted by COUNTY at PROJECT' expense).
No contracts shall be awarded until said deposits have been received by
ODOT. A supplement to this agreement will be required if the total cost
for design, construction, right-of-way acquisition, and monumentation of
this PROJECT is to exceed $2,395,000. COUNTY agrees to
renegotiate funding responsibilities with CITY if the contractor'bids come
in higher than estimated and push the project costs above $2,395,000 or
if the contract overruns beyond the contract amount. COUNTY agrees
to make additional deposits as needed upon request from ODOT."
COUNTY OBLIGATIONS Paragraphs No.5, 6, 7, 8 & 9 shall be added as follows:
"5. The COUNTY shall, within three weeks, review and approve, the
PROJECT plans and specifications.
6. The COUNTY shall, upon completion of the PROJECT, continue to
maintain all roadway and right-of-way within its jurisdiction at its own
expense including the roadway surface of the structure crossing over
Beaverton - Tigard Highway. County shall also be responsible for all
landscaping and irrigation and all traffic signals and illumination beyond
the limits of the Greenburg Road interchange.
7. The COUNTY shall, upon completion of the PROJECT, reimburse
ODOT annually for 50 percent of all electrical power and maintenance
costs of the traffic signals and associated illumination located at the
north and southbound ramp terminals of the interchange. . Maintenance
and power responsibilities for all other PROJECT traffic signals and
illumination is to be determined by COUNTY and CITY.
7
M. C. &A. NO. 13489
SUPPLEMENT NO. 1
WASHINGTON COUNTY
CITY OF TIGARD
8. COUNTY acknowledges the effect and. scope of ORS 105.755 and
agrees that all acts necessary to complete construction of the PROJECT
which may alter or change the grade of-existing COUNTY roads are
being accomplished at the,direct request of the COUNTY."
9. The COUNTY shall, at PROJECT expense, obtain all Right-of-way
necessary for the PROJECT (estimated at $50,000): Said acquisition will
be monitored by ODOT and will be addressed further in a supplemental
Right-of-way Services agreement. COUNTY agrees that right-of-way
activities shall be in accord with the Uniform Relocation Assistance &
Real Property Acquisition Policy Act of 1970, as amended, State's Right
of Way Manual and the Code of Federal Regulations, Title 23, Part 74D
and Title 49, Part 24.
All projects must have . right-of-way certification coordinated through
Region Right of Way offices (even for projects where no federal funds
were used for right-of-way, but federal funds were used elsewhere on the
project). COUNTY should contact ODOT's Region Right of Way office for
additional information or clarification.
COUNTY shall enter into and execute this supplemental agreement during a duly
authorized session of its Board of Commissioners.
i
CITY OBLIGATIONS Paragraph No. 1 which reads as follows:
1. CITY hereby grants ODOT the exclusive right to enter onto and occupy
its CITY right-of-way for the performance of the preliminary engineering,
surveying, inspection, construction and installation of the improvements
as outlined herein associated with the PROJECT."
Shall be change to read:
1. CITY hereby grants ODOT the.exclusive right to enter onto and occupy
its CITY right-of-way for the performance of the preliminary engineering,
surveying, inspection, construction, monumentation and installation of
the improvements as outlined herein associated with the PROJECT."
8
M. C. &A. NO. 13489
SUPPLEMENT NO. 1
WASHINGTON COUNTY
CITY OF TIGARD
CITY OBLIGATIONS Paragraphs No. 3, 4, 5, & 6 shall be added as follows:
"3. CITY shall within three weeks review and-approve the PROJECT plans
and specifications, and promptly issue necessary CITY required permits
(at no expense to PROJECT or ODOT).
4. CITY shall, upon notification by ODOT, forward an advance deposit for its
share of the project construction and monumentation costs. For the
advance deposit, CITY shall provide_$41,080 in local match and will
authorize ODOT the use of$358,920 in CITY'S STP funds. A supplement
to this agreement will be required if the total cost for design,
construction, right-of-way acquisition, and monumentation of this
PROJECT is to exceed $2,395,000. ODOT will not award any contracts
prior to receipt of said deposits.
5. CITY shall,; upon completion of the PROJECT, continue to maintain all
roadway and right-of-way within its jurisdiction- at its own expense
including all landscaping, irrigation, drainage and all pavement
surrounding vehicle detector loops.
6. CITY by execution of this agreement, does hereby give its consent as
required by ORS 373.030(2) to any and all changes of grade within the
CITY limits, if any there be, in connection with or arising out of the
PROJECT covered by this agreement. City, hereby accepts
responsibility for all claims for damages from said grade changes."
CITY shall enter into and execute this agreement during an official meeting
of its City Council.
GENERAL PROVISIONS Paragraph No. 1 which reads as follows:
1. ODOT standards shall be used when designing any portion of the
PROJECT within ODOT right-of-way."
Shall be amended to read:
9
M. C. &A. NO. 13489
SUPPLEMENT NO. 1
.WASHINGTON COUNTY
CITY OF TIGARD
1. All federal requirements must be met for each phase of the PROJECT as
federal funds will be used on certain elements and phases of the
PROJECT.
GENERAL PROVISIONS Paragraphs No. 3 ,4, 5, 6, 7, 8 & 9 shall be added as follows:
"3. ODOT, COUNTY and CITY agree and understand that a mutual review
of the PROJECT plans and specifications will be conducted prior to
ODOT's advertisement for construction-bid proposals.
