HomeMy WebLinkAboutBUP2023-00020 (2) 6scD2023-0ocg
COMcheck Software Version 4.1.5.5
Interior Lighting Compliance Certificate
Project Information RECEIVED
Energy Code: 90.1 (2016)Standard �/
Project Title: Marshalls r r r) i ' 9fl91
Project Type: Alteration
Construction Site: Owner/Agent: Designer/Contractor:
16200 SW Pacific Hwy T.J. Maxx Robert D Anderson P.E.
Suite X 770 Cochituate Road Dallas,TX
Tigard,OR 97224 Framingham, MA
Allowed Interior Lighting Power
A B C D
Area Category Floor Area Allowed Allowed Watts
(ft2) Watts/ft2 (B X C)
1-Retail:Sales Area:Exempt
Total Allowed Watts= N/A
Area Category Exemption Qualifications
Connected Watts Total#Watts
Activity Area
Pre-Alt. Repl./Added Pre-Alt. Post-Alt.
Retail:Sales Area(20122 sq.ft.) 682 0 682.000 0.000
Exemption:Less than 20%connected lighting watts replacement.
Proposed Interior Lighting Power
A B C D E
Fixture ID: Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D)
Fixture Fixtures Watt.
Retail:Sales Area(20122 sq.ft.): Exempt
Track lighting:T4L:LED TRACK: Wattage based on current limiting device capacity 0 0 4800 4800
LED 1:W,Y:LAY-IN:LED Panel 110W: 1 134 133 17822
Total Proposed Watts= N/A
Interior Lighting PASSES
Interior Lighting Compliance Statement
Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the
building plans, specifications, and other calculations submitted with this permit application.The proposed interior lighting
systems have been designed to meet the 90.1 (2016) Standard requirements in COMcheck Version 4.1.5.5 and to comply with
any applicable mandatory requirements listed in the Inspection Checklist.
Mark Swanson-Project Manager Mark E swawsow 01/24/23
Name-Title Signature Date
Project Title: Marshalls Report date: 01/24/23
Data filename: S:\DWG\ROGUE\ MARSHALLS TIGARD,OR REMODEL\MARSHALLS TIGARD ,OR 2019 90.1.cck Page 1 of 5
COMcheck Software Version 4.1.5.5
rill' Inspection Checklist
Energy Code: 90.1 (2016) Standard
Requirements: 0.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement,the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed.Where compliance is itemized in a separate table, a reference to that table is provided.
e l q r I II� -s Corn - ti s/As urnp" ' rz
r�R r i �15 ,0 ties
&Req.ID .. + ', '�Tr :'" ��e �< 15 s'�l" . = ' a t,d °P4�, " �__ _ � a "_"= ,a"�"x r r;° �1.
�4 �, Plans, specifications, and/or ❑Complies
k1 ,,calculations provide all information i❑Does Not
®m„with which compliance can be
determined for the electrical systems ❑Not Observable i
(P and equipment and document where '❑Not Applicable
tl�� "���exceptions are claimed. Feeder
'5E
' ' connectors sized in accordance with
� jsized fordmaximum dropsbranch
ot 3�acuits
4.2.2, Plans,specifications, and/or I❑Complies
9.4.3, 9.7 calculations provide all information ❑Does Not
[PR ;with which compliance can be
'determined for the interior lighting ❑Not Observable
and electrical systems and equipment ❑Not Applicable
and document where exceptions to
:
:the standard are claimed. Information
jprovided should include interior
;lighting powerballasts calculations, wattage of
bulbs and ,transformers and
control devices.
Additional Comments/Assumptions:
1 High Impact(Tier 1) INAMedium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Marshalls Report date: 01/24/23
Data filename: S:\DWG\ROGUE\ MARSHALLS TIGARD,OR REMODEL\MARSHALLS TIGARD ,OR 2019 90.1.cck Page 2 of 5
Ct1O�1
1N? ts ss
Sfl
tons
�'0 :
least 50%of all 125 volt 15-and ❑Complies
yO] 20AmP receptacles are controlled by ODoes Not
} an automatic control device.
