Loading...
HomeMy WebLinkAbout08-August (5) CITY OF TIGARD BUILDING PERMIT ■' COMMUNITY DEVELOPMENT Permit#: BUP2023-00151 TI G ARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 8l30l2023 Parcel: 2S113AB00101 Jurisdiction: Tigard Site address: 16101 SW 72ND AVE 100 Project: PacTrust Subdivision: None Lot: None Project Description: Landlord work in common area: Demolition, new partition walls,suspended ceiling,doors,and lighting. Contractor: WALEN CONSTRUCTION Owner: PACIFIC REALTY ASSOCIATES LP 20915 SW 105TH AVE ATTN: N PIVEN TUALATIN, OR 97062 15350 SE SEQUOIA PKWY#300 PORTLAND, OR 97224 PHONE: 503-718-6680 PHONE: FAX: Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: I IB Permit Fee-Additions,Alterations, 08/30/2023 $586.19 Occupancy Grp: B Occupancy Load: 12 Demolition 12%State Surcharge-Building 08/30/2023 $70.34 Dwelling Units: 0 Plan Review 08/21/2023 $381.02 Stories: 0 Height: 0 k Tenant Improvements in Existing 08/30/2023 $123.00 Bedrooms: 0 Bathrooms: 0 Development Value: $37,000 Plan Review-Fire Life Safety 08/30/2023 $234.48 Info Process/Archiving-Lg$2.00(over 08/30/2023 $14.00 11x17) Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $1,409.03 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may ob . ..• : he rules or direct questions to OUNC by calling 503.232.1987 or 1. 0.332.2344. Issued By: A •ermittee Signature: Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. City of Tigard i 7 II 1111 COMMUNITY DEVELOPMENT DEPARTMENT TICA` Building Permit Review — Commercial - No Land Use Building Permit #: 4 yoir3—cas1 Site Address: lb I 0 I S%-‘1 72nd Ave Suite/Bldg#: Project Name: PC(Ct — PbC 19 I CoM vh co ,1r m o.4 I (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: (fry tor?or P-0YVloot2/( 't) Covylrna✓i cWJ4 geot1S )1CIUott:r1 '. CesioIMnc lobby, ,SV1,ower roon+s, lamed' CUitei . hreabr000 , o girdx11 075f3S) Existing Business Activity: ()f-f 1CA (co '"or' Sc ) Proposed Business Activity: Verify site address/suite#exists and active in permit system. River Terrace Neighborhood: ❑ Yes ...Er No Zoning: I—t7 ,Z Permitted Use: Er Yes ❑ No ❑ Spec Space 7-Confirm no land use required. p Business License: g6 Exists: ❑ Yes ❑ No,applicant was provided a business license application Notes: fir -P,ic y1pir (n)fitc. Approved by Planning: yti---- Date: 8/i 1 / 23 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: / Site Plans: # Building Plans: # Building Permit#: ter building,��p,ermit#above. Workflow Routing: [-p r g L�'Tu��it Coordinator g Workflow Sign-off: i-off for Planning(include notes from planning review) Route Application Documents: g: original permit application,site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: ?6_ _ ate: 8/V/y� I:1B uil ding\Forms\B IdgPermitRvw_COM_NoLandUse_09072022.docx Engineering Review ❑ Slope at building pad: j ❑ PFI Permit#:� • ❑ Conditions "Met"p to issuance of permit ❑ Easements (encroachment .er engineering conditions of approval . plat (not typical on SDR/CUP) ❑ Water Quality/Quantity Facility. Assess Water Quality Fee in-lieu: ❑ Yes ❑ .lo Assess Water Quantity Fee in-lieu: ❑ Yes i No LIDA Facility on lot: ■ _- ❑ No Add Fee: 0 Yes ❑ No ❑ NOT Approved by Engineering: Date Notes: Approved by Engine- 'ng: Date: Revisions (after : .riding Submittal only) Review:. Date Revision 1- ❑ Approved ❑ Not Approved Revisi. 2: ❑ Approved ❑ Not Approved Re sion 3: ❑ Approved ❑ Not Approved Permit Coordinator Review *Conditions "Met"prior to issuance of permit ❑ Approved,NOT Released: Date: ❑ ENG Revisions Required: Date: Notes: ,'SDC Exemption ❑ Applied for ❑ Received Does not apply Fees Entered: Wash Co Trans Dev Tax: ❑ Yes ,� /A ❑ Deferred Tigard Trans SDC: ❑ Yes XJ N/A ❑ Deferred Parks SDC: ❑ Yes /A ❑ Deferred LIDA Fee: ❑ Yes .rJ N/A r8'OK to Issue/Approved by Permit Coordinator: 7 Y/M„ Date: 42,5)262,3 Revisions (after Building Submittal only) (J` Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved I:1Building\Forms\BldgPermitRvw_COM_NoLandUse_08162022.docx