4. CITY and COUNTY guarantee the availability of CITY and COUNTY
funding in an amount required to fully fund the project. CITY and
COUNTY further guarantee that adequate funds are available prior to
advertisement for bids to accommodate 110 percent of the engineer's
estimate.
5. ODOT's new access control limits will run along Greenburg Road
from Washington Square Road to Cascade Blvd. If right-of-way is
purchased for the PROJECT within these limits, it will also include access
control. In the areas not requiring right-of-way purchase, CITY and
COUNTY agree to not issue any new access permits to Greenburg Road
and will look for opportunities to close existing accesses when
redevelopment occurs.
6. This supplemental agreement shall become effective upon execution
of this agreement by all parties.
7. This agreement may be terminated by mutual consent of all parties
upon 30 days notice, in writing and delivered by certified mail or in
person.
ODOT may terminate this agreement effective upon delivery of written
notice to COUNTY and CITY, or at such later date as may be established
by ODOT, under any of the following conditions, but not limited to these
conditions.
10
M. C. &A. NO. 13489
SUPPLEMENT NO. 1
WASHINGTON COUNTY
CITY OF TIGARD
a. If COUNTY or CITY fails to provide services called for ,by
this agreement within the time specified herein or any extension
thereof.
b. If COUNTY or CITY fails,to perform any of the other
provisions of this agreement, or so fails to pursue the work- as to
endanger performance of this agreement in accordance with its
terms, and after receipt of written notice from ODOT fails to correct
such failures within 10 days or such longer period as ODOT may
authorize.
C. If ODOT fails to receive funding, or appropriations,
limitations or other expenditure authority at levels sufficient to pay
for the work provided in the agreement.
Any termination of this agreement shall not prejudice any rights or
obligations accrued to the parties prior to termination.
8. All parties shall comply with all federal, state, and local laws,
regulations, executive orders and ordinances applicable to the work
under this agreement, including, without limitation, the provisions of ORS
279.312,279.314, 279.316, 279.320, and 279.555, which hereby are
incorporated by reference. Without limiting the generality of the
foregoing, the parties expressly agree to comply with (I)-Title VI of Civil
Rights Act of 1964; (ii) Section V of the Rehabilitation Acts of 1973; (iii)
the Americans with Disabilities Act of 1990 and ORS 659.425; (iv) all
regulations and administrative rule established pursuant to the foregoing
laws; and (v) all other applicable requirements of federal and state civil
rights and rehabilitation statutes, rules, and regulations.
9. This agreement and attached exhibits constitute the entire agreement
between the parties on the subject matter hereof. There are no
understandings, agreements, or representations., oral or written, not
specified herein regarding this agreement. No waiver, consent,
modification or change of terms of this agreement tshall bind -either party
unless in writing and signed by both parties and all necessary approvals
have been obtained. Such waiver, consent, modification or change, if
made, shall be effective only in the specific instance and for the specific
11
M. C. &A. NO. 13489
SUPPLEMENT NO. 1
WASHINGTON COUNTY
CITY OF TIGARD
purpose given. The. failure of ODOT to enforce any provision of this
agreement shall not.constitute a waiver by ODOT of that or any other
provision."
12
M. C. &A. NO. 13489
SUPPLEMENT NO. 1
WASHINGTON COUNTY
CITY OF TIGARD
IN WITNESS WHEREOF, the parties hereto have set their hands and affixed their seals
--as of the day and year hereinafter written.
This PROJECT was approved by the Oregon Transportation Commission as a part of the
1996-1998 Transportation Improvement Program on page 47 (City's use of STP funds)
and on page 49.
On March 7, 1996 the Oregon Transportation Commission adopted Delegation Order 2,
which grants authority to the Region Manager to approve and execute agreements for
work in the current Statewide Transportation Improvement Program.
APPROVAL RECOMMENDED STATE OF OREGON, by and through its;2 De klmzzao,,�
By
Regi Project Delivery Mgr.
Region anager
By
Stat Tffic Engineer Date -- ?.-`f
.07
REV7:K
OR ODOT, WASHINGTON COUNTY, by and through its
By I/" Elected Officials
Assistant Attorney General 9����j? By
Chairman
Byz8a,44am
APPROVED A§TO LEGAL SUFFICIENCY Recording Ccretary
By LL % Date q-12- -ell
County Counsel
CITY O TIGARD, by and ugh its Elected
Officia
APPROVED AS TO LEGAL SUFFICIENCY
By k, I City Mayor
I City Attorney
By
City Recorder
13 Date —
APPROVED WASHINGTON
BOARD OF COMMISSIONER$
MINUTE ORDER 0 ....9./..��...�..�7f...se.aawe.
