Loading...
09-September (3) 71 CITY OF TIGARD BUILDING PERMIT COMMUNITY DEVELOPMENT Permit#: BUP2023-00163 T I G AR D 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 9/27/2023 Parcel: 1 S136DC00500 Jurisdiction: Tigard Site address: 11626 SW PACIFIC HWY Project: Tigard Cinemas Subdivision: None Lot: None Project Description: Demolition of a 48,624 sq.ft. building on sewer. UPON FINAL INSPECTION, DEMO CREDITS FOR SEWER, PARKS,AND TRANSPORTATION FEES WILL APPLY. Contractor: ELDER DEMO LLC Owner: PACIFIC REALTY ASSOCIATES LP PO BOX 1060 WOODBURN 15350 SW SEQUOIA PKWY#300 WOODBURN, OR 97071 PORTLAND, OR 97224 • PHONE: 971-235-5002 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: DEM Type of Const: Hourly Building Rate 09/27/2023 $90.00 Occupancy Grp: Occupancy Load: Erosion Control w/Development 09/27/2023 $386.40 Dwelling Units: 0 Info Process/Archiving-Lg$2.00(over 09/27/2023 $2.00 Stories: 0 Height: 0 ft 11x17) Bedrooms: 0 Bathrooms: 0 Value: $350,000 Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $478.40 Required: Required Items and Reports(Conditions) 1 Ersn Cntrl 503-639-4175 Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 95 -001-0090. You may obtai a opy of the rules or direct questions to OUNC by calling 503.232 �9Q.332.2344. Issued By: /rl e' Permittee Signature: 0}2Y\T Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. City of Tigard COMMUNITY DEVELOPMENT DEPARTMENT i Tlc nlzr, Building Permit Review — Commercial - No Land Use u, Building Permit #: 0 1.,,/ 3-vv /(,3 Site Address: l«! 1(0 JlA) {hail c dlwA1 Suite/Bldg#: Project Name: TM-t 9-Ow10 7, • ,u 6, j ;,,S (Name of commercial bu less°edifying the space. If vacant,enter Spec Space.) Planning Review Proposal: CovhPteje- $Atjdini peolO Sete stabllitatrv., Existing Business Activity: Vote 3- / I vi4onr 64 ff/r1-*;1 Wtgyli- Proposed Business Activity: Vet 0o✓1n f i.Q{ Verify site address/suite# exists and active in permit system. River Terrace Neighborhood: ❑ Yes No 4 Zoning: '[MV ,lam Permitted Use: Z Yes ❑ No ❑ Spec Space V4C441r" 64. 7 Confirm no land use required. /-Business License: Exists: ❑ Yes ,I` No, applicant was provided a business license application Notes: Approved by Planning: f7 — - Date: 9///z3 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved 1__- Building Permit Submittal Original Submittal Date: l///.3/13 Site Plans: # Building Plans: # Building Permit#: C ier building permit#above. Workflow Routing: al--Panning ermitCoordinator �"u�ding Workflow Sign-off: 3-"Sign-off for Planning(include notes from planning review) Route Application Documents: Criulyding: original permit application,site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: M By Permit Technician: �� Date: 4j /3/73 I:\Building\Forms'BldgPermitRvw COM_NoLandUse_09072022.docx Engineering Review ❑ Slope at building pad: ❑ PFI Permit#: ❑ Conditions"Met"prior to issuance of pe ❑ Easements (encroachments)per e ' eering conditions of approval and plat (not typical on SDR/CUP) ❑ Water Quality/Quantity F ' ty: Assess Water Fee in-lieu: ❑ Yes ❑ No , ' Assess W r Quantity Fee in-lieu: ❑ Yes ❑ No LI acuity on lot: 0 Yes 0 No Add Fee: 0 Yes ❑ No 41 ❑ OT Approved by Engineering: Date Cr Notes: .41c tApproved by Engineering: Date: Revisions (after Building Submittal only) Reviewer Date Revision 1: 0 Approved ❑ Not Approved Revision 2: ❑ Approved • ❑ Not Approved cl Revision 3: 0 Approved ❑ Not Approved y- Permit Coordinator Review e ❑ Conditions "Met"prior to issuance of permit 0 Approved,NOT Released: Date: ❑ ENG Revisions Required: Date: Notes: DC Exemption ❑ Applied for ❑ Received Does not apply Fees Entered: Wash Co Trans Dev Tax: ❑ Yes N/A ❑ Deferred Tigard Trans SDC: ❑ Yes N/A ❑ Deferred Parks SDC: ❑ Yes N/A ❑ Deferred LIDA Fee: ❑ Yes N/A 11. OK to Issue/Approved by Permit Coordinator: \A qr, q(k ` Date: q. i ci z`3 Revisions(after Building Submittal only) Reviewer Date Revision 1: 0 Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved 1:1BuildinglForms\BldgPermitRvw_COM NoLandUse_08162022.docx