Report (2) 13vP2o22 — Dot—l"i
Tualatin Valley Water District 3 s St...) �L N�N ST
Delivering the Best Water Service Value
October 25, 2021
REACH Community Development
Attn: Erik Pattinson
4150 S Moody Avenue
Portland, OR 97239
Subject: Statement of Service Availability
Dear Mr. Pattinson,
Tualatin Valley Water District has adequate capacity to provide service to Tax Lots 2900, 3001,
and 3100 (assessor tax map 1S136DD)from the 12"waterlines on SW Clinton St and SW 68th
Pkwy, and the 8"waterline on SW 69th Ave. The proposed use will make the necessary
connections and/or extensions of water mains, as required,to serve the subject property and
will be shown on plans submitted for approval prior to connection to the system.
Contact the Tualatin Valley Water District for requirements regarding submittal of plans for
review and approval and for review fees or any questions you may have.
Sincerely,
Digitally signed by Sarah Afton
o DN:C=US,
E=sarah.atton@Nwd.org,
O= WD,Alton eedng,
Dae:2021arah Afton
Date:xort.to.zs ta:os:n-oroo'
Sarah Alton, PE
Engineering Associate
Sarah.alton@tvwd.org
971-327-6304
18505W 170th Avenue • Beaverton,Oregon 97003 • Phone:503-642-1511 • Fax:503-649-2733 • www.tvwd.org
October 20, 2021
Tigard, OR, 97223
Subject: Proposed construction site at 11800 SW 69th Ave., Tigard, Oregon
Dear REACH DEVELOPMENT/Dartmouth Crossing Apartments:
Thank you for inquiring about electrical services provided through Portland General
Electric. Your proposed project located in Tigard, Oregon is within PGE's service territory.
PGE has enough electrical capacity to serve your anticipated load. However, in all
likelihood, additional infrastructure and electrical equipment will need to be installed to
serve this anticipated load. This letter does not address any issues concerned with
easements or right-of-ways.
The owner/developer is responsible for all costs associated with providing electric
service to a new project, including the expenses for realigning existing electric
facilities. However, PGE currently has a line extension allowance (LEA) that may help
offset some of the costs of providing electrical service. We calculate the LEA for your
project based on an estimate of the yearly incremental kWh consumption. This LEA is
subject to change.
Please note that the LEA does not apply to certain project expenses involving
underground service. The owner/developer is always responsible for the cost of all
necessary excavation, trenching, conduit, vaults, submersible transformers, pads
and permits.
Expenses for providing electric service to a project can be considerable. In order to
provide a good cost estimate, PGE must receive your detailed plans and load estimates.
When you have this information, please call (503) 323-6700, and a Service and Design
Consultant will be assigned to your project and make contact with you.
Sincerely,
Hap English
Portland General Electric
cc: Click here to enter text.
p* R * 1 * D * E
DISPOSAL COMPANY
P.O. Box 820 Sherwood, OR 97140
Phone: (503) 625-6177 Fax: (503) 625-6179
October 15, 2021
Christian Cutul
Bora
720 SW Washington, Suite 800
Portland, OR 97205
Re: Dartmouth Crossing
We have reviewed the site plan for the above-mentioned project. The site plan shows one trash
room 14'6" x 22'6"that will hold front load trash and recycling containers (provided by Pride
Disposal). This room is for trash and recycling only, no other material will be stored there.
Our driver will be responsible for moving the trash and recycling containers in and out of the
trash room on collection days provided the electric pallet jack is available for our driver to
access. The site will also have an electronic key pad, which you will provide the code to Pride to
allow for access to the containers via the roll up door on collection days. There is a 8' wide
motorized coiling door that the drivers will use to move containers in and out of the trash room.
If there are any modifications to this site plan, Pride will need be made aware of those changes
and sign off on them before the modifications can be made.
If you have any questions, feel free to contact me.
Sincerely,
Kristen Tabscott
Pride Disposal Co.
(503) 625-6177
® www.tvfr.com
Tualatin Valley
Fire & Rescue
October 5, 2021
Christian Cutul/Bora Architecture,
Associate Planner/
City of Tigard
13125 SW Hall Blvd
Tigard, Oregon 97223
Re: 11770 SW 69TH, 11800 SW 69th, 6835 SW Clinton St
Tualatin Valley Fire and Rescue has the equipment and staffing to provide Fire protection and emergency services to
the address of 6835 SW Clinton St. Tigard Oregon 97223, encompassing the neighboring addresses noted above.
If you have questions or need further clarification, please feel free to contact me at 503-259-1504.
Sincerely,
2•040.1. WO
John Wolff
Deputy Fire Marshal II
John.wolff@tvfr.com
Cc:
A full copy of the New Construction Fire Code Applications Guide for Residential Development is available at
http://www.tvfr.com/DocumentCenter/View/1438
Command and Business Operations Center and South Operating Center Training Center
North Operating Center 8445 SW Elligsen Road 12400 SW Tonquin Road
11945 SW 70th Avenue Wilsonville,Oregon Sherwood,Oregon
Tigard,Oregon 97223-9196 97070-9641 97140-9734
503-649-8577 503-259-1500 503-259-1600
Agnes Lindor
From: Agnes Lindor
Sent: Wednesday, February 22, 2023 11:50 AM
To: Alex Aleman
Cc: Christian Cutul; Brady Bullinger; Hope Pollard
Subject: RE: Dartmouth Crossing BUP2022-00177
Thanks Alex.
This permit is approved but cannot be released until the PFI permit issued. Please also send me your approved SDC
exemption once approved so that I can put it with the permit records.Thanks again!
Agnes Lindor I Senior Planner
City of Tigard I Community Development
13125 SW Hall Boulevard
Tigard, Oregon 97223
Phone: 503.718.2429
Email:AgnesL@tgard-or.gov
From:Alex Aleman<AAleman@reachcdc.org>
Sent:Wednesday, February 22, 2023 10:55 AM
To:Agnes Lindor<agnesl@tgard-or.gov>
Cc: Christian Cutul <cutul@bora.co>
Subject: RE: Dartmouth Crossing
Hey Agnes,
See below for the answers to your questions,
Let me know if you need anything else,
Thanks,
Alex
Alex Aleman
Housing Development Project Manager I he/him/his
Email:AAleman@reachcdc.org I Direct:323-547-9634 I Fax:503-236-3429
Main Office:4150 S Moody Ave. I Portland,OR 97239
REACH In 0 112
r rid Community Development
Everyone deserves a place to call home.
1
From:Agnes Lindor<agnesl@tgard-or.gov>
Sent:Wednesday, February 22, 2023 10:45 AM
To:Alex Aleman<AAleman@reachcdc.org>
Cc: Christian Cutul<cutul@bora.co>
Subject: Dartmouth Crossing
Hi Alex/Christian-
I just wanted to confirm the following:
1. There were 4 existing homes on this site that were demolished, correct?
I do not think there were any homes on the property, my understanding is that this has been a vacant property
for quite some time,
Currently it is vacant and Reach has not done any demolition work since owning the property in 2019.
2. The proposal only includes housing (with support services), no retail/office that would make this mixed-use,
correct?
Correct,this will only be 100%affordable housing with supportive services for the residents,our community
room will be for our residents,
Thanks!
Agnes Lindor I Senior Planner
City of Tigard I Community Development
13125 SW Hall Boulevard
Tigard, Oregon 97223
Phone: 503.718.2429
Email:L correct?
DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail
may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained
by the City of Tigard in compliance with the Oregon Administrative Rules"City General Records Retention Schedule."
2
, ,_ ,BoRA
MEMORANDUM
Date Project Name Project Number
June 6, 2022 Dartmouth Crossing 30095
6835 SW Clinton Street
Tigard, OR 97223
To From Subject
Gary Pagenstecher Christian Cutul Project Compliance Report
Project Planner,City of Tigard
13125 SW Hall Blvd
Tigard OR 97223
garyo@tgard-or.gov
Copy
Alex Aleman, REACH CDC
This memo identifies information required by the TMU Zone Development Review Worksheet:Site
Details, Project Details,and the Project Compliance Report.
Site Details
• Tax lot numbers: 11800 SW 69th Ave(tax lot 3100-7), 11770 SW 69th (tax lots 2900-5&2900-
6), and 6835 SW Clinton St(tax lot 3001-8);consolidation application LLC2021-00007 was
approved and recorded. See G101 for vicinity/site map and V102,V103 for survey map.