DATE ........................ ..�iY....lwlue�neuwe
. .; FS Nrrctw SM mw cr
�:.. x
N. LiRi ER_ SW SM 01RCN
3 .s CEDARCRESfi ST '<
sN c!Ni g Ap s 1Q / a 6 SW � e CEDARCREST` ST
is• :' 0 _ '�`- .--_'
A urNtor w ac € A � � 1 1`I `.. I ST < g
r o < WASHINGTON SOUARE q 600ay 8200 7900 rl
I. CZ a�� ' N CH TNUT
vl CRf^d'. b Zi t^f n SHOP CTR > yr 5 _.-. .L.*
♦ rN! w < 114 a±-'B000
HARNESS- LN x�'C $w• ^� !Y_lwfMMw a [i U RDBBINS 9P \ ''y > <
i:.. O Ku a sANr PF yr 4 .. SWd-a BORDERSd B�/j. - OC
A n�..y,�a•�\ Afsw v1�IGorER x11 sK� Sw�NnN[ i 1 z 9100> BB00 ST a SW 770
' .. ..t'•i AS 41 �9'`-ty�' u,clw.rn�eiNreaa n�.reutOs q O N -..'i_-----�--- -
.x GREEWAY CRESCENT SSI LEHMAN< ST 1 < HEMLOC' I
s.NI� x Grµr DRO ,tr 1 6ROYf 92 ! ST >
r IIRAl�ilEI CTE a pITAn A snnn r PARK I Q sN IARcn Si c: •�
A P 9 RD d C� STOGA � A; y SMI CORRAL ST N RYA
!= a�. `gE rarer SW '_ 8 ( -� SW_ LARCH
'3t W Eft'SL IIMT � 3 �
A 5 PERCHERON LM: I q
�� Q SW ST 9�ST °' ` C0 0
�t�1f K f3 _
. NITEON LN SW INTSf� I �{">' i i BEND �. $ c'PF�( > ST SN'MAPLEL 57•. �
SW . Row-
I
T^
c I ER LS A �ir� r, < < SII I T 5 SW m.+ ^ MAF
«Y d
SW COTTONTA ��'8•'. ,��
CA CHOL y Nr1 no TIP SY M OAK `7' ST --- SW
< I OAK
2 SWC Ct t d a :* C C.;; 'MOM= %y ash' � � 900p J -...SWI
I a� •:. 3 F-9 ctref:K _ = z..eao0 --
SW ..
SGNt,� 'f a a t z; N sr o�a 's< ►u"MSOR cr W TO ._.,SW_ 'J
CE
91 HAWKS ST
.. 6 "'p sW sW THORNsr
csrM; -SrT N1N � _ o .. `_It.�— GSTAF �/ N "It 1SW o E< ST <
4 Q N1N7ANIiA si •...-.._...._ �A A _-- ASJ _'-- - > ... Q
It SW ANTDN II 1 oC >
h3 h . c ER T d d 3t DAKOTA RT ` T l�/ `a� to ir o;
SW NORTH >
sr BLAKE ""rt MIllY1CW it < ae
h k sY> PARK �d �C CT 4� ` _ 8< �• < -> > _ H '�
y RVINER Si
a � � : SW PFAFFIE 8000 ST
. '•'I W NTE C �RCRES D0. A pp d
3 � F c.•
<A
SW _� �pE x � SN TIGARD S " g � j4Y SW NERESTONE 1 > S DTT LEWI G �a rpt y QPG� to
Sti A N SW fAl.CON SE OR 3 I '< ' B LN T ST A
A Ny SY
W1LL N(I AE Af A- N THERINE ST G
R MEAS WAST g' Sil q 1 \ EL <> t m
li Q y : jli
ER N ST I ,a SW TNER NE 4►r 9► res < ! 49.
� �. RIDGE _ I..� ...�•� .. _ .. ._ ♦ � -
wit ITNN ST m ..
1 mAAAv q ¢i w d o 8,�
s"al JR HS�r 1s - avDDESMUE PK , y Z
1 , ac
a <o a SW KAREN ST lb nl 1 � PL � �
L SW M cT 31 SW SIA T' g ? — ro F"r Ivo 'yly� SI
Z gyp_ r �. a > ys oR
9A JACK °S :S d�< I S o k< p f�LY L p� SW
SW WALNUT f I PK < �� SW-' ERROL ST 1✓ �p J). `` c
T St �✓ SW MANtE d d" rival m ,�d 6T" arc
1.1� dpi" A Ct4 j� }g , i AFF t- sr Jam, HU
SW_ FERN I d WALNUT SW t SW �f ��
Si L ' IN ix WN'ST sN S s Fb s ! FANM9
LU _ _ SW <ALBERTA ST < - L .� WATKINS PLS." CREEK �i I
to A 2` o I IZJ 2FONNER Si
Y N ti°jSW JAMEcr D oEl ` I I _ CiH"
_ ...._._... ._ .i S RD _ ....__..- Qy Q CR
-- 3 ,c �sw 2 r 9► r O
I
� EIS,
'SW MARION ST r �.^9► <PARK ST y n d �1 �/ �I .I I SW<
LN „
• �LEti tL '•..j �y` _ 'tM� LL •¢O
FSAIWAYEN w� Sw
fAI YE Sr � �'� tw
9i ST 0 �'O.� N
3
5 gtd i I - SW rA M '< FAIRHAv e) C a r SW EDGEWOOD ST ¢ ` ✓f SW
_ 105E m �` a e d sr sN N ti 4 9M
'-
JV TA} �' sr Arndr SW YfE1RQIMtt- SSW HILLYI STcr HILLYIElI Sy ��i^ ! SW TEG
SW
N CEN r u 1 1 Q' '< 87
SW d�'< ' � MCDONALD ST
If {{ -..roriuiu 'C�a�Iyt --I----r 1 i�l ^1� �a ' ST ri pu sii Eek sW ST > SW ELROSE CT S COLONY-CREEK-CTS i
n'1 SW W FANIIO
EE1 sYAv1M ssr,t uKmur i` - - I J-� < 3181 SW
fl it �.' (— '- '$sW NCF' IAN MOUNTAINYIEW LN fit,
M r
i SW , I T I- A s u Efv YEW ER 3t G Yt EW, SW GREEn5i1nA6 ix< g tv m
1 x Cwrt ! 1�f p d TTN CT KR{E LT r
I J E ..��`� >'1 f cr .' 9'n T o r ,uRoaR r�P�
IN a a ST j° 91 INE sr A �."SW d $r ! BON ITA
IBJ ' IMO NT I N EVANGLE P sW P K S r `Q p L.,.f A sN RD cr 000 a
CEN SS d d°( ir<7CT'. u 4 a
,,nnnP c7 g _ .Ip HC d T
ATTACHMENT NO. 2
STANDARD PROVISIONS ,
JOINT OBLIGATIONS
PROTECT ADMINISTRATION
1. State is acting to fulfill its responsibility to the Federal Highway
Administration (FHWA) by the administration of this project, and Agency hereby
agrees that State. shall have full authority to carry out this administration. If
requested by Agency, State will further act for the Agency in other matters
pertaining to the project. State and Agency shall actively cooperate in fulfilling the
requirements of the Oregon Action Plan. State and Agency shall each assign a
liaison person to coordinate activities and assure that the interests of both parties are
considered during all phases for all projects.
