HomeMy WebLinkAboutBUP2020-00147 BUP2o20-001'-1"1
W D Y Structural • Civil Engineers
RECEIVED
STRUCTURAL CALCULATIONS SUN g 2020
FOR
ACE HARDWARE CITY OF TiGARD
BUILDING DIVISION
DISPLAY SHELVING & RACK ANCHORAGE
TIGARD, OREGON
FEBRUARY 21, 2020
WDY Project#20005
40113151144
14,1
/c. o t x t `�'-py
17'• 9.
GON
*ti '
et% : ta, vv
G MVO
RENEWS: 12-31-2020
DESIGN PARAMETERS: 2019 Oregon Structural Specialty Code
RMI/ANSI MH16.1-2008
LOADING
SEISMIC
MAPPED RESPONSE Ss = 0.843; Si = 0.392
SITE CLASS D
IMPORTANCE IE = 1.00
CONTENTS:
LOADING G-1 to G-4
DISPLAY ANCHORAGE AN-1 to AN-14
RACK ANCHORAGE RK-1 to RK-9
ANCHORAGE PLAN & DETAILS S-1
6443 SW Beaverton-Hillsdale Hwy,suite 210•Portland,OR 97221 •ph:503.203.8111 •www.wdyi.com
15WDY Structural . Civil Engineers
Job Name: ACE Hardware Display Anchorage Job No: 20005 Sheet No: G-1
Client: Tigard Ace Hardware Date: Feb 2020 By: GGM
Design Criteria:
Seismic Loading: USGS Hazard Maps, USGS Design Map Program
Site Coordinates: 45.403 N -122.796 W
Soil Classification: D-Stiff Soil
Risk Category: II
Codes: 2019 Oregon Structural Specialty Code (OSSC/IBC), Chpt 16
ASCE 7-16, Chpts 13 & 15
RMI /ANSI MH16.1 -2008
Anchorage: ACI 318, Chpt 17
Seismic anchorage required for all display shelving over 6 ft tall and all steel storage or pallet racks
Seismic anchorage recommended for high load display shelving (Paint, Bulk Hardware, etc)where
typical shelf loading is in excess of 100 lbs
Seismic anchorage of display shelving under 6 ft tall is not required but may be installed using the
provided details at the tenants option.
The new shelving is limited to the expanded space located in an existing retail building with concrete
- slab on grade floors. Attachments to demising walls should be made only with a spreader
(wood ledger or similar) installed to evenly distribute loads. Field verify top of wall attachments.
InWDY Structural . Civil Engineers
- Job Name: ACE Hardware Display Anchorage Job No: 20005 Sheet No: G-2
Client: Tigard Ace Hardware Date: Feb 2020 By: GGM
Seismic Design Info:
Design Code Reference Document ASCE7.16
Risk Category
II
Site Class D-Stiff Soil
Type Value Description
Ss 0.843 MCER ground motion.(for 0.2 second period)
Si 0.392 NICER ground motion.(for 1.0s period)
Sall D.98 Ste-modified spectral acceleration value
Salt null-See Section 11,4.8 Ste-modified spectral acceleraton value
SOS 0.653 Numeric seismic design value at 0.2 second SA
Sot null-See Secton 11.4.8 Numeric seismic design value at 1.0 second SA
Type Value Description
SOC null-See Section 11.4.8 Seismic design categnn/
F, 1.163 Situ arnpt8catcn factor at 0.2 suc'nd
Fs. null-See Secton 11.4.8 Site emptficalion factor at 1.0 second
PGA 0.384 MCEG peak ground acceleratica
FPUA 1,216 Site ampificalion facxnr at PGA
PGA 0.467 Site modified pock ground acceleration
Ti_ 16 Long-period transition period in seconds
SsRT 0.843 Prcbebifistic risk-targeted ground motion.(0.2 second)
SsUil 0.953 , Factored uniform-hazard(2%probablt:ty of exceedance In 50 years)spectral acceleration
SsD 1.5 Factored deterministic acceleration value.(0.2 second)
- SIRT 0.392 Probabilistic risk-targeted ground motion.(1.0 second)
S1UH 0.452 Factored uniform-hazard(2%probability of exceedance In 50 years)spectral acceleration.
S1D 0.6 Factored deterministic acceleration value.(1.0 second)
- PGAd 0.5 Factored deterministic acceleration value.(Ptak Ground Acceleration)
Caa 0.884 Mapped value of the risk coefficient at short periods
CR1 0.866 Mapped value of tF.e risk coefffr`.ienl at a period of 1 s
WD Y Structural • Civil Engineers
Job Name: ACE Hardware Display Anchorage Job No: 20005 Sheet No: G-3
Client: Tigard Ace Hardware Date: Feb 2020 By: GGM
Lozier Display Shelving -Seismic Anchorage
• Anchorage for 8 foot tall typical height& (3) configurations
/ - /
_ —
io - - .- _ .
rn - rn
1
19" 19" 1 1 19" 28" 1 1 25"
1)Balanced 2)Unbalanced 3)One Sided
• Max load capacities per Lozier installation manual
19" shelf= 500 lbs
25"shelf= 500 lbs
28" shelf= 400 lbs
• Max unbalanced load per Lozier installation manual
12000 in-lbs
1000 ft-lbs
Wo contribution is negligible
• For 7-or 8-shelf configuration assume max uniform load = 1/2 total capacity
Ism/ W D Y Structural • Civil Engineers
Job Name: ACE Hardware Display Anchorage Job No: 20005 Sheet No: G-4
Client: Tigard Ace Hardware Date: Feb 2020 By: GGM
Lozier Display Shelving -Loading
• Configuration#1
Balanced W, = 2 x 8'x 500/2 = 4000#per section
Wo = 2 x 8' x 9#+ 2 x 37#= 218#per section
Unbalanced Wi = 8'x 500/2 =2000# per section
W2= 8 x 70#= 560#per section
Wo= 218# per section
ML= 180#x 8'x 0.79' = 1,137 lb-ft
• Configuration #2
Balanced W1 = 8' x 500/2= 2000# per section
W2 = 8'x 400/2 = 1600# per section
Wo = 235# per section
ML= 248 lb-ft
Unbalanced W, = 8' x 500/2 =2000#per section
W2 = 8 x 78#=624# per section
Wo= 235#per section
ML= 1,137 lb-ft
nWDY Structural . Civil Engineers
Job Name: ACE Hardware Display Anchorage Job No: 20005 Sheet No: AN-1
Client: Tigard Ace Hardware Date: Feb 2020 By: GGM
Seismic Anchorage Island Display(balanced)
Per ASCE 7-16, Sec 13.3.1
Seismic Force, Fp= [(0.4*ap*Sps*Wp)/(Rp/lp)]*(1 + 2*(z/h))
Upper Limit, Fp= 1.6*Sps*lp*Wp
Lower Limit, Fp= 0.3*Sps*lp*Wp
Input:
Sps= 0.653 From USGS Lookup
ap= 1.0 From Table 13.6-1
Rp= 2.5 From Table 13.6-1
1p= 1.00 From Sec. 13.1.3
Wo = 218.0 lbs Component operating weight(lbs)
We = 2666.80 lbs Load per 15.5.3.6 (a)
Wrote,= 2884.80 lbs
. f
i
- ......._ _ LI iiik_ • . _ ...1
ii ;
Ilaill _ ,.
Plan Section
H = 8.00 ft Height of Unit
w= 3.00 ft Depth of unit base
L= 12.00 ft Length -long dimension of unit
z= 0.00 ft Height of point of attachment of component
h = 3.50 ft Ave. height w/respect to base
c1 = 3.00 ft Height to center of mass of unit
c2 = 3.50 ft Height to center of mass of contents
c3 = 1.50 ft Dist to center of mass of unit from back wall
c4 = 1.50 ft Dist to center of mass of contents from back wall
- y = 3.47 ft Vert dist to center of mass
x = 1.50 ft Horiz dist to center of mass
0 W D Y Structural . Civil Engineers
Job Name: ACE Hardware Display Anchorage Job No: 20005 Sheet No: AN-2
Client: Ace Hardware Tigard Date: Feb 2020 By: GGM
Seismic Anchorage Island Display(balanced)
Per ASCE 7-16, Sec 13.3.1
Calculated Values
SOS= 0.653 WTOT= 2884.8 lbs
a = 1.0 I = 1.0
RP= 2.5 z= 0.00 ft
h = 3.50 ft
Resulting Seismic Force
Fp= 301.4 lb
Fp(upper limit) = 3014.0 lb
Fp(lower limit) = 565.1 lb
Fp(controlling) = 565.1 lb
Overturning & Uplift
MOB= 1961.0 ft-lb Fp*y
MRES= 2596.3 ft-lb (0.9WO+ 0.6Wc) *w/2
A = 0.0 ft-lb MovT- MRES
/(W-.2*w) = 0.0 lb Uplift Force
Fp(asd)= 403.7 lbs
Concrete anchor yes Anchor factor 1.3
Max load = 524.8 lbs
#of anchors = 4.0 (2)anchors per clip; (2) clips per section
Shear/anchor= 131.2 lbs
DC1248 Base every other upright w/(2) 3/8"dia
Dewalt Power Stud + SD2 anchors
(refer to Appendix D anchor calculation)
nW D Y Structural . Civil Engineers
Job Name: ACE Hardware Display Anchorage Job No: 20005 Sheet No: AN-3
Client: Ace Hardware Tigard Date: Feb 2020 By: GGM
Seismic Anchorage Heavy Load Island Display(balanced)4'oc
Per ASCE 7-16, Sec 13.3.1
Seismic Force, Fp= [(0.4*ap*Sos*Wp)/(Rp/Ip)]*(1 +2*(z/h))
Upper Limit, Fp= 1.6*Sos*IP*WP
Lower Limit, Fp= 0.3*SDs*Ip*Wp
Input:
Sos= 0.653 From USGS Lookup
ap= 1.0 From Table 13.6-1
Rp= 2.5 From Table 13.6-1
Ip= 1.00 From Sec. 13.1.3
Wo= 109.0 lbs Component operating weight(Ibs)
We = 3000.00 lbs Load per 15.5.3.6 (a)
Wtotai= 3109.00 lbs
.ice...--
4
V'wltammulfl/'
ti t
}
Plan Section
H = 8.00 ft Height of Unit
w= 3.00 ft Depth of unit base
L= 12.00 ft Length -long dimension of unit
z= 0.00 ft Height of point of attachment of component
h = 3.50 ft Ave. height w/respect to base
c, = 3.00 ft Height to center of mass of unit
cZ = 3.50 ft Height to center of mass of contents
c3= 1.50 ft Dist to center of mass of unit from back wall
c4 = 1.50 ft Dist to center of mass of contents from back wall
y= 3.47 ft Vert dist to center of mass
x= 1.50 ft Horiz dist to center of mass
WD Y Structural . Civil Engineers
Job Name: ACE Hardware Display Anchorage Job No: 20005 Sheet No: AN-4
Client: Ace Hardware Tigard Date: Feb 2020 By: GGM
Seismic Anchorage Heavy Load Island Display (balanced)4'oc
Per ASCE 7-16, Sec 13.3.1
Calculated Values
Sos= 0.653 WTOT = 3109.0 lbs
ap= 1.0 1p= 1.0
Rp= 2.5 z= 0.00 ft
h = 3.50 ft
Resulting Seismic Force
Fp= 324.8 lb
FP(upper limit) = 3248.3 lb
