Loading...
HomeMy WebLinkAboutRiver Terrace East No. 3SW 1 6 9 T H A V E SW SCHOLLS F E R R Y R D (C.R. N O . 3 1 1 0) SW WOODGROVE ST SW LARKSPRING LN SW SNOWDALE ST SW LEMONGRASS LN ALLEY M SW P E A C H B L O S S O M A V E SW R O Y R O G E R S R O A D ( C .R . N O . 3 15 0 ) AU B G E R G I N E T E R FOREST HOLLOW ST SW L A R K W O O D P L SW FRIENDLY LN SW LEM O N G R A S S L N FOREST HOLLOW ST SW M E A D B R O O K L N LIMITS OF PHASE 3 PROJECT CONSTRUCTION OVERALL PROJECT BOIUNDARY 1 INCH = 150 FEET 150 75 150 SCALE 0 WASHINGTON COUNTY BENCHMARK NO. 107, A BRASS DISK SET IN CONCRETE, SOUTH SIDE OF S.W. SCHOLLS FERRY RD NEAR PROJECTED CENTERLINE OF S.W. 175TH AVE. ELEVATION DATUM: NGVD 29, ELEVATION = 306.552 UTILITIES & SERVICES: WATER: STORM: SEWER: POWER: GAS: FIRE: POLICE: SCHOOL: PARKS: PHONE: WASTE DISPOSAL: CABLE: BENCHMARK: TAYLOR MORRISON INC. 109 E. 13TH ST. VANCOUVER, WA 98660 [P] 503-221-1920 CONTACT: CHRIS WALTHER APPLICANT: PACIFIC COMMUNITY DESIGN, INC 12564 SW MAIN ST. TIGARD, OR 97223 [P] 503-941-9484 CONTACT: PATRICK ESPINOSA, PE CIVIL ENGINEER: PACIFIC COMMUNITY DESIGN, INC 12564 SW MAIN ST. TIGARD, OR 97223 [P] 503-941-9484 CONTACT: STACY CONNERY, AICP PLANNER: KITTELSON & ASSOCIATES, INC 610 SW ALDER STREET, STE 700 PORTLAND, OR 97205 [P] 503-228-5230 CONTACT: JULIA KUHN, PE TRAFFIC ENGINEER: GEODESIGN, INC 15575 SW SEQUOIA PARKWAY, SUITE 100 PORTLAND, OR 97224 [P] 503-968-8787 CONTACT: SHAWN DIMKE, G.E., P.E. GEOTECHNICAL ENGINEER: SHEET INDEX: GROSS ACREAGE: 0.69 AC (4 LOTS) PORTION OF TAX LOT 200: CRESCENT GROVE CEMETERY ASSOCIATION TAX LOT 24300: KINTON LAND & BISON, LLC OWNERS: PACIFIC COMMUNITY DESIGN, INC 12564 SW MAIN ST. TIGARD, OR 97223 [P] 503-941-9484 CONTACT: TRAVIS JANSEN, PLS, PE SURVEYOR: SWCA ENVIRONMENTAL CONSULTANTS 434 NW SIXTH AVENUE, STE 304 PORTLAND, OR 97209 [P] 503-224-0333 CONTACT: MIRTH WALKER, PWS, CWD NATURAL RESOURCE CONSULTANT: TL 24300 & PORTION OF TL 200 TOWNSHIP 2 SOUTH, RANGE 1 WEST, SEC. 6 W.M. CITY OF TIGARD WASHINGTON COUNTY, OREGON RIVER TERRACE EAST NO.3 PHASE 3 SW BULL MOUNTAIN RD. S W R O Y R O G E R S R D . VICINITY MAP PACIFIC COMMUNITY DESIGN, INC 12564 SW MAIN ST. TIGARD, OR 97223 [P] 503-941-9484 CONTACT: KERRY LANKFORD, RLA, CLARB LANDSCAPE ARCHITECT: Construction Documents N: \ p r o j \ 3 9 5 - 0 6 1 \ 0 9 D r a w i n g s \ 0 5 A s b u i l t s \ S h e e t s - P h a s e 3 \ 3 9 5 0 6 1 . ( 1 ) P H 3 - C O V E R . D W G - S H E E T : CO V E R Ju n . 1 6 , 2 1 - 4: 0 8 P M je f f ELEVATION DATUM: NGVD 29 GEODESIGN, INC River Terrace East No. 3 Phase 3 REVISIONS DATE DESCRIPTION REVIEWED BY: TYPE: PROJECT NO.: AS-BUILTS 395-061 KCS RENEWS: JUNE 30, 2022 12564 SW Main Street Tigard, OR 97223 [T] 503-941-9484 05/18/20211ST SUBMITTAL: SW SCHOLLS FERRY RD. PROJECT SITE CITY OF TIGARD WATER, [P] 503-718-2591 CITY OF TIGARD, [P] 503-639-4171 CITY OF TIGARD, [P] 503-639-4171 PORTLAND GENERAL ELECTRIC, [P] 503-736-5450 NORTHWEST NATURAL, [P] 503-721-2512 TUALATIN VALLEY FIRE & RESCUE, [P] 503-649-8577 CITY OF TIGARD, [P] 503-629-0111 BEAVERTON SCHOOL DISTRICT, [P] 503-356-4500 CITY OF TIGARD, [P] 503-645-6433 FRONTIER, [P] 503-277-2383 WASTE MANAGEMENT, [P] 800-808-5901 COMCAST, [P] 800-266-2278 ATTENTION: OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED BY THE OREGON UTILITY NOTIFICATION CENTER. THOSE RULES ARE SET FORTH IN OAR 952-001-0010 THROUGH 952-001-0090. YOU MAY OBTAIN COPIES OF THE RULES BY CALLING THE CENTER. THE TELEPHONE NUMBER FOR THE OREGON UTILITY NOTIFICATION CENTER IS (503) 232-1987 THIS DESIGN COMPLIES WITH ORS 92.044 (7) IN THAT NO UTILITY INFRASTRUCTURE IS DESIGNED TO BE WITHIN ONE (1) FOOT OF A SURVEY MONUMENT LOCATION SHOWN ON SUBDIVISION OR PARTITION PLAT. NO DESIGN EXCEPTIONS NOR FINAL FIELD LOCATION CHANGES SHALL BE PERMITTED IF THAT CHANGE WOULD CAUSE ANY UTILITY INFRASTRUCTURE TO BE PLACES WITHIN THE PROHIBITED AREA. 1 COVER SHEET 1 COVER SHEET 1.1 CONDITIONS OF APPROVAL 2 GENERAL CONSTRUCTION NOTES 3 EXISTING CONDITIONS & DEMOLITION PLAN 4 SITE PLAN 5 GRADING PLAN 6 LOT GRADING SECTIONS 7 COMPOSITE UTILITY PLAN 8 SW LARKWOOD PL STREET & STORM PLAN & PROFILE 9 SW LARKWOOD PL SANITARY SEWER & WATER PLAN & PROFILE DTL1 STREET DETAILS DTL2 SEWER DETAILS DTL3 WATER DETAILS L1.01 STREET TREE PLANTING PLAN EC1 COVER SHEET EC2 EXISTING CONDITIONS & DEMOLITION PLAN EC3 EROSION & SEDIMENT CONTROL PLAN EC4 EROSION & SEDIMENT CONTROL DETAILS Construction Documents N: \ p r o j \ 3 9 5 - 0 6 1 \ 0 9 D r a w i n g s \ 0 5 A s b u i l t s \ S h e e t s - P h a s e 3 \ 3 9 5 0 6 1 . ( 1 ) P H 3 - C O V E R . D W G - S H E E T : CO A Ju n . 1 6 , 2 1 - 4: 0 8 P M je f f ELEVATION DATUM: NGVD 29 GEODESIGN, INC River Terrace East No. 3 Phase 3 REVISIONS DATE DESCRIPTION REVIEWED BY: TYPE: PROJECT NO.: AS-BUILTS 395-061 KCS RENEWS: JUNE 30, 2022 12564 SW Main Street Tigard, OR 97223 [T] 503-941-9484 05/18/20211ST SUBMITTAL: 1.1 CONDITIONS OF APPROVAL PRIOR TO COMMENCING ANY ONSITE IMPROVEMENTS: 1.PRIOR TO ANY SITE WORK, THE PROJECT ARBORIST SHALL PERFORM A SITE INSPECTION FOR TREE PROTECTION MEASURES, DOCUMENT COMPLIANCE/NON-COMPLIANCE WITH THE URBAN FORESTRY PLAN AND SEND WRITTEN VERIFICATION WITH A SIGNATURE OF APPROVAL DIRECTLY TO THE CITY MANAGER OR DESIGNEE WITHIN ONE WEEK OF THE SITE INSPECTION. 2.THE PROJECT ARBORIST SHALL PERFORM SEMIMONTHLY (TWICE MONTHLY) SITE INSPECTIONS FOR TREE PROTECTION MEASURES DURING PERIODS OF ACTIVE SITE DEVELOPMENT AND CONSTRUCTION, DOCUMENT COMPLIANCE/NONCOMPLIANCE WITH THE URBAN FORESTRY PLAN AND SEND WRITTEN VERIFICATION WITH A SIGNATURE OF APPROVAL DIRECTLY TO THE PROJECT PLANNER WITHIN ONE WEEK OF THE SITE INSPECTION. 3.PRIOR TO ANY SITE WORK, THE APPLICANT SHALL PROVIDE A FEE IN THE AMOUNT OF $2,054 FOR THE CITY'S COST OF COLLECTING AND PROCESSING THE INVENTORY DATA FOR THE ENTIRE URBAN FORESTRY PLAN OF 60 PLANTED TREES, AND TWO EXISTING STANDS TO BE PRESERVED ($154 FIRST TREE + $1,652 ($28 X 59) + $248)=$2,054. 4.PRIOR TO ANY SITE WORK, THE APPLICANT SHALL PROVIDE A TREE ESTABLISHMENT BOND IN THE AMOUNT OF $30,600 (60 PLANTED TREES X $510/TREE) IS REQUIRED. 5.PRIOR TO ANY SITE WORK, THE APPLICANT SHALL OBTAIN ANNEXATION APPROVAL FROM WASHINGTON COUNTY AND METRO FOR EXTENSION OF THE CLEAN WATER SERVICES DISTRICT AND METRO SERVICE DISTRICT BOUNDARIES, RESPECTIVELY, TO INCLUDE THE SUBJECT PROPERTY. 6.PRIOR TO ANY SITE WORK, THE APPLICANT SHALL SUBMIT A WRITTEN DEFERRAL AGREEMENT IN A FORM SATISFACTORY TO THE CITY THAT MEETS THE REQUIREMENTS OF 18.660.030.C.2.B. SUBMIT TO THE ENGINEERING DEPARTMENT (GREG BERRY, 503-718-2468) FOR REVIEW AND APPROVAL: 7.PRIOR TO COMMENCING ONSITE IMPROVEMENTS, A PUBLIC FACILITY IMPROVEMENT (PFI) PERMIT IS REQUIRED FOR THIS PROJECT TO COVER ALL INFRASTRUCTURE WORK AND ANY OTHER WORK IN THE PUBLIC RIGHT-OF-WAY. SIX (6) SETS OF DETAILED PUBLIC IMPROVEMENT PLANS SHALL BE SUBMITTED FOR REVIEW TO THE ENGINEERING DEPARTMENT. NOTE: THESE PLANS ARE IN ADDITION TO ANY DRAWINGS REQUIRED BY THE BUILDING DIVISION AND SHOULD ONLY INCLUDE SHEETS RELEVANT TO PUBLIC IMPROVEMENTS. PUBLIC FACILITY IMPROVEMENT PERMIT PLANS SHALL CONFORM TO CITY OF TIGARD PUBLIC IMPROVEMENT DESIGN STANDARDS, WHICH ARE AVAILABLE AT CITY HALL AND THE CITY'S WEB PAGE (WWW.TIGARD-OR.GOV). 8.PRIOR TO COMMENCING GRADING OR ONSITE IMPROVEMENTS, DEMONSTRATE THAT ALL RELIED UPON OFFSITE FACILITIES ARE COMPLETE AND OPERATIONAL INCLUDING: LOCAL STREET CONNECTIONS TO ROY ROGERS AND SCHOLLS FERRY ROADS, SANITARY SEWER LINES AND PUMP STATION, STORM DRAIN LINES AND COMBINED TREATMENT FACILITIES, AND ADEQUATE WATER PRESSURE TO SERVE THE ENTIRE SITE. 9.PRIOR TO “GRADING ONLY” PERMIT THE APPLICANT SHALL COMPLY WITH THE CITY OF TIGARD'S GRADING ONLY POLICY AND APPLICATION REQUIREMENTS. NOTE: A 1200-CN PERMIT WILL BE REQUIRED PRIOR TO ANY SITE GRADING. 10.PRIOR TO COMMENCING ONSITE IMPROVEMENTS, A WASHINGTON COUNTY ROW AND/OR FACILITIES PERMIT IS REQUIRED FOR THIS PROJECT TO COVER ALL INFRASTRUCTURE WORK AND ANY OTHER WORK IN THE PUBLIC RIGHTS-OF-WAY OF ROY ROGERS ROAD AND SCHOLLS FERRY ROAD. THE APPLICANT SHALL COMPLY WITH THE RECOMMENDED CONDITIONS BY WASHINGTON COUNTY LUT, DATED SEPTEMBER 29, 2016. 11.PRIOR TO COMMENCING ONSITE IMPROVEMENTS, THE APPLICANT SHALL OBTAIN APPROVAL OF THE RIGHT-OF-WAY VACATION DESCRIBED IN A MEMORANDUM WITH THE RECOMMENDED CONDITIONS BY WASHINGTON COUNTY LUT, DATED SEPTEMBER 29, 2016. 