Transportation Advisory Committee Agenda
MEETING DATE/TIME: June 4, 2025 – 6:00 to 8:00 p.m.
JOINNT MEETING WITH TOWN CENTER ADVISORY COMMISSION
HYBRID MEETING
In-person: Tigard City Hall, 13125 SW Hall Blvd
MS Teams: https://teams.microsoft.com/l/meetup-
join/19%3ameeting_ZjI1NWYzYTgtNjZlNS00MzIyLWE5NzctYzcyMmNkZWIyNjkx%40thread.v2/0?con
text=%7b%22Tid%22%3a%22f3a8bd73-e9c5-4c7e-9f1f-
c7a3ca9f70f7%22%2c%22Oid%22%3a%22c8f287ca-4b00-4032-bd80-3e670bc9886e%22%7d
1. CALL TO ORDER Chair Hendrickson 6:00
2. INTRODUCTIONS Chair Hendrickson 6:02
3. PUBLIC COMMENT Chair Hendrickson 6:05
4. MICROTRANSIT PILOT PROJECT Reza Farhoodi, Washington Co 6:10
5. TRAILS SYSTEM PLAN UPDATE Courtney Furman 6:30
6. E-GO PROJECT UPDATE Tiffany Gehrke 6:50
7. 72nd AVE PRE-DESIGN PROJECT UPDATE Susan Wright 7:10
8. NON-AGENDA ITEMS All 7:30
9. ADJOURNMENT Chair Hendrickson 8:00
Related websites and information:
• Tigard 2040 TSP
• Tigard Construction Updates
• Tigard Traffic Safety Reporting
• Tigard Capital Improvement Projects
• Public Work Service Request Page
• ODOT Construction Projects
• Safe Streets for Tigard
72nd Avenue
Pre-Design Project
Tigard Transportation Advisory Committee (TTAC) &
Town Center Advisory Commission (TCAC)
June 4, 2025
Agenda
•Project Overview and Goals
•Public Involvement
•Design Elements
•Next Steps
Project Overview
Redesign of SW 72 nd Avenue from Highway 99
to Highway 217
Project Goals
•Develop north section (Hwy 99W to Dartmouth Street) to 30% design
•Help the City pursue grant funding
•Coordinate with upcoming development frontage improvements and Red
Rock Creek Trail
•Develop south section (Dartmouth Street to Hwy 217) to 10% design
•Refine the ultimate cross section and roadway alignment
72nd Avenue Project Phases
Planning Study72nd Avenue
Corridor Study
2019 to 2020
Identified
concept for 72 nd
Avenue Pre-Design72nd Avenue
Pre-Design
2024 to 2025
Develop design
for 72nd Avenue
Design & Construction72nd Avenue
Reconstruction
Future Phase
Finalize design
process and build
improvements
72nd Avenue Corridor Study (Planning Phase)
•Identified a new roadway design concept for SW 72nd Avenue to transform the busy arterial into
an attractive, multimodal street for all users and added the preferred cross sections into City
code.
•Public involvement in 2019:
o Stakeholder interviews (7 stakeholders)
o 2 open houses (~40 participants)
o 3 online surveys (~350 participants)
•What we heard from the community in the planning phase:
•Safe Walking and Biking –desire for safer options for walking, biking, transit
•Bicycle Treatments –preference for protected bike lanes (separated from vehicle traffic by
physical barriers) rather than buffered bike lanes (separated by pavement markings)
•On-Street Parking –support for additional on-street parking
Public Involvement for Design Phase
•Focus Group Meetings –October 8th, 2024
•Targeted Outreach
•McDonald’s –November 12, 2024
•Maria Latina –November 13, 2024
•Viewfinder Apartments –November 14, 2024 & May 9, 2025
•Overland Apartments –November 22, 2024
•Neighborhood Meeting –April 17, 2025
Proposed Design Elements
•Sidewalk
•Protected bicycle lane (cycle track)
•Landscaping buffer
•One travel lane in each direction
with center turn lane
•On-street parking
Proposed Intersection
Improvements
•Protected intersection
•Pedestrian crossings
•Future transit stops
•Curb extensions
•Green bike lane extensions
•High visibility crosswalks
•Lighting
Dartmouth Street –Existing Condition
Dartmouth Street –Proposed Improvements
Beveland Street –
Existing Condition
Beveland Street –
Proposed Improvements
Future Transit Stops –
Proposed Locations
•Future transit service with TriMet along
72nd Avenue/Dartmouth Street
•Transit stops shown at Beveland and
Dartmouth per conversations with TriMet 72nd AveBeveland St
Dartmouth St
Future Transit Stops
•Bus stops designed per
TriMet’s FX Standards
•Frequent express service
•In-lane bus stops at far side
of signalized intersections
•Concrete bus landing and
platform
Pedestrian Crossings
•New pedestrian crossing
locations:
•Future Red Rock Creek Trail
(RRFB)
•Future Atlanta Street
(Traffic Signal)
•Between Baylor Street and
Clinton Street (RRFB)
•Elmhurst Street (Future
Traffic Signal or RRFB)
Between Baylor Street and Clinton Street –
Existing Condition
Between Baylor Street and Clinton Street –
Proposed Crossing
Red Rock Creek –
Existing Condition
Red Rock Creek –
Proposed Trail Crossing
THE AVE - Reconstruction of SW 72nd Ave on VimeoCorridor Visualization
Website
72nd Avenue | City of Tigard
72nd Avenue Storymap
https://storymaps.arcgis.com/stories/6f5993c58a00455096bb8577843
ed298
Next Steps
•Complete 30% design plans of north section (Hwy 99W to
Dartmouth Street)
•Cost estimates
o Applied for BUILD Federal Grant in February 2025 (North Segment
~$25M)
o Will be preparing a similar breakdown for the South Segment
•Final Design Memo
Contact Information
Courtney Furman
Principal Engineer
Courtney.furman@tigard-or.gov
Tiffany Gehrke
Principal Transportation Planner
tiffany.gehrke@tigard-or.gov