Loading...
HomeMy WebLinkAboutAttachment 3 Agency Comments MEMORANDUM Date: October 17, 2025 To: Jenny McGinnis, Associate Planner, City of Tigard From: Jackie Sue Humphreys, Clean Water Services (CWS) Subject: Sears Partition, MLP2025-0003, 1S1260000300, 00400 Please include the following comments when writing your conditions of approval: PRIOR TO ANY WORK ON THE SITE AND PARTITION PLAT RECORDING A Clean Water Services (CWS) Storm Water Connection Permit Authorization must be obtained prior to plat approval and recordation. Application for CWS Permit Authorization must be in accordance with the requirements of the Design and Construction Standards, Resolution and Order No. 19-5 as amended by R&O 19-22, or prior standards as meeting the implementation policy of R&O 18-28, and is to include: a. Detailed plans prepared in accordance with Chapter 2, Section 2.04. b. Detailed grading and erosion control plan. An Erosion Control Permit will be required. Area of Disturbance must be clearly identified on submitted construction plans. c. Detailed plans showing each lot within the development having direct access by gravity to public storm and sanitary sewer. d. Provisions for water quality in accordance with the requirements of the above named design standards. Water Quality is required for all new development and redevelopment areas per R&O 19-5, Section 4.04. Access shall be provided for maintenance of facility per R&O 19-5, Section 4.07.6. e. If use of an existing offsite or regional Water Quality Facility is proposed, it must be clearly identified on plans, showing its location, condition, capacity to treat this site and, any additional improvements and/or upgrades that may be needed to utilize that facility. f. If private lot LIDA systems proposed, must comply with the current CWS Design and Construction Standards. A private maintenance agreement, for the proposed private lot LIDA systems, needs to be provided to the City for review and acceptance. g. Show all existing and proposed easements on plans. Any required storm sewer, sanitary sewer, and water quality related easements must be granted to the City. h. Any proposed offsite construction activities will require an update or amendment to the current Service Provider Letter for this project. CONCLUSION This Land Use Review does not constitute CWS approval of storm or sanitary sewer compliance to the NPDES permit held by CWS. CWS,prior to issuance of any connection permits, must approve final construction plans and drainage calculations. Outlook RE: You've been invited to Studio Session MLP2025-0003 09-30-2025 From McGladrey, Alexander M. <alexander.mcgladrey@tvfr.com> Date Tue 9/30/2025 1:30 PM To Jenny McGinnis <jenny.mcginnis@tigard-or.gov> Hi Jenny, If I remember correctly this is just for the partition and the buildings will come in the future. If that's the case TVF&R does not have comment on this project. Thanks Alex McGladrey I Deputy Fire Marshal Tualatin Valley Fire & Rescue Direct: 503-259-1420 www.tvfr.com From:studio@bluebeamops.com <studio@bluebeamops.com> Sent:Tuesday, September 30, 2025 11:06 To: McGladrey,Alexander M. <alexander.mcgladrey@tvfr.com> Subject:You've been invited to Studio Session MLP2025-0003 09-30-2025 External Sender Alert a This email is from outside TVF&R. Do not click links or open attachments unless you are sure they are safe. [ Bluebeam Logo Join Session to Start Collaborating jenny.mcginnis@tigard-or.gov has invited you (alex.mcgladrey-@tvfr.com) to collaborate on a Session with Bluebeam. Invited Email: alex.mcgladrey-@tvfr.com Session Name: MLP2025-0003 09-30-2025 Session ID: 786-546-211 Server: studio.bluebeam.com Their message: Hello, This is an invitation to review a Minor Land Partition application within the City of Tigard. Please provide comments if you have any by October 14, 2025. Thank you!Jenny McGinnis Associate Planner, City of Tigard New to Bluebeam? Join Session Create Account_ New to Bluebeam? Bluebeam is markup and collaboration solution designed for design and construction professionals. Start a free 14-day trial today, or visit our website to learn more. LFacebook LLinkedln LTwitter ;YouTube LInstagram This email is sent by: Bluebeam,Inc., 443 S. Raymond Ave. Pasadena,CA 91105,USA We respect your right to privacy;view our policy. ©Copyright 2002-2025 Bluebeam, Inc.All Rights Reserved.