Loading...
HomeMy WebLinkAboutBUP2023-00020 (2) 6scD2023-0ocg COMcheck Software Version 4.1.5.5 Interior Lighting Compliance Certificate Project Information RECEIVED Energy Code: 90.1 (2016)Standard �/ Project Title: Marshalls r r r) i ' 9fl91 Project Type: Alteration Construction Site: Owner/Agent: Designer/Contractor: 16200 SW Pacific Hwy T.J. Maxx Robert D Anderson P.E. Suite X 770 Cochituate Road Dallas,TX Tigard,OR 97224 Framingham, MA Allowed Interior Lighting Power A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts/ft2 (B X C) 1-Retail:Sales Area:Exempt Total Allowed Watts= N/A Area Category Exemption Qualifications Connected Watts Total#Watts Activity Area Pre-Alt. Repl./Added Pre-Alt. Post-Alt. Retail:Sales Area(20122 sq.ft.) 682 0 682.000 0.000 Exemption:Less than 20%connected lighting watts replacement. Proposed Interior Lighting Power A B C D E Fixture ID: Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. Retail:Sales Area(20122 sq.ft.): Exempt Track lighting:T4L:LED TRACK: Wattage based on current limiting device capacity 0 0 4800 4800 LED 1:W,Y:LAY-IN:LED Panel 110W: 1 134 133 17822 Total Proposed Watts= N/A Interior Lighting PASSES Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans, specifications, and other calculations submitted with this permit application.The proposed interior lighting systems have been designed to meet the 90.1 (2016) Standard requirements in COMcheck Version 4.1.5.5 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Mark Swanson-Project Manager Mark E swawsow 01/24/23 Name-Title Signature Date Project Title: Marshalls Report date: 01/24/23 Data filename: S:\DWG\ROGUE\ MARSHALLS TIGARD,OR REMODEL\MARSHALLS TIGARD ,OR 2019 90.1.cck Page 1 of 5 COMcheck Software Version 4.1.5.5 rill' Inspection Checklist Energy Code: 90.1 (2016) Standard Requirements: 0.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement,the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed.Where compliance is itemized in a separate table, a reference to that table is provided. e l q r I II� -s Corn - ti s/As urnp" ' rz r�R r i �15 ,0 ties &Req.ID .. + ', '�Tr :'" ��e �< 15 s'�l" . = ' a t,d °P4�, " �__ _ � a "_"= ,a"�"x r r;° �1. �4 �, Plans, specifications, and/or ❑Complies k1 ,,calculations provide all information i❑Does Not ®m„with which compliance can be determined for the electrical systems ❑Not Observable i (P and equipment and document where '❑Not Applicable tl�� "���exceptions are claimed. Feeder '5E ' ' connectors sized in accordance with � jsized fordmaximum dropsbranch ot 3�acuits 4.2.2, Plans,specifications, and/or I❑Complies 9.4.3, 9.7 calculations provide all information ❑Does Not [PR ;with which compliance can be 'determined for the interior lighting ❑Not Observable and electrical systems and equipment ❑Not Applicable and document where exceptions to : :the standard are claimed. Information jprovided should include interior ;lighting powerballasts calculations, wattage of bulbs and ,transformers and control devices. Additional Comments/Assumptions: 1 High Impact(Tier 1) INAMedium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Marshalls Report date: 01/24/23 Data filename: S:\DWG\ROGUE\ MARSHALLS TIGARD,OR REMODEL\MARSHALLS TIGARD ,OR 2019 90.1.cck Page 2 of 5 Ct1O�1 1N? ts ss Sfl tons �'0 : least 50%of all 125 volt 15-and ❑Complies yO] 20AmP receptacles are controlled by ODoes Not } an automatic control device. ❑Not Observable ❑Not Applicable New buildings have electrical energy i❑Complies [ use measurement devices installed. ❑Does Not Where tenant spaces exist, each a "tenant is monitored separately. In ['Not Observable � buildings with a digital control system ;❑Not Applicable the energy use is transmitted to to rx control system and displayed graphically. r4:014:41:-Y:JAutomatic control requirements ;❑Complies prescribed in Table 9.6.1,for the 3❑Does Not ' appropriate space type,are installed. ai Mandatory lighting controls(labeled ;❑Not Observable; as'REQ')and optional choice controls 'ENot Applicable j �. 'j(labeled as'ADD1'and 'ADD2')are 'implemented. a, € Independent lighting controls installed ❑Complies [ 244 per approved lighting plans and all ❑Does Not controls readily accessible and visible to occupants. ❑Not Observable , ❑Not Applicable 9.4.1.1f Daylight areas under skylights and ❑Complies [EL13]1 ':roof monitors that have more than ;❑Does Not 150 W combined input power for ;general lighting are controlled by ❑❑Not Observable photocontrols. Not Applicable 9.4.1.3 ;Separate lighting control devices for ❑Complies [EL4]1 :specific uses installed per approved ;❑Does Not lighting plans. j❑Not Observable ❑Not Applicable 9.6.2 ;Additional interior lighting power ;❑Complies [EL8]1 :allowed for special functions per the :❑Does Not approved lighting plans and is :automatically controlled and ❑Not Observable :separated from general lighting. ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) E2;,Medium Impact(Tier 2) 3. Low Impact(Tier 3) Project Title: Marshalls Report date: 01/24/23 Data filename: S:\DWG\ROGUE\ MARSHALLS TIGARD,OR REMODEL\MARSHALLS TIGARD,OR 2019 90.1.cck Page 3 of 5 • 0. �y ` ",-;A t.,,„ Filnal inspection Complies? Comments/Assam t ,ns _ ` ,I, aC.l i ,..s,,,i aV �� , iM ,jh ';. 4-- ..e-.. .`, ..;::W: .' .- i,,t, t ltraw ij, im r .., V , q ,l) a s,.,,o m N II 8.73. Furnished as-built drawings for i0Complies (11:16 , 5electric power systems within 30 days !❑Does Not ,,,, wd of system acceptance. .a '❑Not Observable; :0Not Applicable 8,7 2 .',!,Furnished O&M instructions for ;❑Complies [F117}3 „„systems and equipment to the i0Does Not building owner or designated representative. Not Observable 1 :„; ❑Not Applicable j 1 9.2.2.3 ;Interior installed lamp and fixture j❑Complies ;See the Interior Lighting fixture schedule for values. [FI18]1 ;lighting power is consistent with what ❑Does Not is shown on the approved lighting : ;plans, demonstrating proposed watts ❑Not Observable' 'are less than or equal to allowed '❑Not Applicable 3 ;watts. 9.4.4 At least 75%of all permanently i0Complies [F120]1 ?installed lighting fixtures in dwelling ❑Does Not units have>= 55 Im/W efficacy or a '>=45 Im/W total luminaire efficacy. ,❑Not Observable' ❑Not Applicable ; Additional Comments/Assumptions: 1 High Impact(Tier 1) -21;Medium Impact(Tier 2) 7,3 Low Impact(Tier 3) Project Title: Marshalls Report date: 01/24/23 Data filename: 5:\DWG\ROGUE\ MARSHALLS TIGARD,OR REMODEL\MARSHALLS TIGARD,OR 2019 90.1.cck Page 4 of 5 • Project Title: Marshalls Report date: 01/24/23 Data filename: S:\DWG\ROGUE\ MARSHALLS TIGARD,OR REMODEL\MARSHALLS TIGARD ,OR 2019 90.1.cck Page 5 of 5