Loading...
HomeMy WebLinkAboutPLM2024-00505 .711 CITY OF TIGARD PLUMBING PERMIT • • COMMUNITY DEVELOPMENT Permit#: PLM2024-00505 Date Issued: 3/12/2025 T I ;A I I) 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 2S 115AB01900 Jurisdiction: Tigard Site address: 16200 SW PACIFIC HWY F Project: Consumer Cellular Subdivision: 1994-028 PARTITION PLAT Lot: 2 Project Description: Interior plumbing for TI:Capping(1)sink and(1)water closet;Adding(1)drinking fountain,(1)3"floor drain,(3) sinks,and(1)water closet;Installing(1)water heater and water piping. Contractor: DEVELOPMENT NORTHWEST INC Owner: SN PROPERTIES PARTNERSHIP 1075 W HISTORIC COLUMBIA RIVER HWY 1121 SW SALMON ST TROUTDALE,OR 97060 PORTLAND,OR 97205 PHONE: 503-667-1781 PHONE: FAX: 503-667-9891 FEES Quantity Description Date Amount 1 ea Drinking Fountain 03/12/2025 $25.02 Specifics: 2 ea Fixture/Sewer Cap 03/12/2025 $50.04 1 ea Floor Drain/Floor Sink/Hub 03/12/2025 $25.02 Type of Use: COM 3 ea Sink 03/12/2025 $75.06 Class of Work: ALT 1 ea Water Piping/DWV 03/12/2025 $56.29 Type of Const: 1 ea Water Closet 03/12/2025 $25.02 Occupancy Grp: 1 ea Water Heater 03/12/2025 $37.52 Stories: 1 12%State Surcharge- 03/12/2025 $35.28 Plumbing Total $329.25 Required Items and Reports(Conditions) This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules Issued By: 144 4. Permittee Signature: /�u 0 /�/�T��f�'1/ Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection.