Loading...
HomeMy WebLinkAboutMST2022-00384 (2) City of Tigard RECEIVED Deferral Until Occupancy Request APR 4 2023 CITY OF TIGARD Washington County Transportation Development Tax (TDT),Tran ,IrQI [ tW1c Ids System Development Charges (SDCs) This form is to be signed and submitted prior building permit issuance or,if no building permit is required,then upon land use approval(TMC 3.24, as amended by Ordinance No. 21-09). Date: 4/4/2023 Site Address: 7728 SW Layton Lane Project Land Use Case or Name: Brookside SUB Building Permit#: MST2022-00384 Tax Lot 2S 112CA14300 Total Parks #: Lot 3 Amount*: $11,225.00 TDT N/A- not eligible Total TSDC Amount: Amount*: $8,208.00 *The total TSDC amount shown above is the sum of S7 760 00 for TSDC-Improvement,$448.00 for TSDC- Reimbursement,and$ N/A for TSDC-River Terrace,if applicable.. *The total Parks SDC amount shown above is the sum of$6,812.00 for Parks-Improvement,$ 1 R87 00 for Parks- Reimbursement,and either$ 2.526,00 for Parks-Neighborhood or$ N/A for Parks-Neighborhood River Terrace. This constitutes my request to defer payment of the TDT,•TSDC, and Parks SDCs, as provided above, to prior to final inspection. Payment of the TDT,TSDC, and Parks SDCs may be deferred until issuance of the occupancy permit. In requesting this option, I understand that any deferred TDT,TSDC,and Parks SDCs must be paid prior to final inspection. TDT may only be deferred if the TDT is greater than the amount for a single-family residence. I further understand that the amount of TDT due on deferred obligations shall be the amount in effect at the time of issuance of the building permit. For a deferral request to be accepted both the Property Owner and the Developer must sign this request. 0/23Property Owner: Date: Developer: Date: g/1/2' Permit Coordinator: - Date: 4/4/2023