Any project that uses federal funds, in project development, is subject to
PS&E review and approval by FHWA prior to advertisement for bid proposals,
regardless of the source of funding for construction.
!.F &CONSTRUCTION ENGINEERING
2. Preliminary and construction engineering may be performed by State,
Agency,'or others. If Agency, or others, perform the engineering, State will monitor
the work for conformance with FHWA rules and regulations. In the event that "
Agency elects to engage the services of a consultant to perform any of the work
covered by this agreement, Agency and Consultant shall enter into an agreement
describing-the work to be performed and the method of payment. State shall concur
in the agreement prior to the beginning of any work. No reimbursement shall be .
made using federal-aid funds for any costs incurred by such Consultant prior to
receiving authorization from State to proceed.
On all construction projects where State is the signatory party to the contract,
and where Agency is doing the construction engineering and project management,
Agency agrees to accept all responsibility for and defend lawsuits involving tort
claims, contract claims,.or any other lawsuit arising out of the contractor's work or
Agency's supervision of the project.
Revised: 04/20/93
LJW026c.th#3
REQUIRED STATEMENT FOR USDOT FINANCIAL
ASSISTANCE AGREEMENT:
3. If as a condition of assistance the Agency has submitted and the U..S.
Department of Transportation has approved a Minority Business Enterprise
Affirmative Action Program which the Agency. agrees to carry out, this affirmative
action program.is incorporated into this financial assistance agreement by reference.
That program shall be treated as a legal obligation and failure to carry out its terms
shall be treated' as a violation of .this financial assistance .agreement. Upon
notification to the Agency of its failure to carry out the approved program, the U.S.
Department of Transportation shall impose such sanctions as noted in Title 49, Code
of Federal Regulations, Part 23, Subpart E, which sanctions may include termination
of the agreement or other measures that may affect the ability of the Agency to
obtain future U.S. Department of Transportation financial assistance.
The Agency further agrees to comply with all applicable Civil Rights Laws,
Rules and Regulations, including Section 504. of the Rehabilitation Act of 1973 and
the Vietnam Era Veterans' Readjustment Act.
4. The parties hereto agree and understand that they will comply with all
applicable statutes and regulations, including but not limited to Title 49 CFR, Parts
23 and 90, Audits of State and Local Governments;Title 41, USC, Anti-Kickback Act;
Title 23, USC, Federal-Aid Highway Act; 42 USC, Uniform Relocation Assistance
and Real Property Acquisition Policies Act of 1987; provisions of Federal-Aid Policy
Guide (FAPG), Title 23 Code of Federal Regulations .(23 CFR) 1.11, 710, and 140; and
the Oregon Action Plan.
STATE OBLIGATIONS
PROGRAM REQUEST
5. State shall submit a program to the FHWA with a request for approval of
federal-aid participation in all engineering, right-of-way acquisition, eligible utility
relocations and construction work for the project. NO WORK SHALL PROCEED
ON ANY ACTIVITY IN WHICH FEDERAL-AID PARTICIPATION IS DESIRED
UNTIL•SUCH APPROVAL HAS BEEN OBTAINED. The program shall include
services to be provided by State, Agency or others. State shall notify Agency in
writing when authorization to proceed has been received from the FHWA. Major
responsibility for the various phases of the project will be as outlined in the Special
Provisions. All work and records of such work shall be in conformance with
FHWA rules and regulations, and the Oregon Action Plan.
Revised: 04/20/93 2
LJW026c.th#3
AUTHORITY FOR SURVEY
6. State shall prepare an .Authority for Survey which will itemize the
estimate of cost for preliminary engineering,services to be provided by State, Agency
or others, and shall furnish Agency with a copy of such cost estimate. .
FINANCE
7. State shall, in the first instance, pay all reimbursable costs of. the project,
submit all claims for federal-aid participation to the FHWA in the normal manner
and compile accurate cost accounting records. Agency may request a statement of
costs to.date, at anytime, by submitting a written request. When the actual total cost
of the project has been computed, State.shall furnish Agency with an itemized
statement of such final costs.