12.THE PFI PERMIT PLAN SUBMITTAL SHALL INCLUDE THE EXACT LEGAL NAME, ADDRESS AND TELEPHONE NUMBER OF THE INDIVIDUAL OR CORPORATE ENTITY WHO WILL BE DESIGNATED AS THE “PERMITTEE”, AND WHO WILL PROVIDE THE FINANCIAL ASSURANCE FOR THE PUBLIC IMPROVEMENTS. FOR EXAMPLE, SPECIFY IF THE ENTITY IS A CORPORATION, LIMITED PARTNERSHIP, LLC, ETC. ALSO SPECIFY THE STATE WITHIN WHICH THE ENTITY IS INCORPORATED AND PROVIDE THE NAME OF THE CORPORATE CONTACT PERSON. FAILURE TO PROVIDE ACCURATE INFORMATION TO THE ENGINEERING DIVISION WILL DELAY PROCESSING OF PROJECT DOCUMENTS. 13.THE APPLICANT SHALL PROVIDE A CONSTRUCTION VEHICLE ACCESS AND PARKING PLAN FOR APPROVAL BY THE CITY ENGINEER. THE PURPOSE OF THIS PLAN IS FOR PARKING AND TRAFFIC CONTROL DURING THE PUBLIC IMPROVEMENT CONSTRUCTION PHASE. ALL CONSTRUCTION VEHICLE PARKING SHALL BE PROVIDED ON-SITE. NO CONSTRUCTION VEHICLES OR EQUIPMENT WILL BE PERMITTED TO PARK ON THE ADJOINING RESIDENTIAL PUBLIC STREETS. CONSTRUCTION VEHICLES INCLUDE THE VEHICLES OF ANY CONTRACTOR OR SUBCONTRACTOR INVOLVED IN THE CONSTRUCTION OF SITE IMPROVEMENTS OR BUILDINGS PROPOSED BY THIS APPLICATION, AND SHALL INCLUDE THE VEHICLES OF ALL SUPPLIERS AND EMPLOYEES ASSOCIATED WITH THE PROJECT. 14.THE APPLICANT'S CITY OF TIGARD PUBLIC FACILITY IMPROVEMENT PERMIT CONSTRUCTION DRAWINGS SHALL INDICATE THAT FULL WIDTH STREET IMPROVEMENTS, INCLUDING TRAFFIC CONTROL DEVICES, MAILBOX CLUSTERS, CONCRETE SIDEWALKS, DRIVEWAY APRONS, CURBS, ASPHALTIC CONCRETE PAVEMENT, SANITARY SEWERS, STORM DRAINAGE, STREET TREES, STREETLIGHTS, AND UNDERGROUND UTILITIES SHALL BE INSTALLED WITHIN THE INTERIOR SUBDIVISION STREETS. IMPROVEMENTS SHALL BE DESIGNED AND CONSTRUCTED TO LOCAL STREET STANDARDS. 15.PRIOR TO ISSUANCE OF PERMITS THE APPLICANT SHALL SUBMIT A PLAN FOR THE EAST SIDE OF PEACHBLOSSOM AVENUE SHOWING HOW STREET TREES OR OTHER APPROPRIATE VEGETATION WILL BE ACCOMMODATED BEHIND THE SIDEWALK. 16.THE APPLICANT'S WASHINGTON COUNTY FACILITIES PERMIT CONSTRUCTION DRAWINGS SHALL INDICATE THAT FULL HALF-STREET IMPROVEMENTS, MEETING THE COUNTY'S A-2 STANDARD AND CITY STANDARDS SHALL BE CONSTRUCTED ALONG THE SCHOLLS FERRY ROAD FRONTAGE. RIGHT-OF-WAY DEDICATION PROVIDING 55 FEET FROM CENTERLINE (EASTERN PORTION), 80 FEET FROM CENTERLINE (WESTERN PORTION) AND ADDITIONAL RIGHT-OF-WAY AS NEEDED FOR ADEQUATE CORNER RADIUS AT ROY ROGERS ROAD. DEDICATION OF ADDITIONAL RIGHT-OF-WAY TO PROVIDE 56 FEET (WEST SIDE) AND 70 FEET (EAST SIDE) FROM THE CENTERLINE OF SW ROY ROGERS ROAD, INCLUDING AN 18-FOOT SLOPE EASEMENT AND CORNER RADIUS AT SCHOLLS FERRY ROAD WILL BE REQUIRED. ALL IMPROVEMENTS AND RIGHT-OF-WAY DEDICATIONS SHALL BE AS DESCRIBED IN A MEMORANDUM WITH THE RECOMMENDED CONDITIONS BY WASHINGTON COUNTY LUT, DATED SEPTEMBER 29, 2016. 17.THE APPLICANT SHALL PROVIDE TO THE CITY OF TIGARD PRELIMINARY CERTIFICATION FROM A REGISTERED PROFESSIONAL ENGINEER THAT ADEQUATE SIGHT DISTANCE WILL BE OBTAINED BOTH DIRECTIONS FOR ALL DEVELOPMENT INTERSECTIONS. 18.THE APPLICANT'S CONSTRUCTION DRAWINGS SHALL SHOW THAT THE PAVEMENT AND ROCK SECTION FOR THE PROPOSED PRIVATE ALLEYS SHALL MEET THE CITY'S PUBLIC STREET STANDARD FOR A LOCAL RESIDENTIAL STREET. STREET LIGHTS ON PRIVATE STREETS SHALL BE METERED SEPARATE FROM THE PUBLIC SYSTEM. 19.SANITARY SEWER AND STORM DRAINAGE DETAILS SHALL BE PROVIDED TO THE CITY FOR REVIEW AND APPROVAL AS PART OF THE PUBLIC FACILITY IMPROVEMENT (PFI) PERMIT PLANS. 20.PRIOR TO ISSUANCE OF PFI PERMIT, THE APPLICANT SHALL OBTAIN A (CWS) STORMWATER CONNECTION AUTHORIZATION. PLANS SHALL BE SUBMITTED TO THE CITY OF TIGARD FOR REVIEW. THE CITY WILL FORWARD PLANS TO CLEAN WATER SERVICES (CWS) AFTER PRELIMINARY REVIEW. 21.PRIOR TO CONSTRUCTION, THE APPLICANT'S DESIGN ENGINEER SHALL SUBMIT DOCUMENTATION, FOR REVIEW AND APPROVAL BY CWS AND FOR REVIEW BY THE CITY, OF THE DOWNSTREAM CAPACITY OF ANY EXISTING STORM FACILITY IMPACTED BY THE PROPOSED DEVELOPMENT. THE DESIGN ENGINEER MUST PERFORM AN ANALYSIS OF THE DRAINAGE SYSTEM DOWNSTREAM OF THE DEVELOPMENT TO A POINT IN THE DRAINAGE SYSTEM WHERE THE PROPOSED DEVELOPMENT SITE CONSTITUTES TEN PERCENT OR LESS OF THE TOTAL TRIBUTARY DRAINAGE VOLUME, BUT IN NO EVENT LESS THAN 1/4 MILE. THE APPLICANT CAN SHOW THEY MEET THIS CONDITION BY RUNNING THE TRUST MODEL FOR DETENTION. 22.THE APPLICANT SHALL BE REQUIRED TO SUBMIT SEPARATE FINAL CALCULATIONS FOR THE COMBINED WATER QUALITY AND DETENTION FACILITY FOR THE PORTIONS OF THE DEVELOPMENT EAST AND WEST OF ROY ROGERS ROAD USING THE TRUST MODEL TO MEET THE CONTINUOUS FLOW DURATION REQUIREMENTS. THE CALCULATIONS AND ANY SUBSEQUENT REVISIONS TO SITE LAYOUT SHALL BE SUBMITTED WITH THE APPLICANT'S CITY OF TIGARD PFI PERMIT APPLICATION. 23.THE APPLICANT SHALL RESUBMIT DESIGN PLANS FOR THE COMBINED STORMWATER FACILITY MEETING THE CITY OF TIGARD DESIGN GUIDELINES PRIOR TO ISSUANCE OF SITE PERMITS. THIS SUBMITTAL SHALL INCLUDE A MAINTENANCE PLAN, IN ACCORDANCE WITH THE CWS DESIGN AND CONSTRUCTION STANDARDS AND THE CITY OF TIGARD DESIGN GUIDELINES, FOR THE FACILITY AND MUST BE REVIEWED AND APPROVED BY THE CITY PRIOR TO ISSUANCE OF THE SITE PERMIT. 24.ANY EXTENSION OF PUBLIC WATER LINES SHALL BE SHOWN ON THE PROPOSED PUBLIC FACILITY IMPROVEMENT (PFI) PERMIT CONSTRUCTION DRAWINGS AND WASHINGTON COUNTY FACILITIES PLANS AND SHALL BE REVIEWED AND APPROVED BY THE CITY AND WASHINGTON COUNTY, AS A PART OF THE ENGINEERING DEPARTMENT PLAN REVIEW. NOTE: AN ESTIMATED 12 PERCENT OF THE WATER SYSTEM COST WILL BE ASSESSED PRIOR TO APPROVAL OF THE CITY OF TIGARD'S PFI PERMIT. 25.AN EROSION CONTROL PLAN SHALL BE PROVIDED AS PART OF THE PUBLIC FACILITY IMPROVEMENT (PFI) PERMIT DRAWINGS. THE PLAN SHALL CONFORM TO THE "CWS EROSION PREVENTION AND SEDIMENT CONTROL DESIGN AND PLANNING MANUAL” (CURRENT EDITION) AND SUBMITTED TO CITY OF TIGARD WITH THE PFI PLANS. 26.A FINAL GRADING PLAN SHALL BE SUBMITTED SHOWING THE EXISTING AND PROPOSED CONTOURS. THE PLAN SHALL DETAIL THE PROVISIONS FOR SURFACE DRAINAGE OF ALL LOTS, AND SHOW THAT THEY WILL BE GRADED TO INSURE THAT SURFACE DRAINAGE IS DIRECTED TO THE STREET OR A PUBLIC STORM DRAINAGE SYSTEM APPROVED BY THE ENGINEERING DIVISION. FOR SITUATIONS WHERE THE BACK PORTIONS OF LOTS DRAIN AWAY FROM A STREET AND TOWARD ADJACENT LOTS, APPROPRIATE PRIVATE STORM DRAINAGE LINES SHALL BE PROVIDED TO SUFFICIENTLY CONTAIN AND CONVEY RUNOFF FROM EACH LOT. 27.THE APPLICANT SHALL INCORPORATE THE RECOMMENDATIONS FROM THE SUBMITTED GEOTECHNICAL REPORT INTO THE FINAL GRADING PLAN. THE GEOTECHNICAL ENGINEER SHALL BE EMPLOYED BY THE APPLICANT THROUGHOUT THE ENTIRE CONSTRUCTION PERIOD TO ENSURE THAT ALL GRADING, INCLUDING CUTS AND FILLS, ARE CONSTRUCTED IN ACCORDANCE WITH THE APPROVED PLAN AND APPENDIX J OF THE OREGON STRUCTURAL SPECIALTY CODE (OSSC). A FINAL CONSTRUCTION SUPERVISION REPORT SHALL BE FILED WITH THE ENGINEERING DEPARTMENT PRIOR TO ISSUANCE OF BUILDING PERMITS. 28.THE DESIGN ENGINEER SHALL INDICATE, ON THE GRADING PLAN, WHICH LOTS WILL HAVE NATURAL SLOPES BETWEEN 10 PERCENT AND 20 PERCENT, AS WELL AS LOTS THAT WILL HAVE NATURAL SLOPES IN EXCESS OF 20 PERCENT. THIS INFORMATION WILL BE NECESSARY IN DETERMINING IF SPECIAL GRADING INSPECTIONS AND/OR PERMITS WILL BE NECESSARY WHEN THE LOTS DEVELOP. 29.THE FINAL CONSTRUCTION PLANS SHALL BE SIGNED BY THE GEOTECHNICAL ENGINEER TO ENSURE THAT THEY HAVE REVIEWED AND APPROVED THE PLANS. THE GEOTECHNICAL ENGINEER SHALL ALSO SIGN THE AS-BUILT GRADING PLAN AT THE END OF THE PROJECT. 30.THE APPLICANT SHALL OBTAIN A 1200-CN GENERAL PERMIT ISSUED THROUGH THE CITY OF TIGARD PURSUANT TO ORS 468.740 AND THE FEDERAL CLEAN WATER ACT. 31.PRIOR TO CONSTRUCTION, THE APPLICANT WILL HAVE TO PROVIDE SUFFICIENT INFORMATION TO SHOW THAT PUBLIC UTILITY CONNECTIONS (WATER, SEWER AND STORM SEWER) CAN BE MADE TO ADJACENT PROPERTIES. 32.PRIOR TO ISSUANCE OF PERMITS, THE APPLICANT SHALL PROVIDE CALCULATIONS AND PLANS THAT PROVIDE ADEQUATE WATER SERVICE TO THE PROPOSED DEVELOPMENT ON THE WEST SIDE OF ROY ROGERS ROAD. 33.THE APPLICANT WILL BE REQUIRED TO PROVIDE WRITTEN APPROVAL FROM TUALATIN VALLEY FIRE AND RESCUE FOR FIRE FLOW, HYDRANT PLACEMENT AND ACCESS PRIOR TO ISSUANCE OF THE CITY OF TIGARD'S SITE PERMIT. PRIOR TO FINAL PLAT APPROVAL: 34.34. PRIOR TO FINAL PLAT APPROVAL, THE APPLICANT SHALL PROVIDE AUTHORIZATION, BINDING ITS SUCCESSORS AND ASSIGNS, FOR THE CITY TO ENTER THE PROPERTY AND TAKE SUCH ACTIONS AS ARE NECESSARY TO DEMOLISH AND REMOVE ANY TEMPORARY SALES OFFICE OR MODEL HOME THAT HAS BEEN DECLARED A NUISANCE. THE APPLICANT SHALL POST A PERFORMANCE BOND IN FAVOR OF THE CITY IN AN AMOUNT DESIGNATED IN THE TEMPORARY USE APPROVAL AS A REASONABLE ESTIMATE OF THE COST SUFFICIENT FOR THIS PURPOSE. THE BOND SHALL BE RELEASED UPON FINAL PLAT APPROVAL. 