• Site size and dimensions:Total site area is 37,350 SF excluding right of way dedications.
• Names and Locations of existing streets:The site has frontage on three streets (SW 68th Ave,
SW 69th Ave,SW Clinton Street),and negotiates 10 to 18 feet of grade change between SW
68th and SW 69th Avenues.
• Location of future streets, paths,or trails: N/A
• Location of natural resources: N/A
Project Details
• Proposed and existing uses to remain:The site was cleared by the prior owner, has no
structures or trees,and lacks public right-of-way improvements.
• Proposed and existing site improvements to remain:The site will be graded for development
work.
• Proposed and existing buildings to remain: No existing uses. The project proposal is for a 4-
story building with 85 units of affordable housing with 4 off-street parking spaces.
720 SW Washington,Suite 800 Portland,Oregon 97205 503 226 1575 www.bora.co
BORA
• Proposed demolition or modification of any existing buildings or site improvements:There are
no existing buildings or site improvements. The public right-of-way will be built out and site
landscape improvements will cover all remaining surfaces.
Project Compliance Report
I. Site and Building Design Standards (Sections 18.660.070& 18.660.080)
1. Building Location:See Site Plan on G100.
2. Utilities and Services:Above grade transformer is screened. See Site Plan on G100 and
Landscape drawings.
3. Off-street Vehicle Parking: (4)on-site parking spots are provided. They are 9'x18.5', uncovered,
and screened by the transformer screen. The parking area is paved and has a turnaround
zone. Parking is 34'-8"from the property line. In prior discussions about potential
adjustments, Gary Pagenstecher did not feel that the parking distance warranted an
adjustment for being<35'. See landscape and civil drawings for documentation of parking.
4. Off-street Vehicle Parking Landscaping: N/A,<10 spaces.
5. Public Bicycle Parking:The building has 498.5'of building frontage along street property lines,
requiring (498.5'/30') = 16.6 bicycle parking spaces. (10) bicycle staple racks are located in the
ROW, accommodating (20) bicycle spaces. A ROW encroachment permit will be requested.
6. Walls and Fences: No retaining walls or fences above grade are being provided. At the
southeast corner of the building,there is a below-grade retaining wall with a 42"guard/screen
for fall protection, per building code.
7. Street Screens:The above-grade transformer is surrounded by an 8'tall screen. The length
(12.5') is driven by the size of the transformer and PGE-required clearances. On-site parking is
also screened by the transformer enclosure.
8. Driveways: (1) 20'wide driveway is provided. A sight distance memo has been submitted with
the PFI application.
9. District Trees: N/A. There are no trees on site or in the ROW.
10. Building Height: Proposed building is 4 stories. See drawing sheets A201,A202,A301,and
A302 for elevations and sections with floor level elevations noted. An adjustment for first story
height was approved in ADJ 2021-00033, as a portion of the first floor has 10' height due to
site topography.
11. Building Entries: Building entries are shown on G100 and have weather protection.The main
building entry is>35'from the street property line due to plaza design;adjustments were
approved in ADJ2021-00033 for the main building entry distance from the street property line,
and for the building length along SW 68th Avenue without an entry.
12. Building Projections: N/A. There are no projections into the ROW.
13. Building Windows: Clear glass windows are provided. See building elevations on drawing
sheets A201 and A202. Adjustments for first floor window area were approved in ADJ2021-
00033.
II. Transportation Facility Standards(Section 18.660.090)
1. Project Triggers ROW dedication and Street Frontage Improvements:See active PFI permit
application for ROW improvements, PF12022-00169. ROW dedication has been processed
with the lot consolidation, per LLA2021-00007. See also Record of Survey,drawing sheet
V103.
III. Minimum Public Facility Standards (Section 18.660.040.B.2.c)
1. Site has frontage on a public street.
2. A minimum of 24'of pavement and horizontal clearance on a public street along each frontage
where access is taken:exists. See PFI application package.
3. Adequate public utilities&stormwater management facilities:See PFI application package.
garyp@tigard-or.gov page 2 of 3
-- - 8ORA
4. Encroachments: Public bicycle parking is proposed in ROW. An encroachment permit will be
submitted.
5. Adjustments:See ADJ2021-00033 notice of decision,02/14/2022.
END OF MEMO