Loading...
HomeMy WebLinkAboutMEC2023-00150 (2) 111 CITY OF TIGARD MECHANICAL PERMIT 411 ' COMMUNITY DEVELOPMENT Permit#: MEC2023-00150 T I GARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 4/17/2023 Parcel: 2S115AB01900 Jurisdiction: Tigard Site address: 16200 SW PACIFIC HWY J1 Project: Chipotle Mexican Grill Subdivision: 1994-028 PARTITION PLAT Lot: 2 Project Description: Mechanical for TI:New RTU,ductwork, kitchen hood system with exhaust fan,and new restroom exhaust fan. Contractor: WESTERN CONSTRUCTION SERVICES INC Owner: SN PROPERTIES PARTNERSHIP 2300 E 3RD LOOP SUITE 110 1121 SW SALMON ST VANCOUVER, WA 98661 PORTLAND, OR 97205 PHONE: 360-699-5317 PHONE: FAX: 360-694-7818 FEES Specifics: Description Date Amount Type of Use: COM Permit Fee 04/17/2023 $4,325.67 Class of Work: ALT Type of Const: VB Plan Review 04/17/2023 $1,081.42 Occupancy Grp: B Occupancy Load: 12%State Surcharge-Mechanical 04/17/2023 $519.08 Stories: 1 Info Process/Archiving-Lg$2.00(over 04/17/2023 $12.00 Project Valuation: $158,800.00 11x17) Info Process/Archiving-Sm$0.50(up to 04/17/2023 $10.50 Fuel Air Handlers 11x17) Fuel Types: Electricity Units< 10000 cfm: Additional Plan Review 04/17/2023 $45.00 Gas Pressure: Units>10000 cfm: Furnaces Boilers&Compressors Furnaces< 100K BTU: 0-3 HP: Furnaces>= 100K BTU: 3-15 HP: Floor Furnaces: 15-30 HP: Unit Heaters: 30-50 HP: Vents w/o Appliances: 50 or Greater HP: Air Conditioning: Heat Pump: Appliances Vent Fans: 2 Vent Systems: Total $5,993.67 Hoods: Comm Incinerators: Woodstoves: Gas Fireplaces: Required Items and Reports(Conditions) Clothes Dryers: Other Mech Units: Gas Outlets: Other Desc: Duct Work: 10 Fire/Smoke Dampers: This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set fort 'n OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules Issued By: Permittee Signature: . Call 503.639.4175 by 7:00 a.m,for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Mechanical Permit Application FOR OFFICE I'SE ONEN. City of Tigard :-1tC � E Received 7 - 3 PermitNo.: 13125 SW Hall Blvd.,Tigard,OR D 97223 Date/By: 7/ ple-C ).3 C 1)/� ' Phone: 503.718.2439 Fax: 503.598.1960 (RllF9 DPlan Review, J C_ J ether Permit: U'IR15f ��s-oo o y TIGARD Inspection Line: 503.639.4175 0 b Date/Ready: Juts: See age 2 for , l Internet: www.tigard-or.gov - i rir L 1 Notified/Method: if Supplemental ll�`t"�, �� /�� -�.� Information p(' 1 - t'.r„ltJ '" ,i TYPE+ OP'wQ P CV: i RC1AL::FEE*' BE' JLE-h'USE C,HECIU ST. ip Mechanical permit fees*are based on the value of the work ❑New construction Addition/alteration/replacement performed.Indicate the value(rounded to the nearest dollar)of all ❑Demolition ❑Other: mechanical materials,equipment,labor,overhead,and profit. value $ 158 800 'iip CAIT`EGORY7 Q ONS'C) VcTIbI 6 ,, ';: 0 1-and 2-familydwelling i,"' - 110�SIDEl�i�ALITIPI�I1,, 'IYS�EM )�I�ES� _�,' welli g Commercial/industrial 0 Accessory building For special information use checklist. ❑Multi-family ❑Master builder 0 Other: Description Qty. Ea. Total '' ",�` ?ihiliPi d0 SITI&�i: iFt}It ntliV AN)1 LO IlljN i,,�i ii, v' Heating/cooling: ' Air conditioning 46.75 Job site address: 16200 SW PACIFIC HWY. Furnace 100,000 BTU(ducts/vents) 46.75 City/State/ZIP: TIGARD, OR 97224 Furnace 100,000+BTU(ducts/vents) 54.91 Suite/bldg./apt.no.SUITE J1 Project name: CHIPOTLE MEXICAN GRILL Heat pump 61.06 Duct work 23.32 Cross street/directions to job site: Hydronic hot water system 23.32 Residential boiler(radiator or hydronic) 23.32 Unit heaters(fuel-type,not electric), in-wall,in-duct,suspended,etc. 46.75 Flue/vent for any of above 23.32 Subdivision: Other: 23.32 Lot no.: Other fuel appliances: Tax map/parcel no.: 2S115AB01900 Water heater 23.32 .' `r' uI ESCRI IIt_11� `; VORI(, „ :? Gas fireplace/insert 33.39 Flue vent for water heater or gas _ Alteration of an existing freestanding building for a new fast causal fireplace 23.32 dining restaurant. Scope of work includes new rooftop units and Log lighter(gas)__ _,_ . 23.32 _ - associated ductwork, new kitchen hood system with exhaust - Wood/pellet stove 33.39 . fan/makeup air unit, and new restroom exhaust fan. _ Wood fireplace/insert 23.32 Chimney/liner/flue/vent 23.32 Other: 23.32 , `i.PROPL; .TY OWNER 1T 'U 'TENA 'x . , - Environmental exhaust and ventilation: Name: SN INVESTMENT PROPERTIES, LLC Range hood/other kitchen equipment 33.39 Address: 1121 SW SALMON ST. STE 500 Clothes dryer exhaust 33.39 City/State/ZIP: PORTLAND, OR 97205 Single-duct exhaust(bathrooms, toilet compartments,utility rooms) 23.32 Phone:(503 )450-0806 Fax:( ) Attic/crawlspace fans 23.32 :APFLt"tNT '': 'r' ❑ CONTACT PERSQN ii Other: 23.32 Business name: INTERIOR ARCHITECTS Fuel piping: $14.15 for first four;$4.03 for each additional Contact name: MELISSA STONIKINIS Furnace,etc. Address: 1217 SANSOM STREET, FLOOR 8 Gas heat pump Wall/suspended/unit heater City/State/ZIP: PHILADELPHIA, PA 19107 Water heater Phone:( 267)439 4887 Fax: :( ) Fireplace Range E-mail: M.STONIKINIS@INTERIORARCHITECTS.COM Barbecue 'o' l! . . ! ' ry CQNTRA TOR 10= Clothes dryer(gas) Business name: WESTERN CONSTRUCTION SERVICES, INC. Other: Address: -°?' -14IECRANI jPERMITI 1Ci .. 2300 E THIRD LP, SUITE 110 Subtotal $4325.67 City/State/ZIP:VANCOUVER, WA 98661 Minimum permit fee($90.00) Plan review(25%of permit fee) $1081.42 Phone:( 360)699 5317 Fax:(360)694 7818 State surcharge(12%of permit fee) $519.08 CCB lic.: 63717 TOTAL PERMIT FEE $5926.17 This permit application expires if a permit is not obtained within 180 /�// days after it has been accepted as complete. Authorized Signature:/// 1,�,Q� L_- ' ,,�, * Fee methodology set by Tri-County Building Industry Service Board Print name: MELISSA STONIKINIS Date: 1/6/23 / ^, I:\Building\Permits\MEC_PermiiApp_t40113.doe 440-4617T(l1/02/COM/WEB) / ,n l / /� ! ',7s- City of Tigard a COMMUNITY DEVELOPMENT DEPARTMENT TIGARD Building Permit Review — Commercial - No Land Use Building Permit #: ri j 3 —605—j Site Address: t(0206 61,0 rotes, k1 ' Suite/Bldg#: 3 I Project Name: UivIferkl12, PeAt Garr era (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: -AvhG t,'Jw (2-1-Us Existing Business Activity: {$OA.C&A tre ces (javf) Proposed Business Activity: f".41141 d_ PA'A ictiAy eslab Gish V' T/"i4 tLJ Verify site address/suite# exists and active in permit system. .r River Terrace Neighborhood: ❑ Yes .2' No %Zoning: C- CI Z Permitted Use: Yes ❑ No ❑ Spec Space Confirm no land use required. Business License: Exists: ❑ Yes ,v1 No, applicant was provided a business license application Notes: Stit, ray-Cif u JV 1Cfil�'bfl�y obScvveS -the, pus Approved by Planning: 3/7/ '',3 Date: Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: 3 7/23 Site Plans: # Building Plans: # Building Permit#: nter wilding permit#above. Workflow Routing: arming ❑ Permit Coordinator gh-firr--'1ding Workflow Sign-off: Sign-off for Planning(include notes from planning review) Route Application Documents: wilding: original permit application, site plans,building plans, engineer and beam calculations and trust details,if applicable, etc. Notes: By Permit Technician: Date: 3/--VA-3 I:\Building\Forms\B1dgPermitRvw_COM_NoLandUse 09072022.docx Permit Coordinator Review ❑ Conditions "Met"prior to issuance of permit ❑ Approved,NOT Released: Date: ❑ ENG Revisions Required: Date: Notes: ❑ SDC Exemption ❑ Applied for ❑ Received ❑ Does not apply ❑ Fees Entered: Wash Co Trans Dev Tax: ❑ Yes ❑ N/A ❑ Deferred Tigard Trans SDC: ❑ Yes ❑ N/A ❑ Deferred Parks SDC: ❑ Yes ❑ N/A ❑ Deferred LIDA Fee: ❑ Yes ❑ N/A ❑ OK to Issue/Approved by Permit Coordinator: Date: Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved El Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: El Approved El Not Approved I:\Building\Fonns\BldgPermitRvw_COM_NoLandUse_08162022.docx