Loading...
BUP2022-00098 (4) CROWN 1505 Westlake Ave N, N Seattle,WA 98109 Phone vring : v Cfl4 CASTLE .crormc .com project,which will improve wireless telecommunication services in your community using collocation on existing infrastructure. If you have any questions,please do not hesitate to contact me. Regards, (4ac/iv alhalianw Gary Abrahams - GMA Network Services,LLC Consultant to Crown Castle The Foundation for a Wireless World CrownCastie.com je CROWN O A/A t 1505 Westlake Ave N, N 4R VV '�! phone: Seattle,WA98109 www.crovmcastle.com CASTLE Attachment"B" Proposed Scope of Work PROJECT DESCRIPTION THE PURPOSE OF THIS PROJECT IS TO PROPOSE AN ANTENNA MODIFICATION ON AN EXISTING WIRELESS SITE. TOWER SCOPE OF WORK Both LTE & NR must be or the same CPRI Rate7. 1st LTE CPRI should be SFP7 (NE0.20022) on both Radio and ABIA sides for AirScale RRH (AHLBA, AHLB A, AHFI B. AHCA, AHNA) and SFP7 ,CEO.'6446 or NE0.20022) or both Radio and ABIA sides for ALL radios (UHFA, UHIE). The 2rd 5G CPRI should be SFi'7 (NEQ.20022/NEO.53020) on both Radio and ABIL/ABIO sides for Airscale and ALU radios. Add 2nd CPRI correction for all bands/radio that is missing. n77 Band requires (2) CPRI connections (CEC.24407) or both Radio and ARID sides. Mr-motor to maintain RRH to hack o` antenna clearance and 3.4/B29 & r77 antenna separation per latest .AT&T guidelines. • REMOVE (6) ANTENNAS • INSTALL (9) ANTENNAS • INSTALL (2) # 6 AWG DC TRUNKS GROUND SCOPE OF WORK • REMOVE (2) BATTERY CABINETS • REMOVE +24v DC POWER PLANT • REMOVE POWER EQUIPMENT FROM EXISTING CONVERTER SHELF, REMOVE CONVERTER SHELF; TRANSFER LOADS TO NEW POWER PLANT • INSTALL —48V EMERSON NETSURE 5'2 DC ^'CANT WI (1 ') RECTIFIERS & (2) CONVERTER MODULES • INSTALL EMERSON BATTERY CABINET • RECONFIGURE (16) +24V STRINGS AS (8) —48V STRINGS • EXISTING FSM4 (AMIA) — REMOVE EXISTING (1) ASIK AND (1) ABIL CARDS ON THE C2 SIDE. ADD (1) ASIL AND (3) ABIO CARDS TO THE C2 SIDE FOR 5G 850/1900/AWS, 5G C n77 & 5G C r.77 dod The Foundation for a Wireless World CrownCastle.com