Plans (15) RECEIVED
" CASCADE AUG 7 2023
ENGINEERING, INC CITY OF TIGARD
209 NE Lincoln Street, Suite.A BUILDING DIVISION
Hillsboro, OR 97124-3043
503-846-1131
Calculations
For
Rich's Racks
9350 SW Washington Square Rd.
Tigard, OR 97223
Job No: 23125
Client: Rich's for the Home
5/4/2023
SPECIAL#NSPECTION REQUIR 'i'`'�'' to Calculations
State of Oregon Structural Spw:;,Ity Code Sheet
❑ Concrete and Reinforcing Steel Design Criteria an. Loads D1 - D9
M/ Bolts Installed in Concrete
Anchor Design F1 - F10
❑ Special Moment-Resisting Concrete Frame
CD Reinforcing Steel&Prestressing Steel Tendons `�� �F�
FiN GIN
EFR
❑ Structural Wekling •s� 58926 PE
❑ High-Strenght Bolting OFFICE COPY
❑ Structural Masonry t
OR
•
❑ Reinforced Gypsum Concrete ''4/4 Y g,ao°\c$�
❑ insulating Concrete Fill • s. W�� CITY
RE EWS: 6/3Q/24 REVIEWED FOROF CODE
TIGARD COMPLIANCE
❑ Spray Applied Fire-Resistive Materials \
Digital! signed by Dmitri Wright Approved: `( ,
Pilings, Drilled Piers and Caissons
Date.2 23.05.0916:30.48-0700' OTC: r
❑ Shotcrete Permit#: R
ElSpecial Grading, Excavation and Fitting Address: UPasaaa: ---�_
El Smake-::rx',iroi 3ysterns flute#: �`S Cam_
D Other'nsiaecuons .
Date.:
These calculations apply to specific structural framing elements and foundations subjected to the
gravity and lateral loads required by the Building Code. Analysis is only for structural elements
specifically addressed in these calculations. The Owner is responsible for the all other structural
elements and the overall structural integrity of the building.
ASC CAC` E
ENGINEERING, INC Client Rich's for the Home
209 NE Lincoln Street, Suite.A Project Rich's Racks - 9350 SW Washington Square Rd.
Hillsboro, OR 97124-3043 Location Tigard, OR.97223
503-846-1131
STRUCTURAL DESIGN CRITERIA
Location: City of Tigard, OR
Latitude: 45.45125 Longitude: -122.7783 Elevation: 233 ft
Occupancy: Typical Structures not in Categories I, Ill, or IV Risk Category II
Applicable Codes:
2022 Oregon Structural Specialty Code
2021 International Building Code
ASCE7-16 Minimum Design Loads for Buildings and Other Structures
ANSI MH16.1 -Specification for the Design,Testing, and Utilization of Industrial Steel Storage racks
ACI 318-19 Building Code Requirements for Structural Concrete
Protect Narrative:
Design of storage rack anchors to existing concrete floor.
Seismic Loads:
Mapped Short Period Ss: 0.866 Site Class: D
Mapped 1 Second Si: 0.397 Importance Factor le: 1.0
Seismic Design Category: D
Seismic Force Resisting Systems:
Steel Storage Racks (Braced Direction)
R= 6 1/0= 2 Cd= 5
Steel Storage Racks (Unbraced direction)
R = 4 Sto= 2 Cd= 3.5
Analysis Procedure Used: Equivalent Lateral Force Analysis
Seismic Weight Includes: Total Dead Load + Partial Product Load
Load Combinations:
LRFD Load Combinations:
(1.2+ 0.2Sos)Dead + (1.2+0.2Sps)(3Product+0.7pSeismic
Job# 23 125 By SIP Date 5/4/23 Sheet# D I
CASCAbE
ENGINEERING, [NC Client Rich's for the Home
209 NE Lincoln Street, Suite. A Project Rich's Racks - 9350 SW Washingtor Square Rd.
Hillsboro, OR 97124-3043 Location Tigard, OR 97223
503-846-1131
MATERIALS SPECIFICATIONS
Anchorage to Concrete: Fy psi Fu psi
Mechanical Anchors: Simpson "Strong Bolt 2"expansion anchors 85,000 115,000
(Continuous Special Inspection Required)
Concrete: fc' psi
Foundations, slabs (assumed existing): 2500
Statement of Special Inspections:
THIS PROJECT MAY BE CONSIDERED"CONSTRUCTION OF A MINOR NATURE" AND
NEED NOT REQUIRE SPECIAL INSPECTION BY IBC 2021 SECTION 1704.2 EXCEPTION 1.
Job# 23125 By STP Date 5/4/23 Sheet# D2 .
ØCA5CAbE
ENGINEERING, INC Client Rich's for the Home
209 NE Lincoln Street, Suite.A Project Rich's Racks - 9350 SW Washington Square Rd.
Hillsboro, OR 97124-3043 Location Tigard, OR 97223
503-846-1131
Seismic Load Calculation
Nonbuilding Structures
2012 IBC, Earthquake Loads, 1613 &ASCE7-10, Chapter 15
Location: Ss Si Soil Profile:
City of Hillsboro, OR 0.866 0.397 Default
Occupancy: Risk Category II
Importance Factor le 1.00 ASCE7 Table 1.5-2
Site Coefficient for Acceleration F, 1.2 ASCE7 Table 11.4-1
Site Coefficent for Velocity F� 1.61 ASCE7 Table 11.4-2
Short Period Spectral, SDs =2/3`Fs*Ss(g) 0.69 ASCE7 11.4-1 & 11.4-3
1 s Period Spectral, SDI =2/3*F„`S1 (g) 0.43 ASCE7 11.4-2& 11.4-4
Seismic Design Category: D ASCE7 11.6-1 & 11.6-2
Steel Storage Racks(Braced Direction)
Structural System: Steel Storage Racks (Braced Direction)
Response Modification Coefficient R 6 ASCE7 Table 15.4-2
System Overstrength Factor no 2.0
Approximate Period T, by Analysis 0.20 ASCE7 12.8-7
Maximum Value: Cs=SDs/(R/le) 0.12 ASCE7 12.8-2
Period Dependent Value: Cs=SD1/T(R/le) 0.35 ASCE7 12.8-3
Minimum Value Cs = 0.044SDsle >0.03 0.03 ASCE7 15.4-1
Minimum for Si >0.6: CS =0.8S1/(R/le) 0.00 ASCE7 15.4-2
Governing Coefficient Cs(g) 0.12
p May be taken as 1.0 for nonbuilding structures not similar to buildings
Redundancy Factor p 1.0 ASCE7 12.3.4.1
Ultimate Load Effect pQE 0.12 ASCE7 12.4-3
Load Effect with Overstrength SZoQE 0.23 ASCE7 12.4-7
Allowable Stress Design Load 0.7pQE (g) 0.08 ASCE7 12.4.2.3
Vertical seismic load effect, 0.2SDsD 0.14 ASCE7 12.4.2.2
Vertical load for ASD, 0.14SDsD (g) 0.10 ASCE7 12.4.2.3
Deflection Apmlification Factor Cd 5.0 ASCE7 Table 15.4-2
Allowable Drift is 0.020 ASCE7 Table 12.12-1
Elastic calculated drift limit=0.7'Da*le/Cd 0.0028 ASCE7 12.8-15
(modified for drift calculated from working loads)
Job# 23125 By SIP Date 5/4/P3 Sheet# D3 _�
�,,
A•►G ENGINEERING,INC Client Rich's for the home
209 NE Lincoln Street, Suite.A Project Rich's Racks - 9350 SW Washington Square R .
Hillsboro, OR 97124-3043 Location Tigard, OR 97223
503-846-1131
Seismic Load Calculation
Nonbuilding Structures
2012 IBC, Earthquake Loads, 1613&ASCE7-10, Chapter 15
Location: Ss Si Soil Profile:
City of Hillsboro, OR 0.866 0.397 Default
Occupancy: Risk Category II
Importance Factor Is 1.00 ASCE7 Table 1.5-2
Site Coefficient for Acceleration F8 1.2 ASCE7 Table 11.4-1
Site Coefficent for Velocity Fv 1.61 ASCE7 Table 11.4-2
Short Period Spectral, Sox=2/3*Fa*Ss (9) 0.69 ASCE7 11.4-1 & 11.4-3
1 s Period Spectral, Sim =2/3*Fv*S1 (g) 0.43 ASCE7 11.4-2& 11.4-4
Seismic Design Category: D ASCE7 11.6-1& 11.6-2
Steel Storage Racks(Unbraced Direction)
Structural System: Steel Storage Racks(Unbraced Direction)
Response Modification Coefficient R 4 ASCE7 Table 15.4-2
System Overstrength Factor(E, 2.0
Approximate Period T, by Analysis 0.20 ASCE7 12.8-7
Maximum Value: Ca=SDs/(R/18) 0.17 ASCE7 12.8-2
Period Dependent Value:C.=So1/T(R/le) 0.53 ASCE712.8-3
Minimum Value Ca=0.044SDSIe>0.03 0.03 ASCE7 15.4-1
Minimum for S, >0.6: C.=0.851/(R/18) 0.00 ASCE7 15.4-2
Governing Coefficient C. (g) 0.17
p May be taken as 1.0 for nonbuilding structures not similar to buildings
Redundancy Factor p 1.3 ASCE7 12.3.4.1
Ultimate Load Effect pQE 0.23 ASCE7 12.4-3
Load Effect with Overstrength 11,QE 0.35 ASCE7 12.4-7
Allowable Stress Design Load 0.7pQE(g) 0.16 ASCE7 12.4.2.3
Vertical seismic load effect, 0.2SDsD 0.14 ASCE7 12.4.2.2
Vertical load for ASD, 0.14SDsD(g) 0.10 ASCE7 12.4.2.3
Deflection Apmlification Factor Cd 3.5 ASCE7 Table 15.4-2
Allowable Drift Aa 0.020 ASCE7 Table 12.12-1
Elastic calculated drift limit=0.7*Aa*IfCd 0.004 ASCE7 12.8-15
(modified for drift calculated from working loads)
Job# 23125 By 5TP Date 5/4/2,1 Sheet# D4 .
„ ,!! CASCAbE
r, :;;g2Ao' .-ENGINEERING,INC Client Rich's for the Home
209 NE Lincoln Street, Suite.A Project Rich's Racks - 9350 SW Washington Square Rd.
Hillsboro, OR 97124-3043 Location Tigard, OR 97223
503-846-1131
Load Calculation
Rack Loading and configuration information from client:
Conservatively assuming all rack column baseplates are the same 3”wide, the rack with the greatest
product of loading and height of loading will produce the highest anchor force for all racks
Index Weight(Ibs)Height of load (in) Anchor Product(in-Ibs):
1 581 26 1/2" 15106
2 266 36 1/2" 9510
3 175 27 3/8" 4769 <- Governs
4 215 21 3/8" 4515
5 285 26 1/2" 7410
6 1788 29 1/2" 51852 <- Governs
7 497 29 1/2" 14165
8 141 15 3/8" 2115
9 529 29 1/2" 15341
10 138 12 1/2" 1656
11 256 26 1/2" 6656
12 483 30 1/2" 14490
13 312 39 1/2" 12298
14 482 41 1/2" 19601
15 518 39 1/2" 20288
Depth of racks in the short direction vary between racks, however since the rack verticals are braced in this
direction, the width of the columns for the purposes of resisting overturning are high enough that no anchors
are ever in tension as a result of forces in the short direction, so this variation is not considered when
determining the governing load case
One governing load case each for the 1/2"diameter and the 3/8"diameter anchor bolts were selected
Job# 2. L25 By SIP Date 5/4/2.3 Sheet# D5 .
A.SCA D E'
- ENGINEERING, INC Client Rich's for the home
209 NE Lincoln Street, Suite.A Project Rich's Racks - 9350 5W Washington Square R .
Hillsboro, OR 97124-3043 Location Tigard, OR 97223
503-846-1131
Load Calculation
Results for most highly loaded installed rack (Rack 6)
Seismic Weight: Showroom Product Display Racks
Dead Loads: lbs count
10ft. Steel Upright Frames: 73 2
Steel Step Beams: 26 4
Plywood Decking 52 2
Total Weight of Rack Structure 354
Product Loads, Papp: lbs count
Max. Product Weight on Shelf: 447 4
Total Weight of Products 1788
W,=(0.67P)+ D
Location of installation shall be considered open to public: no reduction for average loading is allowed
The importance factor 1,shall be 1.5
(3 = 1.0 for seismic uplift load combination, 0.7 for all others
Seismic Uplift Load Cases govern, so R will be taken as 1.0
p=redundancy factor,for short direction loading 1.0 when two or more frames are used
for long direction loading, 1.3 unless racks are braced or two or more bays are tied together
redundancy factor is listed in the Seismic Load Calculation sheets
Long Short
Total Seismic Weight Ws: 1551.96 1551.96 lbs
Seismic Design Coefficient Cs (g) 0.23 0.12
Importance Factor l 1.5 1.5
Ultimate Load Effect 524 269 lbs
Check Bearing Through slab:
Max. Downward force from gravity(Ibs): 535.5
Max. Downward force from overturning (Ibs): 181.9 0.7*Earthquake load for Working Level
Max. Downward force in rack column (Ibs): 717.4
Slab Thickness(in): 7
Assume 45 degreee bearing cone through slab
Bearing area per column (sq.ft.): 1.36
Bearing pressure(psf): 527 <1500 O.K.
Check shear in anchor:
Max. Shear at anchor(Ibs): 524
Allowable shear in anchor(Ibs): 4100
Utilization: 0.13
Job# 23 125 By_5Tf_ Date 5/4/23 Sheet# D6
CASCAbE
1 '`ENGINEERING, INC Client Rich's for the Home
209 NE Lincoln Street, Suite. A Project Rich's Racks - 9350 5W Washington 5cluare Rd.
Hillsboro, OR 97124-3043 Location Tigard, OR.97223
503-846-1131
Column Base Reaction Calculation
Load Combination: (0.9—0.2Sos)Dead+ (0.9-0.2Sos)RPapP+pSeismic
Long Direction:
Base Shear: 524 lbs
2•_ Resisting Columns 4
Loading per Column: 131 lbs
Height of Reaction: 2.42 ft
Moment at Base: 317 ft-lbs
Zn i L1
Vertical Reaction at Column 408 lbs
Bolt Distance from Center 1.75 in
Restoring Moment from Gravity 59 ft-lbs
Applied Moment at Baseplate 257 ft-lbs
Typical Column Foot
Tension at Anchor Bolt 1764 lbs
1/2"Anchor Bolt Allowable Tension 2400 lbs
Utilization: 0.73
Short Direction:
Base Shear: 269 lbs
Resisting Frames 2
Loading per Frame: 134 lbs
Height of Reaction: 2.42 ft
Moment at Base: 325 ft-lbs
Vertical Reaction at Frame 816 lbs
Frame Width 2.5 ft
Restoring Moment from Gravity 1019 ft-lbs
Tension at Anchor Bolt -185 lbs
Verify 3"x2-1/2"foot plate at all rack columns and provide 1/2"diameter
Simpson Stronqbolt 2 wedge anchor w/3-7/8"embedment in (E)slab below
Verify positive connection between column foot plates and columns
b —
Arrangement of Most Highly Loaded Rack
Job# 23 125 By SW Date 5M J2a Sheet# D7 .
ENGINEERING, INC Client Rich's for the home
209 NE Lincoln Street, Suite.A Project Rich's Racks - 9350 SW Washington Square Rd.
Hillsboro, OR 97124-3043 Location Tigard, OR 97223
503-846-1131
Load Calculation
Results for most highly loaded installed rack using 3/8"anchor(Rack 3)
Seismic Weight: Showroom Product Display Racks
Dead Loads: lbs count
10ft. Steel Upright Frames: 73 2
Steel Step Beams: 26 4
Plywood Decking 52 2
Total Weight of Rack Structure 354
Product Loads, Papp: lbs count
Max. Product Weight on Shelf: 175.00 1
Total Weight of Products 175
Ws=(0.67P) +D
Location of installation shall be considered open to public: no reduction for average loading is allowed
The importance factor l shall be 1.5
= 1.0 for seismic uplift load combination, 0.7 for all others
Seismic Uplift Load Cases govern, so(3 will be taken as 1.0
p=redundancy factor,for short direction loading 1.0 when two or more frames are used
for long direction loading, 1.3 unless racks are braced or two or more bays are tied together
redundancy factor is listed in the Seismic Load Calculation sheets
Long Short
Total Seismic Weight Ws: 471.25 471.25 lbs
Seismic Design Coefficient Cs (g) 0.23 0.12
Importance Factor l 1.5 1.5
Ultimate Load Effect 159 82 lbs
Check Bearing Through slab:
Max. Downward force from gravity(Ibs): 132.25
Max. Downward force from overturning (Ibs): 57.1 0.7*Earthquake load for Working Level
Max. Downward force in rack column (Ibs): 189.4
Slab Thickness(in): 7
Assume 45 degreee bearing cone through slab
Bearing area per column (sq.ft.): 1.36
Bearing pressure(psf): 139 <1500 O.K.
Check shear in anchor:
Max. Shear at anchor(lbs): 159
Allowable shear in anchor(Ibs): 4100
Utilization: 0.04
Job# 23 125 By STP Date 5/4/2.3 Sheet# D8 .
•
),,, .\CASCADE
ENGINEERING, INC Client Rich's for the dome
209 NE Lincoln Street, Suite. A Project Rich's Racks - 9350 SW Washington Square Rd.
Hillsboro, OR 97124-3043 Location Tigard, OR 97223
503-846-1131
Column Base Reaction Calculation
Load Combination: (0.9—0.2S0s)Dead +(0.9-0.2Sos)(3Papp +pSeismic
Long Direction:
Base Shear: 159 lbs
�Z -- . Resisting Columns 4
Loading per Column: 40 lbs
Height of Reaction: 3.28 ft
Moment at Base: 130 ft-lbs
0
r — Vertical Reaction at Column 159 lbs
Bolt Distance from Center 1.75 in
Restoring Moment from Gravity 23 ft-lbs
Applied Moment at Baseplate 107 ft-lbs
Typical Column Foot
Tension at Anchor Bolt 735 lbs
3/8"Anchor Bolt Allowable Tension 1350 lbs
Utilization: 0.54
Short Direction:
Base Shear: 82 lbs
Resisting Frames 2
Loading per Frame: 41 lbs
Height of Reaction: 2.42 ft
Moment at Base: 99 ft-lbs
Vertical Reaction at Frame 319 lbs
Frame Width 3.28 ft
Restoring Moment from Gravity 523 ft-lbs
Tension at Anchor Bolt -86 lbs
Verify 3"x2-1/2"foot plate at all rack columns and provide 318"diameter
Simpson Stronqbolt 2 wedge anchor w/2-7/8"embedment in (E)slab below
Verify positive connection between column foot plates and columns
a3f I
1 —1
Arrangement of Most Highly Loaded Rack
Job# 23 125 By- STP Date 514/23 Sheet# D9
SIMPSON Anchor Designer TM Company: Cascade Engineering,inc. Date: 4/26/2023
Software Engineer: STP Page: 1/5
• 1tronfr=Tie Project: Rich's Racks-9350 SW Washington Square Rd.
Version 3.1.2303.1 Address: 209 NE Lincoln St.,Suite A
Phone: 5038461131
E-mail:
1.Project information
Customer company:Rich's for the Home Project description:Design for acnhorage of steel display racks In a
Customer contact name:Paul Haynes product showroom
Customer e-mail:paulhaynes@gmail.com Location:
Comment: Fastening description:Anchors at rack rolumn foot plates to concrete
slab below
2.Input Data&Anchor Parameters
General Base Material
Design method:ACI 318-19 Concrete:Normal-weight
Units:Imperial units Concrete thickness,h(inch):7.00
State:Cracked
Anchor Information: Compressive strength,fc(psi):2500
Anchor type:Torque controlled expansion anchor Wc,v: 1.0
Material:Carbon Steel Reinforcement condition:Supplementary reinforcement not present
Diameter(inch):0.500 Supplemental edge reinforcement:Not applicable
Nominal Embedment depth(inch):3.875 Reinforcement provided at corners:No
Effective Embedment depth,her(inch):3.375 Ignore concrete breakout in tension:No
Code report:ICC-ES ESR-3037 Ignore concrete breakout in shear:No
Anchor category:1 Ignore 6do requirement:Not applicable
Anchor ductility:Yes Build-up grout pad:No
hmn(inch):6.00
cec(inch):7.50
Cnn(inch):4.00
&In(inch):2.75
Recommended Anchor
Anchor Name:Strong-Bolt®2-1/2"13 CS Strong-Bolt 2,hnom:3.875"(98mm)
Code Report:ICC-ES ESR-3037
•
Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W.Las Positas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax:925.847.3871 www.stronglie.com
Job# 23125 By STP Date 05/02/23 Sheet# F1
SIMPSON Anchor Designer TM Company: Cascade Engineering,inc. Date: 4/26/2023
Software Engineer: SW Page: 2/5
Strong-Tie Version 3.1.2303.1 Project: Rich's Racks-9350 SW Washington Square Rd.
Address: 209 NE Lincoln St.,Suite A
Phone: 5038461131
E-mail:
Load and Geometry
Load factor source:ACI 318 Section 5.3
Load combination:not set
Seismic design:Yes
Anchors subjected to sustained tension:Not applicable
Ductility section for tension:17.10.5.2 not applicable
Ductility section for shear:17.10.6.2 not applicable
flo factor:not set
Apply entire shear load at front row:No
Anchors only resisting wind and/or seismic loads:No
Strength level loads:
N.[lb]:2400
VuaK[lb]:0
V.ay[lb]:0
<Figure 1>
Z
� I
[
y
7
A
Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W.Las Positas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax:925.847.3871 www.strongtie.com
Job# 23125 By STP Date 05/02/23 Sheet# F2
SIMPSON Anchor Designer TM Company Cascade Engineering,inc. Date: 4/26/2023
Software Engineer STP Page: 3/5
•
• Strong-Tie Version 3.1.2303.1 Project: Rich's Racks-9350 SW Washington Square Rd.
•
Address: 209 NE Lincoln St.,Suite A
Phone: 5038461131
E-mail:
<Figure 2>
era"
00 CO
Input data and results must be chocked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W.Las Positas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax:925.847.3871 www.strongtie.com
Job# 23125 By STP Date 05/02/23 Sheet# F3
SIMPSON Anchor DesignerTM Company: Cascade Engineering,inc. Date: 4/26/2023
Engineer: STP Page: 4/5
hong-` ie SoftwareVers 3.1.2303.1n Project: Rich's Racks-9350 SW Washington Square Rd.
•
Address: 209 NE Lincoln St.,Suite A
Phone: 5038461131
E-mail:
3.Resulting Anchor Forces
Anchor Tension load, Shear load x, Shear load y, Shear load combined,
N.(lb) V.(Ib) Vu..(Ib) J(V..)2+(Vuay)2(Ib)
1 2400.0 0.0 0.0 0.0
Sum 2400.0 0.0 0.0 0.0
Maximum concrete compression strain(%e):0.00
Maximum concrete compression stress(psi):0
Resultant tension force(Ib):2400
Resultant compression force(lb):0
Eccentricity of resultant tension forces in x-axis,e'r, (inch):0.00
Eccentricity of resultant tension forces in y-axis,e'Ny(inch):0.00
4.Steel Strenath of Anchor in Tension(Sec.17.6.11
Nse(Ib) 0 0Ne.(Ib)
12100 0.75 9075
5.Concrete Breakout Strength of Anchor in Tension(Sec.17.6.2)
Ni,=kod.vfch.P'(Eq.17.6.2.2.1)
lie .t•. fe(psi) he(in) Nn(Ib)
17.0 1.00 2500 3.375 5270
•
0.750Nm=0.750(ASANro)'Yed,N'f%,N`Wtp,NNb(Sec.17.5.1.2&Eq.17.6.2.1a)
ANe(in2) Asw(in2 ce,,,,,,(in) Ved.N Top Pcp,N Ni,(Ib) 0 0.750N.(Ib)
102.52 102.52 - 1.000 1.00 1.000 5270 0.65 2569
6.Pullout Strength of Anchor in Tension(Sec.17.6.3)
0.750Npe=0.750y'o.pAeNp(fe/2,500)e(Sec. 17.5.1.2,Eq.17.6.3.1 &Code Report)
Y,p A. Np(lb) f,(psi) n 0 0.750Npe(lb)
1.0 1.00 4985 2500 0.50 0.65 2430
Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W.Las Positas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax:925.847.3871 www.strongtie.com
Job# 23125 By STP Date 05/02/23 Sheet# F4
SIMPSON Anchor Designer TM Company: Cascade Engineering,inc. Date: 4/26/2023
Software Engineer: STP Page: 5/5
• Strong.-Tie Version 3.1.2303.1 Project: Rich's Racks-9350 SW Washington Square Rd.
Address: 209 NE Lincoln St.,Suite A
Phone: 5038461131
E-mail:
11.Results
Interaction of Tensile and Shear Forces(Sec.17.81
Tension Factored Load,N.(Ib) Design Strength,oN„(Ib) Ratio Status
Steel 2400 9075 0.26 Pass
Concrete breakout 2400 2569 0.93 Pass
Pullout 2400 2430 0.99 Pass(Governs)
1/2"0 CS Strong-Bolt 2,hnom:3.875"(98mm)meets the selected design criteria.
12.Warnings
-Per designer input,the tensile component of the strength-level earthquake force applied to anchors does not exceed 20 percent of the total
factored anchor tensile force associated with the same load combination.Therefore the ductility requirements of ACI 318 17.10.5.2 for tension
need not be satisfied—designer to verify.
-Per designer input,the shear component of the strength-level earthquake force applied to anchors does not exceed 20 percent of the total
factored anchor shear force associated with the same load combination.Therefore the ductility requirements of ACI 318 17.10.6.2 for shear need
not be satisfied—designer to verify.
-Designer must exercise own judgement to determine if this design is suitable.
-Refer to manufacturer's product literature for hole cleaning and installation instructions.
Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5958 W.Las Positas Boulevard Pleasanton,CA 94588 Phone:925.580.9000 Fax:925.847.3871 www.strongtie.com
Job# 23125 By STP Date 05/02/23 Sheet# F5
SIMPSON Anchor DesignerTM Company: Cascade Engineering,Inc. Date: 4/26/2023
Engineer: STP Page: 1/5
Software
Stroup-Tie Project: Rich's Racks-9350 SW Washington Square Rd.
Version 3.1.2303.1
e Address: 209 NE Lincoln St.,Suite A
Phone: 5038461131
E-mail:
1.Proiect information
Customer company:Rich's for the Home Project description:Design for acnhorage of steel display racks in a
Customer contact name:Paul Haynes product showroom
Customer e-mail:paulhaynes@gmail.corn Location:
Comment: Fastening description:Anchors at rack rolumn foot plates to concrete
slab below
2.Input Data&Anchor Parameters
General Base Material
Design method:ACI 318-19 Concrete:Normal-weight
Units:Imperial units Concrete thickness,h(inch):7.00
State:Cracked
Anchor Information: Compressive strength,fc(psi):2500
Anchor type:Torque controlled expansion anchor Wc.v:1.0
Material:Carbon Steel Reinforcement condition:Supplementary reinforcement not present
Diameter(inch):0.375 Supplemental edge reinforcement:Not applicable
Nominal Embedment depth(inch):2.875 Reinforcement provided at corners:No
Effective Embedment depth,her(inch):2.500 Ignore concrete breakout in tension:No
Code report:ICC-ES ESR-3037 Ignore concrete breakout in shear.No
Anchor category:1 Ignore 6do requirement:Not applicable
Anchor ductility.Yes Build-up grout pad:No
hw.(inch):4.50
c.(inch):6.00
Cnn (inch):6.00
Smm(inch):3.00
Recommended Anchor
Anchor Name:Strong-Bolt®2-3/8121 CS Strong-Bolt 2,hnom:2.875"(73mm)
Code Report:ICC-ES ESR-3037
Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W.Las Positas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax:925.847.3871 www.strongtie.com
Job# 23125 By STP Date 05/02/23 Sheet# F6
SIMPSON Anchor Designer TM Company: Cascade Engineering,inc. Date: 4/26/2023
Software Engineer: STP Page: 2/5
- Strong- Version 3.1.2303.1 Project: Rich's Racks-9350 SW Washington Square Rd.
Address: 209 NE Lincoln St.,Suite A
Phone: 5038461131
E-mail:
Load and Geometry
Load factor source:ACI 318 Section 5.3
Load combination:not set
Seismic design:Yes
Anchors subjected to sustained tension:Not applicable
Ductility section for tension:17.10.5.2 not applicable
Ductility section for shear:17.10.6.2 not applicable
Do factor:not set
Apply entire shear load at front row:No
Anchors only resisting wind and/or seismic loads:No
Strength level loads:
N.[lbj:1350
VIM rib]:0
Vey[Ib]:0
<Figure 1>
A
4.�
X
Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W.Las Positas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax:925.847.3871 www.strongtie.com
Job# 23125 By STP Date 05/02/23 Sheet# F7
SIMPSON Anchor DesignerTM Company: Cascade Engineering,inc. Date: 4/26/2023
Software Engineer STP Page: 315
• StavittelFie Version 3.1.2303.1 Project: Rich's Racks-9350 SW Washington Square Rd.
m Address: 209 NE Lincoln St.,Suite A
Phone: 5038461131
E-mail: •
<Figure 2>
8 zg >
Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc 5956 W.Las Positas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax:925.847.3871 www.strongtie.com
Job# 23125 By STP Date 05/02/23 Sheet# F8
SIMPSON Anchor Designer TPA Company: Cascade Engineering,inc. Date: 4/26/2023
Software Engineer: STP Page: 4/5
• StrongTie Project: Rich's Racks-9350 SW Washington Square Rd.
Version 3.1.2303.1 Address: 209 NE Lincoln St.,Suite A
s
Phone: 5038461131
E-mail:
3.Resulting Anchor Forces
Anchor Tension load, Shear load x, Shear load y, Shear load combined,
N.(Ib) V.(Ib) V.(Ib) ,j(V e.)'+(Vusv)2(Ib)
1 1350.0 0.0 0.0 0.0
Sum 1350.0 0.0 0.0 0.0
Maximum concrete compression strain(%o):0.00
Maximum concrete compression stress(psi):0
Resultant tension force(Ib):1350
Resultant compression force(Ib):0
Eccentricity of resultant tension forces in x-axis,e'N.(inch):0.00
Eccentricity of resultant tension forces in y-axis,e'Ny(inch):0.00
4.Steel Strength of Anchor in Tension(Sec.17.6.1)
Ms(Ib) 4 ON.(Ib)
5600 0.75 4200
5.Concrete Breakout Strength of Anchor in Tension(Sec.17.6.2).
Na=kcAsll reher1 s(Eq. 17.6.2.2.1)
k" As re(psi) he(in) Na(lb)
17.0 1.00 2500 2.500 3360
0.75¢Nca=0.750(ANc/AN�)Pad,NWc.N9' ,NNa(Sec.17.5.1.2&Eq.17.6.2.1a)
AN°(In2) Aft"(in2 ce."e (in) V"4N Y'<,N 'Yap,N Nb(Ib) i6 0.75.6NPa(Ib)
56.25 56.25 - 1.000 1.00 1.000 3360 0.65 1638
6.Pullout Strength of Anchor in Tension(Sec.17.6.31
0.750.Np"=0.75 W.P%.NP(re/2,500)"(Sec.17.5.1.2,Eq.17.6.3.1 &Code Report)
Po. As Np(Ib) re(psi) n sb 0.75q)Npn(Ib)
1.0 1.00 2775 2500 0.50 0.65 1353
Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company inc. 5956 W.Las Positas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax:925.847.3871 www.strongtie.com
Job# 23125 By STP Date 05/02/23 Sheet# F9
SIMPSON Anchor Designer1M Company: Cascade Engineering,inc. Date: 4/26/2023
Engineer: STP Page: 5/5
• tt`D11 -Tie Software Project: Rich's Racks-9350 SW Washington Square Rd.
Version 3.1.2303.1 Address: 209 NE Lincoln St.,Suite A
Phone: 5038461131
E-mail:
11.Results
Interaction of Tensile and Shear Forces(Sec.17.81
Tension Factored Load,N.(Ib) Design Strength,eN"(Ib) Ratio Status
Steel 1350 4200 0.32 Pass
Concrete breakout 1350 1638 0.82 Pass
Pullout 1350 1353 1.00 Pass(Governs)
3/8"0 CS Strong-Bolt 2,hnom:2.875"(73mm)meets the selected design criteria.
12.Warnings
-Per designer input,the tensile component of the strength-level earthquake force applied to anchors does not exceed 20 percent of the total
factored anchor tensile force associated with the same load combination.Therefore the ductility requirements of ACI 318 17.10.5.2 for tension
need not be satisfied—designer to verify.
-Per designer input,the shear component of the strength-level earthquake force applied to anchors does not exceed 20 percent of the total
factored anchor shear force associated with the same load combination.Therefore the ductility requirements of ACI 318 17.10.6.2 for shear need
not be satisfied—designer to verify.
-Designer must exercise own judgement to determine if this design is suitable.
-Refer to manufacturer's product literature for hole cleaning and installation instructions.
Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie.Company Inc_ 5956 W.Las Pasitas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax 925.847.3871 www.strongtie.com
Job# 23125 By STP Date 05/02/23 Sheet# F10
Iz/e gs FQQ Pat HomE 15S-3"
72,9cK OiaVi - RECEIVED
AUG 7 2023
i CITY OF TIGARD
L ,.-- o BUILDING DIVISION
) ---r
SHOWROOM
AREA-' I
i�
IH0M° ERS
L.....,( ROOFid.. : 0I
N ACCESS NIC I
�� U IT ROOM
N
i w FN,
b
a
M
UNUSED I
RESTROOM 1 N
L
WAREHOUSE DROP CEILING
AREA AREA
10'
-( I
` DOCK
8'x 8' \ I
lNCigH \ HIGH DOLL DOOR
\� !/
1 91'-7R 73'-2"
164'-9„
f.iCHS ,4Q 7 Homc co z rj'' vJrn " oari// SHELF /irUNr g.6" /k'g6,yr /-avir sg/ 4,3s
PM" 1/AV 6. G 5.7 W+Cz 30'" p/sn H, Ski 75 "/v✓a-I6.14,-- 1-0147 646 rah;
goy 4_ 0,-3401 771kf a-ii-' o/'smac H: Z.zs"/�6/i ur
r i- ', i 7�I-8s RECEIVED
.�C r/r / g
•77v✓ a.y"r: s H .l`' L&I J6 'r i-r�r✓/ a/6-L
n ,r77 �CK - F,2Qr"1 Cas7(/) ® log. '"pi 'D l q4.6-Z f.' y/ cl,x r r i -u.Nr r 213-485 AUG 1 2023
to" j�Dr44-: 0' Foc" ® g9"w 30"0 r 5/ /Q.'H z!�''"/-//o✓<i `f oNirs 1�783 Las CITY OF TIGARD
f u f 9Q w'"' `f"" 0/ •, % fa-"r •'y6-'"/4/ % r 4 opirs ''9 7 Ls35 BUILDING DIVISION
4 B7 iive s7-xIJrL, a 77 w -f'' D/ suet, , "tl/ ro#' wwl6*r i-ov,r iHi Leis
99 0 iO3 w 3o'• D / Silni- lo:'N) y5,"K ' z1n w ic-'r q .wir glgyaS
Jq2j - e '7.7 '"w ;wet0,5feez- /�." H/we/ is"gujs ,-r ur,,r ai , 177/G
,,, 8[.i H a7'W 30 0/S/ '1F ,;24" 266' s-r vv"r _ ._ �,1�/,�, —/
t! f
D/4iE7 ® g7 w 30" D / 430"k/inli�h1NrY83Lgs -la',` 0 ' TI, a/ Q osoJ 1 /J&T0V
"----- t casTco- 3/g
7, /1 7- , l� �7'' i SQU4'A'/ X.D,
/NZV-aTIz1A[, f=k-K.; ri_, io ;; (4l r7 7"N %/G "4� Q,✓ `�7,,2 5
�, � '`)
`�t. vvq ` 00w „a/i'D j SrrE�F s.. h 9 4 77 �U
acKs
.,s' �y L✓�rlG/i/✓� 3 �r✓,rs 3I / /O vv 3o C�/5% 1Fs �''ry `' 7;1 "/I / w-lbir5ors y8 LS
,'49 ?O '"id g-y'' o/syezrs 5 '' 3.7",7; 73614'/w<<i6r1 6 (/rf,rS' S/S ii3S
115
I E No I �- 1124 > —;
fr-"X 7/ O/ P 'Y
thit 441104 T***/'£htl TtrirtW 1MOam atom tiaataaVo A latatac,
Beam capacity chart
A II
. r2V g*
i r ,i.
... Iiii
. i
at a 4,,,,
36E rali 11, 44: ME pi 4 r 49I 4:
331 -ii. ,i, I..._ti
�.
.111 ,11
,..,....Je. ott
,,,,,,...,
2 le
la
2 i6* I r iiitr_.„
i , .. 1.-.
_4,10! ,
r 7d
404, 1 .
..00
tio , it
sat
1 _ 4,
sag
i. ..f. -e
tow 0.14646 dot dam'PoWS
- _ ..._,,.....y
1am� ,, ...... .. 16$ d
•aw«.wm�.i. .ro I , .. w wawr,n xx.._ w�rwwrnmxr -
-d"31e� d 6414•dr'4 15hod not MA-W S End Oliisi
411* Svc 60305 11,456 1133XI 13,69S 16313613,115 VAS
�.. . .
iir
Or 4,66S 6,675 ON US 1406 13JOS 16,1618
IiirvI ,�„� 't' n 1T..-,.,,,rill I: ;trii ik- ;, III (II �) rht= 4 r r
, 7Y'" 3,5 4' 7 11,5 13 7S 19,7
' me
111111111
ill d T V _ ,er �" , �i� =iili �'
e
N4* 3, 4, n '1 14$TS 41010 14710
A, 'y Y d . - 0,-4 &T f. I, ` b <f ' iII,I.Nf fT(i '. (I f " (R 1
SW 2, MO t7 S "10 3.91S 1?MO ,365
. ...
e. o a. r «. .. .. v
_so
tau.
tdlf• 199d 3 4 Dad S. kin d 9145 12 71D
ef--- III. " .,,r - .. Ie r Ord{i{fli ii e. ..,- a .-Y_ .,�,.
" } 1 ki gip1I f.... III ('` ..
1 1910 $71f0 3> Sd5 S57S 731N5 8411� 11575
1�• 141S 2,795 4795 I , 7475 1�
^ � ,� ion -�%F`! I f.. :�, III)6kW ba;fl a,.,.; .. ��,....�.� (IIIr3(: . .; 1
144• 1. 1* L 3 4440 a S. s,371! 0,711'r
155' 10770 1,1# 1,06S � 3,S3S °5 5 @{UM
116$ Imo 1,d10 i 2,515 3,4095 q5 M
•( as pr,fft 20$7taf 4r.,4xe)1 &votkom .0,40,0400t%4,,e fix wawa*ito 604 wow 5iiii owiiiii, 30/3 60664
•4c s_ ,. .r P raaa cut; ra at
ata laer ay .Cstys s �A* at
•1 * tioN,c4oitaftt/MAW WA Alli eXAMIgtuttcHfal Itticlricrtp
Z6�da rc ae ert s gli? tam _ w ,....
• eM a taxwity al avaaatag64600 totthohxw 01 ift 01,' s is
A ' /',Act:. IP I,Z r il/ 12- ,eA zAyx/r AUG / 2023
CITYOFTIGARD
C — /2ACK it
�� 9 �y BUILDING DIVISION
61 � 2AcK
s
• Pallet Rack
Pallet Rack Capacity varies according
to manufacturer.
Call Us for assistance or clarification.
Capacity Chart for Interlake Mecalux
Pallet Rack;
.... ,41r 3* 3i 1 i " t._ 4" 4
5"a7 '646 5"*"..4'"?ii: '
5"'"\1''?;4
g. CA t c. r"?11,ii
313.IS CIA 314.14 CA 312.12 GA. 48101.13 GA 58122.12 Cat
�,,112T.-.3a2 �yy.�µ 413102' 12 GA
illed
,Opaidilas
11440 315 343 34P ° 313' 143 2 3 ' 4 k
1 1Il.A 119" _ 1748 . "9 9lkA : S"1 1 MC'X WA t2 `t
. t94.yy. *d{�11*/ ,70114 3222 .q§�2.„$447 11,11 4s1,3 $+' %NO
14
4b' W117 21,832 43,7732 10, e7 24,442 27.l19 3d6500 43,300 St xa
or Iwo 144A9 17,362 23t70 2-544 111,4Si 313•11 32-40 II .. 407700
72` t925 w2.01
135 q4, - 19,153 15,737 13," X. I3,�0 3T.'s' 470171
ac 4491 1.7.4 1 ,17/5 14747 31,2S4 Y 11,707. n.IVD -7.17 1
tr 922IngallEall 1"121 34144 I. 43 4,911 1723110 71,740 37.5,09
143` 9:417 11,716
t 4.5% 11712 8P41 VA10 I:.,f9 7+.
'.I114,'__ t '4pw�t l 7 > ANC# , __ n '113
,^
1.1 VP 4,917 5.034 UN. 2.142 5.436 S,170 11,9. 14,709 21,E
731271131seebr twiov4eit,*due*/8+ast r 5w& 0toko
3" -.. A !�. .__.�
+ 977• 5E.33 O w11GA,
O .. 12 GA l
I am.11 GA 1.
025F,13GA ,
mom ' SW.. OM ant OS
31113._ . +
11* MAC
Ow 13 4 A770Cm" 1.)0A :,78671 12 GA WW1 IIIMMOI 136A 71{47,WW1
X* 73.410 MAW A00 44304 547064 37,E 020.... . _
. ...,.—
M.
I
%"+' 11701 17.479 14,100 2744011=11111 25,43W 13
WO 12,E 16307 W4717 . 23,E KW
" 9178 17400 1$874 1bs90d WOW 21,Y00 171,74
_. .. ._
or *Att
lost 43'EMICCall d4,4A@ }Cq� Oq AN
9A' /AA 4,700 17611 t1,574 15,770 Item 741,07
18S-iirt Y0~14<Yk •L 4Tr 0•A 6664A 404 wok 4*** /Moto 0911*r4 turn 422t7
•Ca�i7l DM .1411111.4 614AOUAW 1 1012 wedlicatiom, • ,m*OM stalk 1pMgt.
721 gvtd•rr -41}1'+e. nr1.
ookid iti MOO 7t> rs rn ;%Roft tr oret c iorA 0Thran 4r 4et Asmot tat umize* *10, tow l'n tsa /Y**n.4411
•Wow*
4r4etm naa ototi Mt11AltA i 7opat feu aaa e t rA .
PETSMART . , .. - —
•c
S uxlii �t011 + C7 i• r 4i',, -.. 1. iy0//B 1r I
ss "" 3
MAnM w F� t { /"ry _
o wonsto cn < 7 2023
n m o ,
a
DAVID'S BRIDAL :c- p, •tc6 .,. .
A`
NQRPCT Ri mi .. ,
rack `, a •
�y-�r+ • ..
a `4 O I I hl 1GC..yS Ti i G
V i, ,s -�NM.. OM6 TYRO _
I CARmax M1 r
rK.tn7 • �
f^
Fint a..ar3 1
• AIL '� g _ S (���Q\/ Summit Drivel ..
'� ! ..: AII _ tlVtTlNo oaoos JVI GI I� �riV Y _ lYIt
•••
sitar ' � - R f f
Met ., s- r. �l esecake y,
:(lei'° ,21 7 ,` i . . + -. _ ,a, WASHINGTON SQUARE - I
-
4_ u,
,> � '• '- ' p xr ;� 4-N AIIIti —'� '"• f ; .a.Sw Washington Square Rd "*
', w '^'tizt tiONOAiA .f t.."t �,,,
1.
SUM CO
• X ... V
" r
Nr.
1:'„''.'3•:: • .
'.
•
r‘ _ L1CaSC� , �a NORDSTROM SW aLehm arJ -FG w a ,r—
j- lif- 1 ,
'!x NgoC.)
y y ' . •
w:.fir. • 3 �' SW Crl St
Illi
illii
-f , 4«w�� ;7.h ...r.
r
Product Details RECEIVED
‹K 7; ion i 3j 15 AUG 7 2023
S L i J K LAYou _cal'O TI ARD
• Heavy-duty garage shelving rack supports 1800
lbs. per shelf
• Shelves are 24 in. deep & adjustable for versatile
storage needs
• Welded garage shelves are covered by Husky's
lifetime warranty
Model#: N2W902490W5B
Skutt: 1007587682
Internet#: 319132842
Husky's Extra Large Welded Frame Shelving Unit
measures 90 in. H x 90 in. W x 24 in. D making it
perfect for organizing your garage or workshop. The
5 adjustable black wire shelves provide ample
storage space to accommodate a variety of heavy
items, each shelf supporting up to 1800 lb. This unit
is constructed with steel in a black textured finish for
durability and strength. Bolt-free and easy to
assemble.
i
i
I
_________
.Imi, ,
•
S
..
r 4
r it
1 iii: il,.„ Filliii,_ , ...„,.. .
1
1. .Amom_
pr 1
. ,
4 'I,
t 4 :
. ,. _......:. .........
. ..„.... ............__. ............ ._. .,. .
...,
~fir ..::„.......',....„........„....„ :
..,
" ,._, r 1
Husky's Extra Large Welded Frame Shelving Unit
measures 90 in. H x 90 in. W x 24 in. D making it
perfect for organizing your garage or workshop. The
5 adjustable black wire shelves provide ample
storage space to accommodate a variety of heavy
items, each shelf supporting up to 1800 lb. This unit
is constructed with steel in a black textured finish for
durability and strength. Bolt-free and easy to
assemble.
• Each shelf supports up to 1800 lbs. when the
weight is evenly distributed
• Instructions included for easy assembly
• Heavy-duty steel construction with black,
textured finish for lasting durability
• 5-wire shelves provide ample storage for heavy
or bulky items such as paint cans, tools, work
equipment and more
• Shelves adjust in 1-1/2 in. increments for more
flexibility to accommodate a variety of different
size items
• Not intended for outdoor use
• Welded rack matches and coordinates with
Husky's heavy duty welded cabinet set for a
complete garage storage solution
• Heavy-duty steel construction with black,
textured finish for lasting durability
• 5-wire shelves provide ample storage for heavy
or bulky items such as paint cans, tools, work
equipment and more
• Shelves adjust in 1 -1/2 in. increments for more
flexibility to accommodate a variety of different
size items
• Not intended for outdoor use
• Welded rack matches and coordinates with
Husky's heavy duty welded cabinet set for a
complete garage storage solution
• NSF certified for dry food storage
• Backed by a Lifetime Warranty. If your Husky
product ever fails, bring it back and we will
replace it for free. Click here for details.
• Backed by a lifetime warranty, if your Husky
product ever fails, bring it back and we will
replace it for free
• Click here to learn more about exclusive Husky
products
• Return Policy
3'9^
m
'4
z e a
... 'a
x z
- a&v . . "_
y 3 8 r_
3
as r�. �`a y s :
% ¢ ' �;, v �,m..,.. • £fie'
3 »- r � •e { s S W -
h`� „� ` co '
—
�4. Po'P # HI y;ysi5`p4. M. .q rsw:>R' 4' `.2
F.
1.
�yt'gy� • LtaH:—.' s 1�:! 4'd wpy .
ra , s ,
# +P+' ,:
x aq,
a s :. ,- - L
ie4 k E.+A Fr
ar ea ` 6:.G iedM.1t'. „
, ."
_ ` ' a.
Shelving fiACK Sig ,$ t 1Q RECEIVED
is $t1- PACK, LAYOOr AUG 7 2023
Warehouse Only
CITY OF TIGARD
Whalen 4-Shelf Heavy Duty Steel IndustrlGI
gg�� LDING DIVISION
Rack, 77"W x 24"D x 72"H, Black
Item 956886 Model WSIR772472BS-SWD
•
II 11.1 r
t a
t 1
r 1
r 1
t
r i
Ai
_ _. ,,
Al Mil
t s
t
f
f
,....4
Features:
• Each shelf holds up to 2,000 pounds
(evenly distributed weight)
• No tools required for assembly
Dimensions:
• 77"W x 24"D x 72"H
• Weight: 182.9 lbs •
Specifications
Assembly Ready to Assemble
Brand Whalen
Color Black
Depth 24 in.
Height
72 in.
Material Steel
Model WS1R7724728S-SWD
Number of Shelves per 4
Unit
Shipping Weight 182.9 lb.
Warehouse Only Warehouse Only
Width 77 in.
Product Details
The Whalen Industrial Rack with Interlocking Wire
Decks is the ultimate home and shop storage
solution. Built for strength and stability, each of the
four adjustable shelves can hold up to 2000 pounds
(evenly distributed weight). Built to last, the welded
end frames are powder-coated to resist scrapes and
dents. Easy, no tool assembly allows you to have
your Industrial Rack up and operational in no time.
These racks are also expandable allowing you to
connect multiple racks side-by-side. Look no further
for your industrial, garage and shop storage with the
Industrial Rack with Interlocking Wire Decks by
Whalen.
Features:
• Welded end frames provide strength and stability
• Each shelf holds up to 2,000 pounds (evenly
distributed weight)
• Protective powder-coated steel
• 4 adjustable shelves with wire decks
• Easily expandable by adding units
• Limited lifetime warranty
• Assembly required
• No tool assembly
e
i
s vim-. , i �_ fi".'�' gb L j�tA �Z�+ w�-
y4w +'W "L. A1"�b:n e e5" k �e. ;. ._ ��o- r �� ,
i
5
+—.—.+- Zt 4d E.145 i4 ti$ ! OIMF N5ION£5 "¢" em
nw '""" ' s" ate ,o....
�TYi2'enf� (7s3 � + 's 'r' ton
l B 609esr�d24 n124pcy .r
gus' eyl s'e i,r '' s r✓ r 147'41 "�lr ",a ys
.>eY.n„�? s,c tl t "�"t .i s d ' ° '�+ , i ,� I°'l:��U' Z a i4� ,�' ?�s '�'i' _ �L�' x e -� .
%,i '1 ,. .. "s ra s i ��9�a „ rdi}�s �}13^g.g Y' -��r'
> :' d'n" a -a ak'>�n °�}� :s,',+wrT`�. P ` fig"
¢ yy