Fp(lower limit) = 609.1 lb
Fp(controlling)= 609.1 lb
Overturning & Uplift
Mot= 2113.4 ft-lb Fp*y
MRES= 2847.2 ft-lb (0.9WO+0.6Wc) *w/2
A = 0.0 ft-lb MOVT-MRES
/(w-.2'w) = 0.0 lb Uplift Force
Fp(asd) = 435.0 lbs
Concrete anchor yes Anchor factor 1.3
Max load = 565.5 lbs
#of anchors = 4.0 (2) anchors per clip; (2)clips per section
Shear/anchor= 141.4 lbs
DC1248 Base every upright w/(2) 3/8" dia Dewalt
Power Stud+ SD2 anchors
(refer to Appendix D anchor calculation)
niNDY Structural . Civil Engineers
Job Name: ACE Hardware Display Anchorage Job No: 20005 Sheet No: AN-5
Client: Ace Hardware Tigard Date: Feb 2020 By: GGM
Seismic Anchorage Island Display(unbalanced) 8*oc
Per ASCE 7-16, Sec 13.3.1
Seismic Force, Fp= [(0.4*ap*Sos*Wp)/(Rp/lp)j*(1 + 2*(z/h))
Upper Limit, Fp= 1.6*SDs*IP*WP
Lower Limit, Fp= 0.3*SDs*IP*Wp
Input:
SDs= 0.653 From USGS Lookup
ap= 1.0 From Table 13.6-1
Rp= 2.5 From Table 13.6-1
Ip= 1.00 From Sec. 13.1.3
Wo= 218.0 lbs Component operating weight(Ibs)
We = 2240.00 lbs Load per 15.5.3.6 (a)
Wtoia1= 2458.00 lbs
i }
Plan Section
H = 8.00 ft Height of Unit
w= 3.00 ft Depth of unit base
L= 12.00 ft Length -long dimension of unit
z= 0.00 ft Height of point of attachment of component
h = 3.50 ft Ave. height w/respect to base
= 3.00 ft Height to center of mass of unit
C2= 3.50 ft Height to center of mass of contents
c3 = 1.50 ft Dist to center of mass of unit from back wall
c4 = 1.50 ft Dist to center of mass of contents from back wall
y= 3.47 ft Vert dist to center of mass
x= 1.50 ft Horiz dist to center of mass
riwpy Structural . Civil Engineers
Job Name: ACE Hardware Display Anchorage Job No: 20005 Sheet No: AN-6
Client: Ace Hardware Tigard Date: Feb 2020 By: GGM
Seismic Anchorage Island Display(unbalanced)8'oc
Per ASCE 7-16, Sec 13.3.1
Calculated Values
Sps= 0.653 WTOT= 2458.0 lbs
a = 1.0 1p= 1.0
Rp= 2.5 z= 0.00 ft
h= 3.50 ft
Resulting Seismic Force
Fp= 256.8 lb
Fp(upper limit)= 2568.1 lb
Fp(lower limit) = 481.5 lb
Fp(controlling) = 481.5 lb
Overturning & Uplift
Mom= 1670.9 ft-lb Fp*y
MRES= 2310.3 ft-lb (0.9W0+ 0.6Wc)*w/2
A = 0.0 ft-lb MovT- MRES2
A /(w-.2*w) = 0.0 lb Uplift Force
Fp(asd)= 343.9 lbs
Concrete anchor yes Anchor factor 1.3
Max load = 447.1 lbs
#of anchors = 4.0 (2) anchors per clip; (2)clips per section
Shear/anchor= 111.8 lbs
DC1248 Base every other upright wl(2)3/8" dia
Dewalt Power Stud+ SD2 anchors
(refer to Appendix D anchor calculation)
W D Y Structural . Civil Engineers
lima
Job Name: ACE Hardware Display Anchorage Job No: 20005 Sheet No: AN-7
Client: Ace Hardware Tigard Date: Feb 2020 By: GGM
Seismic Anchorage Wall Display
Per ASCE 7-16, Sec 13.3.1
Seismic Force, Fp= [(0.4*ap*Sos*Wp)/(Rp/lp)]*(1 +2*(z/h))
Upper Limit, Fp= 1.6*Sos*Ip*Wp
Lower Limit, Fp= 0.3*Sos*lp*Wp
Input:
SIDS= 0.653 From Figure 22-1
ap= 1.0 From Table 13.6-1
Rp= 2.5 From Table 13.6-1
1p= 1.00 From Sec. 13.1.3
Wo= 180.0 lbs Component operating weight(lbs)
We = 1760.00 lbs Average content weight(lbs)-200#/shelf, fully loaded
Wtotai = 1930.00 lbs
iii
1,-'t:W4':
- I
Plan Section
H = 8.00 ft Height of Unit
w= 2.50 ft Depth of unit base
L= 12.00 ft Length -long dimension of unit
z= 7.50 ft Height of point of attachment of component
h = 4.00 ft Ave. height w/respect to base
c1 = 4.00 ft Height to center of mass of unit
c2= 3.50 ft Height to center of mass of contents
c3= 0.70 ft Dist to center of mass of unit from back wall
c4= 0.91 ft Dist to center of mass of contents from back wall
y= 3.45 ft Vert dist to center of mass
x= 0.89 ft Horiz dist to center of mass
riwpy Structural . Civil Engineers
Job Name: ACE Hardware Display Anchorage Job No: 20005 Sheet No: AN-8
Client: Ace Hardware Tigard Date: Feb 2020 By: GGM
Seismic Anchorage Wall Display
Per ASCE 7-16, Sec 13.3.1
Calculated Values
S0S= 0.653 WTOT= 1930.0 lbs
a = 1.0 IP= 1.0
RP= 2.5 z= 7.50 ft
h = 8.00 ft
Resulting Seismic Force
Fp= 579.7 lb
Fp(upper limit)= 2016.5 lb
Fp(lower limit) = 378.1 lb
Fp(controlling)= 579.7 lb
Overturning & Uplift
Movr= 2000.1 ft-lb Fp*y
MRES = 1078.7 ft-lb (0.9W0+ 0.6Wc) *w/2
A = 921.4 ft-lb MOVT- MRES
/h = 122.9 lb Wall Anchor Load
Fp(asd) = 414.1 lbs
SDS25175 allow= 250.0 lbs
#provided = 4.0 (2) per level
Capacity= 1000.0 lbs
(2) Simpson SDS25175 screws bracket to blocking
+ (1)#12 screws at 12"oc blocking to girt
flW D Y Structural • Civil Engineers
Job Name: ACE Hardware Display Anchorage Job No: 20005 Sheet No: AN-9
Client: Ace Hardware Tigard Date: Feb 2020 By: GGM
Display Anchorage:
DEWALT DEWAI,T Design Assist Ver.1.4.6.0 Pegs I
ENGINEERED BY'tr?OWerS" Ace Hardware
J_ 11 i.-i1 1 lair.
Company:
Project Engineer: Grog Munsell
Address: 6443 SW Beaverton I Iillsdale Suite 210 Portland OR 97221
Phone: M:50320381 l l
Email: gm unseli1n'wdyi.com
Project Name: Untitled
Project Address: Untitled
Notes:
Selected Anchor: Screw-Holt+
Brand: DEW'ALT
Material: 3i8"0 Low Carbon Steel
Embedment: ha 2.39 in h ,tti 3.25 in
Approval: IC C-ES ESR-3889
Issued Revision: Nov,2llls -
Drill Method: I hammer Drilled
Design Method: AC l 318.14
Load Combinations Section 5.3 User 1)etined Loads
Seismic Loading: Tension 17.2.3.4.30) Shear 17 2_3.5.34e" Sty,— User I?etined
Concrete:
Type ('racked Normal Weight Concrete
Strength 3000 pjci
Reinforcement:
Edge Rvinforremvnt >- i 4 Behar
Spacing Tension No(Condition 13) Shear Yes(Condition A)
Controls Breakout Tension False Shear False
Base Plate:
Sizing Thickness 0.25 in Length 5.5 in Width 3 in
Standoff None ['eight 0 in
Strength 36000 psi
Profile: HSS Rectangular 2 X 2 X 0.125
Input dais and mutts oust he eheckrd fur agreement will the existing cumdin res.ihr ssandnris and guidelines mmi nest be checked for p{aruib lily
riwpy Structural . Civil Engineers
Job Name: ACE Hardware Display Anchorage Job No: 20005 Sheet No: AN-10
Client: Ace Hardware Tigard Date: Feb 2020 By: GGM
Display Anchorage:
DEWALT DE V'AL.'1'Design Assist Ver.1,4.6.0 Page 2
Acc IIardware
ENGINEERED BY'Powers.
S::p 25 20I9
i as:o
/1S1
-'
3s5
I
II v
1 - x
hnin 5.000 in cmin 1.500 in Cr 7.800 in sat 2.000 in
Tension Loading
Design Proof Demand Oh) Capacity 4lb) Utilization Status Critical
Steel Strength 76.00 5674,00 0,01:3 OK
Concrete Breakout Strength 151_00 2554.00 (I_059 OK Controls
Pullout Strength 76.00 1477.00 0,051 OK
Shear Loading
De-sign Proof Demand (Ih) Capacity 1113) Utilization Status Critical
Steel Strength 260.00 1818.00 0.143 OK Controls
Concrete Breakout Strength 520.00 4470.00 0.116 OK
Tryout Strength 520,00 3930,00 0,132 OK
ANCHOR DESIGN CRITERIA IS SATISFIED 0
• The re-cults of the ealculutions canted out by means of the DDA Saliware are based essentially on the data you pot in.T etdote,
you Tear the auk ropunaibility fur the abaouce el errors,the curnplerenens and the relevance of the data to be lint in by yort.
Moreorcr,you heir sole respon,ihility for lowing the results of the calculation checked ltnd cleared by an design
psufessiitnal'ettgineet,pinticahiily with regard to compliance with applicable standards,norms:ant peliitits,prior to tua nf:than
for your speed tie project The DDA Scsftwnre:Servos only at an silt to interpret slundurt ,norms and permits withers!any
gnatanlec as to the absence of errors,the correcusess and the relewinee of the results.or suitability for a specific application.
• Culenlalinns including seismic design recluircrnents in accordance with AC1 318 are required for anchors in structures assigned to
seismic design ratetorit}s C.D.F and F.
• Under that a scisnnie conditions,the direction of sheer may not he predictable.In accordance with AC1 311i the€u t shear force
stioultl be assumed also in rgrkme dircelion fur a safe design.Load reVersai may influence the direction of the controlling
cumenete breakout siirenudi.
Input data and reautts must tk chteI e d for aprhmeni with the misting cundliicstu,the erandurat and guidetiues acid must he etiedied fur idausibiltty
flW D Y Structural • Civil Engineers
Job Name: ACE Hardware Display Anchorage Job No: 20005 Sheet No: AN-11
Client: Ace Hardware Tigard Date: Feb 2020 By: GGM
Display Anchorage:
DEWALT im,WALT Design Assist Ver.1.4.6.0 Page 3
Ace Hardware.
ENGINEERED BY-'owers'
:. 1 r iii t4I ai
Design Loads/Actions Z
Nu 151 lb Vux 0 lb V'uv 520 lb 4,
dY
Muz 0 in-lb hiux 0 in-lb Muy 0 in-lb 1;,tt. ,
Consider l.cvicl Reversal X Direction 100% Y l)iretrtion 100%
4G�1.4il j(
1,,I 4,1,i.
Max.concrete compressive.strain: 0.000 °•„ Anchor Eccentricity
MUN.concrete compressive stress; 0.000 psi ex 0.813 in ey 0,833 in
Resulting tension force: 151,000 lb Ptutile Eccentricity
Resulting compression farce.: 0.000 lb ex 0 in cy 0 in
Resulting anchor forces I Load distribution
Anchor Tension Load ON Shear!Avid (Ib} Component Shear l.uatl (lb) Anchor Comrdit1;il s(in)
Shear X Shear Y X �.•
1 75.50 280.0 0.0 260.0 0.000 1.875
75.50 260,0 0_0 260.0 0.000 -1.R75
Loads indicated include over-strength factor
to meet ACI ductility requirements
Input data and re...At must tx dueled ha munition with the noting cr,nditi';.the tamdnr 1.and guidelines cod must he•li.l ed tar plausih city
rilW D Y Structural . Civil Engineers
Job Name: ACE Hardware Display Anchorage Job No: 20005 Sheet No: AN-12
Client: Ace Hardware Tigard Date: Feb 2020 By: GGM
Display Anchorage:
DEWALT L)I:NALT L7tsign Assist Ver.1.4.6.0 Page 4
ENGIMEEHEIieT'r�UAA11e1"5' Ace I{urrltturr.
sr aT„ il it, ilL fi i I �aI ti
Sleet Strength: t N
ACI 318.14 17.4.1
J k • i♦I
Variables x* 44
N,, (lb) ip
I1711).000 (L65
Results
`PNsi - 5674.0 lb '['able 17.3.1.1
Tau:, 76.0 lb
Utilization - 1.3%
Concrete Breakout Strength: t N
ACt 318-14 17.4.2
Equations A A
R ;." ;
,, c ` '�.-i M1 -y 'tyr<s n }qll. 1 T.A.�.117
v..._ - .fe7 . h_r . Fin. 17.4.2.2u
Variables
AN, (in:) ANea (in=) Y�tc.N ‘Ved.N '1'c,N slrip,R
71 2CIt5 51.409 l.000 1 000 I,000
e (in) ke ). I', [psi) h„l, fin) C'amiu (in)
7.800 17.000 I.000 3000 1,30 8
TL (lbl Ip 'psria
1440.380 (1_65 0.750
l;exults
2554 lb Table 17.3.1.1
Nua = I51.1) 1b
Utilization = 5.9%
Pullout Strength: ' N
ACt 318-1417,4,3
7
I:yttotionS a+ • 1* All
Eqn. 17.4.3.1
{pr,A• p • (,; .;0)
Input dma and rtsuu is must t a checked fur dereemem with the ed ling eundiii..,thr srmulr n+t.and guktelines aro!must he checked for pLwsiL iIy
flW D Y Structural • Civil Engineers
Job Name: ACE Hardware Display Anchorage Job No: 20005 Sheet No: AN-13
Client: Ace Hardware Tigard Date: Feb 2020 By: GGM
Display Anchorage:
DEWALT UGWALT Design Assist Ver.I.4.6.0 Page 5
Ace llurdwarc
ENGINEEHED ay`mowers'
Variables
eP Np,ey Ott) i' Ip�i) n et'
1.000 11)28.406 30th) 0.500 0.65
Pseis
11.750
Results
tpNp,n = 1477 lb
Nua = 76 lb Table 17.3.1.1
Lltliz:etitn — 5.1e7i
lupus dohs and rusks must be rtu eks4 for ugrcemem with the outing oanditiwv,the uundnre:and guideltttcs en.i must he:heeled for plausiltility
riwpy Structural . Civil Engineers
`d
Job Name: ACE Hardware Display Anchorage Job No: 20005 Sheet No: AN-14
Client: Ace Hardware Tigard Date: Feb 2020 By: GGM
Display Anchorage:
DEWALT t)I[WALT Design Assist Ver.1,4,6.0 fags 6
ENGIMEEAEDBY'tr'owers Ace ITurd«uic
Steel Strength: V
ACI 318-14 17.5.1
Variables :#+
.r . 4
na.cu ;1bi hl'
3030.000 0.60
Results
V til,lll — l k l 1 lb
tr,ta — 260 lb -titbit.17,3.1,1
Utilization - 14.3%
Concrete Breakout Strength: V
ACI 318-14 17.5.2 _
Equations
17 5.2.1b
r Fqn. 17.5?.2a
V _ �8 • ( 1. .r7;) •) ti+ ` • (c ) '
Variables
Avc (1101 Avca (i0 `Y. v `Pet V y11
c,V tl')t,\'
120.000 2}0.000 1.000 1.000 1.200 1.549
I. (in) d,., (ink l. f; IItisi) col (in') Vb (1b)
2.390 0.375 1.000 3000 11..000 7694.539
9' h1'S cis
0.75 0,750
Results
tp4'dig - 4470 lb
Direction `t'+
Y„a = 520 lb Table 17.3.1.1
Utilization = 11.6%
Input d:un and results must be checked fur agreentem with du ciisting eunditiceA,the,zandir,u and guidelines and most he:h.tked tea plausikvlity
flW D y Structural . Civil Engineers
- Job Name: ACE Hardware Display Anchorage Job No: 20005 Sheet No: AN-15
Client: Ace Hardware Tigard Date: Feb 2020 By: GGM
Display Anchorage:
DE AL1 1)EWALi'Design Assist Ver.1.4.6.0 Page 7
Ace ILudwurc
ENGINEERED HI powers'
Pryaut Strength: V
ACI 318-1417.5.3
Equations a+ ;
lrcp •Yspg Eqn. 17.5.3.1 h
A _ Eqn. I7.4.2.1h
,
Itl r'�y �c<.N - +r's:J:ticii .r,n
v,.s b.e •),, • ,t • h.;t' Eon. 17,4,2,23
Variables
ANc (in') ANctt (in') ,„.N IYed.N wc•N •rP,N
7R.296 51.409 1,000 1,000 1.000 1,000
c tin) 1: �a her (in) lc (MI) C.antin (In)
7_R00 17.000 LON) 2.39 3000,000 8.000
Nh (lb) kg, Ntpe (Ib) C�
3440.380 1.00(1 5239.742 0,75
Results
s Fret: - 3930 Ii.+ Table 17,3,1,.I
4 uu 520 lb
Utilization — 132%,
Input data and rnaitts must be checked for agreement with the existing cunditiitrs,ahe tvndardx and guidelines land must he:necked tar plausibility
riwpy Structural . Civil Engineers
- Job Name: ACE Hardware Display Anchorage Job No: 20005 Sheet No: AN-16
Client: Ace Hardware Tigard Date: Feb 2020 By: GGM
Display Anchorage:
DE WA LT 131VirAL'i Design Assist N.rrr.1.4.15.0 Page S
ENGINEERED BY lowers" Ace I[urda urc
1+1l tPl i al i�i1f ) ii ,1 it
AU 3118.14 17.b
Equations
N Ef Egn. 17.6.3
+ ua
keta ci7 •N„ •Vn 1,0
1,2
Variables
tin
0,059 0.I4.3
Results
O.143 = 1.t1
Status OK
ANCHOR DESIGN CRITERIA IS SATISFIED 0
input data and r¢k+=1ts nm>t to checked lar agreement with the itdll j condilA-.the unWard.and gillikilas29 arra matt he:hacked Vox plauetKliq
WD Y Structural . Civil Engineers
- Job Name: Ace Hardware Rack Anchorage Job No: 20005 Sheet No: RK-1
Client: Ace Hardware Tigard Date: Feb 2020 By: GGM
Unit ID: Widespan Racks Garden & Storage areas
1�l
1'1*
.111:1A1
g2
g9 WTN �E
�
\ GT�
Configuration:
Length 96.0 in
Width 24.0 in
Height to brace, 61 8.0 in
Max brace spacing, 62 48.0 in
Overall height, H 96.0 in
Shelf 1 height, H1 48.0 in
Shelf 2 height, H2 96.0 in
Shelf 3 height, H3 0.0 in
Shelf 4 height, H4 0.0 in
Shelf 5 height, H5 0.0 in
Loading:
Shelf 1 1600.0 lbs 100.0 psf
Shelf 2 1600.0 lbs 100.0 psf
Shelf 3 0.0 lbs 0.0 psf
Shelf 4 0.0 lbs 0.0 psf
Shelf 5 0.0 lbs 0.0 psf
rillWDY Structural . Civil Engineers
- Job Name: Ace Hardware Rack Anchorage Job No: 20005 Sheet No: RK-2
Client: Ace Hardware Tigard Date: Feb 2020 By: GGM
Unit ID: Widespan Racks Per ASCE 7 Sec 15.5.3 & MH16.1
Seismic Force, Cs= (1.2*Sips* I) /(R *T 2/3) RMI Specification, Sec 2.7.3
Upper Limit, Cs= 2.5* Ca/ R
Input:
SDS= 0.653 Per USGS lookup
R= 4.0 RMI Spec, braced direction
R= 6.0 RMI Spec, unbraced direction
Aa= 0.15 RMI Figure 2.7.1
A„= 0.10 RMI Figure 2.7.2
Soil Profile= D RMI Specification, Sec 2.6.3.2
Ca= 0.18 RMI Table 2.7.1
C„= 0.17 RMI Table 2.7.2
1= 1.0
h = 8.00 ft Ave. height w/respect to base
T= 0.14
Cs= 0.72 RMI Specification, Sec 2.7.3
Cs= 0.11 Upper Limit
Use Cs= 0.113
Storage rack loads
Level Element Wt(Ibs) Load factor Net (Ibs)
Top rack Rack wt 50 1.00 50
Contents 1600 0.67 1072
1122
2nd rack Rack wt 50 1.00 50
Pallets 1600 0.67 1072
1122
Bottom rack Rack wt 0 1.00 0
Pallets 0 0.67 0
0
riwpy Structural . Civil Engineers
- Job Name: Ace Hardware Rack Anchorage Job No: 20005 Sheet No: RK-3
Client: Ace Hardware Tigard Date: Feb 2020 By: GGM
Unit ID: Widespan Racks Per IBC 2208.1 &ASCE 7-16 Sec 15.5.3
Distribution RMI Section 2.7.4
Level hX wX w,,* hX FX E FX
(feet) (Ibs) (Ibs) (Ibs)
Top rack 8 1122 8976 168.3 168.3
2nd rack 4 1122 4488 84.2 252.5
Bottom rack 0.5 0 0 0.0 252.5
Totals 2244 13464 252.5
V= CSl,WS = 0.113 x 2244 = 252.5
Overturning -Case 1: 0.67 x fully loaded shelves
Level hX wx MOT
(feet) (Ibs) (ft-lbs)
Top rack 8 80.5 644.3
2nd rack 4 40.3 185.3 1.15*h*Fx
Bottom rack 0.5 0.0 0.0 1.15*h*Fx
829.6
Resisting
Level hX wX MOT
(feet) (Ibs) (ft-lbs)
Top rack 1.0 751.7 751.7
2nd rack 1.0 751.7 864.5 1.15*h*Fx
Bottom rack 1.0 0.0 0.0 1.15*h*Fx
1616.2
FS = 1.95
rill
W D Y Structural . Civil Engineers
binosi
- Job Name: Ace Hardware Rack Anchorage Job No: 20005 Sheet No: RK-4
Client: Ace Hardware Tigard Date: Feb 2020 By: GGM
Unit ID: Widespan Racks Per IBC 2208.1 &ASCE 7-16 Sec 15.5.3
Overturning -Case 2: Top shelf only fully loaded
Level hx wx MOT
(feet) (Ibs) (ft-lbs)
Top rack 8 168.3 1346.4
2nd rack 4 0.0 0.0
Bottom rack 0.5 0.0 0.0
1346.4
Resisting
Level hx wx MOT
(feet) (Ibs) (ft-lbs)
Top rack 1.0 1122.0 1122.0
2nd rack 1.0 0.0 0.0
Bottom rack 1.0 0.0 0.0
1122.0
FS = 0.83
Net Uplift= MOT-0.9 *MREs/W= 841.5 lbs
Base Plate Anchors
Max shear load = 180.3 lbs (ASD Load)
Load per leg = 90.2 lbs
Max tension load = 841.5 lbs
Load per leg = 420.8 lbs
nINDY Structural . Civil Engineers
- Job Name: Ace Hardware Rack Anchorage Job No: 20005 Sheet No: RK-5
Client: Ace Hardware Tigard Date: Feb 2020 By: GGM
Anchorage Widespan Racks
Dill Iillmr11.1.1111
wwrtr,hlnl,us Prolix.Anchor 2.8.0
company. /I'DY EInrairal&Civil€n]lnears Page; 1
5pectryer: Project:. Ace Hardware
Addreass: E443 SW Beaverton;Hillsdale 0210-Portland,OR Sub-Projecl i P .No.: Widesipan Anchorage
Phone 1 Fax: 503-203-6111 I Date.
E-Mail:
$.pecl1lt is comments:
1 Input data
Anchor type and dlanKItar- Kw*Bolt TZ-Cs 10(3 1/4)
FHarllve amhodnner1 depth: h6,_„1=3.750 In,..h. =:UV!,`n,
tdatodat_ Carbon Stool
Evaluation Service Report: ESR.1917
Issued I Valid: 4,1i20111 j 5i 112019
Proof; De tgn Teethed ACI 3151-11 i 1Aech
80nd-off installation: q,=41,000 in.(na stand-afft;t=0,250 in.
Mchor plate: I,x Ir x t=2.500 in.x 4.000 in.x 0-260 in-;(Recommended plate thickness:not calculated
Profile: Square H55.(AISC):(I.x.W x T)-1250 in.x 1.250 in.x 0.168 in.
Base matetisl: clacked concrete,3000,k'-3.0G0 psi,h-5.000 In.
Installation: hair mar drilled/veto,Installation condition:Dry
Reinforcement: tension;condipon B,shear,condition p;no supplemental splitting reinforcement present
edge reir arcement:none or,c No.4 bar
"-The exichor calculation is based on a rali:l baseptale eaeurnpilon.
Geometry fin.]&Loading lib,in.ib]
Loads indicated include overstrength factor
z increase to satisfy ACI 17.2.3.4.3(d)
ductility requirements
S't
•
6T5 _ a
y.
rr•
x
riINDY Structural • Civil Engineers
- Job Name: Ace Hardware Rack Anchorage Job No: 20005 Sheet No: RK-6
Client: Ace Hardware Tigard Date: Feb 2020 By: GGM
Anchorage Widespan Racks
1II`TI
wwz+.hlnl.us Profis Anchor 2,8.0
Company, WUY Stractoral&r lvil Engineers Page; 2
Specifies. Pro]ect. Ace He'dxare
Addrevs: €443 SW semicolon Hillsdale 0210-Portland,OR Sub aojacl I Pos.Na.: Wklespien Isncharage
Phone I Fax: 593-203-6111 I Dale_
E•Mafl;
2 Load caselResulfing anchor forces y
Load cam Design loads
Anchor reactions[mil
Tension farce (*Tenss7n.-Compression]
Anchor Tomsion fcrco Shear force Shear force x Shear force y
1 2.543 225 0 725
max.ooncret're cornpresSiv strain; si,I'4 l'S.]
max.ooncrete compressr a stress- 3.225 1ps4
reetleng tension force Ili jxfyI-i0.600?-1.125): 2,643 pb]
retailing cohrptei skim forte in(X)y) (0.0001-1.9881: 1.591 iIb] /"
Anrhogr tnrra5 ere ciao clad based id on the assnmplion of a rigid h Wl4 Alfa. •f .} i
0
3 Ter►s[orn load
Load Waib] Capacity$M„[lb] Utilization pm■IN„){N Status
S1e.1 Slren9111' 7.643 8.929 33 OK.
P`ulk,nt Strengths' 2,643 3,5&0D Try OK
Concrete Bred-coat Slrenglh•' 2,643 3.546 76 OK
artttrar laiviny7 Iha lagtle'sl leading "aectrur group 1anchors in leveionj
3_1 Steal Strength
ESR value refer to ICC-ES ESR.1917
} Nty c N,t ACI 318.11 Tabs D.4.1.1
Varlabies
0.10 1 M,C30
Calculations
hL,lot
10,706
RasuMs
Ww lb'] 4 raai 4_N.,lib] N,..(Ib]
141, 9./VI 2.441
aW p y Structural . Civil Engineers
•
- Job Name: Ace Hardware Rack Anchorage Job No: 20005 Sheet No: RK-7
' Client: Ace Hardware Tigard Date: Feb 2020 By: GGM
Anchorage Widespan Racks
104111X11"11
w 'w.hllli,us Protis Anchor 2,8.0
Company- VrUY Slne:tilral 6 VIVII Engineers Page; 3
Sieedtfer Project. Ace Hetcheare
Address_ 6443 SW Sea veatorLHiltsdaie e210-Purllertd,OR Sub-irojecl I Pos.Wu.; Widespan,4nchccey
Phcule I Fax: 503,-203-6111 I Dale_
E•hlail;
3.2 Pullout Strength
Nr',r 2500
-NF.,t„i.. Y f refer to ICC-ES ESR.1917
4 N a N„ ACI 316.11 Table D.4,1.1
Variebtos
F.:Inzfl )-a h4r2173lib']_
3,4Q 100i1 4,915
GeWtdptione
251`+0
1.095
Reeuile
Nw,e.Obi ,:C..114. 4. Ida,r PIA N",Pbl
5,364 0..650 3,500 2,643
3,3 Concrete Breakout 5tfengtit
�A ACI 318-11 Eq. D-3)
�f.'r7���trN'1�rN'�rt,,-V ter,, Ni,r N„ ACI 318-11 Table 1)4,1.1
A,„ sae ACI 318 11,Pan 0.52.1,FIg.RO.6.2.103)
AreA =0 htr AC1-41&-11 Eq lD-b)
1
;,,{>< - 1*2 e„ _:1.0 ACI 318-11 Ea_(0-6)
3he
y ,y-0.7+0.3 ft) 1.0 ACI 318-11 E4-ID-10)
u =MAX( atom)s 1.0 ACI 318-11 Eq (O-12)
C,. C�
rat, =141_, t,U° ACt:118.I I Eq.