PROTECT ACTIVITIES
8. State shall, if the work is performed by Agency or others, review and
process or approve all environmental statements, preliminary and final plans,
specifications and cost estimates. State shall, if they prepare these documents, offer
Agency the opportunity to review and approve the documents prior to advertising
for bids. State shall prepare contract and bidding documents, advertise for bid
proposals, award all contracts and, upon award of a construction contract, perform
all necessary laboratory testing of materials, process and pay all contractor progress
estimates, check final quantities and costs, and oversee and provide intermittent
inspection services during the construction phase of the project.., The actual cost of
laboratory testing services provided by State will be charged to the project
construction engineering expenditure account and will be included in the total cost
of the project.
FREE BRIDGE DMIGN
9. State shall, as provided in ORS 366.155(h), prepare plans and specifications
for the structure portion only of bridges and culverts at no expense to the counties.
RIGHT-OF-WAY
10. State is responsible 'for acquisition of the necessary right-of-way and
easements for construction and maintenance of the.project. Agency may request to
perform the acquisition functions, subject to execution of a written agreement. State
Revised: 04/20/93
LJW026c.th#3 3
shall review all right-of-way activities engaged in by Agency to assure compliance
with applicable laws and regulations.
If any real property purchased with federal-aid participation is no longer
needed for the originally authorized purpose, the disposition of such property shall
be subject to applicable rules and regulations which. are in effect at the time of
disposition. Reimbursement to State of the required proportionate share of the fair
market value may be required.
AGENCY OBLIGATIONS
FINANCE
11. Agency shall, prior to the commencement of the preliminary engineering
and right-of-way acquisition phases, deposit with State its estimated share of each
phase.
Agency's share of construction will be deposited in two parts. The initial
deposit will represent 65 percent of the Agency's share, based on the engineer's
estimate, and will be requested three weeks prior to opening bids on the project.
Upon award of the contract, the balance of.the applicant's share will be requested.
Collection of advance deposits amounting to less than $2,500 for the P.E. and .
.R/W phase of the project will be postponed until collectively the amount exceeds '
$2,500 or until the collection of the advance deposit for construction is required.
Pursuant to ORS 366.425, the advance deposit may be in the form of 1)'money
deposited in the State Treasury (an option of which may be a deposit in the Local
Government Investment Pool accompanied by an.Irrevocable Limited Power of
Attorney ), or 2) an Irrevocable Letter of Credit-issued by a local bank in the name of
State.
12. Agency shall present properly certified bills for 100 percent of actual costs
incurred by Agency on behalf of the project directly to State's Liaison Person for
review and approval. Such bills shall be in a form acceptable to State and
documented in such a manner as to be easily verified. Billings shall be presented for
periods of not less than one month duration, based on actual expenses to date. All
billings received from Agency must be approved by State's.Liaison Person prior to
presentation to Highway Division Accounting for payment. Agency's actual costs
eligible for federal-aid participation shall be those allowable under the provisions of
FAPG, 23 CFR 111, 710, and 140. Final billings shall be submitted to State for
Revised: 04/20/93
QW026c.1h N3 .4
processing within six.months from date that costs were incurred. Partial billing
(progress payment) shall be submitted to State within three months from date that
costs incurred.
13. The costs records and accounts pertaining to the work covered by this
agreement are to be kept available for inspection by representatives of State and the
FHWA for a period of,three (3) years following the date of final payment. Copies of
such records and accounts shall be made available upon request. For real property
and equipment, the retention period starts from the date of disposition
(49 CRF 18.42).
This agreement is subject to the provisions of the Single Audit Act of 1984 (49
CFR, Part 90) as stated in Circular A-128 of the United States Office of Management
and Budget.
PROJECT CANCELLATION
14: Agency agrees that should they cause the project to be canceled or
terminated for any reason prior to its completion, Agency shall reimburse..State for
any costs that have been'incurred by State on behalf of the project.
DELAYED STARTING DATE
* 15. In the event that right-of-way acquisition for, or actual construction of the
facility for which this preliminary engineering is undertaken is not started by the
close of the TENTH FISCAL YEAR following the fiscal year in which this agreement
is executed, State may request reimbursement of the sum or sums of Federal-Aid
funds disbursed to Agency-under the terms-of this agreement.
tJ'1'ILNIH5
* 16. Agency shall relocate or cause to be relocated, all utility conduits, lines,
poles, mains, pipes, .and such other facilities where such relocation is necessary in
order to conform said utilities and facilities with the plans and ultimate
requirements of the project. Only those utility relocations which are eligible for
federal-aid participation.under the FAPG, 23 GFR 645A, shall be included in the total
project costs and participation; all other utility relocations shall be at the sole
expense of Agency, or others.. State will arrangefor utility adjustments in areas
lying within jurisdiction of State and, if State is performing the preliminary
engineering. Agency may request State to arrange for utility adjustments lying
within Agency jurisdiction, acting on behalf of Agency.
Revised. 04/20/93
LIW026cth#3 5
1
Agency shall, five weeks prior to the opening of construction bid proposals,
furnish State with an estimate of cost for eligible reimbursable utility relocations,
based on the plans for the project. Agency shall notify State's.Liaison Person.prior to
proceeding with any utility relocation work in order that the work may be properly
coordinated into the project and receive the proper authorization.
CONSTRUCTION
17. Design Standards for all projects shall meet the requirements of the
Intermodal Surface Transportation Efficiency Act of 1991. In addition, all projects on
the Oregon State Highway System'shall be in compliance to Standards specified in
the current ODOT Highway Design Manual and related references. Construction
plans shall be in conformance with standard practices of State for plans prepared by
its own staff. All specifications for the project shall be in substantial compliance
with the most current Oregon Standard:S=cifications for Highway Construction.
GRADE CHANGE LIABILITY
18. Agency, if;a County, acknowledges the effect and scope of ORS 105.755 and
agrees that all acts necessary to complete construction of the project which may alter
or change the grade of existing county roads are being accomplished at -the direct
request of the County.
Agency, if a City, hereby accepts responsibility for all claims for damages from
grade changes. Approval of plans by State shall not subject State to liability under
ORS 105.760 for change of grade.
CONTRACTOR CLAIMS
19. Agency shall provide legal defense against all claims brought by the
contractor, or others, resulting from Agency's failure to comply with the terms of
this agreement.
MAINTENANCE RESPONSIBILITIES
* 20. Agency shall, upon completion of construction, thereafter maintain and
operate the project at its own cost and expense, and in a manner satisfactory to State
and the SHWA.
Revised: 04/20/93
LJW026c.th#3 6
1
WORKERS' COMPENSATION COVERAGE
21. The contractor, its subcontractors, if any, and all employers working under
this (Agreement/Contract) are subject employers under the Oregon Workers'
Compensation Law and shall coymplwith ORS 656.017, which requires thern to
provide Workers' Compensation coverage for, all their subject workers.
LOBBYING RESTRICTIONS
22. Agency certifies by signing this agreement that:
A. No Federal appropriated funds have been paid or will be paid, by or
on behalf of the undersigned, to any person for influencing or
attempting to influence an officer or employee of any Federal agency,
a Member of Congress, an officer or employee of Congress, or an
employee of a Member of Congress in connection.with the awarding
of any Federal contract, the making of any Federal grant, the making
of any Federal loan, the entering into of any cooperative agreement,
and the extension, continuation, renewal, amendment, or
modification of any Federalcontract, grant, loan, or cooperative
agreement.
B. If any funds other than Federal appropriated funds have been paid or
will be paid:to any person for influencing or attempting to influence
an officer or employee of any Federal agency, a.Member of Congress,
an officer or employee of Congress,. or an employee of. a Member of
Congress in connection with this Federal, contract, grant,: loan, or
cooperative agreement,I the undersigned shall complete and, submit
Standard Form-LLL, ";Disclosure Form to Report, Lobbying", in
accordance with its instructions.
C. The undersigned shall require that the language of this certification
be included in the award documents for all subawards at all tiers
(including subgrants, and contracts and subcontracts under grants,
subgrants, loans; and cooperative agreements) which exceed $100,000,
and that all such subrecipients shall certify and disclose accordingly.
This certification_is a material representation of fact upon which
reliance was placed when this transaction was made or entered into.
Submission of this certification 'is a prerequisite for .making or
entering into this. transaction imposed by Section 1352, U.S. Code.,
Revised: 04/20/93
L]W026c.th N3 7
Anyerson who fails to file the r uired certification shall be
p � subject
to.a civil penalty of not less than $10,000 and not more than $100,000
for each such failure.
* Paragraphs 15, 16, and 20 are not applicable to any local agency on state
highway projects.
Revised: 04/20/93
LJW026c.th#3 8
Uregon
October 3,1995 �u •, ��u-s('�.s
DEPARTMENT OF
Washington County TRANSPORTATION
Dept. of Land Use and Transportation
Attn: Gregg Miller
155 North First Avenue, Suite 350
Hillsboro, OR 97124
FILE CODE:
City of Tigard AGR
Attn: Catherine Wheatley
13125 SW Hall Blvd.
Tigard,OR 97223
Attached for your records is a fully executed copy of an agreement covering
preliminary engineering to widen Greenburg Road where it crosses the Beaverton-
Tigard Highway to two through lanes in each direction plus other improvements.
We have retained a fully executed copy of this agreement for the Department of
Transportation's files.
Fran Neavoll, Agreement Specialist
Contracts Unit
Program Services
Attachment
Washington Co. (2 Original Agreements)
City of Tigard (1 Original Agreement)
FN084.lw
Rev. 4/28/95 Transportation Building
734-3122(1-93) Salem,OR 97310
Misc. Contracts and Agreements
No. 13489
SCC q S—�1K10
COOPERATIVE IMPROVEMENT AGREEMENT
PRELIMINARY ENGINEERING
THIS AGREEMENT is made and entered into by and between THE STATE OF
OREGON, acting by and through its Department of Transportation, hereinafter referred
to as "ODOT; WASHINGTON COUNTY, a political subdivision of the State of Oregon,
acting by and through its Board of County Commissioners, hereinafter referred to as
"COUNTY"; and the CITY OF TIGARD, also a municipal corporation of the State of
Oregon, acting by and through its Elected Officials, hereinafter referred to as "CITY".
WITNESSETH
RECITALS
1. The Beaverton -Tigard Highway (Oregon 217), is a part of the state highway system
Under the jurisdiction and control of the Oregon Transportation Commission. SW
Greenburg Road north of SW Oak Street is a COUNTY road under jurisdiction and
control of Washington County. SW Oak Street, SW Shady Lane, and SW
Greenburg Road south of Beaverton -Tigard Hwy. are City of Tigard facilities.
2. By the authority granted in ORS 366.770, and 366.775, ODOT may enter into
cooperative agreements with the counties and cities for the performance of work on
certain types of improvement projects with the allocation of costs on terms and
conditions mutually agreeable to the contracting parties.
