Loading...
HomeMy WebLinkAbout06/04/2025 - AgendaCity of Tigard | 13125 SW Hall Blvd., Tigard, OR 97223 | 503-639-4171 | www.tigard-or.gov | Page 1 of 1 Transportation Advisory Committee Agenda MEETING DATE/TIME: June 4, 2025 – 6:00 to 8:00 p.m. JOINNT MEETING WITH TOWN CENTER ADVISORY COMMISSION HYBRID MEETING In-person: Tigard City Hall, 13125 SW Hall Blvd MS Teams: https://teams.microsoft.com/l/meetup- join/19%3ameeting_ZjI1NWYzYTgtNjZlNS00MzIyLWE5NzctYzcyMmNkZWIyNjkx%40thread.v2/0?con text=%7b%22Tid%22%3a%22f3a8bd73-e9c5-4c7e-9f1f- c7a3ca9f70f7%22%2c%22Oid%22%3a%22c8f287ca-4b00-4032-bd80-3e670bc9886e%22%7d 1. CALL TO ORDER Chair Hendrickson 6:00 2. INTRODUCTIONS Chair Hendrickson 6:02 3. PUBLIC COMMENT Chair Hendrickson 6:05 4. MICROTRANSIT PILOT PROJECT Reza Farhoodi, Washington Co 6:10 5. TRAILS SYSTEM PLAN UPDATE Courtney Furman 6:30 6. E-GO PROJECT UPDATE Tiffany Gehrke 6:50 7. 72nd AVE PRE-DESIGN PROJECT UPDATE Susan Wright 7:10 8. NON-AGENDA ITEMS All 7:30 9. ADJOURNMENT Chair Hendrickson 8:00 Related websites and information: • Tigard 2040 TSP • Tigard Construction Updates • Tigard Traffic Safety Reporting • Tigard Capital Improvement Projects • Public Work Service Request Page • ODOT Construction Projects • Safe Streets for Tigard 72nd Avenue Pre-Design Project Tigard Transportation Advisory Committee (TTAC) & Town Center Advisory Commission (TCAC) June 4, 2025 Agenda •Project Overview and Goals •Public Involvement •Design Elements •Next Steps Project Overview Redesign of SW 72 nd Avenue from Highway 99 to Highway 217 Project Goals •Develop north section (Hwy 99W to Dartmouth Street) to 30% design •Help the City pursue grant funding •Coordinate with upcoming development frontage improvements and Red Rock Creek Trail •Develop south section (Dartmouth Street to Hwy 217) to 10% design •Refine the ultimate cross section and roadway alignment 72nd Avenue Project Phases Planning Study72nd Avenue Corridor Study 2019 to 2020 Identified concept for 72 nd Avenue Pre-Design72nd Avenue Pre-Design 2024 to 2025 Develop design for 72nd Avenue Design & Construction72nd Avenue Reconstruction Future Phase Finalize design process and build improvements 72nd Avenue Corridor Study (Planning Phase) •Identified a new roadway design concept for SW 72nd Avenue to transform the busy arterial into an attractive, multimodal street for all users and added the preferred cross sections into City code. •Public involvement in 2019: o Stakeholder interviews (7 stakeholders) o 2 open houses (~40 participants) o 3 online surveys (~350 participants) •What we heard from the community in the planning phase: •Safe Walking and Biking –desire for safer options for walking, biking, transit •Bicycle Treatments –preference for protected bike lanes (separated from vehicle traffic by physical barriers) rather than buffered bike lanes (separated by pavement markings) •On-Street Parking –support for additional on-street parking Public Involvement for Design Phase •Focus Group Meetings –October 8th, 2024 •Targeted Outreach •McDonald’s –November 12, 2024 •Maria Latina –November 13, 2024 •Viewfinder Apartments –November 14, 2024 & May 9, 2025 •Overland Apartments –November 22, 2024 •Neighborhood Meeting –April 17, 2025 Proposed Design Elements •Sidewalk •Protected bicycle lane (cycle track) •Landscaping buffer •One travel lane in each direction with center turn lane •On-street parking Proposed Intersection Improvements •Protected intersection •Pedestrian crossings •Future transit stops •Curb extensions •Green bike lane extensions •High visibility crosswalks •Lighting Dartmouth Street –Existing Condition Dartmouth Street –Proposed Improvements Beveland Street – Existing Condition Beveland Street – Proposed Improvements Future Transit Stops – Proposed Locations •Future transit service with TriMet along 72nd Avenue/Dartmouth Street •Transit stops shown at Beveland and Dartmouth per conversations with TriMet 72nd AveBeveland St Dartmouth St Future Transit Stops •Bus stops designed per TriMet’s FX Standards •Frequent express service •In-lane bus stops at far side of signalized intersections •Concrete bus landing and platform Pedestrian Crossings •New pedestrian crossing locations: •Future Red Rock Creek Trail (RRFB) •Future Atlanta Street (Traffic Signal) •Between Baylor Street and Clinton Street (RRFB) •Elmhurst Street (Future Traffic Signal or RRFB) Between Baylor Street and Clinton Street – Existing Condition Between Baylor Street and Clinton Street – Proposed Crossing Red Rock Creek – Existing Condition Red Rock Creek – Proposed Trail Crossing THE AVE - Reconstruction of SW 72nd Ave on VimeoCorridor Visualization Website 72nd Avenue | City of Tigard 72nd Avenue Storymap https://storymaps.arcgis.com/stories/6f5993c58a00455096bb8577843 ed298 Next Steps •Complete 30% design plans of north section (Hwy 99W to Dartmouth Street) •Cost estimates o Applied for BUILD Federal Grant in February 2025 (North Segment ~$25M) o Will be preparing a similar breakdown for the South Segment •Final Design Memo Contact Information Courtney Furman Principal Engineer Courtney.furman@tigard-or.gov Tiffany Gehrke Principal Transportation Planner tiffany.gehrke@tigard-or.gov