Variables
era 1Er.1 lin I y rN
3,250 0ODD 0,000 6.750 1.O3Q
(in.) a IP3')
7.600 17 1.000 3,01'f3
Gaicuilatl fora AA .E.[Mn f h ta
_. Are @n,I _ Af4 ,'1 _. "Q.r1,I4 _ V grill. V.ION __ `f�mN b]
95.06 :+i,06 1,000 1 Ma 1,000 1.O03 11,465
h1,4,11] 4 Ny,ph)
5,455 0 650 3,546 2.643
rlIWDYStructural • Civil Engineers
•
• Job Name: Ace Hardware Rack Anchorage Job No: 20005 Sheet No: RK-8
• Client: Ace Hardware Tigard Date: Feb 2020 By: GGM
Anchorage Widespan Racks
UI11'TI
ww.l,hlul.u: Profis Anchor 2.0.0
Company WDY Structural d.Clvll Eng neere Page: 4
Spertfe Project Ace Hardware
Address: 6443 SW 8aageolsn Hillsdale 0210-Portland,OR Sub-Project I Poe.Ne.: Widetpert Anchorage
Phone I Fax: 6Q I-203-13111 I Dale:
E-Mall:
4 Shear load
Load V.,Ilbl Capetity Vh Ifb1 Utillarftion ov in Vail,V. Statile
Sinai Slrnngth 225 3,572 7 OK
Sled failure(with lever arm)" 14(A WA WA NIA
Pryvul Slrenglh" 225 7,636 3 OK
Concrete edge failure in cirec0oo"" WA WA WA WA
"anchor having Via hirAfir<-t loading "'am:nor group(rstevar4 nnchcra)
41 Stool Strengths
V.. =ESR vaxie rater to ICC-ES ESR-1917
4 V,,,,,,.yr,;, ACI 3163-11 Table 0.4.1 1
Varlebl4e
A,..,[in'I f.Wall
0.10 1043.030
Caloulatlahe
V..PA
5,495
- Ree4JIt
V,.Pb1 4 v.,, , Vr,(6n4 V..Ilb)
5,495 6..050 3,572 225
4-2 Pryout Strength
14, -k"'L(,°rr-)v arN 1.,R W':i,:v h4,] ACI 316-11 Eq.(D•40)
4 V„It Va• AC.I 316-11 i able 13,4,1.1
AH: nee ACt ma-11,Pvt D..5,2.1,Fig,RD,S.2,lIb)
Asko =9h[I ACI Me-11 F'q.(t)f)
1
V„h. 1'Tel
2 .s 1.0 ACI 310-11 Eq.(D-8)
v,,,,,,-0.7 4 0.3(� )c 1.0 ACI 316-11 Eq.(D-10)
u rah=yto,}f( ';h—^F',1 r s 1,0 ACI 331e-11 Eq.(D-12)
Nn =k.;..'ti�hliz J ACI 316-11 Fq.(13 e)
Varlablue
K. no Dn.) eel NColl e_,14l01 ca„„[+nI
2 3250 0.004 0.003 0.750
V+..H c.,[n.i k; k. f.trizii
1.000 7 500 17 1 WA 3,000
Calculations
Ara.Pn21 P•••e Iin•tl W•,,,H V aar+ V tot., 4.,.,H Nh Pal
- 96.06 65.09 1.000 1.003 1.000 1_0O0 5,456
Re uII
V,o[bl 0.i.o.+, 4 V,,,,ituf V,,[lb]
10,911 D.700 7,630 226
r3WDY Structural . Civil Engineers
• Job Name: Ace Hardware Rack Anchorage Job No: 20005 Sheet No: RK-9
Client: Ace Hardware Tigard Date: Feb 2020 By: GGM
Anchorage Widespan Racks
1■411.:111"1
ewvw,hutl.ils Profis Anchor 2.8.0
Company 1MDY 91ntiral&,CIvll Engineers Page; 5
Specifier: Project. Ace Hardware
Addrette, 6443 SW Beave•ton Hillsdale 0210-Portland.OR Sub-Project I Pos.No.: 4Yidespan Anchorage
Phone I Fax: 543-203-Bill I Date:
C-f loll,'
5 Combined tension and shear loads
itp I;v C. UIIt tturrIs I'i Stehle
0.755 0A63 tH'3 64 OK
11hv=ISua IF/<=1
6 Warnings
• The anchor design methods in PROftS Anchor require rigid anchcr piates per current regulations tETAG pOtlAnnex C,IOTA TR029,etc.'.This
means load re-dstribulien en the anchors duo to ala.lic defarrnations of lira anchor plalo aro not considered•the anchor ply Is assumed to be
sulfa enUY sDH,In order net la be deformed when traiblerind le Iha design roaring PROF IS Anchor ralrt,feies the mtrrmtan required anchor plate
thfirness with FEM 1a lima the stress or the anchor prate based on the essurnpllcne explained above,The pooef if the rgkt base plebs ae-sunrplIcn
is valid is not carried out by talOfI3 Anchor.Input data and results most be chadced for agreement with the exieUng tont:eons and for
plausibility!
• Condition A appees Mien air iplenlentarf reinforcement Is used.The th factor is Increased for non-51eel Design Strengths except Pullout Strengdi
and Pryout strength. Condition B appies when simplernentary reinforcement is not used and cur Pulout Strength and PryouL Strength.Refer to
your boat standard.
• Refer to the manufacturer's product literature fur cleaning and installation instructons.
• Checaintl die traneter of loads into the base material and the shear reelalance are required i1 aoaardance with ACI 316 or the relevant standard)
• Hitt post-Imballad arsfihrre shah be instated In accordance AO the HIIII fdarufariurer'a Pnnled Installation Instructions(Nell).Refererxs AC1
31 B-11,Ira r1 D.Q.1
•
Fastening meets the design criteria!