3. Under such authority and for the purpose of providing acceptable traffic patterns on
public highways, COUNTY and CITY have requested ODOT to widen Greenburg
Road where it crosses Beaverton - Tigard Hwy. to two through lanes in each
direction plus other associated improvements necessary for the smooth flow of
traffic, hereinafter referred to as "PROJECT'. The location of the PROJECT is .
approximately as shown on the map attached hereto, marked "Exhibit A", and by
this reference made a part hereof. This agreement covers only the preliminary
engineering and design portion of the project.
4. The PROJECT preliminary engineering and design will be financed with a maximum
of $215,000 in MSTIP (Major Street Transportation Improvement Program) funds
provided by COUNTY and at no cost to ODOT or CITY:
5. By the authority granted in ORS 366.425, ODOT may accept deposits of money, or
an irrevocable letter of credit, from any county, city, person, firm or corporation for
M.•C. &A. NO. 13489
WASHINGTON COUNTY
CITY OF TIGARD
the performance of work on any public highway within ODOT. When said money or
a letter of credit is deposited, ODOT shall proceed with the PROJECT. Money so
deposited shall be disbursed for the purpose for which it was deposited.
6. By the authority granted in ORS 810.210, ODOT is authorized to determine the
character or type of traffic control devices to be used, and to place or erect them
upon State highways at places where ODOT deems necessary for the safe and
expeditious control of traffic. No traffic control devices shall be erected, maintained,
or operated upon any State highway by any authority other than ODOT, except with
its written approval.
NOW, THEREFORE, the premises being in general as stated in the foregoing
RECITALS, it is agreed by and between the parties hereto as follows:
ODOT OBLIGATIONS
1. ODOT shall, at PROJECT expense, conduct the necessary field surveys and traffic
investigations; and perform all preliminary engineering and design work required to
produce plans, specifications and estimates.
2. ODOT shall, upon execution of this agreement, request COUNTY to forward an
advance deposit for the full.estimated cost ($215,000) to design this PROJECT.
3. ODOT shall compile accurate cost accounting records and furnish COUNTY with
monthly itemized statements of said preliminary engineering and design costs.
4. ODOT shall, upon execution of this agreement, provide a schedule for preliminary
engineering and design work. The schedule will be reviewed and approved by
County and CITY prior to commencing work on the PROJECT. The $215,000 cost
for PROJECT preliminary engineering and design work is fixed. Any changes to the
schedule or cost estimate identified by any party to this agreement must be
reviewed and approved by the other parties to this agreement. A-new schedule and
cost estimate, as needed, will be provided by ODOT. A supplement to this
agreement will be requiredfor any PROJECT cost increase above $215,000.
2
• M. C. &A. NO. 13489
WASHINGTON COUNTY
CITY OF TIGARD
COUNTY OBLIGATIONS
1 The COUNTY hereby grants ODOT the exclusive right to enter onto and occupy
COUNTY right-of-way for the performance of the preliminary engineering and
surveying, associated with the PROJECT.
2. The COUNTY shall, upon execution of this agreement and notification from ODOT,
forward to ODOT a maximum of $215,000 for the estimated costs of preliminary
engineering and design of the PROJECT. Additional advance deposit requests will
not be made without a supplement to this agreement.
3. County shall identify and obtain all project required permits at its own expense.
4. The COUNTY shall authorize execution of this agreement during a regularly or
specially convened session of its Board of Commissioners.
CITY OBLIGATIONS
1. CITY hereby grants ODOT the exclusive right to enter onto and occupy its city right-
of-way for the performance of the preliminary engineering and surveying associated
with the PROJECT.
2. CITY shall authorize execution of this agreement during a regularly or specially
convened public session of its City Council.
GENERAL PROVISIONS
1. ODOT standards shall be used when designing any portion of the PROJECT within
ODOT right-of-way.
2. The contractor, its subcontractors, if any, and all employers working under this
Agreement are subject employers under the Oregon Worker's Compensation Law
and shall comply with ORS .656.017, which requires them to provide workers'
compensation coverage for all their subject workers.
IN WITNESS WHEREOF, the parties hereto have set their hands and affixed their seals
as of the day and year hereinafter written.
3
M.JC. &A. NO. 13489
WASHINGTON COUNTY
CITY OF TIGARD
On April 12, 1'995 the Oregon Transportation Commission adopted.Delegation Order 2,
which became effective May 1„ 1995. The order grants authority to the Region
Manager to approve and execute agreements for work,involving day-to-day operations.
STATE OF OREGON, by and through
its Department of Transportation
APPROVAL RECOMMENDED:
By: 0. �: By:
Re ion Engi eering Manager Region Manager
By: Date:
State Traffic Engineer
WASHINGTON COUNTY, by and
APPROV AS TO through its Board of County
LEGAL FF CIENC Commissioners
.yam
Asst. Attorney General Chairman
Date: �Il Z V�� Date:
APPROVED AS TO CITY OF TIGARD, by and ugh its
LEGAL SUFFICIENCY Elected fficials
B By
Cou Counsel Mayor
By By Gtr
City Counsel Recorder -r;54,.d Rps it
Date �la.3l4i
APPROVED WASHINGTON COUNTY
BOARD OF COMppMISSIONERS
MINUTE ORDER N .......r( ,„,
DATE.. ...............UL
.......
9T
x arakfi..