35.PRIOR TO FINAL PLAT APPROVAL, THE APPLICANT SHALL SUBMIT A DETERMINATION IN WRITING BY THE PARKS AND FACILITIES DIVISION MANAGER REGARDING DEDICATION OF OPEN SPACE OR OTHER PUBLIC USES. SUBMIT TO THE ENGINEERING DEPARTMENT (GREG BERRY, 503-718-2468) FOR REVIEW AND APPROVAL: 36.PRIOR TO FINAL PLAT APPROVAL, THE APPLICANT SHALL PAY AN ADDRESSING FEE FOR 38 UNITS IN THE AMOUNT OF $1,9000.00. 37.PRIOR TO FINAL PLAT APPROVAL, THE APPLICANT SHALL RECORD THE RIGHT-OF-WAY VACATION DESCRIBED IN A MEMORANDUM WITH THE RECOMMENDED CONDITIONS BY WASHINGTON COUNTY LUT, DATED SEPTEMBER 29, 2016. 38.PRIOR TO TO APPROVAL OF THE FINAL PLAT, A NON-ACCESS RESERVATION ALONG SW ROY ROGERS AND SW SCHOLLS FERRY ROAD FRONTAGES SHALL BE PROVIDED. 39.PRIOR TO APPROVAL OF THE FINAL PLAT, THE APPLICANT SHALL PREPARE CONDITIONS, COVENANTS AND RESTRICTIONS (CC&R'S) FOR THIS PROJECT, TO BE RECORDED WITH THE FINAL PLAT, THAT CLEARLY LAYS OUT A MAINTENANCE PLAN AND AGREEMENT FOR THE PROPOSED PRIVATE STREETS AND ALLEYS. THE STREET LIGHTS REQUIRED FOR ALLEYS AND PRIVATE STREETS SHALL BE MAINTAINED AND PAID FOR BY THE HOA AND METERED SEPARATELY FROM THE PUBLIC STREET LIGHT SYSTEM. THE CC&R'S SHALL OBLIGATE THE PRIVATE PROPERTY OWNERS WITHIN THE SUBDIVISION TO CREATE A HOMEOWNER'S ASSOCIATION TO ENSURE REGULATION OF MAINTENANCE FOR THE ALLEYS. THE APPLICANT SHALL SUBMIT A COPY OF THE CC&R'S TO THE ENGINEERING DIVISION PRIOR TO APPROVAL OF THE FINAL PLAT. 40.PRIOR TO APPROVAL OF THE FINAL PLAT, THE APPLICANT SHALL DEMONSTRATE THAT THEY HAVE FORMED AND INCORPORATED A HOMEOWNER'S ASSOCIATION. 41.THE APPLICANT'S FINAL PLAT SHALL CONTAIN STATE PLANE COORDINATES ON TWO MONUMENTS WITH A TIE TO THE CITY'S GLOBAL POSITIONING SYSTEM (GPS) GEODETIC CONTROL NETWORK (GC 22). THESE MONUMENTS SHALL BE ON THE SAME LINE AND SHALL BE OF THE SAME PRECISION AS REQUIRED FOR THE SUBDIVISION PLAT BOUNDARY. ALONG WITH THE COORDINATES, THE PLAT SHALL CONTAIN THE SCALE FACTOR TO CONVERT GROUND MEASUREMENTS TO GRID MEASUREMENTS AND THE ANGLE FROM NORTH TO GRID NORTH. THESE COORDINATES CAN BE ESTABLISHED BY: ·GPS TIE NETWORKED TO THE CITY'S GPS SURVEY. ·BY RANDOM TRAVERSE USING CONVENTIONAL SURVEYING METHODS. 42.FINAL PLAT APPLICATION SUBMISSION REQUIREMENTS: A.SUBMIT FOR CITY REVIEW FOUR (4) PAPER COPIES OF THE FINAL PLAT PREPARED BY A LAND SURVEYOR LICENSED TO PRACTICE IN OREGON, AND NECESSARY DATA OR NARRATIVE. B.ATTACH A CHECK IN THE AMOUNT OF THE CURRENT FINAL PLAT REVIEW FEE (CONTACT PLANNING/ENGINEERING PERMIT TECHNICIANS, AT 503-718-2464). C.THE FINAL PLAT AND DATA OR NARRATIVE SHALL BE DRAWN TO THE MINIMUM STANDARDS SET FORTH BY THE OREGON REVISED STATUTES (ORS 92.05), WASHINGTON COUNTY, AND BY THE CITY OF TIGARD. D.THE RIGHT-OF-WAY DEDICATION FOR ALL PUBLIC STREETS SHALL BE MADE ON THE FINAL PLAT. E.NOTE: WASHINGTON COUNTY WILL NOT BEGIN THEIR REVIEW OF THE FINAL PLAT UNTIL THEY RECEIVE NOTICE FROM THE ENGINEERING DEPARTMENT INDICATING THAT THE CITY HAS REVIEWED THE FINAL PLAT AND SUBMITTED COMMENTS TO THE APPLICANT'S SURVEYOR. F.AFTER THE CITY AND COUNTY HAVE REVIEWED THE FINAL PLAT, SUBMIT ONE MYLAR OF THE FINAL PLAT FOR CITY ENGINEER SIGNATURE (FOR PARTITIONS), OR CITY ENGINEER AND COMMUNITY DEVELOPMENT DIRECTOR SIGNATURES (FOR SUBDIVISIONS). PRIOR TO ISSUANCE OF BUILDING PERMITS: 43.43. PRIOR TO ISSUANCE OF BUILDING PERMITS, THE APPLICANT SHALL PROVIDE THE PLANNING DEPARTMENT WITH A PAPER COPY OF THE RECORDED FINAL PLAT. 44.AT THE TIME OF BUILDING PERMIT APPLICATION SUBMITTAL, THE APPLICANT SHALL SUBMIT PLANS AND ELEVATIONS DEMONSTRATING THAT EACH SINGLE FAMILY DWELLING UNIT IS DESIGNED AND CONSTRUCTED TO CONFORM TO THE APPLICABLE DESIGN STANDARDS IN 18.660.070.I. 45.UNLESS EXPRESSLY PROVIDED OTHERWISE IN THIS APPROVAL, THIS PROPOSED DEVELOPMENT IS CONDITIONED ON THE APPLICANT FULLY COMPLYING WITH THE PLANS, SPECIFICATIONS AND COMMITMENTS SET FORTH IN THE APPLICATION DATED AND RECEIVED BY THE CITY AUGUST 11, 2016, RESUBMITTED ON SEPTEMBER 26, 2016 AND ALL RELATED SUBMITTALS. SUBMIT TO THE ENGINEERING DEPARTMENT (KIM MCMILLAN 503-718-2642) FOR REVIEW AND APPROVAL: 46.PRIOR TO ISSUANCE OF BUILDING PERMITS, THE APPLICANT SHALL PROVIDE THE ENGINEERING DEPARTMENT WITH A PAPER COPY OF THE RECORDED FINAL PLAT. 47.PRIOR TO ISSUANCE OF BUILDING PERMITS WITHIN THE SUBDIVISION, THE CITY ENGINEER SHALL DEEM THE PUBLIC IMPROVEMENTS SUBSTANTIALLY COMPLETE. SUBSTANTIAL COMPLETION SHALL BE WHEN: 1) ALL UTILITIES ARE INSTALLED AND INSPECTED FOR COMPLIANCE, INCLUDING FRANCHISE UTILITIES, 2) ALL LOCAL RESIDENTIAL STREETS SHALL BE FULLY PAVED, 3) ANY OFF-SITE STREET AND/OR UTILITY IMPROVEMENTS ARE SUBSTANTIALLY COMPLETED, AND 4) ALL PUBLIC STREET LIGHTS ARE INSTALLED AND READY TO BE ENERGIZED. (NOTE: THE CITY APART FROM THIS CONDITION AND IN ACCORDANCE WITH THE CITY'S MODEL HOME POLICY, MAY ISSUE MODEL HOME PERMITS). 48.PRIOR TO ISSUANCE OF BUILDING PERMITS, OBTAIN A FINALED WASHINGTON COUNTY FACILITY PERMIT FOR ANY REQUIRED IMPROVEMENTS TO SW SCHOLLS FERRY ROAD AS REQUIRED BY A WASHINGTON COUNTY LUT MEMORANDUM DATED SEPTEMBER 29, 2016. 49.PRIOR TO ISSUANCE OF BUILDING PERMITS, THE APPLICANT SHALL PROVIDE THE CITY WITH AS-BUILT DRAWINGS OF THE PUBLIC IMPROVEMENTS AS FOLLOWS: 1) PAPER, 2) AN ELECTRONIC COPY, AND 3) THE AS-BUILT DRAWINGS SHALL BE TIED TO THE CITY'S GPS NETWORK. THE APPLICANT'S ENGINEER SHALL PROVIDE THE CITY WITH AN ELECTRONIC FILE WITH POINTS FOR EACH STRUCTURE (MANHOLES, CATCH BASINS, WATER VALVES, HYDRANTS AND OTHER WATER SYSTEM FEATURES) IN THE DEVELOPMENT, AND THEIR RESPECTIVE X AND Y STATE PLANE COORDINATES, REFERENCED TO NAD 83 (91). 50.THE APPLICANT SHALL PROVIDE POST-CONSTRUCTION INTERSECTION SIGHT DISTANCE CERTIFICATION FOR INTERSECTIONS WITHIN THE DEVELOPMENT. 51.THE PUMP STATION MUST BE FULLY OPERATIONAL AND THE SEWER MAIN CONNECTED TO THE RIVER TERRACE NORTHWEST DEVELOPMENT PRIOR TO ISSUANCE OF BUILDING PERMITS FOR THE PORTION OF THE DEVELOPMENT WEST OF ROY ROGERS ROAD. PRIOR TO OCCUPANCY: 52.PRIOR TO ISSUANCE OF OCCUPANCY, OBTAIN A FINALED WASHINGTON COUNTY FACILITY PERMIT. CONTINGENT UPON THE FOLLOWING: A.THE ROAD IMPROVEMENTS COMPLETED TO COUNTY STANDARDS. B.UPON COMPLETION OF NECESSARY IMPROVEMENTS, SUBMIT FINAL CERTIFICATION OF ADEQUATE SIGHT DISTANCE IN ACCORDANCE WITH COUNTY CODE, PREPARED AND STAMPED BY A REGISTERED PROFESSIONAL ENGINEER. CONDITIONS OF APPROVAL CONDITIONS OF APPROVAL CONDITIONS OF APPROVAL 2 CONSTRUCTION NOTES Construction Documents N: \ p r o j \ 3 9 5 - 0 6 1 \ 0 9 D r a w i n g s \ 0 5 A s b u i l t s \ S h e e t s - P h a s e 3 \ 3 9 5 0 6 1 . ( 2 ) P H 3 - N O T E S . d w g - S H E E T : 2 Ju n . 1 6 , 2 1 - 4: 0 8 P M je f f ELEVATION DATUM: NGVD 29 GEODESIGN, INC River Terrace East No. 3 Phase 3 REVISIONS DATE DESCRIPTION REVIEWED BY: TYPE: PROJECT NO.: AS-BUILTS 395-061 KCS RENEWS: JUNE 30, 2022 12564 SW Main Street Tigard, OR 97223 [T] 503-941-9484 05/18/20211ST SUBMITTAL: 1.AN ESTIMATED 12 PERCENT OF THE WATER SYSTEM COST MUST BE ON DEPOSIT PRIOR TO BEGINNING CONSTRUCTION ON WATER LINES, AND TO RECEIVE A TPW (CITY OF TIGARD PUBLIC WORKS, WATER DIVISION) STAMPED APPROVAL ON CONSTRUCTION PLANS. 2.THE CONTRACTOR SHALL MAINTAIN ONE SET OF TPW STAMPED APPROVED PLANS ON THE CONSTRUCTION SITE AT ALL TIMES. 3.ALL WORK SHALL BE IN ACCORDANCE WITH AWWA (AMERICAN WATER WORKS ASSOCIATION) STANDARDS. 4.ALL PIPE AND FITTINGS SHALL BE DUCTILE IRON, CEMENT-LINED, OF NEW MANUFACTURE AND MADE IN THE USA. PIPE SHALL BE "TYTON" JOINT DUCTILE IRON, CLASS 52. ALL FITTINGS SHALL BE MJ (MECHANICAL JOINT) UNLESS OTHERWISE SPECIFIED. 5.COVER FOR ALL WATER MAINS IN STREET AND RIGHTS-OF-WAY SHALL BE 36". BACKFILL SHALL BE ¾"-0" GRAVEL. 6.ALL VALVE-OPERATING NUTS SHALL BE WITHIN 36" OF FINISHED GRADE, OTHERWISE VALVE OPERATING NUT EXTENSIONS WILL BE REQUIRED. 7.A 4" X 4" X 8'-0", PAINTED BLUE, SHALL BE INSTALLED IN FRONT OF EVERY 2-INCH WATER SERVICE LOCATION, AND REMAIN THERE UNTIL THE WATER METER IS INSTALLED. ALL 2-INCH WATER SERVICES SHALL CONSIST OF A MJ X 2" IPT TEE AND 2" IPT X 110 COMPRESSION FITTING AS MANUFACTURED BY MUELLER COMPANY. 8.FIRE HYDRANT ASSEMBLY CONSISTS OF A MJ X 6" FLG. (FLANGE) TEE, 6" FLG. X MJ GATE VALVE, 6" MJ, 5-1/4" MVO, 3-PORT (2-2½" NST HOSE CONNECTION, 1-4½" NST PUMPER), 1½" PENTAGON OPERATING NUT, OPENING LEFT, COLOR: YELLOW; APPROVED EQUAL: MUELLER CENTURION A-423, WATERIOUS PACER 6790, CLOW MEDALLION 9.EACH FIRE HYDRANT SHALL BE INSTALLED UPON A PRE-FORMED CONCRETE BLOCK WITH 1½ CUBIC YARDS OF CRUSHED 2" - ¾" DRAIN ROCK. TARPAPER WILL BE LAID ON TOP OF THE DRAIN ROCK TO SEPARATE THE ROCK FROM EARTH COVER. 10.ALL SANITARY SEWER LINES WITHIN 10 FEET LATERALLY OR 3 FEET VERTICALLY OF A WATER MAIN SHALL BE ENCASED IN A REINFORCED CONCRETE JACKET 6" THICK FOR A DISTANCE OF 10 FEET ON BOTH SIDE OF THE CROSSING. WHERE CROSSINGS ARE NECESSARY, THEY MUST BE MADE AT APPROXIMATELY 90 DEGREES WITH AT LEAST 18" OF SEPARATION BELOW THE WATER LINE. 11.ALL MAINS WITH A STATIC PRESSURE UP TO 100 PSI (POUNDS PER SQUARE INCH) SHALL BE TESTED AT 150 PSI FOR 1 HOUR WITH A MAXIMUM LOSS OF 5 PSI. WATER MAINS WITH A STATIC PRESSURE GREATER THAN 100 PSI SHALL BE PRESSURE TESTED AT 1.5 TIMES THE STATIC PRESSURE FOR 1 HOUR WITH A MAXIMUM LOSS OF 5 PSI. 12.UPON SATISFACTORY COMPLETION OF TESTING, THE NEW MAINS AND CONNECTIONS TO EXISTING MAINS SHALL BE CLEANED AND FLUSHED WITH POTABLE WATER PRIOR TO DISINFECTION. FLUSHING VELOCITIES SHALL BE AT LEAST 2.5 FEET PER SECOND. DISINFECTION SHALL BE IN ACCORDANCE WITH AWWA STANDARD C651-92, THE STATE HEALTH DIVISION AND CITY REQUIREMENTS. THE CONTINUOUS FEED METHOD OF DISINFECTION SHALL BE USED. DISINFECTING MIXTURE SHALL BE A CHLORINE-WATER SOLUTION HAVING A FREE CHLORINE RESIDUAL OF 40-50 MG/L (MILLIGRAMS PER LITER). THE DISINFECTION MIXTURE WILL BE PREPARED BY INJECTING A CALCIUM/SODIUM HYPOCHLORITE AND WATER SOLUTION INTO THE PIPELINE AT A MEASURED RATE WHILE FRESH (POTABLE) WATER IS ALLOWED TO FLOW THROUGH THE PIPELINE SO THAT THE CHLORINE-WATER SOLUTION IS OF THE SPECIFIED STRENGTH. TREATED (CHLORINATED) WATER SHALL BE RETAINED IN THE PIPELINE LONG ENOUGH TO DESTROY ALL NONSPORE-FORMING BACTERIA. TYPICAL RETENTION PERIOD IS 24 HOURS. AT THE END OF THE 24-HOUR PERIOD, THE PIPELINE IS TO HAVE A FREE CHLORINE RESIDUAL OF A LEAST 10 MG/L. AFTER SATISFACTORY CHLORINATION, FLUSH THE WATER FROM THE LINE UNTIL THE WATER THROUGHOUT THE PIPELINE IS EQUAL CHEMICALLY AND BACTERIOLOGICALLY TO THE PERMANENT SOURCE OF SUPPLY. DISPOSE OF THE DISINFECTION WATER IN AN APPROVED MANNER. DO NOT ALLOW DISINFECTION WATER TO FLOW INTO A WATERWAY WITHOUT ADEQUATE DILUTION OR OTHER SATISFACTORY METHODS OF REDUCING CHLORINE RESIDUALS TO A SAFE LEVEL AS MANDATED BY DEQ. AFTER DISPOSAL AND FLUSHING OF THE DISINFECTION SOLUTION, THERE WILL BE ANOTHER 24-HOUR RETENTION PERIOD PRIOR TO BACTERIOLOGICAL TESTING. BACTERIOLOGICAL TESTS WILL BE TAKEN BY TPW. 13.PROVIDE AN ECLIPSE NO. 88 SAMPLING STATION MANUFACTURED BY KUPFERTE FOUNDRY, ST. LOUIS, MO 63102. THE SAMPLING STATION SHALL BE 2'-0" BURY, WITH A ¾" FIPT(FEMALE IRON PIPE THREAD) INLET, AND A ¾" UNTHREADED HOSE NOZZLE. ALL SAMPLING STATIONS SHALL BE ENCLOSED IN A LOCKABLE, NON-REMOVABLE, ALUMINUM-CAST HOUSING. WHEN OPENED, THE SAMPLING STATION SHALL REQUIRE NO KEY FOR OPERATION, AND THE WATER WILL FLOW IN AN ALL-BRASS WATERWAY. ALL WORKING PARTS WILL BE OF BRASS AND BE REMOVABLE FROM ABOVE GROUND WITH NO DIGGING. A COPPER VENT TUBE (STANDARD) WILL ENABLE THE SAMPLING STATION TO BE PUMPED FREE OF STANDING WATER TO PREVENT FREEZING, AND TO MINIMIZE BACTERIA GROWTH. THE EXTERIOR PIPING WILL BE BRASS, AND A ¼" BALL VALVE SHALL BE PROVIDED IN PLACE OF THE ¼" PET COCK ON THE VENT PIPE. 14.WATER METERS WILL BE INSTALLED BY TPW UPON INDIVIDUAL REQUEST AND PAYMENT BY OTHERS (OWNERS). ALL WATER METERS CONNECTED TO AN IRRIGATION SYSTEM MUST HAVE THE PROPER OREGON STATE APPROVED BACKFLOW PREVENTION DEVICE , MINIMUM OF A DCVA (DOUBLE CHECK VALVE ASSEMBLY) INSTALLED ON THE PROPERTY SIDE OF THE WATER METER. IN ADDITION, EVERY METER FOR COMMERCIAL, MULTI-FAMILY, INDUSTRIAL, AND INSTITUTIONAL SERVICE, REGARDLESS OF SIZE, SHALL HAVE THE PROPER OREGON STATE APPROVED BACKFLOW PREVENTION DEVICE MINIMUM OF A DCVA INSTALLED ON THE PROPERTY SIDE OF THE METER. THE BACKFLOW PREVENTION DEVICE SHALL BE INSTALLED AND TESTED BY THE OWNER, WITH THE RESULTS FORWARDED TO TPW WATER DIVISION, BEFORE WATER SERVICES CAN BEGIN. 15.ALL JOINTS TO BE RESTRAINED. OPERATION OF VALVES IN THE TIGARD WATER SERVICE AREA IS PROHIBITED WATER CONSTRUCTION NOTES 1.OWNER OR DESIGNATED PERSON SHALL BE RESPONSIBLE FOR PROPER INSTALLATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL MEASURES, IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL REGULATIONS. 2.PRIOR TO ANY LAND DISTURBING ACTIVITIES, THE BOUNDARIES OF THE CLEARING LIMITS, VEGETATED BUFFERS, AND ANY SENSITIVE AREAS SHOWN ON THIS PLAN SHALL BE CLEARLY DELINEATED IN THE FIELD. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE IS PERMITTED BEYOND THE CLEARING LIMITS. THE OWNER/PERMITTEE MUST MAINTAIN THE DELINEATION FOR THE DURATION OF THE PROJECT. NOTE: VEGETATED CORRIDORS TO BE DELINEATED WITH ORANGE CONSTRUCTION FENCE OR APPROVED EQUAL. 3.PRIOR TO ANY LAND DISTURBING ACTIVITIES, THE BMP's THAT MUST BE INSTALLED ARE A GRAVEL CONSTRUCTION ENTRANCE, PERIMETER SEDIMENT CONTROL, AND INLET PROTECTION. THESE BMP's MUST BE MAINTAINED FOR THE DURATION OF THE PROJECT. 4.IF VEGETATIVE SEED MIXES ARE SPECIFIED, SEEDING MUST TAKE PLACE NO LATER THAT SEPTEMBER 1; THE TYPE AND PERCENTAGES OF SEED IN THE MIX MUST BE IDENTIFIED ON THE PLANS. 5.ALL PUMPING OF SEDIMENT LADEN WATER SHALL BE DISCHARGED OVER AN UNDISTURBED, PREFERABLY VEGETATED AREA, AND THROUGH A SEDIMENT CONTROL BMP i.e. (FILTER BAG). 6.THE ESC PLAN MUST BE KEPT ON SITE. ALL MEASURES SHOWN ON THE PLAN MUST BE INSTALLED PROPERLY TO ENSURE THAT SEDIMENT OR SEDIMENT LADEN WATER DOES NOT ENTER A SURFACE WATER SYSTEM, ROADWAY, OR OTHER PROPERTIES. 7.THE ESC MEASURES SHOWN ON THIS PLAN ARE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE MEASURES SHALL BE UPGRADED AS NEEDED TO COMPLY WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL EROSION CONTROL REGULATIONS. CHANGES TO THE APPROVED ESC PLAN MUST BE SUBMITTED IN THE FORM OF AN ESC REVISION TO CWS PER THE 1200 C PERMIT. 8.IN AREAS SUBJECT TO WIND EROSION, APPROPRIATE BMP's MUST BE USED WHICH MAY INCLUDE THE APPLICATION OF FINE WATER SPRAYING, PLASTIC SHEETING, MULCHING, OR OTHER APPROVED MEASURES. 9.ALL EXPOSED SOILS MUST BE COVERED DURING THE WET WEATHER PERIOD, OCTOBER 01 - MAY 31. CLEAN WATER SERVICES - SPECIFIC EROSION CONTROL NOTES 1.ALL PERMIT REGISTRANTS MUST IMPLEMENT THE ESCP. FAILURE TO IMPLEMENT ANY OF THE CONTROL MEASURES OR PRACTICES DESCRIBED IN THE ESCP IS A VIOLATION OF THE PERMIT. (SCHEDULE A 8.A) 2.THE ESCP MEASURES SHOWN ON THIS PLAN ARE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, UPGRADE THESE MEASURES AS NEEDED TO COMPLY WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL EROSION AND SEDIMENT CONTROL REGULATIONS. (SCHEDULE A.8.C.II.(1)(C)) 3.SUBMISSION OF ALL ESCP REVISIONS IS NOT REQUIRED. SUBMITTAL OF THE ESCP REVISIONS IS ONLY UNDER SPECIFIC CONDITIONS. SUBMIT ALL NECESSARY REVISION TO DEQ OR AGENT. (SCHEDULE A.12.C.III) 4.PHASE CLEARING AND GRADING TO THE MAXIMUM EXTENT PRACTICAL TO PREVENT EXPOSED INACTIVE AREAS FROM BECOMING A SOURCE OF EROSION. (SCHEDULE A 8.C.II.(1)(D)) 5.IDENTIFY, MARK, AND PROTECT (BY FENCING OFF OR OTHER MEANS) CRITICAL RIPARIAN AREAS AND VEGETATION INCLUDING IMPORTANT TREES AND ASSOCIATED ROOTING ZONES, AND VEGETATION AREAS TO BE PRESERVED. IDENTIFY VEGETATIVE BUFFER ZONES BETWEEN THE SITE AND SENSITIVE AREAS (E.G., WETLANDS), AND OTHER AREAS TO BE PRESERVED, ESPECIALLY IN PERIMETER AREAS. (SCHEDULE A.8.C.I.(1) & (2)) 6.PRESERVE EXISTING VEGETATION WHEN PRACTICAL AND RE-VEGETATE OPEN AREAS. RE-VEGETATE OPEN AREAS WHEN PRACTICABLE BEFORE AND AFTER GRADING OR CONSTRUCTION. IDENTIFY THE TYPE OF VEGETATIVE SEED MIX USED. (SCHEDULE A.7.B.III(1) AND A.7.B.III(3)) 7.EROSION AND SEDIMENT CONTROL MEASURES INCLUDING PERIMETER SEDIMENT CONTROL MUST BE IN PLACE BEFORE VEGETATION IS DISTURBED AND MUST REMAIN IN PLACE AND BE MAINTAINED, REPAIRED, AND PROMPTLY IMPLEMENTED FOLLOWING PROCEDURES ESTABLISHED FOR THE DURATION OF CONSTRUCTION, INCLUDING PROTECTION FOR ACTIVE STORM DRAIN INLETS AND CATCH BASINS AND APPROPRIATE NON-STORMWATER POLLUTION CONTROLS. (SCHEDULE A.7.D.I AND A.8.C) 8.ESTABLISH CONCRETE TRUCK AND OTHER CONCRETE EQUIPMENT WASHOUT AREAS BEFORE BEGINNING CONCRETE WORK. (SCHEDULE A.8.C.I.(6)) 9.APPLY TEMPORARY AND/OR PERMANENT SOIL STABILIZATION MEASURES IMMEDIATELY ON ALL DISTURBED AREAS AS GRADING PROGRESSES AND FOR ALL ROADWAYS INCLUDING GRAVEL ROADWAYS. (SCHEDULE A.8.C.II.(2)) 10.ESTABLISH MATERIAL AND WASTE STORAGE AREAS, AND OTHER NON-STORMWATER CONTROLS. (SCHEDULE A.8.C.I.(7)) 11.PREVENT TRACKING OF SEDIMENT ONTO PUBLIC OR PRIVATE ROADS USING BMPS SUCH AS: GRAVELED (OR PAVED) EXITS AND PARKING AREAS, GRAVEL ALL UNPAVED ROADS LOCATED ONSITE, OR USE AN EXIT TIRE WASH. THESE BMPS MUST BE IN PLACE PRIOR TO LAND-DISTURBING ACTIVITIES. (SCHEDULE A 7.D.II.(1) AND A.8.C.I(4)) 12.WHEN TRUCKING SATURATED SOILS FROM THE SITE, EITHER USE WATER-TIGHT TRUCKS OR DRAIN LOADS ON SITE. (SCHEDULE A.7.D.II.(3)) 13.USE BMPS TO PREVENT OR MINIMIZE STORMWATER EXPOSURE TO POLLUTANTS FROM SPILLS; VEHICLE AND EQUIPMENT FUELING, MAINTENANCE, AND STORAGE; OTHER CLEANING AND MAINTENANCE ACTIVITIES; AND WASTE HANDLING ACTIVITIES. THESE POLLUTANTS INCLUDE FUEL, HYDRAULIC FLUID, AND OTHER OILS FROM VEHICLES AND MACHINERY, AS WELL AS DEBRIS, LEFTOVER PAINTS, SOLVENTS, AND GLUES FROM CONSTRUCTION OPERATIONS. (SCHEDULE A.7.E.I.(2)) 14.IMPLEMENT THE FOLLOWING BMPS WHEN APPLICABLE: WRITTEN SPILL PREVENTION AND RESPONSE PROCEDURES, EMPLOYEE TRAINING ON SPILL PREVENTION AND PROPER DISPOSAL PROCEDURES, SPILL KITS IN ALL VEHICLES, REGULAR MAINTENANCE SCHEDULE FOR VEHICLES AND MACHINERY, MATERIAL DELIVERY AND STORAGE CONTROLS, TRAINING AND SIGNAGE, AND COVERED STORAGE AREAS FOR WASTE AND SUPPLIES. (SCH A 7.E.III.) 15.USE WATER, SOIL-BINDING AGENT OR OTHER DUST CONTROL TECHNIQUE AS NEEDED TO AVOID WIND-BLOWN SOIL. (SCHEDULE A 7.B.II) 16.THE APPLICATION RATE OF FERTILIZERS USED TO REESTABLISH VEGETATION MUST FOLLOW MANUFACTURER'S RECOMMENDATIONS TO MINIMIZE NUTRIENT RELEASES TO SURFACE WATERS. EXERCISE CAUTION WHEN USING TIME-RELEASE FERTILIZERS WITHIN ANY WATERWAY RIPARIAN ZONE. (SCHEDULE A.9.B.III) 17.IF A STORMWATER TREATMENT SYSTEM (FOR EXAMPLE, ELECTRO-COAGULATION, FLOCCULATION, FILTRATION, ETC.) FOR SEDIMENT OR OTHER POLLUTANT REMOVAL IS EMPLOYED, SUBMIT AN OPERATION AND MAINTENANCE PLAN (INCLUDING SYSTEM SCHEMATIC, LOCATION OF SYSTEM, LOCATION OF INLET, LOCATION OF DISCHARGE, DISCHARGE DISPERSION DEVICE DESIGN, AND A SAMPLING PLAN AND FREQUENCY) BEFORE OPERATING THE TREATMENT SYSTEM. OBTAIN PLAN APPROVAL BEFORE OPERATING THE TREATMENT SYSTEM. OPERATE AND MAINTAIN THE TREATMENT SYSTEM ACCORDING TO MANUFACTURER'S SPECIFICATIONS. (SCHEDULE A.9.D) 18.TEMPORARILY STABILIZE SOILS AT THE END OF THE SHIFT BEFORE HOLIDAYS AND WEEKENDS, IF NEEDED. THE REGISTRANT IS RESPONSIBLE FOR ENSURING THAT SOILS ARE STABLE DURING RAIN EVENTS AT ALL TIMES OF THE YEAR. (SCHEDULE A 7.B) 19.AT THE END OF EACH WORKDAY SOIL STOCKPILES MUST BE STABILIZED OR COVERED, OR OTHER BMPS MUST BE IMPLEMENTED TO PREVENT DISCHARGES TO SURFACE WATERS OR CONVEYANCE SYSTEMS LEADING TO SURFACE WATERS. (SCHEDULE A 7.E.II.(2)) 20.CONSTRUCTION ACTIVITIES MUST AVOID OR MINIMIZE EXCAVATION AND CREATION OF BARE GROUND DURING WET WEATHER. (SCHEDULE A.7.A.I) 21.SEDIMENT FENCE: REMOVE TRAPPED SEDIMENT BEFORE IT REACHES ONE THIRD OF THE ABOVE GROUND FENCE HEIGHT AND BEFORE FENCE REMOVAL. (SCHEDULE A.9.C.I) 22.OTHER SEDIMENT BARRIERS (SUCH AS BIOBAGS): REMOVE SEDIMENT BEFORE IT REACHES TWO INCHES DEPTH ABOVE GROUND HEIGHT. AND BEFORE BMP REMOVAL. (SCHEDULE A.9.C.II) 23.CATCH BASINS: CLEAN BEFORE RETENTION CAPACITY HAS BEEN REDUCED BY FIFTY PERCENT. SEDIMENT BASINS AND SEDIMENT TRAPS: REMOVE TRAPPED SEDIMENTS BEFORE DESIGN CAPACITY HAS BEEN REDUCED BY FIFTY PERCENT AND AT COMPLETION OF PROJECT. (SCHEDULE A.9.C.III & IV) 24.WITHIN 24 HOURS, SIGNIFICANT SEDIMENT THAT HAS LEFT THE CONSTRUCTION SITE, MUST BE REMEDIATED. INVESTIGATE THE CAUSE OF THE SEDIMENT RELEASE AND IMPLEMENT STEPS TO PREVENT A RECURRENCE OF THE DISCHARGE WITHIN THE SAME 24 HOURS. ANY IN-STREAM CLEAN UP OF SEDIMENT SHALL BE PERFORMED ACCORDING TO THE OREGON DIVISION OF STATE LANDS REQUIRED TIMEFRAME. (SCHEDULE A.9.B.I) 25.THE INTENTIONAL WASHING OF SEDIMENT INTO STORM SEWERS OR DRAINAGE WAYS MUST NOT OCCUR. VACUUMING OR DRY SWEEPING AND MATERIAL PICKUP MUST BE USED TO CLEANUP RELEASED SEDIMENTS. (SCHEDULE A.9.B.II) 26.THE ENTIRE SITE MUST BE TEMPORARILY STABILIZED USING VEGETATION OR A HEAVY MULCH LAYER, TEMPORARY SEEDING, OR OTHER METHOD SHOULD ALL CONSTRUCTION ACTIVITIES CEASE FOR 30 DAYS OR MORE. (SCHEDULE A.7.F.I) 27.PROVIDE TEMPORARY STABILIZATION FOR THAT PORTION OF THE SITE WHERE CONSTRUCTION ACTIVITIES CEASE FOR 14 DAYS OR MORE WITH A COVERING OF BLOWN STRAW AND A TACKIFIER, LOOSE STRAW, OR AN ADEQUATE COVERING OF COMPOST MULCH UNTIL WORK RESUMES ON THAT PORTION OF THE SITE. (SCHEDULE A.7.F.II) 28.PROVIDE PERMANENT EROSION CONTROL MEASURES ON ALL EXPOSED AREAS. DO NOT REMOVE TEMPORARY SEDIMENT CONTROL PRACTICES UNTIL PERMANENT VEGETATION OR OTHER COVER OF EXPOSED AREAS IS ESTABLISHED. HOWEVER, DO REMOVE ALL TEMPORARY EROSION CONTROL MEASURES AS EXPOSED AREAS BECOME STABILIZED, UNLESS DOING SO CONFLICTS WITH LOCAL REQUIREMENTS. PROPERLY DISPOSE OF CONSTRUCTION MATERIALS AND WASTE, INCLUDING SEDIMENT RETAINED BY TEMPORARY BMPS. (SCHEDULE A.7.B.III(2) AND A.8.C.III) STANDARD EROSION AND SEDIMENT CONTROL PLAN (ESCP) DRAWING NOTES 1. ALL PUBLIC STORM SEWER CONSTRUCTION AND ALL MATERIALS SHALL CONFORM CWS DESIGN AND CONSTRUCTION STANDARDS - R&O 07-20. 2. PUBLIC STORM SEWER PIPE SHALL BE THE SIZE AND MATERIALS SHOWN ON THE PLANS. 3.INSTALLATION OF THE STORM SEWER SYSTEM SHALL BE IN ACCORDANCE WITH STANDARD PRACTICES. ALL TRENCH BACKFILL IN PUBLIC RIGHT-OF-WAY SHALL BE 3/4"-0 COMPACTED CRUSHED ROCK, (CLASS "B"). 4.ALL SERVICE LATERALS TO BE CONSTRUCTED AT A MINIMUM SLOPE OF 1/4" (2%) PER LINEAR FOOT UNLESS OTHERWISE SHOWN ON THE PLANS. LATERALS SHALL BE 4" DIAMETER. SIDE STORM SEWER PIPE TO BE WHITE IN COLOR AND CONFORM TO CWS STANDARD DWG NO. 170. 5.SERVICE LATERALS SHALL EXTEND A MINIMUM OF 10 FEET FROM THE MAIN AND TWO FEET PAST THE P.U.E. INTO THE LOT. THE END OF EACH LATERAL SHALL BE MARKED WITH A 2"x4" PAINTED WHITE, EXTENDING FROM THE INVERT TO A MINIMUM OF THREE FEET ABOVE THE GROUND SURFACE, WITH THE DEPTH FROM THE TOP OF THE 2"x4" TO THE INVERT WRITTEN THEREON. 6.ALL SANITARY & STORM SEWER LINES MUST BE THOROUGHLY CLEANED PRIOR TO MANDRELLING OF PVC PIPE AND TELEVISING THE SYSTEM FOR ACCEPTANCE. 7.COMPACTION SHALL BE 95% T-99 FOR TRENCH BACKFILL IN STREET AND PARKING AREA. CONTRACTOR TO DETERMINE TYPE OF EQUIPMENT AND METHOD USED TO ACHIEVE REQUIRED COMPACTION. 8.PRIVATELY MAINTAINED STORM SEWER SYSTEMS SHALL BE CONSTRUCTED TO THE STANDARDS AND SPECIFICATIONS OF THE 1994 EDITION OF THE U.P.C. AS AMENDED BY THE STATE OF OREGON, TITLED THE 1996 OREGON PLUMBING SPECIALTY CODE 918-701-0040(1)] STORM SEWERS 1.ALL PUBLIC SANITARY SEWER CONSTRUCTION AND ALL MATERIALS SHALL CONFORM WITH THE APPLICABLE SECTIONS OF THE SPECIFICATIONS OF THE CWS OF WASHINGTON COUNTY, OREGON. DESIGN AND CONSTRUCTION STANDARDS - R&O 07-20. ALL BACKFILL IN RIGHT-OF-WAY SHALL COMPLY WITH CWS R&O 07-20. 2.MAIN LINE PIPE SHALL BE 8" PVC AND SERVICE LATERALS SHALL BE 4" PVC CONFORMING TO ASTM D-3034. SIDE SANITARY SEWER PIPE TO BE GREEN IN COLOR UNLESS OTHERWISE SHOWN. 3.SERVICE LATERALS SHALL EXTEND A MINIMUM OF 10 FEET FROM THE MAIN AND TWO FEET PASSED THE P.U.E. INTO THE LOT. THE END OF EACH LATERAL SHALL BE MARKED WITH A 2"x4" PAINTED GREEN, EXTENDING FROM THE INVERT TO A MINIMUM OF THREE FEET ABOVE THE GROUND SURFACE, WITH THE DEPTH FROM THE TOP OF THE 2"x4" TO THE INVERT WRITTEN THEREON. 4.SERVICE LATERALS SHALL BE CONSTRUCTED AT A MINIMUM GRADE OF 2% WITH A MAXIMUM GRADE OF 100% (45°) AND CONFORM TO CWS STANDARD DWG NO. 170. 5.ALL MAIN SEWERS SHALL BE BALLED, FLUSHED, THOROUGHLY CLEANED, MANDRELLED, AND AIR-TESTED AFTER THE BACKFILL IS PLACED AND COMPACTED. A V.H.S. T.V. VIDEO TAPE AND REPORT AND AIR-TEST RESULTS SHALL BE PROVIDED TO CITY OF HILLSBORO. MANHOLES SHALL BE HYDROSTATIC OR VACUUM TESTED. 6.TRENCH BACKFILL IN STREET AREAS, PUBLIC RIGHT-OF-WAY, AND PRIVATE STREET TRACTS SHALL BE WITH 3/4"-0" ROCK, COMPACTED TO 95% T-99. 7.PRIVATELY MAINTAINED SANITARY SEWER SYSTEMS SHALL BE CONSTRUCTED TO THE STANDARDS AND SPECIFICATIONS OF THE 1994 EDITION OF THE U.P.C. AS AMENDED BY THE STATE OF OREGON, TITLED THE 1996 OREGON PLUMBING SPECIALTY CODE [OAR 918-701-0040(1)]. SANITARY SEWERS 1. ALL PUBLIC STREETS SHALL BE CONSTRUCTED AS PER THE APPLICABLE SECTIONS OF THE CITY OF TIGARD PUBLIC IMPROVEMENT DESIGN STANDARDS AND OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION, 2008. 2. THE CONTRACTOR SHALL DO ALL THE WORK SHOWN ON THE DRAWINGS AND ALL INCIDENTAL WORK CONSIDERED NECESSARY TO COMPLETE THE PROJECT IN AN ACCEPTABLE MANNER. 