❑Not Observable
❑Not Applicable
New buildings have electrical energy i❑Complies
[ use measurement devices installed. ❑Does Not
Where tenant spaces exist, each
a "tenant is monitored separately. In ['Not Observable
� buildings with a digital control system ;❑Not Applicable
the energy use is transmitted to to
rx control system and displayed
graphically.
r4:014:41:-Y:JAutomatic control requirements ;❑Complies
prescribed in Table 9.6.1,for the 3❑Does Not
' appropriate space type,are installed.
ai Mandatory lighting controls(labeled ;❑Not Observable;
as'REQ')and optional choice controls 'ENot Applicable j
�. 'j(labeled as'ADD1'and 'ADD2')are
'implemented.
a, € Independent lighting controls installed ❑Complies
[ 244 per approved lighting plans and all ❑Does Not
controls readily accessible and
visible to occupants. ❑Not Observable
, ❑Not Applicable
9.4.1.1f Daylight areas under skylights and ❑Complies
[EL13]1 ':roof monitors that have more than ;❑Does Not
150 W combined input power for
;general lighting are controlled by ❑❑Not Observable
photocontrols. Not Applicable
9.4.1.3 ;Separate lighting control devices for ❑Complies
[EL4]1 :specific uses installed per approved ;❑Does Not
lighting plans. j❑Not Observable
❑Not Applicable
9.6.2 ;Additional interior lighting power ;❑Complies
[EL8]1 :allowed for special functions per the :❑Does Not
approved lighting plans and is
:automatically controlled and ❑Not Observable
:separated from general lighting. ❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) E2;,Medium Impact(Tier 2) 3. Low Impact(Tier 3)
Project Title: Marshalls Report date: 01/24/23
Data filename: S:\DWG\ROGUE\ MARSHALLS TIGARD,OR REMODEL\MARSHALLS TIGARD,OR 2019 90.1.cck Page 3 of 5
•
0.
�y ` ",-;A t.,,„ Filnal inspection Complies? Comments/Assam t ,ns _ ` ,I,
aC.l i ,..s,,,i aV �� , iM ,jh ';. 4-- ..e-.. .`, ..;::W: .' .- i,,t, t ltraw ij, im r .., V , q ,l) a s,.,,o m N II
8.73. Furnished as-built drawings for i0Complies
(11:16 , 5electric power systems within 30 days !❑Does Not
,,,, wd of system acceptance.
.a '❑Not Observable;
:0Not Applicable
8,7 2 .',!,Furnished O&M instructions for ;❑Complies
[F117}3 „„systems and equipment to the i0Does Not
building owner or designated
representative. Not Observable
1 :„; ❑Not Applicable j
1
9.2.2.3 ;Interior installed lamp and fixture j❑Complies ;See the Interior Lighting fixture schedule for values.
[FI18]1 ;lighting power is consistent with what ❑Does Not
is shown on the approved lighting :
;plans, demonstrating proposed watts ❑Not Observable'
'are less than or equal to allowed '❑Not Applicable 3
;watts.
9.4.4 At least 75%of all permanently i0Complies
[F120]1 ?installed lighting fixtures in dwelling ❑Does Not
units have>= 55 Im/W efficacy or a
'>=45 Im/W total luminaire efficacy. ,❑Not Observable'
❑Not Applicable ;
Additional Comments/Assumptions:
1 High Impact(Tier 1) -21;Medium Impact(Tier 2) 7,3 Low Impact(Tier 3)
Project Title: Marshalls Report date: 01/24/23
Data filename: 5:\DWG\ROGUE\ MARSHALLS TIGARD,OR REMODEL\MARSHALLS TIGARD,OR 2019 90.1.cck Page 4 of 5
•
Project Title: Marshalls Report date: 01/24/23
Data filename: S:\DWG\ROGUE\ MARSHALLS TIGARD,OR REMODEL\MARSHALLS TIGARD ,OR 2019 90.1.cck Page 5 of 5