Loading...
HomeMy WebLinkAboutThe Beaverton-Tigard Connection ;u d 7 Connect to existing 12" D.I. _ > < with 12" S.S. WASHINGTON SQUARE L END PROJECT < - - ' 4 CITY OF BEAVERTON a, i o 100' #m M I '.--_ - - -- • Existing 12" D.Z. 3 aj. 202 204 •; PROJECT cn SITE Ly Eet�v u p ' ' - SCt'ol c 1› 12i' - ---1 Existing 12" 14,14 H 5, a :I300 + j 1 o m • a / !D .+ u a - c "" Install 12" D.1. in steel FERRY, Q �� a (plugnorth) $ - _/ nstall 2-12" BFV's� PROGRESS I W to m o casing with 12" BFV SC�OT+T', r 1 ' 12 cross (Plug no. BIBLE j � x m " n a 5 W/1C & so.) and F.H. / CHURCH w s S. w. Walnut Street p•t -- PROPOSED 15' of 60, 11 + r; Install 12" BFV, EASEMENT VICINITY MAP - 1 Future F.H.--- 501 N.T.S. -.'� / ,Install F.H. Install 12" MJ x 6" Flg m tees w/6" Flg G. V.(plug south) 20-FOOT 4 EASEMENT r Install 24" 0.D. steel casing N \ ", SEE DETAIL "B" p "SUMMER LAKE" I m a , SEE DETAIL "A" or I Concrete Vault a H ''''PAP 104 I & Master Meters to , A r),T LUCINDA 300 w _ S. W. HAWK'S BEARD STREET • y F GRABHORN 1r _r 3 1 $ G�OS.L 40'--. o r Existing 12" D.I. �/OZ'O r+ ice I ,�. L//5 100 w Install F.H. a Z )� // a . a SECTION 33, T1S, R1W, W. M. a j/ , m Map 1S 1 33A ,n PROPOSED 15 x Ma 1S 1 33C EASEMENT ,w w Mapp 1S 1 33D 103 3 NOTE: a Washington County, New sanitary sewer W Oregon m W in creek bed Q CONSTRUCTION NOTES: .0 I I o 1. All work shall be in accordance with A.W.W.A. standards. 300 Install F.H. and 16" BFV CITY OF TIGARD r , 2. 24-inch bore under S. W. Scholls Ferry Road will be 102 3 accomplished by private contractor. All other work will I be done by Tigard Water District personnel. m .O 105 ' I 3. Poured concrete thrustblocks at least 8 square feet of 4- 700 i bearing surface at each tee, lateral and bend location. 4 4� ' I 4. 36" earth cover for all mains except 3/4" minus gravel y 107 for mains located in streets, shoulders, and driveways. v G''' 5. Fire hydrant assembly consists of 12" or 16" MJ x 6" 4 1II Install F.H. Fig tee, 6" Flg gate valve, and Pacific States fire 3.. hydrant, 51/2" MVO, 3-port (2 - 21" NST hose connections, 106 j S. W. SHEFFIELD CIRCLE 1 - 41" pumper) , 6" Flg connections, 11" Pent Opr Nut, . I - (FUTURE) open left, color: yellow, traffic model. 800 301 108 / 6. Mains shall be tested at 150 psi for 1 hour. Static _ 1 pressure = 85 psi. 101 "BRITTANY SQUARE" 7. O.S.B.H. bacteriological tests required. BEGIN PROJECT:' ' Connect to existing 16" D.I. w/ 16" D.I. -) Fb_ TIGARD WATER DISTRICT 1000 900 ,I IT, S. W. SBRITTANY DRIVE 8841 S.W.COMMERCIAL STREET•TIGARD,OREGON 97223 TExisting 8" D.I. -' } 71..,",t;� ,` TELEPHONE. 1503)639-1554 H . / t ._ ..