Loading...
HomeMy WebLinkAbout10-October (4) Mechanical Permit Appill:1 EIVED FOR OFFICE USE ONLY City of Tigard A p 2 8 2023 Received 'I Date/By PrnmtNo.: to y UQS 13125 SW Hall Blvd.,Tigard,OR 972 N ��q . Plan Review Phone: 503.718.2439 Fax: 503.59 `gfxo OF TIGARD Date/By: Other Permit: . 11.i; I,i, Inspection Line: 503.639.4175 I T( Date Ready/By: wo l y: t : See Page 2 for Internet: wwvw.tigard-or.gov BUILDING DIVISION Notified/Method: Supplemental Information TYPE OF WORK COM)(ERC1AL FEE• SCHEDULE USE CHECKLIST Mechanical permit fees°are based on the value of the work ®New construction 0 Addition/alteration/replacement performed.Indicate the value(rounded to the nearest dollar)of all 0 Demolition 0 Other: mechanical materials,equipment,labor,overhead,and profit. Value:S CATEGORY,OF CONSTRUCTION RESIDENTIAL EQUIPMENT/SYSTEMS FEES* ►T 1-and 2-family dwelling 0 Commercial/industrial ❑Accessory building For special information use checklist ( )Multi-family 0 Master builder 0 Other. Description Qty. Es. Total JOB SITE LNFORMATION AND LOCATION Heating/cooling: _. - -. - Air conditioning I 46.75 46.75 lob site addre,<, 14596 SW 165th Ave Furnace l00,000 BTU(ducts/veats) 1 46.75 46.75 City/State/ZIP. Tigard,OR 97224 Furnace 100,000+BTU(ductwcnni , 54.91 Heat pump 1 61.06 61.06 Suite/bldg./apt.no.: 18 Project name: South River Terrace Duct work 23.32 Cross street/directions to job site: Hydronic hot water system 23.32 , Residential boiler(radiator or hydronic) 2332 Unit heaters(fuel-type,not electric), in-wall,in-duct,suspended,etc. 46.75 Fhe/vent for any of above 23.32 Subdivision: South River Terrace l Lot no.:2 Other: 23.32 Other fuel appliances: Tax map/parcel no.: Water heater 23.32 DESCRIPTION OF WORK Gas fireplace/insert 33.39 Flue vent for water heater or gas New construction-Type SFU fireplace 23.32 Log lighter(gas) 23.32 Wood/pellet stove 33.39 Wood fireplace/insert 23.32 Chimney/liner/flue/vent 23.32 ® PROPERTY OWNER ❑ TENANT Other 23.32 Environmental exhaust and ventilation: Name:Taylor Morrison Northwest LLC. Range hood/other kitchen equipment 1 33.39 33.39 Address:703 Broadway St.,Ste.510 Clothes dryer exhaust 1 33.39 33.39 City/State/ZIP:Vancouver,WA 98660 Single-duct exhaust(bathrooms, 23.32 toilet compartments,utility rooms) 1 23.32 Phone:(360)69S-7700 Fax:( ) Attic/crawlspacc fans 23.32 ® APPLICANT 0 CONTACT PERSON Other 23.32 Business name:Taylor Morrison Northwest LLC. Fuel piping: y S14.15 for first four,S4.03 for each additional Contact name:Tonja Morris Furnace,etc. 1 - Addes:703 Broadway St.,Ste 510 Gas heat pump I Wall/suspended/unitheater City/State/ZIP:Vancouver,WA 98660 Water heater 1 Phone:(360)695-7700 Fax: (360)693-4441 Fireplace 1 --- Range 1 E-mail:permitsabmittalstataylormOrriSOf.COm Barbecue CONTRACTOR Clothes dryer(gas) Business name:Pro Heating&Cooling Other MECHANICAL PERMIT FEES* Address: NW Alociek Dr,Ste.1104 Subtotal $262.84 City/State/ZIP:Hillsboro,OR Minimum permit fee(S90.00) Plan review(25%of permit fee) Phone:(360)270-1590 Fax:( ) State surcharge(12%of permit fee) CCB lie.:209001 TOTAL PERMIT FEE This permit applicatlaa erpirm if a permit is not obtained within 180 &,t. a. h days after It has been accepted as complete. Authorized signature: ('` * Fee methodology set by Tri-County Building Industry Service Board Print name:Elia Duran Date:9/27/23 r1nni UinetPmmi,sNJPr P.nne inn runt it,In .,.In.err n•,,,n+nrna,mlro, Plumbing Permit ApplicatiRECEWED Building Fixtures FOR OFFICE USE 0yl 1 tq City of Tigard SEP 2 8 2023 Received Permit No.:tt�c't n 1`•WO • 13125 SW Hall Blvd.,Tigard,OR 97222 Date/By: '-1a l W V a V Plan Review Other Permit No.: 2 Phone: 503.718.2439 Fax. 503.598 (1 OF TIGARD Date.By- Inspection Line: 503.639.4175 BUILDING DIVISION TIGARD Date Ready/By: loos ® See Page 2 for Internet: Www tigard-or_gov Not l fie d Alethod Supplemental Inform anon TYPE OF WORK FEE* SCHEDULE ®New construction 0 Demolition For special information use checklist Description I Qty. I Ea. I Total ❑ Addition/alteration/replacement 0 Other: New 1-2-family dwellings(includes 100 II for each utility connection) CATEGORY OF CONSTRUCTION SFR(1)bath 312.70 1-and 2-familydwellingSFR(2)bath 437.78 El 0 Commercial/industrial 0 Accessory building El Multi-family SFR(3)bath 500.32 Each additional bath/kitchen 25.02 ❑Master builder ❑Other Fire sprinkler(_sq.ft.) Page 2 JOB SITE INFORMATION AND LOCATION Site utilities: Job site address: 14596 SW 165th Ave ' Catch basin or area drain 18.76 Drywell,leach line,or trench drain 18.76 City/State/ZIP: Tigard OR 97224 Footing drain(no.linear ft.:_) Page 2 Suite/bldg./apt.no.: Ig I Project name:South River Terrace Manufactured home utilities 50.03 Cross street/directions to job site: Manholes 18.76 Rain drain connector 18.76 Sanitary sewer(no.linear ft:_) Page 2 Storm sewer(no.linear ft.: ) Page 2 Water service(no.linear ft.:_) Page 2 Subdivision:South River Terrace I Lot no.: 2 Fixture or item: Tax map/parcel no.: Backflow preventer 31.27 DESCRIPTION OF' WORK Backwater valve 12,51 Clothes washer 25.02 New home construction. Dishwasher 25.02 Drinking fountain 25.02 Ejectors/sump 25.02 IN PROPERTY OWNER I ❑ TENANT Expansion tank 12.51 Name: Taylor Morrison Northwest LLC Fixture/sewer cap 25.02 Floor drain/floor sink/hub 25.02 Address:703 Broadway St.,Ste 710 Garbage disposal 25.02 City/State/ZIP: Vancouver,WA 98660 Hose bib 25.02 Phone:( 360 )695 7700 Fax:( I Ice maker 12.51 .1 APPLICANT 0 CONTACT PERSON Interceptor/grease trap 25.02 Business name: Medical gas(value:$_) Page 2 Taylor Morrison Northwest LLC Primer 12.51 Contact name: Tonja Morris Roof drain(commercial) 12.51 Address: 703 Broadway St.,Ste 710 Sink/basin/lavatory 25.02 City/State/ZIP: Vancouver,WA 98660 Solar units(potable water) 62.54 Phone:( 360 )695 7700 Fax: :( ) Tub/shower/shower pan 12.51 E-mail: PermitSubmittals c/taylormorrison.com Urinal 25.02 Water closet 25.02 CONTRACTOR Water heater 37.52 Business name: Wolcott Plumbing Water piping/DWV 56.29 Address: 1075 W Historic Columbia River Hwy Other: 25.02 City/State/ZIP:Troutdale, OR 97060 Subtotal Phone:(5031667-1781 Fax:(503)-667-9891 Minimum permit fee: $72.50 