Loading...
HomeMy WebLinkAboutMEC2024-00079 (2) III CITY OF TIGARD MECHANICAL PERMIT II COMMUNITY DEVELOPMENT Permit#: MEC2024-00079 Date Issued: 3/27/2024 TTGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 parcel: 2S115A601900 Jurisdiction: Tigard Site address: 16200 SW PACIFIC HWY W2 Project: Tigard Pet Supply Subdivision: 1994-028 PARTITION PLAT Lot: 2 Project Description: Mechanical for TI:Replace(2)like-for-like 5-ton RTUs. Contractor: OREGON AIRE INC Owner: SN PROPERTIES PARTNERSHIP 7715 NE 33RD DR STE A 1121 SW SALMON ST PORTLAND, OR 97211 PORTLAND, OR 97205 PHONE: 503-335-2222 PHONE: FAX: 360-423-1978 FEES Specifics: Description Date Amount Type of Use: COM Permit Fee 02/27/2024 $812.53 Class of Work: ALT Type of Const: VB Plan Review 02/27/2024 $203.13 Occupancy Grp: B Occupancy Load: 12%State Surcharge-Mechanical 02/27/2024 $97.50 Stories: 1 Project Valuation: $28,250.00 Fuel Air Handlers Fuel Types: Natural Gas Units<10000 cfm: Gas Pressure: Units> 10000 cfm: Furnaces Boilers&Compressors Furnaces<100K BTU: 0-3 HP: Furnaces>= 100K BTU: 3-15 HP: Floor Furnaces: 15-30 HP: Unit Heaters: 30-50 HP: Vents w/o Appliances: 50 or Greater HP: Air Conditioning: Heat Pump: 2 Appliances Vent Fans: Vent Systems: Total $1,113.16 Hoods: Comm Incinerators: Woodstoves: Gas Fireplaces: Required Items and Reports(Conditions) Clothes Dryers: Other Mech Units: Gas Outlets: Other Desc: Duct Work: Fire/Smoke Dampers: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may ••aih - copy of the rules Issued By: -2„,(../1 401-4/1 Permittee Signature: , )41�� c .... Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Mechanical Permit Applicat Eh/ED City of Tigard Received fi '�� 7 1413125 SW Hall Blvd.,Tigard,OR 97223 FEB DateBy: - _ Pef1nl!�'r e f'C'TV Phone: 503.718.2439 Fax: 503.598.1960 2024 Plan Review �� /�,..�.r�, DateBy: ' ,�� Other �` � �'�1� Cr 1.I G A R n Inspection Line: 503.639.4175 COO Internet: www.tigard-or.gov CITY OF TIGARD Date Ready/By: Tuns: H See Page 2 for BUILDING DIVISION Notified Method:0/ �� `✓ Supplemental Information I V.. t ,. : E.:;TiYPI_d W,ORI{` .a . i, . i 'COM gt ,:...L P SC1J DUL VSE CHE .I3 Mechanical permit fees*are based on the value of the work El New construction ❑■ Addition/alteration/replacement performed.Indicate the value(rounded to the nearest dollar)of all 0 Demolition 0 Other: mechanical materials,equipment,labor,overhead,and profit. tzli i e TE RY OF'YC smiiI CTIOi4 Value $2 825000 El1-and 2-family .,.,_ Y dwelling ❑■ Commercial/industrial ❑Accessory building For special information use checklist. ❑Multi-family 0 Master builder ❑Other: Description Qty. Ea. Total <_ : ,,, _ _il. .,'_ JOBSSITE*IaORI AflO AND LOCATIO Heating/cooling: Job site address:16200 SW Pacific Hwy Air conditioning 46.75 Furnace 100,000 BTU(ducts/vents) 46.75 City/State/ZIP:Tigard/Oregon/97224 Furnace 100,000+BTU(ducts/vents) 54.91 Suite/bldg./apt.no.: Project name:Tigard Town Square-Old Party Mart Heat pump 61.06 Duct work 23.32 Cross street/directions to job site: Hydronic hot water system 23.32 Residential boiler(radiator or hydronic) 23.32 Unit heaters(fuel-type,not electric), in-wall,in-duct,suspended,etc. 46.75 Flue/vent for any of above 23.32 Subdivision: Lot no.: Other: 23.32 Other fuel appliances: Tax map/parcel no.: Water heater 23.32 VINIME -1 igii:i DESCRIPTION OI Wkik i , Gas fireplace/insert 33.39 Flue vent for water heater or gas Replace(2)like-and-kind 5-Ton rooftop HVAC units fireplace 23.32 Log lighter(gas) 23.32 Wood/pellet stove 33.39 Wood fireplace/insert 23.32 Chimney/liner/flue/vent 23.32 ItOREItTt UWN1� Q TEIVi4IT Other: 23.32 ffa ,_. .- �.. .. i . .,.- , Environmental exhaust and ventilation: Name:Schnitzer Properties Range hood/other kitchen Address:1121 SW Salmon St I Suite 500 equipment 33.39 Clothes dryer exhaust 33.39 City/State/ZIP:Portland/Oregon/97205 Single-duct exhaust(bathrooms, toilet compartments,utility rooms) 23.32 Phone:(503)242-2900 Fax ( ) Attic/crawlspace fans 23.32 APPLICANT x ti'.., >' ❑ CONACT PERSONl :zInv Other: 23.32 Business name:Oregon-Aire Inc. Fuel piping: $14.15 for first four;$4.03 for each additional Contact name:Ian McDonald Furnace,etc. Address:7715 NE 33rd Drive I Suite A Gas heat pump Wall/suspended/unit heater City/State/ZIP:Portland/Oregon/97211 Water heater Phone:(503)335-2222 Fax::( ) n/a Fireplace E-mail:permits@oregon-aire.com Range Barbecue y.. . OPTRAC``TUR :Y. . . ,. a a.. Clothes dryer(gas) Business name:Oregon-Aire Inc. Other: Z ltKE E iEALECRII,OT#EF �t I Address:7715 NE 33rd Drive I Suite A "" Subtotal City/State/ZIP:Portland/Oregon/97211 Minimum permit fee($90.00) Phone:(503 )335-2222 Fax:( ) n/a Plan review(25%of permit fee) State surcharge(12%of permit fee) CCB lie.:64235 TOTAL PERMIT FEE This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Authorized signature: claw.,7/1�� j�B,�Z ZZ * Fee methodology set by Tri-County Building Industry Service Board Print name:Ian McDonald �c�� Date:2/1/24 I:\Building\Pern>its\IvIEC_PemvtApp_040113.doc 440-4617T(I I/02/COM/WEB) City of Tigard IhilCOMMUNITY DEVELOPMENT DEPARTMENT S T I n r.D Building Permit Review — Commercial - No Land Use Building Permit #: 44 ECG -u G o 71 Site Address: • tVZVO S v3 Paovhc Suite/Bldg#: T , w i Project Name: (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: / iV VA(2. 2 976 a . \ -k c,f'\c v6Nr(L =t.1 u tt. S 6€,v S l S Ure-e tiln $-kaindocol, Existing Business Activity: j(kA () 0\r,L\c c9, kZo. Proposed Business Activity: vac c ovv‘,k" .,P"Verify site address/suite#exists and active in permit system. 0 River Terrace Neighborhood: ❑ Yes ,Er No Zoning: C- L-'( An Permitted Use: ❑ Yes ❑ No V Spec Space giConfirm no land use required. -Er Business License: Exists: ❑ Yes K No, e app ' 'on Notes: Approved by Planning: Date: . / I I Z Revisions(after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: 1)--(( f L' Site Plans: # 2 Building Plans: # Building Permit#: 1.Enter building permit#above. Workflow Routing: gl, Planning [ Permil coordinator .$building Workflow Sign-off: Cign-off for Planning(include notes from planning review) Route Application Documents: Building: original permit application,site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: ,fflDate: c -(r)-- (.3-Lk, I:\Building\Forms\BldgPermitRvw COM NoLandUse_09072022.docx Engineering Review ❑ Slope at building pad: ❑ PFI Permit#: Conditions"Met"prior to issuance of permit ❑ asements (encroachments)per engineering conditions of approval and plat (not typical on SD /CUP) ❑ Wa r Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes ❑ No Assess` Uater Quantity Fee in-lieu: ❑ Yes ❑ No LIDA Facility on lot: ❑ Yes ❑ No Add Fee: Yes Cl No ❑ NOT Approved"by Engineering: Date Notes: Approved by Engineering: `�, Date: Revisions(after Building Submittal only Reviewer Date Revision 1: ❑ Approved ❑ Not ° 'proved Revision 2: ❑ Approved ❑ Not App.•ved Revision 3: ❑ Approved ❑ Not Appro :d Permit Coordinator Review ❑ Conditions "Met"prior to issuance of permit ❑ Approved,NOT Released: Date: ❑ ENG Revisions Required: Date: Notes: ❑ SDC Exemption ❑ Applied fe. ❑ Received ❑ ►oes not apply ❑ Fees Entered: Wash Co T , s Dev Tax: ❑ Yes ❑ N ❑ Deferred Tigard T ,ns SDC: ❑ Yes ❑ N/A\ ❑ Deferred Parks •C: ❑ Yes ❑ N/A '� ❑ Deferred LID.• Fee: ❑ Yes ❑ N/A ❑ OK to Issue/Approve• ,y Permit Coordinator: Date: Revisions (after Building ubmittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: Approved ❑ Not Approved Revision 3: , ❑ Approved ❑ Not Approved I:\Building\Forms\B1dgPermitRvw COM NoLandUse_08162022.docx