3. THE CONTRACTOR AND/OR SUBCONTRACTOR SHALL HAVE A MINIMUM OF ONE (1) SET OF APPROVED CONSTRUCTION PLANS ON THE JOB SITE AT ALL TIMES DURING THE CONSTRUCTION PHASES. 4. ALL MATERIAL SUPPLIER(S) SHALL SUBMIT TO THE ENGINEER PROOF OF MATERIAL(S) TESTED IN ACCORDANCE WITH THE ABOVE SPECIFICATIONS AND SHALL CERTIFY THAT ALL MATERIAL DELIVERED TO THE JOB SITE MEET OR EXCEED WASHINGTON COUNTY SPECIFICATIONS PRIOR TO DELIVERY OF MATERIAL TO THE SITE. ANY MATERIAL NOT CERTIFIED BY THE SUPPLIER SHALL BE REMOVED FROM THE JOB SITE AT NO ADDITIONAL COST TO THE OWNER. 5. A PRE CONSTRUCTION MEETING MUST BE HELD PRIOR TO COMMENCING WORK, WITH YOUR CWS INSPECTOR (INSPECTION HOT LINE # (503) 681-4444) & CITY OF TIGARD ENGINEERING & CONSTRUCTION SERVICES INSPECTOR & WASHINGTON COUNTY INSPECTOR. 6. ABANDON WELLS AND DRAIN FIELDS ONSITE MUST COMPLY WITH OREGON DEPT. OF WATER RESOURCES' REQUIREMENTS. 7. CONSTRUCTION RELATED TO CWS PERMITTING TO BE IN ACCORDANCE WITH R&O 07-20 (CWS). 8. FOLLOW CURRENT WASHINGTON COUNTY DESIGN AND CONSTRUCTION STANDARDS AS REQUIRED. GENERAL 1. ALL TREES, BRUSH AND DEBRIS WITHIN LIMITS OF THE RIGHT-OF-WAY AND ON THE LOTS TO BE FILLED SHALL BE REMOVED AND DISPOSED OF BY THE CONTRACTOR. 2. ALL AREAS OF CONSTRUCTION SHALL BE STRIPPED. STRIPPING SHALL CONSIST OF REMOVING THE TOPSOIL HUMUS. STRIPPING MATERIALS SHALL BE DISPOSED OF ON THE SITE IN AREAS DESIGNATED BY THE ENGINEER. PER GEOTECH'S RECOMMENDATIONS. 3. IF SPRINGS OR GROUND WATER IS ENCOUNTERED DURING CONSTRUCTION, THE CONTRACTOR SHALL ADVISE THE SOILS AND CIVIL ENGINEER OF THE CONDITIONS FOUND AND COORDINATE HIS ACTIVITIES IN A MANNER THAT WILL ALLOW THE ENGINEERS TIME TO REVIEW THE SITUATION AND PREPARE A PLAN TO PROPERLY DISPOSE OF THE WATER ENCOUNTERED. 4. MATERIAL IN SOFT SPOTS WITHIN THE ROADWAY SHALL BE REMOVED TO THE DEPTH REQUIRED TO PROVIDE A FIRM FOUNDATION AND SHALL BE REPLACED WITH 1 1/2"-0" CRUSHED ROCK. THE ENTIRE SUBGRADE SHALL BE THOROUGHLY COMPACTED PER GEOTECHNICAL RECOMMENDATIONS. 5. CONTRACTOR SHALL NOTIFY THE ENGINEER WHEN SUBGRADE IS COMPLETE AND 24 HOURS PRIOR TO PLACEMENT OF ROCK BASE MATERIAL AND 24 HOURS PRIOR TO FINAL PAVING FOR AN INSPECTION OF THE WORK. FAILURE TO DO SO WILL MAKE ANY SUBGRADE FAILURE OR DRAINAGE PROBLEMS THE RESPONSIBILITY OF THE CONTRACTOR. STREETS 1.THE GRADING PERMIT IS NOT TO BE CONSTRUED AS FINAL APPROVAL OF SITE GRADING, EMBANKMENT OR STRUCTURAL FILL WORK; IT MERELY PROVIDES FOR INITIATION OF WORK AND IS SUBJECT TO CHANGE PENDING CITY APPROVAL OF THE ENTIRE CONSTRUCTION-DEVELOPMENT PLAN SET. 2.SPREADING OF MUD OR DEBRIS UPON ANY PUBLIC ROAD IS PROHIBITED. THE CITY MAY ORDER STOPPAGE OF WORK TO EFFECT CORRECTIVE ACTION, AT ANY TIME. 3.EFFECTIVE EROSION CONTROL, DUST CONTROL, AND DRAINAGE CONTROL IS REQUIRED AT ALL TIMES. THE CITY MAY ORDER STOPPAGE OF WORK TO EFFECT CORRECTIVE ACTION, AT ANY TIME. 4.EMBANKMENTS OR STRUCTURAL FILLS FOR ROADWAY CONSTRUCTION OR FILLS TO BE CONSTRUCTED ON BUILDABLE LOTS SHALL BE CONSTRUCTED FROM EXCAVATED MATERIALS ACCEPTABLE TO THE SOILS ENGINEER AND SHALL BE BROUGHT TO GRADE IN LIFTS NOT TO EXCEED 8" LOOSE MEASURE. EACH LIFT SHALL BE COMPACTED TO 90 PERCENT OF MAXIMUM DENSITY AS OBTAINED BY AASTHO T_180 COMPACTION TEST. 5.STRUCTURAL FILLS SHALL COMPLY WITH CHAPTER 70APPENDIX CHAPTER 33 OF THE UNIFORM BUILDING CODE. CONSTRUCTION ON EXISTING SLOPES GREATER THAN 5:1 SHALL BE ACHIEVED BY BENCHING INTO THE EXISTING BANK A MINIMUM OF TEN FEET. IF THE BENCH EXPOSES SAND SOIL AN UNDERDRAIN MUST BE PROVIDED. THE UNDERDRAIN, IF REQUIRED, WILL BE CONSTRUCTED BY LYING INSTALLING NONWOVEN FILTER FABRIC, EQUIVALENT TO EXXON GTF 12500, ALONG THE BOTTOM OF THE STARTING BENCH, THEN PLACING A SIX INCH LAYER OF 1½" -- 03/4" DRAIN ROCK, AND FINALLY COVERING THE DRAIN ROCK WITH THE NONWOVEN FILTER FABRIC. SUCCESSIVE BENCHES WILL BE CONSTRUCTED WITH VERTICAL FILL BETWEEN TWO TO FIVE FEET AND BE COMPACTED IN LAYERS NOT TO EXCEED 8 INCHES. EACH 8-INCH LAYER SHALL BE COMPACTED TO A MINIMUM OF 90 PERCENT AASHTO T-180 DENSITY. THE FILL SLOPES SHALL NOT EXCEED 2:1 AT FINISH GRADE. NO ROCK OR SIMILAR MATERIAL EXCEEDING A 12-INCH DIAMETER SHALL BE ALLOWED IN THE STRUCTURAL FILL. 6.THE GEOTECHNICAL ENGINEER FOR STRUCTURAL FILL SHALL BE NOTIFIED 24 HOURS IN ADVANCE, BY THE CONTRACTOR, OF STARTING BENCHWORK TO DETERMINE THE NEED FOR AN UNDERDRAIN LAYER AND TO VERIFY EXISTING CONDITIONS. 7.THE CITY SHALL BE PROVIDED WITH A COPY OF THE GEOTECHNICAL ENGINEER'S REPORT/RECOMMENDATION CHANGES. 8.IF SPRINGS OR GROUND WATER ARE ENCOUNTERED DURING CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE SOILS AND CIVIL ENGINEERS OF THE CONDITIONS FOUND AND COORDINATE HIS ACTIVITIES IN A MANNER THAT WILL ALLOW THE ENGINEERS TIME TO REVIEW THE SITUATION AND PREPARE A PLAN TO PROPERLY MITIGATE THE WATER ENCOUNTERED. 9.THE CONTRACTOR SHALL HAVE THE SOILS ENGINEER TAKE COMPACTION TESTS. A MINIMUM OF THREE TESTS WILL BE REQUIRED FOR EACH 2 FEET OF FILL. 10.EXCAVATOR MUST COMPLY WITH ORS 757.541 THROUGH 757.571 (UTILITY PRE-NOTIFICATION, ETC.). GRADING NOTES SW SCH O L L S F E R R Y R O A D ( C . R . N O . 3 1 1 0 ) SW R O Y R O G E R S R O A D ( C . R . N O . 3 1 5 0 ) S S S S S S PGE 644 PGE 504 PGE 444 PGE 444 PGE 644 C MC I 24 " X 3 6 " X 3 6 " P G E 6 1 2 PGE 612 MCI 17" X 30" C C C C PGE 444 EXISTING FORCE MAIN TO REMAIN. FORCE MAIN RELOCATION COMPLETED DURING PREVIOUS PHASE UNDER SEPARATE PERMIT EXISTING 66" WATERLINE EXISTING OVERHEAD LINES TO BE UNDERGROUNDED BY PGE EXISTING POWER POLE TO BE REMOVED EXISTING GRAVITY SANITARY SEWER TO REMAIN SAWCUT EXISTING PAVEMENT PHASE 3 LIMITS OFFSITE IMPROVEMENTS TO BE CONSTRUCTED WITH WASHINGTON COUNTY ROY ROGERS MSTIP IMPROVEMENTS. EXISTING SLOPE EASEMENT EXISTING SANITARY SEWER EASEMENT TO BENEFIT CLEAN WATER SERVICE PER DOC. NO. 2019-057638S EXISTING WATERLINE EASEMENT TO BENEFIT TUALATAN VALLEY WATER DISTRICT AND THE CITY OF HILLSBORO EX PUE Construction Documents N: \ p r o j \ 3 9 5 - 0 6 1 \ 0 9 D r a w i n g s \ 0 5 A s b u i l t s \ S h e e t s - P h a s e 3 \ 3 9 5 0 6 1 . ( 3 ) P H 3 - E X C O N . d w g - S H E E T : 3 Ju n . 1 6 , 2 1 - 4: 0 9 P M je f f ELEVATION DATUM: NGVD 29 GEODESIGN, INC River Terrace East No. 3 Phase 3 REVISIONS DATE DESCRIPTION REVIEWED BY: TYPE: PROJECT NO.: AS-BUILTS 395-061 KCS KEY MAP SW 1 6 9 T H A V E SW SCHOLLS F E R R Y R D (C.R. N O . 3 1 1 0) SW WOODGROVE ST ALLEY M SW P E A C H B L O S S O M A V E SW R O Y R O G E R S R O A D ( C .R . N O . 3 15 0 ) AU B G E R G I N E T E R SW L A R K W O O D P L SW FRIENDLY LN SW M E A D B R O O K L N SW LEMO N G R A S S L N FOREST HOLLOW ST Boundary : 2294.31 ACRES Boundary : 2301.90 ACRES RENEWS: JUNE 30, 2022 12564 SW Main Street Tigard, OR 97223 [T] 503-941-9484 05/18/20211ST SUBMITTAL: 1 INCH = 20 FEET 20 10 20 SCALE 0EXISTING CONDITIONS & DEMOLITION SCALE: 1" = 20' 3 EXISTING CONDITIONS/ DEMOLITION PLAN SW R O Y R O G E R S R O A D ( C .R . N O . 3 15 0 ) SW SCHOLLS F E R R Y R D (C.R. N O . 3 1 1 0) SW L A R K W O O D P L SW FOREST HOLLOW ST SW A U B E R G I N E T E R CURVE TABLE CURVE # C1 RADIUS 673.00' LENGTH 153.68' CHORD DIRECTION S5° 39' 36"E 7.50' PUE, TYP. 6.00' PUE, TYP.6.00' PUE, TYP. PAVEMENT SAWCUT AND OVERLAY 8.00' PUE, TYP. PHASE 3 LIMITS OFFSITE IMPROVEMENTS TO BE CONSTRUCTED WITH WASHINGTON COUNTY ROY ROGERS MSTIP IMPROVEMENTS. 8.00' PUE, TYP. 282 280 281 TRACT "FF" 279 7 14 6 13 5 12 11 10 9 8 4 7 + 4 5 8 + 0 0 9+ 0 0 10 + 0 0 C1 15.00' EXISTING SLOPE EASEMENT EXISTING SLOPE EASEMENT EXISTING SANITARY SEWER EASEMENT TO BENEFIT CLEAN WATER SERVICES EXISTING WATERLINE EASEMENT TO BENEFIT TUALATAN VALLEY WATER DISTRICT AND THE CITY OF HILLSBORO 3 2 TRACT HH TRACT "GG" 1 PROPOSED MONUMENT WALL 1 INCH = 20 FEET 20 10 20 SCALE 0 Construction Documents N: \ p r o j \ 3 9 5 - 0 6 1 \ 0 9 D r a w i n g s \ 0 5 A s b u i l t s \ S h e e t s - P h a s e 3 \ 3 9 5 0 6 1 . ( 4 ) P H 3 S I T E . d w g - S H E E T : 4 Ju n . 1 6 , 2 1 - 4: 0 9 P M je f f ELEVATION DATUM: NGVD 29 GEODESIGN, INC River Terrace East No. 3 Phase 3 REVISIONS DATE DESCRIPTION REVIEWED BY: TYPE: PROJECT NO.: AS-BUILTS 395-061 KCS RENEWS: JUNE 30, 2022 12564 SW Main Street Tigard, OR 97223 [T] 503-941-9484 05/18/20211ST SUBMITTAL: 4 SITE PLAN EXISTING RIGHT-OF-WAY PROPOSED RIGHT-OF-WAY PROPOSED SIDEWALK PROPOSED A.C. PAVING LEGEND PROPOSED SIDEWALK BY OTHERS EXISTING SIDEWALK PROPOSED CURB AND GUTTER PROPOSED CENTERLINE EXISTING CENTERLINE PROPOSED HANDICAP RAMP PROPOSED PUBLIC UTILITY EASEMENT PROPOSED BUILDING SETBACK PROPOSED PROPERTY LINE EXISTING PROPERTY LINE EXISTING BOUNDARY LINE PROPOSED HANDICAP RAMP PHASE BOUNDARY LINE A A B B 0+ 0 0 1+ 0 0 2+ 0 0 2+ 3 5 0+00 1+00 2+00 3+00 3+50 S D S D TRACT "FF" TRACT HH 282 280 281 279 7 14 13 12 11 10 9 8 PHASE 3 LIMITS SW R O Y R O G E R S R O A D ( C .R . N O . 3 15 0 ) SW SCHOLLS F E R R Y R D (C.R. N O . 3 1 1 0) SW L A R K W O O D P L 3 2 0 3 1 9 3 2 1 322 323 320 321 322 323 325 321 322 323 324 326 3 2 6 325321321 322 322 322 323 324 325 325 323 324 324 326 326 3 2 5 324 3 2 6 32 5 32 1 32 2 32 3 32 4 32 6 320 321 32 2 323 324 Slopes Table Number 1 2 3 Minimum Slope 0.00% 10.00% 20.00% Maximum Slope 10.00% 20.00% 100.00% Area 21036.04 4178.94 2451.15 Color 1 INCH = 20 FEET 20 10 20 SCALE 0 EX 1-FT CONTOUR EX 5-FT CONTOUR FG 1-FT CONTOUR FG 5-FT CONTOUR LEGEND: 324 320 324 320 PROPOSED RETAINING WALL GRADING LIMITS Construction Documents N: \ p r o j \ 3 9 5 - 0 6 1 \ 0 9 D r a w i n g s \ 0 5 A s b u i l t s \ S h e e t s - P h a s e 3 \ 3 9 5 0 6 1 . ( 5 - 6 ) P H 3 G R A D & L O T S E C . d w g - S H E E T : 5 Ju n . 1 6 , 2 1 - 4: 1 0 P M je f f ELEVATION DATUM: NGVD 29 GEODESIGN, INC River Terrace East No. 3 Phase 3 REVISIONS DATE DESCRIPTION REVIEWED BY: TYPE: PROJECT NO.: AS-BUILTS 395-061 KCS RENEWS: JUNE 30, 2022 12564 SW Main Street Tigard, OR 97223 [T] 503-941-9484 05/18/20211ST SUBMITTAL: 5 GRADING PLAN CONSTRUCTION NOTES BASED ON OUR REVIEW THE GRADING PLANS ARE IN ACCORDANCE WITH OUR GEOTECHNICAL RECOMMENDATIONS.  ALL GRADING SHOULD CONDUCTED AS DESCRIBED IN THE MARCH 4, 2016 GEOTECHNICAL REPORT FOR THE SITE. LOCK+LOAD RETAINING WALLS SHOULD ALSO BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH THE RETAINING WALL DESIGN MEMO FOR THE SITE. BY: GEODESIGN, INC GRADING NOTES 1.FOR EROSION AND SEDIMENT CONTROL PLAN SEE ESC PLANS. 2.REFER TO GEOTECHNICAL REPORT PREPARED BY GEODESIGN INC. AND DATED JUNE 11, 2015 FOR ADDITIONAL STRUCTURAL AND COMPACTION REQUIREMENTS. FG = FINISH GRADE SURFACE TW = TOP OF WALL SW = SIDEWALK ABBREVIATION LEGEND: FG BOTTOM OF WALL, CAP STONE, BOTTOM OF SUBBASE, AND SUB-DRAIN ELEVATION ARE NOT SPECIFIED BY THESE PLANS. REFER TO WALL DETAILS AND SPECIFICATIONS. SW TW FOR RETAINING WALL WITH PILASTERS ALONG SCHOLLS FERRY ROAD (PILASTERS AND BRICK NOT SHOWN FOR CLARITY): FG = FINISH GRADE SURFACE TW = TOP OF WALL SW = SIDEWALK ABBREVIATION LEGEND: FG BOTTOM OF WALL, CAP STONE, BOTTOM OF SUBBASE, AND SUB-DRAIN ELEVATION ARE NOT SPECIFIED BY THESE PLANS. REFER TO WALL DETAILS AND SPECIFICATIONS. FG TW SW 310 320 330 340 310 320 330 340 0+00 1+00 2+00 2+50 LOT 281 LOT 280 LOT 279 TRACT FF SW SCHOLLS FERRY RD PHASE 3 LIMITS 310 320 330 340 310 320 330 340 0+00 1+00 2+00 3+00 3+50 TRACT FF LOT 279 SW LARKWOOD PL (TRACT HH)LOT 14 SW ROY ROGERS RD 2:1 MAX. SLOPE Construction Documents N: \ p r o j \ 3 9 5 - 0 6 1 \ 0 9 D r a w i n g s \ 0 5 A s b u i l t s \ S h e e t s - P h a s e 3 \ 3 9 5 0 6 1 . ( 5 - 6 ) P H 3 G R A D & L O T S E C . d w g - S H E E T : 6 Ju n . 1 6 , 2 1 - 4: 1 0 P M je f f ELEVATION DATUM: NGVD 29 GEODESIGN, INC River Terrace East No. 3 Phase 3 REVISIONS DATE DESCRIPTION REVIEWED BY: TYPE: PROJECT NO.: AS-BUILTS 395-061 KCS RENEWS: JUNE 30, 2022 12564 SW Main Street Tigard, OR 97223 [T] 503-941-9484 05/18/20211ST SUBMITTAL: 6 LOT SECTIONS SECTION A HORIZONTAL SCALE: 1" = 40', VERTICAL SCALE: 1" = 5' SECTION B HORIZONTAL SCALE: 1" = 40', VERTICAL SCALE: 1" = 5' D DX S D X S D X S D X S D X S D X S D X S D X S S X S S X S S X S S X S S X S S X S S X W PGE 644 PGE 444 PGE 644 MC I 24 " X 3 6 " X 3 6 " X W X W X W X W X W X W X W X W X W X W X W X W X W X W X W X W X W X W X W P G E 6 1 2 PGE 612 MCI 17" X 30" PGE 444 SW R O Y R O G E R S R O A D ( C .R . N O . 3 15 0 ) SW SCHOLLS F E R R Y R D (C.R. N O . 3 1 1 0) SW A U B E R G I N E T E R SW FOREST HOLLOW ST SW L A R K W O O D P L X W X W X W X W X W X W X W S EXISTING 66" TVWD WATERLINE OFFSITE IMPROVEMENTS TO BE CONSTRUCTED WITH WASHINGTON COUNTY ROY ROGERS MSTIP IMPROVEMENTS. D X S D X S D X S D X S S X S S X S S X S S S S S S S D S D PHASE 3 LIMITS EXISTING SLOPE EASEMENT EXISTING SANITARY SEWER EASEMENT TO BENEFIT CLEAN WATER SERVICES EXISTING WATERLINE EASEMENT TO BENEFIT TUALATAN VALLEY WATER DISTRICT AND THE CITY OF HILLSBORO S S XS S XSS XSS XSS XSS XSS XSS XSS XSS XSS XSS XSS 7 14 6 13 5 12 4 11 3 10 2 9 8 TRACT HH TRACT FF 282 280 281 TRACT GG 279 EXISTING FORCE MAIN PGE 444SSLN SEE SHEET PUBLIC B 9 EX SDMH #3B.1 EX SSMH #B1.1 SSMH #B2 SDLN SEE SHEET PUBLIC 3 8 EX SDMH #3A EX SSMH #B1 EX SSMH #A1 EX SSMH #G1 EX SSMH #C1 EX SDMH #4A SDMH #3B 1 INCH = 40 FEET 40 20 40 SCALE 0 Construction Documents N: \ p r o j \ 3 9 5 - 0 6 1 \ 0 9 D r a w i n g s \ 0 5 A s b u i l t s \ S h e e t s - P h a s e 3 \ 3 9 5 0 6 1 . ( 7 ) P H 3 C O M P . d w g - S H E E T : 7 Ju n . 1 6 , 2 1 - 4: 1 0 P M je f f ELEVATION DATUM: NGVD 29 GEODESIGN, INC River Terrace East No. 3 Phase 3 REVISIONS DATE DESCRIPTION REVIEWED BY: TYPE: PROJECT NO.: AS-BUILTS 395-061 KCS RENEWS: JUNE 30, 2022 12564 SW Main Street Tigard, OR 97223 [T] 503-941-9484 05/18/20211ST SUBMITTAL: 7 COMPOSITE UTILITY PLAN PROPOSED THRUST BLOCK EX THRUST BLOCK PROPOSED AIR RELEASE VALVE EX AIR RELEASE VALVE PROPOSED BLOW-OFF EX BLOW-OFF PROPOSED WATER VALVE EX WATER VALVE PROPOSED WATER METER EX WATER METER PROPOSED FIRE HYDRANT EX FIRE HYDRANT PROPOSED STORM CLEANOUT EX STORM CLEANOUT EX CATCH BASIN PROPOSED SANITARY CLEANOUT EX SANITARY CLEANOUT EX STORM MANHOLE PROPOSED CATCH BASIN PROPOSED STORM MANHOLE EX SANITARY MANHOLE PROPOSED SANITARY MANHOLE EX BURIED POWER LINE EX GAS LINE PROPOSED WATER LINE EX WATER LINE EX STORM DRAIN PROPOSED STORM DRAIN EX SANITARY SEWER PROPOSED SANITARY SEWER EASEMENT LINES EX OVERHEAD POWER LINE EX TELEPHONE LINE EX CABLE TV LINE EX GAS VALVE EX CABLE RISER EX TELEPHONE RISERTR C D C D S C S XCOM XE XW XG LEGEND XOH XSD SS W XSS SD PHASE BOUNDARY LINE S S SD SS SD SS SS SS SS SS S S S S S S S S S D P G E 6 4 4 P G E 4 4 4 P G E 4 4 4 MCI 24" X 36" X 36" PGE 612 M C I 1 7 " X 3 0 " P G E 4 4 4 P G E 4 4 4 S S S S SSLN-B SSLN-B S S SDMH 3B EX SDMH #3B.1 EX SDMH #3A GRIND AND OVERLAY 1.5" TYPE C LEVEL II AC (ONE LIFT) (TYP) 6.00' PUE 6.00' PUE 6 3 1A 2B 2A 7 7 14 6 13 5 12 4 11 3 10 2 9 1 8 279 TRACT HH 282 280281 TRACT GG TRACT FF 8 1B 2+00 3+00 3+69 2+00 3+00 3+40 7+45 8+00 9+0010+00 S W S C H O L L S F E R R Y R O A D ( C . R . N O . 3 1 1 0 ) SW F O R E S T H O L L O W S T SW AUBERGINE TER SW LARKWOOD PL PHASE 3 LIMITS EXISTING SLOPE EASEMENT EXISTING SANITARY SEWER EASEMENT TO BENEFIT CLEAN WATER SERVICES EXISTING WATERLINE EASEMENT TO BENEFIT TUALATAN VALLEY WATER DISTRICT AND THE CITY OF HILLSBORO EXISTING 66" TVWD WATERLINE SDLN-3 SDLN-3 S S 280 290 300 310 320 330 340 350 280 290 300 310 320 330 340 350 6+757+008+009+009+50 ST A = 8 + 0 8 . 7 5 ( L A R K W O O D ) EL E V = 3 2 3 . 8 9 BE G I N C O N S T R U C T I O N -3.76% EXISTING SW LARKWOOD PLACE BUILT WITH PHASE 1 PHASE 3 - PROPOSED PAVEMENT 64.12' ST A = 7 + 5 1 . 2 6 ( L A R K W O O D ) EL E V = 3 2 6 . 0 6 EN D C O N S T R U C T I O N EXISTING GROUND @ STREET CENTERLINE FINISH GRADE @ STREET CENTERLINE EX SANITARY SEWER EX STORM SEWER PR 6" DI WATER EX 8" DI WATER 61.39 LF 12" @ S=0.0361 37.46 LF 12" (PVC) @ S=0.0103 CLASS 'B' GRANULAR BACKFILL & BEDDING SD M H 3 B ST A = 7 + 9 2 . 0 2 , 3 . 9 1 ' L (L A R K W O O D ) 4" I E I N = 3 1 8 . 5 0 ( W ) 12 " I E O U T = 3 1 8 . 0 0 ( S ) ST A = 3 + 4 0 . 8 1 ( S D L N - 3 ) RI M = 3 2 4 . 4 3 EX S D M H 3 B . 1 ST A = 8 + 2 9 . 5 9 , 1 . 8 5 L ' (L A R K W O O D ) ST A : 3 + 0 3 . 3 5 ( S D L N - 3 ) RI M = 3 2 3 . 0 6 12 " I E O U T = 3 1 7 . 4 1 ( S ) 7+ 9 2 . 3 2 , 0 . 3 0 ' L 2.50 TRAVEL 16' SWTRAVEL 16' 5' 54' R.O.W. 32' PAVEMENT LC RW PRIVATE LOCAL STREET - PARKING ON BOTH SIDES PUE 6' C1 PLANT. 5' 2.50 RW PUE 6' PLANT. 5' SW 5' 2 DTL1 PAVEMENT SECTION 5:1 MAX .5:1 MAX. 0.5'0.5' N.T.S. CURB 0.5' CURB 0.5' Construction Documents N: \ p r o j \ 3 9 5 - 0 6 1 \ 0 9 D r a w i n g s \ 0 5 A s b u i l t s \ S h e e t s - P h a s e 3 \ 3 9 5 0 6 1 . ( 8 ) P H 3 - S T & S D L A R K W O O D . d w g - S H E E T : 8 Ju n . 1 6 , 2 1 - 4: 1 1 P M je f f ELEVATION DATUM: NGVD 29 GEODESIGN, INC River Terrace East No. 3 Phase 3 REVISIONS DATE DESCRIPTION REVIEWED BY: TYPE: PROJECT NO.: AS-BUILTS 395-061 KCS KEY MAP SW 1 6 9 T H A V E SW SCHOLLS F E R R Y R D (C.R. N O . 3 1 1 0) SW WOODGROVE ST ALLEY M SW P E A C H B L O S S O M A V E SW R O Y R O G E R S R O A D ( C .R . N O . 3 15 0 ) AU B G E R G I N E T E R SW L A R K W O O D P L SW FRIENDLY LN SW M E A D B R O O K L N SW LEM O N G R A S S L N FOREST HOLLOW ST Boundary : 2294.31 ACRES Boundary : 2301.90 ACRES RENEWS: JUNE 30, 2022 12564 SW Main Street Tigard, OR 97223 [T] 503-941-9484 05/18/20211ST SUBMITTAL: 1 INCH = 20 FEET 20 10 20 SCALE 0 8 SW LARKWOOD PL STREET & STORM PLAN & PROFILE SW LARKWOOD PL - STREET & STORM PROFILE HORIZ SCALE: 1" = 20', VERT SCALE: 1" = 10' SW LARKWOOD PL - STREET & STORM PLAN SCALE: 1" = 20' LEGEND: SIDEWALK BUILT BY DEVELOPMENT SIDEWALK BUILT BY HOME BUILDER INSTALL STORM MANHOLE PER CWS DWG NO. 010, SHEET DTL2. CONNECT TO EXISTING MANHOLE. CORE DRILL CONNECTION AND SEAL PER CWS DWG NO. 020, SHEET DTL2. INSTALL 4" PVC STORM SEWER LATERAL PER CWS DWG NO. 520, SHEET DTL2. SEE TABLE, THIS SHEET, FOR LATERAL INFORMATION. INSTALL 6" PVC STORM SEWER LATERAL PER CWS DWG NO. 520, SHEET DTL2. SEE TABLE, THIS SHEET, FOR LATERAL INFORMATION. STORM NOTES: 1A STORM LATERAL TABLE LOT#STATION LENG TH SLOPE I.E.MAT. 12-14 3+35.26 SDLN-3 31.60 2.45%318.95 D3034 279 3+38.26 SDLN-3 38.83 2.45%319.43 D3034 GENERAL NOTES: 1.CONSTRUCT SW LARKWOOD PL PER TYPICAL STREET SECTION C1, THIS SHEET. 2.ITALIC STATION LABELS INDICATE PIPE STATIONING. 3.ALL PVC TO BE ASTM D-3034 UNLESS OTHERWISE NOTED. STREET NOTES: INSTALL MONUMENT BOX TYPE PER DETAIL 170, SHEET DTL1. CONSTRUCT RESIDENTIAL DRIVEWAY WITH 3-FOOT WINGS PER DETAIL 141, SHEET DTL1. SEE TABLE, THIS SHEET, FOR LOCATION AND WIDTH. 1.0' MIN. SAWCUT INSIDE EXISTING ASPHALT CONCRETE PAVEMENT AND REMOVE EXISTING ASPHALT. SAWCUT AT UTILITY TRENCH. INSTALL (3) OM4-1 AS END-OF-ROADWAY MARKERS, EVENLY SPACED, ON POSTS. 2 3 PRIVATE DRIVEWAY STATIONS LOT#DELTA STATION WIDTH 12 7+95.13, 16.00' LT 12.00 13 7+79.50, 16.00' LT 8.00 14 7+62.79, 16.00' LT 12.00 279 7+95.66, 16.00' RT 16.00 1B 2A 6 2B 7 SIGN 3 REQUIRED TYPE OM4-1 8 8 30" X 30" MATERIAL: SIGN: RUST FREE ALUMINUM, LAMINATED, UV PROTECTED, WEATHER RESISTANT REFLECTORS: ACRYLIC PLASTIC COLOR: REFLECTORS: RED (RETROREFLECTIVE) BACKGROUND: RED BORDER: RED (RETROREFLECTIVE) 3+40.8 34.8 1.96%319.2 35.2 2.16% S W S C H O L L S F E R R Y R O A D ( C . R . N O . 3 1 1 0 ) S S S S SDLN-3 P G E 4 4 4 S S SD SS SD SS SS SS SS SS S S S S S S S S S D P G E 6 4 4 P G E 4 4 4 P G E 4 4 4 MCI 24" X 36" X 36" PGE 612 M C I 1 7 " X 3 0 " P G E 4 4 4 SSLN-B SSLN-B 2+00 3+00 3+40 7+45 8+00 9+0010+00 2+00 3+00 3+69 S S EX SSMH #B1.1 EX SSMH #B1 SSMH B2 SW F O R E S T H O L L O W S T SW AUBERGINE TER SW LARKWOOD PL 7 14 6 13 5 12 4 11 3 10 2 9 1 8 282 280281 279 TRACT HH (TYP) (TYP) PHASE LINE LIMIT OF PROPOSED IMPROVEMENTS 1A 1C 2 1B 1B 2 9 16 12 6.00' PUE 6.00' PUE PHASE 3 LIMITS EXISTING SLOPE EASEMENT EXISTING SANITARY SEWER EASEMENT TO BENEFIT CLEAN WATER SERVICES EXISTING WATERLINE EASEMENT TO BENEFIT TUALATAN VALLEY WATER DISTRICT AND THE CITY OF HILLSBORO EXISTING 66" TVWD WATERLINE S S 17 280 290 300 310 320 330 340 350 280 290 300 310 320 330 340 350 6+757+008+009+009+50 ST A = 8 + 0 8 . 7 5 ( L A R K W O O D ) EL E V = 3 2 3 . 8 9 BE G I N C O N S T R U C T I O N EXISTING PHASE 1 PROPOSED PHASE 3 ST A = 7 + 5 1 . 2 6 ( L A R K W O O D ) EL E V = 3 2 6 . 0 6 EN D C O N S T R U C T I O N EXISTING GROUND @ STREET CENTERLINE FINISH GRADE @ STREET CENTERLINE EX SANITARY SEWER EX STORM SEWER 6" DI WATER EX 8" DI WATER 61.39 LF 12" @ S=0.0361 CLASS 'B' GRANULAR BACKFILL & BEDDING 78.83 LF 8" @ S=0.0351 57.88 LF 8" (PVC) @ S=0.0317 3.00' MIN. COVER EX S S M H B 1 . 1 ST A : 8 + 1 3 . 9 1 , 9 . 4 8 R ' (L A R K W O O D ) ST A : 3 + 1 1 . 1 6 ( S S L N - B ) RI M = 3 2 3 . 4 6 4" I E I N = 3 1 6 . 8 0 ( E ) 8" I E O U T = 3 1 5 . 9 7 ( S ) SS M H B 2 ST A = 7 + 5 5 . 5 1 , 5 . 3 6 ' R (L A R K W O O D ) 8" I E O U T = 3 1 8 . 0 0 ( S ) ST A = 3 + 6 9 . 0 4 ( S S L N - B ) RI M = 3 2 5 . 7 6 Construction Documents N: \ p r o j \ 3 9 5 - 0 6 1 \ 0 9 D r a w i n g s \ 0 5 A s b u i l t s \ S h e e t s - P h a s e 3 \ 3 9 5 0 6 1 . ( 9 ) P H 3 - S S & W T L A R K W O O D . d w g - S H E E T : 9 Ju n . 1 6 , 2 1 - 4: 1 2 P M je f f ELEVATION DATUM: NGVD 29 GEODESIGN, INC River Terrace East No. 3 Phase 3 REVISIONS DATE DESCRIPTION REVIEWED BY: TYPE: PROJECT NO.: AS-BUILTS 395-061 KCS KEY MAP SW 1 6 9 T H A V E SW SCHOLLS F E R R Y R D (C.R. N O . 3 1 1 0) SW WOODGROVE ST ALLEY M SW P E A C H B L O S S O M A V E SW R O Y R O G E R S R O A D ( C .R . N O . 3 15 0 ) AU B G E R G I N E T E R SW L A R K W O O D P L SW FRIENDLY LN SW M E A D B R O O K L N SW LEM O N G R A S S L N FOREST HOLLOW ST Boundary : 2294.31 ACRES Boundary : 2301.90 ACRES RENEWS: JUNE 30, 2022 12564 SW Main Street Tigard, OR 97223 [T] 503-941-9484 05/18/20211ST SUBMITTAL: 1 INCH = 20 FEET 20 10 20 SCALE 0 9 SW LARKWOOD PL SANITARY & WATER PLAN & PROFILE SW LARKWOOD PL - SANITARY & WATER PROFILE HORIZ SCALE: 1" = 20', VERT SCALE: 1" = 10' SW LARKWOOD PL - SANITARY & WATER PLAN SCALE: 1" = 20' 1A INSTALL SANITARY MANHOLE PER CWS DWG NO. 010, SEE SHEET DTL2. CONNECT TO EXISTING MANHOLE. CORE DRILL CONNECTION AND SEAL PER CWS DWG NO. 020, SHEET DTL2. INSTALL 4" PVC D-3034 SANITARY SEWER LATERAL PER CWS DWG NO. 520, SEE SHEET DTL2, AND LATERAL TABLE, THIS SHEET. SANITARY NOTES: SANITARY LATERAL TABLE LOT#STATION LENGTH SLOPE I.E. 12 3+39.17 SSLN-B 44.19 2.00%324.58 13 3+50.56 SSLN-B 43.55 2.00%324.99 14 3+65.97 SSLN-B 42.42 2.00%325.55 279 3+40.42 SSLN-B 25.95 2.00%324.76 GENERAL NOTES: 1.ALL PVC TO BE ASTM D-3034 UNLESS OTHERWISE NOTED. 2.ITALIC STATION LABELS INDICATE PIPE STATIONING. 1B 2 WATER NOTES: INSTALL 1" WATER SERVICE WITH 3/4" WATER METER PER DETAIL 520, SEE SHEET DTL3. INSTALL 1" WATER SERVICE WITH 1" WATER METER IN DRIVEWAY IN 24"x36"x12" POLYMER CONCRETE METER BOX PER CITY SPECIFICATIONS AND DETAIL 520, SEE SHEET DTL3. INSTALL FIRE HYDRANT ASSEMBLY PER DETAIL 542, SEE SHEET DTL3. STA: 7+62.91, 18.25' RT. (LARKWOOD) INSTALL 6" X 6" MJ TEE STA: 7+63.43, 10.47' LT. (LARKWOOD) REMOVE EXISTING BLOW OFF AND CONNECT TO EXISTING 8" WATERLINE W/ 6" REDUCER. CONTRACTOR TO VERIFY DEPTH AND LOCATION OF EXISTING WATER MAIN PRIOR TO CONNECTION. REPORT CONFLICTS TO ENGINEER. COORDINATE WITH CITY OF TIGARD WATER. STA: 8+08.36, 9.65' LT. (LARKWOOD) INSTALL 6" CAP. INSTALL 1" COMBINATION AIR AND VACUUM VALVE PER DETAIL 590, SEE SHEET DTL3. 1B 1C 12 2 16 9 42.0 3.97%318.9 44.1 2.95%318.9 44.4 2.95%319.0 27.2 318.0 17 Construction Documents N: \ p r o j \ 3 9 5 - 0 6 1 \ 0 9 D r a w i n g s \ 0 5 A s b u i l t s \ S h e e t s - P h a s e 3 \ 3 9 5 0 6 1 . ( D T L ) P H 3 - D E T A I L S . d w g - S H E E T : DT L 1 Ju n . 1 6 , 2 1 - 4: 1 2 P M je f f ELEVATION DATUM: NGVD 29 GEODESIGN, INC River Terrace East No. 3 Phase 3 REVISIONS DATE DESCRIPTION REVIEWED BY: TYPE: PROJECT NO.: AS-BUILTS 395-061 KCS RENEWS: JUNE 30, 2022 12564 SW Main Street Tigard, OR 97223 [T] 503-941-9484 05/18/20211ST SUBMITTAL: DTL1 STREET DETAILS PAVEMENT SECTION NOT TO SCALE 1 COMPACTED SUBGRADE SOILS 95% OF MODIFIED PROCTOR 10" BASE ROCK 2"- (3/4"-0) LEVELING COURSE 8"- (1 1/2"-0) AGGREGATE BASE 95% OF MODIFIED PROCTOR ASTM D1557 4" LEVEL 2, 1/2" DENSE GRADED HMAC - TWO LIFTS COMPACTED TO 92% OF MAMD PAVEMENT SECTION NOT TO SCALE 2 COMPACTED SUBGRADE SOILS 95% OF MODIFIED PROCTOR 10" BASE ROCK 2"- (3/4"-0) LEVELING COURSE 8"- (1 1/2"-0) AGGREGATE BASE 95% OF MODIFIED PROCTOR ASTM D1557 4" LEVEL 2, 1/2" DENSE GRADED HMAC - TWO LIFTS COMPACTED TO 92% OF MAMD PRIVATE ALLEY LOCAL STREET Construction Documents N: \ p r o j \ 3 9 5 - 0 6 1 \ 0 9 D r a w i n g s \ 0 5 A s b u i l t s \ S h e e t s - P h a s e 3 \ 3 9 5 0 6 1 . ( D T L ) P H 3 - D E T A I L S . d w g - S H E E T : DT L 2 Ju n . 1 6 , 2 1 - 4: 1 2 P M je f f ELEVATION DATUM: NGVD 29 GEODESIGN, INC River Terrace East No. 3 Phase 3 REVISIONS DATE DESCRIPTION REVIEWED BY: TYPE: PROJECT NO.: AS-BUILTS 395-061 KCS RENEWS: JUNE 30, 2022 12564 SW Main Street Tigard, OR 97223 [T] 503-941-9484 05/18/20211ST SUBMITTAL: DTL2 SEWER DETAILS Construction Documents N: \ p r o j \ 3 9 5 - 0 6 1 \ 0 9 D r a w i n g s \ 0 5 A s b u i l t s \ S h e e t s - P h a s e 3 \ 3 9 5 0 6 1 . ( D T L ) P H 3 - D E T A I L S . d w g - S H E E T : DT L 3 Ju n . 1 6 , 2 1 - 4: 1 2 P M je f f ELEVATION DATUM: NGVD 29 GEODESIGN, INC River Terrace East No. 3 Phase 3 REVISIONS DATE DESCRIPTION REVIEWED BY: TYPE: PROJECT NO.: AS-BUILTS 395-061 KCS RENEWS: JUNE 30, 2022 12564 SW Main Street Tigard, OR 97223 [T] 503-941-9484 05/18/20211ST SUBMITTAL: DTL3 WATER DETAILS