HomeMy WebLinkAboutRES2025-0013 BUILDING APPLICATION - LE Docusign Envelope ID:7ED2968B-38EF-4976-9795-48795B323173
City of Tigard
- COMMUNITY DEVELOPMENT DEPARTMENT
Residential Building Permit Submittal Requirements
TIGA'' v"
So you're submitting a residential building permit?
You will need to submit a physical application and physical plans in person at the
Permit Center.
Make sure you completely fill out a Building Permit Application. Don't forget to
include:
❑ Email address.
❑ Signature.
❑ Building Permit Application Checklist. Read through all sections (including
Jurisdictional Specifics) and ensure you have all the required items prepared.
Want to reduce the risk of needing corrections? Before you go! Try emailing a copy of
your plans to tigardplanneronduty@tigard-or.gov for pre-review for planning.
Required Site Plan Elements:
❑ 3 copies of site plan on max 11x17" Items required for all residential permits except sheds,
Items required for all residential permits: decks, carports, and similar accessory structures:
❑ Drawn to standard scale ❑ Retained trees, drip line / tree protection
❑ North arrow ❑ Street and site trees shown / labeled
❑ Site address, project name, lot # ❑ Table calculating tree canopy at maturity
❑ Street names (N/A for SFR)
❑ Applicant name and phone # ❑ Courtyard rectangle dimensioned (if applicable)
❑ Lot and setback dimensions ❑ Vision clearance triangle
❑ Existing structures & square footage ❑ Utility locations & easements
❑ Footprint of new structure and FFE ❑ Property corner elevations
❑ Sidewalk/driveway dimensioned ❑ LIDA (>1,000 sf disturbance)
❑ Lot area and lot coverage percentage
❑ Erosion control
Required Elevation Plan Elements
Example on reverse side of this sheet: ❑ Garage doors dimensioned
(For SFR: calcs needed only on street-facing) ❑ Summary table with calculations for:
❑ Drawn to standard scale ❑ Total façade area
❑ Building height dimensioned ❑ Total window and door area
❑ Façade dimensioned ❑ Total garage width
❑ Windows and doors dimensioned ❑ Total façade width
Required Floor Plan Elements
(N/A for SFR): ❑ Summary table that includes
❑ Each story floor dimensioned ❑ Total floor area
❑ Each story floor area calculated ❑ Floor area per story
Docusign Envelope ID:7ED2968B-38EF-4976-9795-48795B323173
How to show facade calculations on your plans:
SHOW AREA
OF RADIAL
\ WINDOWS
DIM.
PROVIDE SUMMARY TABLE
OF CALCULATED DEMONSTRATING COMPLIANCE
/---DIM.—,I' \
/ DIM.TTI
Tt Y
DIM.(TYP) DIM.
DIM.(TYP) M.(TY y
'1' ('' DIMENSION , /\ DIM.
Fir \ / DIM. . sic DIM
/ DIM.
1 *DIM.*
DIM. DIM. I I 1
DIM.
\ 1, \
/ DIMENSION X
Docusign Envelope ID:7ED2968B-38EF-4976-9795-48795B323173
Building Permit Application
Residential FOR OFFICE USE ONLY
City of Tigard Received
By: Permit No.:
II ■ 13125 SW Hall Blvd.,Tigard,OR 97223 Plan Review
e Phone: 503.718.2439 Fax: 503.598.1960 Date/By: Other Permit:
TIGARD Inspection Line: 503.639.4175 Date Ready/By: Juris: 0 See Page 4 for
Internet: www.tigard-or.gov Notified/Method: Supplemental Information
TYPE OF WORK 11 REQUIRED DATA:1-AND 2-FAMILY DWELLING
❑New construction ❑Demolition Permit fees*are based on the value of the work performed.
Indicate the value(rounded to the nearest dollar)of all
❑■ Addition/alteration/replacement ❑Other:0 equipment,materials,labor,overhead,and the profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
El1-and 2-family dwelling ElCommercial/industrial Valuation: $4000
Number of bedrooms: 5
IIIAccessory building ❑Multi-family
El Master builder ❑■ Other: Deck Stairs
Number of bathrooms: 3
JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site address:16894 SW Beemer Lane New dwelling area: 0 square feet
City/State/ZIP:Tigard, OR 97224 Garage/carport area: 0 square feet
Suite/bldg./apt.no.: Project name: Le Deck Stairs Covered porch area: 0 square feet
Cross street/directions to job site: Deck area: 30 square feet
Corner lot of SW 169th Ave & SW Beemer Lane Other structure area: 0 square feet
REQUIRED DATA:COMMERCIAL-USE CHECKLIST
Subdivision:South River Terrace Lot no.:13 Permit fees*are based on the value of the work performed.
Tax map/parcel no.: R2223616 Indicate the value(rounded to the nearest dollar)of all
equipment,materials,labor,overhead,and the profit for the
DESCRIPTION OF WORK II=r work indicated on this application.
Adding a stair case and railing to an existing deck Valuation: $
Existing building area: square feet
New building area: square feet
I=1 PROPERTY OWNER ❑ TENANT Number of stories:
Name:Steven Le Type of construction:
Address:16894 SW Beemer Lane Occupancy groups:
City/State/ZIP:Tigard, OR 97224 Existing:
Phone:(408-306-0663 Fax:N/A ) New:
I] APPLICANT ❑ CONTACT PERSON BUILDING PERMIT FEES*
Business name:Clear Cedar Construction i (Please refer ro fee schedule)
Structural plan review fee(or deposit):
Contact name:Anthony Allen FLS plan review fee(if applicable):
Address:15918 NE 48th Cir
Total fees due upon application:
city/state/ZIP:Vancouver, WA 98682
Amount received:
Phone:(971-312-9940 Fax: :(N/A )
PHOTOVOLTAIC SOLAR PANEL SYSTEM FEES*
E-mail: Clearcedarconstruction@gmail.com
Commercial and residential prescriptive installation of
CONTRACTOR roof-top mounted PhotoVoltaic Solar Panel System.
Business name:Clear Cedar Construction Submit two(2)sets of roof plan with connection details
and fire department access,along with the 2010 Oregon
Address:15918 NE 48th cir Solar Installation Specialty Code checklist.
City/State/ZIP:Vancouver, WA 98682 Permit Fee(includes plan review $180.00
and administrative fees):
Phone:(971-B 12-9940 Fax:(N/A ) State surcharge(12%of permit fee): $21.60
CCB lic.:248461 Total fee due upon application:by: P $201.60
Authorized signature: :Qj This permit application expires if a permit is not obtained
within 180 days after it has been accepted as complete.
Print name:AnthonyAllen �4B2D2F838CF14OA... Date:5/26/25 *Fee methodology set by Tri-County Building Industry
Service Board.
I:\Buildmg\Permits\BUP-RESPermitApp.doc 01/25/2023 440-4613T(11/02/COM/WEB)
Docusign Envelope ID:7ED2968B-38EF-4976-9795-48795B323173
Building Permit Application Checklist
One- and Two-Family Dwelling FOR OFFICE USE ONLY
Received
- City of Tigard Received
Permit No.:
III13125 SW Hall Blvd.,Tigard,OR 97223 Associated permits:
Phone: 503.718.2439 Fax: 503.598.1960
24-Hour Inspection Line: 503.639.4175 ❑ Electrical 12 Plumbing El Mechanical
TIGARD
Internet: www.tigard-or.gov ❑ Other:
THE FOLLOWING ITEMS ARE REQUIRED FOR PLAN REVIEW Yes No N/A
1 Land use actions completed. See jurisdiction criteria for concurrent reviews. ] _ ❑
2 Zoning. Flood plain,solar balance points,seismic soils designation,historic district,etc. ❑ ❑ ❑
3 Verification of approved plat/lot. n n ❑
4 Fire district approval required. Name of district: • n n n
5 Septic system permit or authorization for remodel. Existing system capacity El El
6 Sewer permit. ❑ ❑ ❑
7 Water district approval. _ _ ❑
8 Soils report. Must carry original applicable stamp and signature on file or with application. 'FLAIL ❑
9 Erosion control ❑plan ❑permit required. Include drainage-way protection,silt fence design and location of catch- ❑ ❑ ❑
basin protection,etc.
10 3 Complete sets of legible plans. Must be drawn to scale,showing conformance to applicable local and state ❑ ❑ ❑
building codes. Lateral design details and connections must be incorporated into the plans or on a separate full-size
sheet attached to the plans with cross references between plan location and details. Plan review cannot be completed if
copyright violations exist.
11 Site/plot plan drawn to scale. The plan must show lot and building setback dimensions;property corner elevations(if ❑ U U
there is more than a 4-ft.elevation differential,plan must show contour lines at 2-ft.intervals);location of easements
and driveway;footprint of structure(including decks);location of wells/septic systems;utility locations;direction
indicator;lot area;building coverage area;percentage of coverage;impervious area;existing structures on site;and
surface drainage.
12 Foundation plan. Show dimensions,anchor bolts,any hold-downs and reinforcing pads,connection details,vent size ❑ ❑ ❑
and location.
13 Floor plans. Show all dimensions,room identification,window size,location of smoke detectors,water heater, ❑ ❑
furnace,ventilation fans,plumbing fixtures,balconies and decks 30 inches above grade,etc.
14 Cross section(s)and details. Show all framing-member sizes and spacing such as floor beams,headers,joists,sub- ❑ ❑ ❑
floor,wall construction,roof construction. More than one cross section may be required to clearly portray
construction. Show details of all wall and roof sheathing,roofing,roof slope,ceiling height,siding material,footings
and foundation,stairs,fireplace construction,thermal insulation,etc.
15 Elevation views. Provide elevations for new construction;minimum of two elevations for additions and remodels. ❑ ❑ ❑
Exterior elevations must reflect the actual grade if the change in grade is greater than four foot at building envelope.
Full-size sheet addendums showing foundation elevations with cross references are acceptable.
16 Wall bracing(prescriptive path)and/or lateral analysis plans. Must indicate details and locations;for non- ❑ ❑ ❑
prescriptive path analysis provide specifications and calculations to engineering standards.
17 Floor/roof framing. Provide plans for all floors/roof assemblies,indicating member sizing,spacing,and bearing 0 ❑ ❑
locations. Show attic ventilation.
18 Basement and retaining walls. Provide cross sections and details showing placement of rebar. For engineered ❑ ❑ ❑
systems,see item 22,"Engineer's calculations."
19 Beam calculations. Provide two sets of calculations using current code design values for all beams and multiple joists ❑ ❑ ❑
over 10 feet long and/or any beam/joist carrying a non-uniform load.
20 Manufactured floor/roof truss design details. ❑ ❑ ❑
21 Energy Code compliance. Identify the prescriptive path or provide calculations. A gas-piping schematic is required ❑ ❑ ❑
for four or more appliances.
22 Engineer's calculations. When required or provided,(i.e.,shear wall,roof truss)shall be stamped by an engineer or ❑ ❑ ❑
architect licensed in Ore.on and shall be shown to be al.licable to the .ro•ect under review.
JURISDICTIONAL SPECIFICS
23 Three(3)site plans are required for Item 11 above. Site plans must be 8-1/2"x 11"or 11"x 17". ❑ ❑ ❑
24 Two(2)sets each are required for Items 16, 19,20 and 22 above. ❑ ❑ ❑
25 Building plans shall not contain red lines or tape-ons. "Mirrored"building plans will not be accepted. ❑ ❑ ❑
26 "Reversed"building plans must meet criteria outlined in the Permit&System Development Fees document. ❑ ❑ ❑
27 "Drawn to scale"indicates standard architect or engineer scale. e E El28 Site plan to include tree size,type and location per approved project street tree plan(if applicable),and City of Tigard
Street Tree List.
29 Site plan to include trees and tree protection measures as required by conditions of approval. Tree locations,driplines, ❑ ❑ ❑
and protection measures must be drawn to scale and must include the project arborist's signature of approval.
30 A Clean Water Services'Sensitive Area Pre-Screening Site Assessment form is required for all building additions, ❑ ❑ ❑
including decks,patio covers(over non-impervious surface)and accessory structures to existing residential dwellings
on a lot of record approved prior to September 9,1995.
I:\Building\Permits\BUP-RESPermitApp.doc 01/25/2023 440-4613T(11/02/COM/WEB)