4
!1 vu
— -- — —
FS nfrta vx
«N M
#a d SW Ta[
SW e�ST BtaGi
IRH
CEA
WIOF R I SW 5'w CEDARCREST <S
TC
Z' v 3 > dg#tr 7900
WASHINGTON SQUARE �� 8600�y 8200 TNUT kwr < sW
a ii
..7 sw �n � SHOP;M I r SW CH U
I- HAWIESS LN Sw $ Idr am ry o F FN WF y a 8000
AMBINS ..'►. 4lAC: .,:a •I 1 mrtun SN dr •A• �' PIMLI �t ASN NILKE,vs .� nJz �` N S I o sw 45 80ROER5 ��` SW ELMW00[
CL 1 - d coTEk x s W i" w �yy �A a 9100 y 8800 ST y SW
u~i ctn u"a° c eEa�s� �' CRESCENT y rn Q $7 a HEMLOL +
,� 9• ISM
S d t� lE0. p wi RO d snm R ' 0 ,Ea PARK cof 9 F 0 900 ,� ! SW LARCH ST ST '< L
J a CO STOGA -
'�_ Sy `� �� : � SW d � $W v=i CORRAL IST � SW LARCH -
C i�Sr J I 0. �
r � �• _� pERCHEIiDN-LN -9 Q- L $W 5T ST > CO
r x h a s d I �' 4Zi 9000 < SW L U T
HAYS K '�- DR 'C� s ST g
� � 8000.
HtTEON c EER ` , $ <i m SW MAI
CHOL S �� i W OAK ST S SW $ OAK
SW COTTONTAZ 90oo
SW v2 sw COU CZ '"� r< as € `t::•
sw treFOcA hk ^P sr' o�'� m B h� F'9 CREEK_ ! H eOOON
S � d 9 L N IQ a s+ �LN 4` Cr C SHADY ALM T SW SP CE
SW KANKs �/�/.` sw DKIRN sr Z a' Tt10RH$� sw
9r <Am0" �x rwmwrcA sir �`
NORTH a DAKOTAsi SN a .11
t
sw 19 at
ERLAKE tHC[[wrF SW MILLYIEW IQ,,,, <'
L~=Cf L h Ha PARK ��d .01,,+:r 9► SUMER SST 4 dS` zd < < rn< < ✓ h h H Lai
d; Ma�� ^� A �n o SW PFAFFLE 8O0o ST
A NT aCREs op d ata SW TIGARD " 32SW j G 3 1L
3 8 ` '��aA w a{p"� oR ''a SW NEREsroNE �I c a s OTT L wi G�a $ P �� Qp•G�� :_
s • dLT Sid
91 IAUArONT A I Aw
5W FA�LCa7t SE OR N < GRD Tsw
sw
{ NORM NIIL i COR&of at Ea D15 at I, TM RINE ST �'t MEADOW ST >r S EL TANr£IA
1 c F 3 Q gi ERIIVBBE SN�' KATHERINE `� a
1RIDGE
......
.....
1.
4 ..MURRAY e!_. aergq as ' °fir a vWN ANN �vx SW arm sr�E \ I JR HS 1 y _ eLroEstutE ..\�
a `° sW 5 3 �T E�sW KAaEn T ® g PL ey1 Jp� sT �n KNO y
Cr al VIA NS f O ly S
sr n ZAT� _ SW d' ° ate ` �r FSS yj R
SW WALNUT ! J K K - > a I ` ° y< CC 9a SW
{ •�' a�+�ST S�, sN NeaIE at <S TI ,t� m SW- ERROL STN SWgy �• �'� JJ. f �' '
CT RL ` It
�D SN FERN a WALNUT sw SW
axE - R
LN -rc
Lu
W 5T_ - a V SW ALBERTA sT N T > 9+W E a s If FANNp `_, T R C .
<r < ,� I L WATKINS PL fid` +.CREBC
a-: + h�/ FONNER ST '¢ 1 Ja M_ 91 I ,' f
N 1 d cT CT C, OEL _ CTH 4 ` ... S
I:I
—--- ---_--M. ti SW J, MES� aS" — G� yQ� �Qv _o.._ CF
-e LIB: �... >
'(SW MRION ST i q► ` <PARK ST SW<
aYIEN � ti�� •h� /C� � Cl�.Q, �'y� � y� ..tbOK LN 0� � Ti' �� N�� � :I � n
BERM% SEp + � FFAAI VM F y7 ,A� 9+ 5T 0���,+, `Tom L'
/ ��` FRIM '� FAIRHAV cJr ` J ': `3L �� SA
r `ROSE ('� 4r u "SN SN SW EDGEW000 ST = <�c,
•. _ I _ VISTR 1'�� a: a[ 5"
l RSW HILLYI ST 9000 1 �r
—i I ti ST 8S Sr,NNW Y SN }U P(> > (j HILLVIEW B�sw c SW TEC
Cm+ _ `IS a 5� MCDONALDSTsw 1 GAA
sw au sw �r LROSE sT SW ELROSE CT LONY'�REEIC-CT
ail SW�uDt 'e` Y?+6 ' I SW BSI __ ' N .�< ~ > V < a < S?
Ar W FAN"
O
rn t µ 01-MY J a ti~ z
!I SW w ' r = Q Ar MCF .ter MOUNTAINVIEW LN " 2,a
tar}
iVIEW ERG `IEW SW --- - $ P $.• .
sncmww >e ex a `ili
Nsama W g IN a ST < �9FI ! 'tea i BONITA
4 ! 6 I MO INTAI N �, SW PEHB r ` PI SW CT e000
XLE
CEN 8 as LTa a s� v '< < 'a
r t`' IRDOC ST JR HS _ _ .>