HomeMy WebLinkAbout06-June (3) CITY OF TIGARD BUILDING PERMIT
COMMUNITY DEVELOPMENT Permit#: BUP2023-00092
T I[;A RD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 7/25/2023
Parcel: 2S110AC00400
Jurisdiction: Tigard
Site address: 14737 SW 109TH AVE
Project: Timberline Apartments Subdivision: None Lot: None
Project Description: Replacing(4)decks, like for like,in the same building.
Contractor: FINNMARK PROPERTY SERVICES LLC Owner: KA-5 ASSOCIATES LLC
8383 NE SANDY BLVD STE 370 5335 SW MEADOWS RD#190
PORTLAND, OR 97220 LAKE OSWEGO, OR 97035
PHONE: 503-475-0668 PHONE:
FAX:
Specifics: FEES
Description Date Amount
Type of Use: MF
Class of Work: ALT Type of Const: VB Permit Fee-Additions,Alterations, 07/25/2023 $464.97
Occupancy Grp: R-2 Occupancy Load: 0 Demolition
Dwelling Units: 0 12%State Surcharge-Building 07/25/2023 $55.80
Stories: 0 Height: 0 ft Plan Review 06/26/2023 $302.23
Bedrooms: 0 Bathrooms: 0 Tenant Improvements in Existing 07/25/2023 $123.00
Development
Value: $26,000 Info Process/Archiving-Sm$0.50(up to 07/25/2023 $12.00
11x17)
Floor Areas:
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $958.00
Required: Required Items and Reports(Conditions)
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work
will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more
the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
Issued By: / may, !19 /Q
1 tJ
/ ' Permittee Signature: f z
Call 503 639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
9
IP"
City of Tigard
s i r COMMUNITY DEVELOPMENT DEPARTMENT
T l G A R n Building Permit Review — Commercial - No Land Use
Building Permit #: tP1/61;3. 0004'7
Site Address: ki-mi I T41-yt YPkile Suite/Bldg#:
Project Name: 14erlii% Acavi r►`ek S -jej t. kef4Cewmnt-
(Name of commercial business occupying the space. If vacant,enter Spec Space.)
Planning Review ,
Proposal: ceTARCZ.4 ey1c5t—( c .cis , SCOre glee .
t
Existing Business Activity: ,cp v+ .{-
Proposed Business Activity: .i
-d Verify site address/suite#exists and active in permit system.
.River Terrace Neighborhood: 0 Yes ,zi No
„Er Zoning: WS-9
Permitted Use: -Pi Yes 0 No 0 Spec Space
Ja Confirm no land use required.
AVA-Business License:
Exists: ❑ Yes 0 No, applicant was provided a business license application
Notes:
Approved by Planning: Date: / ( Z3
rQ �
Revisions (after Building Submittal only) Reviewer
Revision 1: 0 Approved ❑ Not Approved Date
Revision 2: 0 Approved ❑ Not Approved
Revision 3: 0 Approved ❑ Not Approved
-
Building Permit Submittal
Original Submittal Date: (I , I/,C.13
Site Plans: #
Building Plans: # 3
Building Permit#: Enter building permit# above.
Workflow Routing: Q'Planning EX Permit Coordinator V Building
Workflow Sign-off: Sign-off for Planning(include notes from planning review)
Route Application Documents: '( Building: original permit application, site plans,building plans,engineer and
11.4 G� beam calculations and trust details,if applicable, etc.
Notes: IL . - d. S6- .
By Permit Technician: 4j1 T'.j- p gyp, Date: (' (1l ('U 1/
IABuildinglPormslBldgPeanitRvw_COM NoIandUse 09072022.docx
Engineering Review
❑ Slope at building pad:
/�' ❑ FI Permit#:
�/ ❑ onditions "Met"prior to issuance of permit
0 asements (encroachments)per engineering conditions of approval and plat(not typical on SDR/CUP)
❑ dater Quality/Quantity Facility:
�/ Assess Water Quality Fee in-lieu: 0 Yes 0 No
Assess Water Quantity Fee in-lieu: ❑ Yes ❑ No Add Fee: ❑ Yes 0 No
LIDA Facility on lot: 0 Yes ❑ No
❑ NOT Approved by Engineering:
Date
Notes: Q /
Date: 7.. 2,
Approved by Engineering:
Revisions (after Building Submittal only)
Reviewer Date
Revision 1: 0 Approved 0 Not Approved
Revision 2: 0 Approved 0 Not Approved
Revision 3: 0 Approved ❑ Not Approved
Permit Coordinator Review
❑ Conditions"Met"prior to issuance of permit
Date:
❑ Approved,NOT Released:
TOW
Date:
❑ ENG Revisions Required: UMWNotes:
PP
❑ SDC Exemption
0 Applied for ❑ Received ❑ Does not apply
0 N/A ❑ Deferred
❑ Fees Entered: Wash Co Trans Dev • 0 Yes0 Deferred
Tigard Trans SDC: ❑ Yes 0 N/A
Parks SDC: 0 Yes 0 N/A 0 Deferred
LIDA Fee: 0 Yes 0 N/A
Date:
• ❑ OK to Issue/Approved by Permit oordinator:
Revisions (after Building Submitta .nly)
viewer Date
Revision 1: 0 Approve. 0 Not Approved
Revision 2: ❑ Appr.•ed 0 Not Approved
Revision 3: 0 Approved ❑ Not Approved
1:\Building\Forms\BldgPermitibrw_COM_NoLandUse_08162022.docx