112220Plumbing 26-824PB Plan review (25%oCpermit fee) CCB Lic. Lic.no.: , / r� State surcharge(12%of permit fee) Authorized signature: �2X� (/9Gtl�'ILQ.Ifi TOTAL PERMIT FEE Cliff Bow n Date: 8/14/23 This permit application expires if a permit is not obtained within 180 days Print name: after it has been accepted as complete. *Fee methodology set by Tri-County Building Industry Service Board. t\Building\Permits\PLMU.PernriApp.doc 10/01/09 4904616T(io/02/COM/WEB) )-e 74 .1 Building Division One & Two-Family Dwelling TIGARD Fees Checklist PERM IT INFORMATION: Application Date - FEE VERSION J Permit#: i Plan #: Floors: '-- V�S 12oZ3- ovSzo yQ�12r,� Valuation: Covexed Porch: Basement Bedrooms: Deck: 1" Floor ( „--7 WC (toilets) Deck Cover: 2nd Floor 95 Lavatories J Patio Cover _ 3`d Floor ------- Tub/shower 2 Accessory Struct. R-3 Total I 'T_ Laundry Tray _ Water Heater ( / Gas Garage 2 B- Exhaust Vents !� Gas Flue Vents ---� Total for Elec. G� D- Backflow Prey. IMP Heat Pump 4gor # for Electrical BBQ Gas Fireplace ------- #Fuel Lines 2 FEES: Description: Fee Applie • Fee Entered: DC Prov Revw: Planning Info Proc/Arch: Lg$2.00 (over 11x17) Info Proc/Arch: Sm $.50 (up to 11x17)1 Metro CET: Residenti�se v7 School CET: District: \9 (i Tigard CET: Admin Tigard CET: ODHCS d� Tigard CET: AH Electrical Permit: Permit Fee: Limited Energy: 12% State Surcharge Mech. Permit: Permit Fee: 12% State Surcharge ' Plumbing Permit: Permit Fee: 12% State Surcharge Erosion Control: w/Permit- Ping 1:\Budding\Forms\ResPlanCheckFees_Dec2022_AA.doc 12/21/22 Page 1 City of Tigard 11 " COMMUNITY DEVELOPMENT DEPARTMENT Building Permit Review - Residential T I GA RD Building Permit #: All Zfil'3 - 005 Site Address: 14596 SW 165th Ave - Cp/Verified in Accela Project Name: South River Terrace Phase 1 Lot/unit #: Tract J Proposal: Rowhouse Building 18, Unit 2 of 3 (Tract J) zone: RES-C Housing Type: 0 SFR(❑ Single Detached ❑ Duplex 0 Triplex❑ADU) ❑ Rowhouse❑Cottage Cluster❑CYU OQuad❑Other Required Site Plan Elements: 0 3 copies of site plan on max 11x17" O Drawn to standard scale O North arrow 0 Street and site trees shown / labeled 0 Site address, project name, lot # ❑ Tabl=�al.,ulatilig Lice ca,.opy al iiiatai it" O Street names (N/A for SFR) L Courtydrd recLdnyle dlrnensioned (ii aNNticalle) O Applicant name and phone # I aranr +•0 Lot and setback dimensions Visio =nie- ture5 o. a feata a 0 Utility locations &easements O Footprint of new structure and FFE 0 Property corner elevations O Sidewalk/driveway dimensioned ❑ LIDA (>1,000 sf distuiLaii-e) El Lot area and lot coverage percentage 0 Erosion control Required Elevation Plan Elements: (For SFR: calcs needed only on street-facing) Summary table with calculations for: O Drawn to standard scale 0 Total facade area O Building height dimensioned El Total window and door area O Facade dimensioned El Windows and doors dimensioned El Garage doors dimensioned Requir n Elements: (Not required for SFR) ❑ Summary table that includes ❑ Each story dimensioned area ❑ Each story floor area calculated ❑ Floor area per sto Planning Review The following standards have been met: Setbacks El Front: 8/12 Rear: 0 (alley)Side: 0(Interior)Min/Max Street Side: 8/3 / Garage: 4/20 Height 0 Max. Height: 35 Proposed Height: 25 O Yes ❑ N/A Landscape ❑ Yes 0 N/A Screening (Quad only) ❑ Yes El N/A % Window Coverage Facade not street facing El Yes ❑ N/A Garage (SFR Only) Parking (Other Res) 0 Yes ❑ N/A Entrance (SFR, Rowhouse, Quad only) O Yes ❑ N/A Other building design standards (Rowhouse only) ❑ Yes El N/A Accessory Structure Standards ❑ Yes 0 No Qualifying pre-existing unit exempt from standards (Cottage unit only) Additional standards for Courtyard Units, Cottage Clusters, Rowhouses, and Quads: El Yes 0 N/A Unit Count: 3 0 Yes ❑ N/A Lot Width and Size Tract J = 114,586sf El Yes 0 N/A Pathway dditional standards for Courtyard Units and Cottage Clusters only: ❑ Yes Unit Area: ❑ Yes ❑ N/A ea (per story) ❑ Yes ❑ N/A Courtyard O Yes 0 N/A Fence ❑ Yes ❑ No ON/A Clean Water Services - Service Provider Letter (lot platted prior to 9/10/1995) ❑ Yes El No ON/A Public Facilities Improvement (PFI) Permit: Required: ❑ Yes ❑ No Applied For: ❑ Yes ❑ No, stop intake O Sensitive Lands: ❑ Yes ❑ No o Main Land Use Case #s: PDR2018-00003, PDR2021-00003 ❑ Conditions met 0 Applicant notified of land use ex ti date: Permits by 11/2/24, Final by 11/2/26 Approved By Planning: ,--- S Date: 9/12/23 Notes Uses rowhouse s an ar - 4iA1i23 Revision 1: 0 Approve Not Approved Date: Revision 2: 0 Approved ❑ Not Approved Date: Building Permit Submittal G Original Submittal Date: f /,,-8/j 3 Site Plans #: Building Plans #: Building Permit #: 11 Building permit # entered on page 1 Workflow Routing: I7/...Planning,Engineering I;Q..Permit Coordinator Building Workflow Sign-off: lg.Sign-off or Planning (include notes from plannin§review) Route Documents: engineering: (1) copy of permit application, (1) site plan, (1) building plan And original plan review routing form. beam calculations and trust details, if applicable, etc.^ Permit Technician: =�, Date: q(/ r/P x5 Notes: Engineering Review ❑ PFI Permit: 1:13/SIope at building pad: fr o /o ,4 .l<d''Conditions met prior to issuance of permit irtasements (encroachments) per engineering conditions of approval and plat dl'Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes 1'IVo Assess Water Quantity Fee in-lieu: ❑ Yes 4No LIDA Facility on lot: ❑ Yes rB-lio Add Fee: 0 Yes 0 No final Plat Recorded 0 NOT Approved: Notes: Date: Approved By Engineering: Date: �J�e A 3 Revision 1: ❑ Approved ❑ Not proved Date: Revision 2: 0 Approved ❑ Not Approved Date: Permit Coordinator Review conditions met prior to permit issuance ❑ Approved, NOT Released: Date notified applicant: _ ENG Revisions Required: Date notified applicant: DC Exemption: ❑ Applied for ❑ Received ,boes not apply lePSDC Fees Entered: Wash Co Trans Dev Tax: Yes ❑ N/A Tigard Trans SDC: l Yes 0 N/A ❑ Deferred Parks SDC: Yes ❑ N/A ti Deferred LIDA ❑ Yes ,ITN/A K to Issue/Approved by Permit Coordinator: 6 Date: lam Revision 1: El Approved ❑ Not Approved Date: Revision 2: 0 Approved ❑ Not Approved Date: