HomeMy WebLinkAbout10-October (4) Mechanical Permit Appill:1 EIVED FOR OFFICE USE ONLY
City of Tigard A
p 2 8 2023 Received
'I Date/By PrnmtNo.: to y UQS
13125 SW Hall Blvd.,Tigard,OR 972 N
��q .
Plan Review
Phone: 503.718.2439 Fax: 503.59 `gfxo OF TIGARD Date/By: Other Permit:
.
11.i; I,i, Inspection Line: 503.639.4175 I T( Date Ready/By: wo l y: t : See Page 2 for
Internet: wwvw.tigard-or.gov BUILDING DIVISION Notified/Method: Supplemental Information
TYPE OF WORK COM)(ERC1AL FEE• SCHEDULE USE CHECKLIST
Mechanical permit fees°are based on the value of the work
®New construction 0 Addition/alteration/replacement performed.Indicate the value(rounded to the nearest dollar)of all
0 Demolition 0 Other: mechanical materials,equipment,labor,overhead,and profit.
Value:S
CATEGORY,OF CONSTRUCTION RESIDENTIAL EQUIPMENT/SYSTEMS FEES*
►T 1-and 2-family dwelling 0 Commercial/industrial ❑Accessory building For special information use checklist
( )Multi-family 0 Master builder 0 Other. Description Qty. Es. Total
JOB SITE LNFORMATION AND LOCATION Heating/cooling:
_. - -. - Air conditioning I 46.75 46.75
lob site addre,<, 14596 SW 165th Ave Furnace l00,000 BTU(ducts/veats) 1 46.75 46.75
City/State/ZIP. Tigard,OR 97224 Furnace 100,000+BTU(ductwcnni , 54.91
Heat pump 1 61.06 61.06
Suite/bldg./apt.no.: 18 Project name: South River Terrace Duct work 23.32
Cross street/directions to job site: Hydronic hot water system 23.32 ,
Residential boiler(radiator or
hydronic) 2332
Unit heaters(fuel-type,not electric),
in-wall,in-duct,suspended,etc. 46.75
Fhe/vent for any of above 23.32
Subdivision: South River Terrace l Lot no.:2 Other: 23.32
Other fuel appliances:
Tax map/parcel no.: Water heater 23.32
DESCRIPTION OF WORK Gas fireplace/insert 33.39
Flue vent for water heater or gas
New construction-Type SFU fireplace 23.32
Log lighter(gas) 23.32
Wood/pellet stove 33.39
Wood fireplace/insert 23.32
Chimney/liner/flue/vent 23.32
® PROPERTY OWNER ❑ TENANT Other 23.32
Environmental exhaust and ventilation:
Name:Taylor Morrison Northwest LLC. Range hood/other kitchen equipment 1 33.39 33.39
Address:703 Broadway St.,Ste.510 Clothes dryer exhaust 1 33.39 33.39
City/State/ZIP:Vancouver,WA 98660 Single-duct exhaust(bathrooms, 23.32
toilet compartments,utility rooms) 1 23.32
Phone:(360)69S-7700 Fax:( ) Attic/crawlspacc fans 23.32
® APPLICANT 0 CONTACT PERSON Other 23.32
Business name:Taylor Morrison Northwest LLC. Fuel piping:
y S14.15 for first four,S4.03 for each additional
Contact name:Tonja Morris Furnace,etc. 1 -
Addes:703 Broadway St.,Ste 510 Gas heat pump I
Wall/suspended/unitheater
City/State/ZIP:Vancouver,WA 98660 Water heater 1
Phone:(360)695-7700 Fax: (360)693-4441 Fireplace 1
--- Range 1
E-mail:permitsabmittalstataylormOrriSOf.COm Barbecue
CONTRACTOR Clothes dryer(gas)
Business name:Pro Heating&Cooling Other
MECHANICAL PERMIT FEES*
Address: NW Alociek Dr,Ste.1104 Subtotal $262.84
City/State/ZIP:Hillsboro,OR Minimum permit fee(S90.00)
Plan review(25%of permit fee)
Phone:(360)270-1590 Fax:( ) State surcharge(12%of permit fee)
CCB lie.:209001 TOTAL PERMIT FEE
This permit applicatlaa erpirm if a permit is not obtained within 180
&,t. a. h days after It has been accepted as complete.
Authorized signature: ('` * Fee methodology set by Tri-County Building Industry Service Board
Print name:Elia Duran Date:9/27/23
r1nni UinetPmmi,sNJPr P.nne inn runt it,In .,.In.err n•,,,n+nrna,mlro,
Plumbing Permit ApplicatiRECEWED
Building Fixtures FOR OFFICE USE 0yl 1 tq
City of Tigard SEP 2 8 2023 Received Permit No.:tt�c't n 1`•WO
• 13125 SW Hall Blvd.,Tigard,OR 97222 Date/By:
'-1a l W V a V
Plan Review Other Permit No.:
2 Phone: 503.718.2439 Fax. 503.598 (1 OF TIGARD Date.By-
Inspection Line: 503.639.4175 BUILDING DIVISION TIGARD Date Ready/By: loos ® See Page 2 for
Internet: Www tigard-or_gov Not l fie d Alethod Supplemental Inform anon
TYPE OF WORK FEE* SCHEDULE
®New construction 0 Demolition For special information use checklist
Description I Qty. I Ea. I Total
❑ Addition/alteration/replacement 0 Other: New 1-2-family dwellings(includes 100 II for each utility connection)
CATEGORY OF CONSTRUCTION SFR(1)bath 312.70
1-and 2-familydwellingSFR(2)bath 437.78
El 0 Commercial/industrial
0 Accessory building El Multi-family
SFR(3)bath 500.32
Each additional bath/kitchen 25.02
❑Master builder ❑Other Fire sprinkler(_sq.ft.) Page 2
JOB SITE INFORMATION AND LOCATION Site utilities:
Job site address: 14596 SW 165th Ave ' Catch basin or area drain 18.76
Drywell,leach line,or trench drain 18.76
City/State/ZIP: Tigard OR 97224
Footing drain(no.linear ft.:_) Page 2
Suite/bldg./apt.no.: Ig I Project name:South River Terrace Manufactured home utilities 50.03
Cross street/directions to job site: Manholes 18.76
Rain drain connector 18.76
Sanitary sewer(no.linear ft:_) Page 2
Storm sewer(no.linear ft.: ) Page 2
Water service(no.linear ft.:_) Page 2
Subdivision:South River Terrace I Lot no.: 2 Fixture or item:
Tax map/parcel no.: Backflow preventer 31.27
DESCRIPTION OF' WORK Backwater valve 12,51
Clothes washer 25.02
New home construction. Dishwasher 25.02
Drinking fountain 25.02
Ejectors/sump 25.02
IN PROPERTY OWNER I ❑ TENANT Expansion tank 12.51
Name: Taylor Morrison Northwest LLC Fixture/sewer cap 25.02
Floor drain/floor sink/hub 25.02
Address:703 Broadway St.,Ste 710
Garbage disposal 25.02
City/State/ZIP: Vancouver,WA 98660 Hose bib 25.02
Phone:( 360 )695 7700 Fax:( I Ice maker 12.51
.1 APPLICANT 0 CONTACT PERSON Interceptor/grease trap 25.02
Business name: Medical gas(value:$_) Page 2
Taylor Morrison Northwest LLC
Primer 12.51
Contact name: Tonja Morris Roof drain(commercial) 12.51
Address: 703 Broadway St.,Ste 710 Sink/basin/lavatory 25.02
City/State/ZIP: Vancouver,WA 98660 Solar units(potable water) 62.54
Phone:( 360 )695 7700 Fax: :( ) Tub/shower/shower pan 12.51
E-mail: PermitSubmittals c/taylormorrison.com Urinal 25.02
Water closet 25.02
CONTRACTOR
Water heater 37.52
Business name: Wolcott Plumbing Water piping/DWV 56.29
Address: 1075 W Historic Columbia River Hwy Other: 25.02
City/State/ZIP:Troutdale, OR 97060 Subtotal
Phone:(5031667-1781 Fax:(503)-667-9891 Minimum permit fee: $72.50
112220Plumbing 26-824PB Plan review (25%oCpermit fee)
CCB Lic. Lic.no.: ,
/ r� State surcharge(12%of permit fee)
Authorized signature: �2X� (/9Gtl�'ILQ.Ifi TOTAL PERMIT FEE
Cliff Bow n Date: 8/14/23 This permit application expires if a permit is not obtained within 180 days
Print name: after it has been accepted as complete.
*Fee methodology set by Tri-County Building Industry Service Board.
t\Building\Permits\PLMU.PernriApp.doc 10/01/09 4904616T(io/02/COM/WEB)
)-e
74 .1 Building Division
One & Two-Family Dwelling
TIGARD Fees Checklist
PERM
IT INFORMATION: Application Date - FEE VERSION J
Permit#: i Plan #: Floors: '--
V�S 12oZ3- ovSzo yQ�12r,�
Valuation: Covexed Porch: Basement
Bedrooms: Deck: 1" Floor ( „--7
WC (toilets) Deck Cover: 2nd Floor 95
Lavatories J Patio Cover _ 3`d Floor -------
Tub/shower 2 Accessory Struct. R-3 Total I 'T_
Laundry Tray _ Water Heater ( / Gas Garage 2 B-
Exhaust Vents !� Gas Flue Vents ---� Total for Elec. G� D-
Backflow Prey. IMP Heat Pump 4gor # for Electrical
BBQ Gas Fireplace ------- #Fuel Lines 2
FEES: Description: Fee Applie • Fee Entered:
DC Prov Revw: Planning
Info Proc/Arch: Lg$2.00 (over 11x17)
Info Proc/Arch: Sm $.50 (up to 11x17)1
Metro CET: Residenti�se v7
School CET: District: \9 (i
Tigard CET: Admin
Tigard CET: ODHCS d�
Tigard CET: AH
Electrical Permit: Permit Fee:
Limited Energy:
12% State Surcharge
Mech. Permit: Permit Fee:
12% State Surcharge '
Plumbing Permit: Permit Fee:
12% State Surcharge
Erosion Control: w/Permit- Ping
1:\Budding\Forms\ResPlanCheckFees_Dec2022_AA.doc 12/21/22
Page 1
City of Tigard
11 " COMMUNITY DEVELOPMENT DEPARTMENT
Building Permit Review - Residential
T I GA RD
Building Permit #: All Zfil'3 - 005
Site Address: 14596 SW 165th Ave - Cp/Verified in Accela
Project Name: South River Terrace Phase 1 Lot/unit #: Tract J
Proposal: Rowhouse Building 18, Unit 2 of 3 (Tract J) zone: RES-C
Housing Type: 0 SFR(❑ Single Detached ❑ Duplex 0 Triplex❑ADU) ❑ Rowhouse❑Cottage Cluster❑CYU OQuad❑Other
Required Site Plan Elements:
0 3 copies of site plan on max 11x17"
O Drawn to standard scale
O North arrow 0 Street and site trees shown / labeled
0 Site address, project name, lot # ❑ Tabl=�al.,ulatilig Lice ca,.opy al iiiatai it"
O Street names (N/A for SFR)
L Courtydrd recLdnyle dlrnensioned (ii aNNticalle)
O Applicant name and phone # I aranr +•0 Lot and setback dimensions Visio =nie-
ture5 o. a feata a 0 Utility locations &easements
O Footprint of new structure and FFE 0 Property corner elevations
O Sidewalk/driveway dimensioned ❑ LIDA (>1,000 sf distuiLaii-e)
El Lot area and lot coverage percentage 0 Erosion control
Required Elevation Plan Elements:
(For SFR: calcs needed only on street-facing) Summary table with calculations for:
O Drawn to standard scale 0 Total facade area
O Building height dimensioned El Total window and door area
O Facade dimensioned
El Windows and doors dimensioned
El Garage doors dimensioned
Requir n Elements:
(Not required for SFR) ❑ Summary table that includes
❑ Each story dimensioned area
❑ Each story floor area calculated ❑ Floor area per sto
Planning Review
The following standards have been met:
Setbacks El Front: 8/12 Rear: 0 (alley)Side: 0(Interior)Min/Max Street Side: 8/3 / Garage: 4/20
Height 0 Max. Height: 35 Proposed Height: 25
O Yes ❑ N/A Landscape
❑ Yes 0 N/A Screening (Quad only)
❑ Yes El N/A % Window Coverage Facade not street facing
El Yes ❑ N/A Garage (SFR Only) Parking (Other Res)
0 Yes ❑ N/A Entrance (SFR, Rowhouse, Quad only)
O Yes ❑ N/A Other building design standards (Rowhouse only)
❑ Yes El N/A Accessory Structure Standards
❑ Yes 0 No Qualifying pre-existing unit exempt from standards (Cottage unit only)
Additional standards for Courtyard Units, Cottage Clusters, Rowhouses, and Quads:
El Yes 0 N/A Unit Count: 3
0 Yes ❑ N/A Lot Width and Size Tract J = 114,586sf
El Yes 0 N/A Pathway
dditional standards for Courtyard Units and Cottage Clusters only:
❑ Yes Unit Area:
❑ Yes ❑ N/A ea (per story)
❑ Yes ❑ N/A Courtyard
O Yes 0 N/A Fence
❑ Yes ❑ No ON/A Clean Water Services - Service Provider Letter (lot platted prior to 9/10/1995)
❑ Yes El No ON/A Public Facilities Improvement (PFI) Permit:
Required: ❑ Yes ❑ No
Applied For: ❑ Yes ❑ No, stop intake
O Sensitive Lands: ❑ Yes ❑ No
o Main Land Use Case #s: PDR2018-00003, PDR2021-00003
❑ Conditions met
0 Applicant notified of land use ex ti date: Permits by 11/2/24, Final by 11/2/26
Approved By Planning: ,--- S Date: 9/12/23
Notes Uses rowhouse s an ar - 4iA1i23
Revision 1: 0 Approve Not Approved Date:
Revision 2: 0 Approved ❑ Not Approved Date:
Building Permit Submittal G
Original Submittal Date: f /,,-8/j 3
Site Plans #:
Building Plans #:
Building Permit #: 11 Building permit # entered on page 1
Workflow Routing: I7/...Planning,Engineering I;Q..Permit Coordinator Building
Workflow Sign-off: lg.Sign-off or Planning (include notes from plannin§review)
Route Documents: engineering: (1) copy of permit application, (1) site plan, (1) building plan
And original plan review routing form.
beam calculations and trust details, if applicable, etc.^
Permit Technician: =�, Date: q(/ r/P
x5
Notes:
Engineering Review
❑ PFI Permit:
1:13/SIope at building pad: fr o
/o
,4 .l<d''Conditions met prior to issuance of permit
irtasements (encroachments) per engineering conditions of approval and plat
dl'Water Quality/Quantity Facility:
Assess Water Quality Fee in-lieu: ❑ Yes 1'IVo
Assess Water Quantity Fee in-lieu: ❑ Yes 4No
LIDA Facility on lot: ❑ Yes rB-lio Add Fee: 0 Yes 0 No
final Plat Recorded
0 NOT Approved:
Notes: Date:
Approved By Engineering: Date: �J�e A 3
Revision 1: ❑ Approved ❑ Not proved Date:
Revision 2: 0 Approved ❑ Not Approved Date:
Permit Coordinator Review
conditions met prior to permit issuance
❑ Approved, NOT Released: Date notified applicant: _
ENG Revisions Required: Date notified applicant:
DC Exemption: ❑ Applied for ❑ Received ,boes not apply
lePSDC Fees Entered: Wash Co Trans Dev Tax: Yes ❑ N/A
Tigard Trans SDC: l Yes 0 N/A ❑ Deferred
Parks SDC: Yes ❑ N/A ti Deferred
LIDA ❑ Yes ,ITN/A
K to Issue/Approved by Permit Coordinator: 6 Date: lam
Revision 1: El Approved ❑ Not Approved Date:
Revision 2: 0 Approved ❑ Not Approved Date: