Loading...
Correspondence (48) Site Address: - Building Division Transmittal Letter To: dD,~en tve ba I-IN DATE RECEIVED: DEPT: BUILDING DIVISION ; i : ~~AR 1 2V 101 FROM: r r5 G 1G COMPANY: T 3U INS r) rvI-. Ir, PHONE 71:11 fS.~3 By: (Case number, site address, etc.) (Z~ On ~CJ-5- (Project name or subdivision n ' e and lot num er) ATTACH D ARE THE FOLLOWING I S/ Co ies', D cri lion: o ies: Description: tional set s o plaann - Revisions: Cro on(s) aL etails. Wall bracing and/or lateral analysis. Floor/roof framing. Basement and retaining walls. Beam calculations. Engineer's calculations. Other (explain): L f C A L 1,'~~I I L. :I-Z: I REMARKS: OR OFFICE USE ONLY Routed to Permit Technician Date: Initials: Fees Due: 111 Yes No Fee Description: Amount Due: Special Instructions: Reprint Permit (per PE): ❑ Yes No ❑ Done Applicant Notified: Date: Initials: I:Building\Forms\Ltr-Transmittal.doc 02/20/07 Re: Alternative Crawl Space Ventilation for Gabriel Woods subdivision V E R L~ iv'!A Q'T`Y -i.Y~-3 CI Attn: Mark g Due to the foundation vent limitations on the interior units here at Gabriel Woods not allowing us to provide the adequate amount of crawl venting we have had Roth Heating and Cooling provide Humidistat fans for these crawl spaces. By using a 6" 150 CFM placed in the crawl with 6" ducting running from the foundation vents in the back to the front crawl space, this 150 CFM fan will replace the 1950 Cubic feet of air space 4.6 times an hour and will be able to pull air from all areas of the crawl space. The fan is also wired with a humidistat sensor that will gauge the humidity of the crawl space and function as needed. We have also provided the fan with a troubleshooting line that runs to the ga- rage where a red sensor light will turn on if ever needed to indicate that the fan is not functioning prop- erly. The following are the Lot numbers, Addresses and Permit numbers for all homes that require this me- chanical Ventilation: Lot 2: 13865 SW Anna Ct. MST 2006-10044-~- Lot 3: 13852 SW Anna Ct. MST 2006-10045x Lot 6: 13819 SW Anna Ct. MST 2006-10048 Lot 7: 13807 SW Anna Ct. MST 2006-100494- T Lot 12:13804 SW Anna Ct., MST 2006-100521 Lot 13: 13814 SW Anna Ct: MST 2006-10053' Lot 14: 13826 SW Anna Ct. MST 2006-10054 1" Lot 17: 11472 SW Lomax Ten. MST 2006-10057 Lot 18:11480 SW Lomax Tern MST 2006-100581 V Lot 19: 11488 SW Lomax Tern MST 2006-10050- Lot 22: 11489 SW Rebecca Terr. MST 2006-10062+ Lot 23: 11481 SW Rebecca Terr. MST 2006-10063 Lot 24: 11475 SW Rebecca Terr. MST 2006-100641 Thank you, Brad Miller Project Manager INTEX Custom Homes ROTH Kory MacGrepr HEATING & COALING P -eside rt Crawl Ventilation for Gabriel Woods 1950 cubic ft. air space in crawl 150 cfrn fan with humidistat will change out air in crawl 4.6- Mmes azi hour crawl ventilation provided by Roth Heating and Cooling ,R z220~ ;y 01, iga Cono,ate Hcacqua ler+. • P.O. Bnx 7En P.Bee 5 An jzr;on Road Cz~by, ..egor 9;~i 3 503.06214 Fa. 5,D32rE 34?8•CCE414009 Centel Oregon Branch 293? Slh Hg~ Ce>ert Dive •Pr:r ~ilie. Oregon 977;4 Mobile 5a: 945.1513 • Office dl E.C:OL :2665• ww.w.rothh?jt.:om om LEMON )t ; ' , ~ raa F 7 TAf W d ~ fl, OF pI. X N prAz "M k t' D k f 9d G ve r Rat. rAV All, c ~r MAR 12 200, CITY OF TJGARD otill.niml r r~gt.,•,, w n { i a d t f I j 1 Y S II ~ 1 Y I rr {I 1 1 Y 1 I ~ t x i ~ ~a