Loading...
HomeMy WebLinkAbout06-June (9) 9 City of Tigard r COMMUNITY DEVELOPMENT DEPARTMENT e 7,4 1(i lz Building Permit Review — Commercial - No Land Use Building Permit #: Qup 161A.QQVCt 0 Site Address: 1,1'(151 CIA) 109 q'k /?v f Suite/Bldg#: Project Name: Tdvkrlin¢, AVctth Ari S -deck- kyotaCe g- (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: 'lace e4istIA1 0(QCki , Sant Sloe Existing Business Activity: f10014(+YVI A/l1- Proposed Business Activity: �� -f1 Verify site address/suite#exists and active in permit system. .River Terrace Neighborhood: E Yes ,ZX No . "Zoning. ¢4S-9 , 1 Permitted Use: -6 Yes 0 No ❑ Spec Space Confirm no land use required. ryVABusiness License: Exists: 0 Yes ❑ No,applicant was provided a business license application Notes: Approved by Planning: (7Date: fo (Z.° 123 Revisions (after Building Submittal only) Reviewer Date Revision 1: 0 Approved 0 Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: /1IS Site Plans: ## Building Plans: # Building Permit#: Enter building permit#above. Workflow Routing: Et' Planning ID/Permit Coordinator l 'Buildin Workflow Sign-off: g gn-o ®' Sign-off for Planning(include notes from planning review) Route Application Documents: [Y Building: original permit application, site plans,building plans,engineer and beam calculations and trust details,if applicable,etc. Notes: .1k 4 By Permit Technician: ,(1 QC,r„ Date: lD IM I /3 I:1BuildingTormslBldgPermitRvw_COM_NoLandUse 09072022.docx / Engineering Review ❑ Slope at building pad: 0 PFI Permit#: ❑ Conditions "Met"prior to iss 'lice of permit ❑ Easements (encroachments) per engineering conditions of .proval and plat (not typical on SDR/CUP) ❑ Water Quality/Quantity Facility: Assess Water Quality Fee in-h-u: 0 Yes • No Assess Water Quantity Fee in-:eu: ❑ Yes ■I No LIDA Facility on lot: 0 Yes No Add Fee: 0 Yes 0 No ❑ NOT Approved by Engineeri' :: Date Notes: Approved by Engineering: Date: Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not A pproved Revision 2: ❑ Approved ❑ Not Approved Revision 3: 0 Approved ❑ Nc{tAp'roved Permit Coordinator Review ❑ Conditions "Met"prior to issuance of p "t ❑ Approved,NOT Released: Date: ❑ ENG Revisions Required: Date: Notes: ❑ SDC Exemption 0 Applied for ❑ R;ceived 0 Does not apply ❑ Fees Entered: Wash Co,Trans Dev Tax: 0 Ye 0 N/A ❑ Deferred Tigard ns SDC: ❑ Yes 0 N/A ❑ Deferred Parks S C: 0 Yes ❑ N/A 0 Deferred LIDA ee: 0 Yes D N/A Date: ❑ OK to Issue/Approved by Permit Coordinator: Revisions (after Building Submittal only) Reviewer Date Revision 1: 0 Approved 0 Not Approved Revision 2: 0 Approved ❑ Not Approved Revision 3: ❑ Approved 0 Not Approved I:\Building\Forms\BldgPemutRvw_COM_NolandUse_08162022.docx