HomeMy WebLinkAbout06-June (9) 9
City of Tigard
r COMMUNITY DEVELOPMENT DEPARTMENT
e
7,4
1(i lz Building Permit Review — Commercial - No Land Use
Building Permit #: Qup 161A.QQVCt 0
Site Address: 1,1'(151 CIA) 109 q'k /?v f Suite/Bldg#:
Project Name: Tdvkrlin¢, AVctth Ari S -deck- kyotaCe g-
(Name of commercial business occupying the space. If vacant,enter Spec Space.)
Planning Review
Proposal: 'lace e4istIA1 0(QCki , Sant Sloe
Existing Business Activity: f10014(+YVI A/l1-
Proposed Business Activity: ��
-f1 Verify site address/suite#exists and active in permit system.
.River Terrace Neighborhood: E Yes ,ZX No
. "Zoning. ¢4S-9
, 1 Permitted Use: -6 Yes 0 No ❑ Spec Space
Confirm no land use required.
ryVABusiness License:
Exists: 0 Yes ❑ No,applicant was provided a business license application
Notes:
Approved by Planning: (7Date: fo (Z.° 123
Revisions (after Building Submittal only) Reviewer Date
Revision 1: 0 Approved 0 Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: ❑ Approved ❑ Not Approved
Building Permit Submittal
Original Submittal Date: /1IS
Site Plans: ##
Building Plans: #
Building Permit#: Enter building permit#above.
Workflow Routing: Et' Planning ID/Permit Coordinator l 'Buildin
Workflow Sign-off: g
gn-o ®' Sign-off for Planning(include notes from planning review)
Route Application Documents: [Y Building: original permit application, site plans,building plans,engineer and
beam calculations and trust details,if applicable,etc.
Notes: .1k 4
By Permit Technician: ,(1 QC,r„ Date: lD IM I /3
I:1BuildingTormslBldgPermitRvw_COM_NoLandUse 09072022.docx
/
Engineering Review
❑ Slope at building pad:
0 PFI Permit#:
❑ Conditions "Met"prior to iss 'lice of permit
❑ Easements (encroachments) per engineering conditions of .proval and plat (not typical on SDR/CUP)
❑ Water Quality/Quantity Facility:
Assess Water Quality Fee in-h-u: 0 Yes • No
Assess Water Quantity Fee in-:eu: ❑ Yes ■I No
LIDA Facility on lot: 0 Yes No Add Fee: 0 Yes 0 No
❑ NOT Approved by Engineeri' :: Date
Notes:
Approved by Engineering:
Date:
Revisions (after Building Submittal only)
Reviewer Date
Revision 1: ❑ Approved ❑ Not A pproved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: 0 Approved ❑ Nc{tAp'roved
Permit Coordinator Review
❑ Conditions "Met"prior to issuance of p "t
❑ Approved,NOT Released: Date:
❑ ENG Revisions Required: Date:
Notes:
❑ SDC Exemption 0 Applied for ❑ R;ceived 0 Does not apply
❑ Fees Entered: Wash Co,Trans Dev Tax: 0 Ye 0 N/A ❑ Deferred
Tigard ns SDC: ❑ Yes 0 N/A ❑ Deferred
Parks S C: 0 Yes ❑ N/A 0 Deferred
LIDA ee: 0 Yes D N/A
Date:
❑ OK to Issue/Approved by Permit Coordinator:
Revisions (after Building Submittal only)
Reviewer Date
Revision 1: 0 Approved 0 Not Approved
Revision 2: 0 Approved ❑ Not Approved
Revision 3: ❑ Approved 0 Not Approved
I:\Building\Forms\BldgPemutRvw_COM_NolandUse_08162022.docx