-___. . WATER PROJECT G C•/� THE BEAVERTON - TIGARD CONNECTION SOB<y 16,�4,.., S. W. 135th and Scholls Ferry Road c FRT E. S� Page 1 of 2 pages a) m '+1 X Robert E. Santee,P.E. Administrator W Scale: 1" = 200' 7 December 1983 ! S. W. SCHOLLS FERRY ROAD i 24" b.D. steel casing 112 D.I. pip MATERIAL LIST: / 12"MJ' 6",P.E.,reducer Item Quantity Main Pipeline: 6"MJ G.v. 12"MJ plug 12"MJ B.F.V. _r 16" TJDI pipe, Class 52 1,700 feet 12" TJDI pipe, Class 52 1,700 feet ' 16" MJ butterfly valve 1 each 12"MJ tee 412" D. I. pipe 12" D.I. pipe 16" MJ x 12" P.E. reducer 1 each 12"M6 x 6"Flg tee G -A.. — — 12" MJ butterfly valVe 5 each =,il 12" MJ cross 1 each I' 12" MJ tee 1 each _____ 12" MJ x 6" Flg tee 2 each 1l 12" MJ plug 3 each . w 6"MJ j45q lateral j� r-6"Flg G.V. 12" MJ solid sleeve (L. P.) 1 each '! 5 Fy— ---d z w 6" Flg plug 2 each `T Fire hydrant assembly: (on 16") 3 each aJ (on 12") 2 each lz"MJ B.F.v. MJ;4nd a; 1 6„ 1 a \Fire H'draq(t/ Master Meter with concrete vault: - =' 12" TJDI pipe, Class 52 70 feet + 6"Flg x dreisrr gouplings 6" TJDI pipe, Class 52 20 feet -T- 1 12" D. I. pipe I _ ( jam-' 16" MJ x 12" MJ tee 1 each 12" MJ butterfly valve 2 each � 6"Flg G , 12" MJ x 6" MJ tee 2 each _ -. \ 6" Rx Fw , turbo-meters,l .C�� --!I Flg x Fl�, registration W-2000 DR, 12" MJ x 6" P. E. reducer 1 each cubic felt registration 12" MJ plug 2 each 1 with strainers 6" MJ gate valve 1 each H r r 6" Flg gate valve w/handwheels 4 each 6" Plg x dresser coupling 4 each 7 _' II I z 6" MJ 450 lateral 1 each "� — t 1 o 6" MJ 450 bend 1 each 16"MJ x 12" P.I. reducer H 1y1'��— 1 S 6" Rockwell turbo-meter, Flg x P,1 4' ;�o ( r - 1 m Flg, Model W-2000 DR, cubic H S--t__ l 4-_- o feet registration, with I ri +171 E. strainers 2 each H O .--3 � Pre-cast vault I • 6"Flg pc r$re#ser coupling 16" D. I. pipe S. W. Scholls Ferry F Road (Road Surface) if n 4,O"t minimum — .__ —�-- ------ ��O��-PttO��cf'.__ Length: 50' Redwood end o D �ot:acF`s� seal (typ.) --- — -.4 W 7149 R �\ 1 16 rte. �', 24" O.D. steel casing 12"MJ B.F.V. (o BF gP Pipe to be cut and joined' 1/4" thick '12" D. I. pipe RT E. for end joints to be 1'0" from end TYPICAL SECTION - 4ii� y - am - c a r" 12"MJ plug 24" O.D. steel casing 116"MJ x _2'MJ tee .`" s ai x _ - . A a TIGARD WATER DISTRICT Stainless steel bands, I x 5 required per 16-foot ; (1 ' - . , ry ' 12" D. I. pipe `* length of pipe , ,v 8841 SW.COMMERCIAL STREET•TIGARD,OREGON 97223 I `� . - 2 - 2"x4" (rough) redwood or TELEPHONE. 15031 639-1554 i cedar skids between bells 1 WATER PROJECT THE BEAVERTON - TIGARD CONNECTION CASING CROSS SECTION (TYP.) 16" D. T. pipe S. W. 135th and Scholls Ferry Road PRE-CAST CONCRETE VAULT FOR MASTER METERS 24" STEEL CASING BORED UNDER S. W. SCHOLLS FERRY ROAD Page 2 of 2 pages DETAIL "B" DETAIL "A" Robert E. Santee, P.E. Adm,msvaeor Scale: 1" = 1'0" Scale. As Shown 7 December 1983