Loading...
Report (9) d0,250 roe1&C.02,.0,22- 5 �� OFFI R � CE COPY ECE1vE 3 MARt32022 BENDERSON G, OF DNASION DEVELOPMENT Bv��o�NG 570 Delaware Avenue, Buffalo, New York 14202 ADDENDUM 2 DATE 12/06/2021 Project: Tesla — Phase 1 Landlord Work Project # 5226j02 Location: 10065 SW Cascade Ave. Tigard, OR 97223 Item: A. Documents 1. RTU #8 Carrier Equipment Package purchased by Landlord (Benderson Development). B. Clarifications 1. RTU #8 Carrier Equipment Package purchased by Landlord (Benderson Development). The contractor is responsible for all other required equipment that is not listed in the Carrier Equipment package document. Acknowledgement of Addendum Please sign and email RTBftbenderson.com and KMBCthbenderson.com Contractor: Date: Contact: Phone: �* Carrier Enterprise Northeast- ti% New York Carrier 21 Humboldt Street Rocphesterstate NY 4609 (PU)(585)2953148 comfort j excellence Proposal Project Name: Tesla Bid Date: 11/09/2021 Location: Tigard, OR 97223 Expiration Date: 12/09/2021 Attention: Ryan/Benderson Proposal Number: 1121MMUE1639 We at Carrier Enterprise Northeast are pleased to quote the following equipment for the above referenced project in accordance with attached terms and conditions. Mark For Qty Model Number Description RTU 1 48GCDMO4A2A6-6W0F0 3T"WeatherMaster"Gas/Electric Packaged Rooftop(460v/3ph) The following items are included: > Electromechanical Control w/W7220 Economizer Controller > Single Circuit,2-Stage Cooling w/Scroll Compressor—R410a > Aluminized Steel Heat Exchanger w/2-Stage Gas(Low Heat) > Medium Static Direct Drive—EcoBlue > Enthalpy Ultra Low Leak Economizer w/Barometric Relief > Non-Fused Disconnect&Thru-The-Base Connections > Accessory 14"Tall Standard Roof Curb > Accessory Enthalpy Sensor > Accessory Commercial Thermostat Pricing Total Price for items as listed above (excluding taxes) Please note the following clarifications in this proposal: ➢ Proposed Unit is 16.10 SEER Convenience Outlet, Smoke Detector, Start-Up/Non-Standard Warranties Excluded. Internal Use Only: 0045593706 CARRIER ENTERPRISE, LLC("CE") TERMS AND CONDITIONS OF SALE •PAYMENT AND TAXES—Payment shall be Net 10`"prox,unless otherwise stated on invoice. CE reserves the right to require cash payment or other alternative method of payment prior to completion of work if CE determines,in its sole discretion,that Customer or Customer's assignee's financial condition at any time does not justify continuance of the Net 10th prox payment terms. In addition to the Agreement price,the Customer shall pay CE any applicable taxes or government charges that may be required in connection with the service or material furnished under this Agreement. •SHIPMENT—All shipments shall be F.O.B.shipping point,freight prepaid and allowed to the job site. Shipment dates quoted are approximate. CE does not guarantee a particular date for shipment or delivery. •WORKING HOURS—All services performed under this Agreement including major repairs,are to be provided during CE's normal working hours unless otherwise agreed. •RETURNS—No items will be accepted for return without prior written authorization. Returned goods may be subject to a restocking charge. Special order and non-stock items cannot be returned. •ADDITIONAL SERVICE—Services or parts requested by Customer in addition to those specified in this Agreement will be provided upon receipt of Customer's written authorization and invoiced at CE's prevailing labor rates and parts charges.Additional services or parts shall be supplied under the terms of this Agreement. •EXCLUSIONS—CE is not responsible for items not normally subject to mechanical maintenance including but not limited to:duct work,casings,cabinets,fixtures,structural supports,grillage,water piping,steam piping,drain piping,cooling tower fill,boiler tubes,boiler refractory,disconnect switches and circuit breakers.CE is not responsible for repairs, replacements,alterations,additions,adjustments,repairs by others,unscheduled calls or emergency calls,any of which may be necessitated by negligent operation,abuse,misuse, prior improper maintenance,vandalism,obsolescence,building system design,damage due to freezing weather,chemical/electrochemical attack,corrosion,erosion,deterioration due to unusual wear and tear,any damage related to the presence of mold,fungi,mildew,or bacteria,damage caused by power reductions or failures or any other cause beyond CE's control. CE is not responsible for the identification,detection,abatement,encapsulating or removal of asbestos,products or materials containing asbestos,similar hazardous substances,or mold,fungi,mildew,or bacteria. In the event that CE encounters any asbestos product or any hazardous material in the course of performing its work,CE may suspend its work and remove its employees from the project,until such product or material,and any hazards connected with it are abated. CE shall receive an extension of time to complete its work and compensation for delays encountered as a result of such situation and its correction.CE shall not be required to perform tests,install any items of equipment or make modifications that may be recommended or directed by insurance companies,government,state,municipal or other authority. However,in the event any such recommendations occur,CE,at its option,may submit a proposal for Customer's consideration in addition to this Agreement. CE shall not be required to repair or replace equipment that has not been properly maintained. •WARRANTY—Carrier warrants that all equipment manufactured by Carrier Corporation will be free from defects in material and workmanship. Carrier shall at its option repair or replace,F.O.B.point of sale,any part determined to be defective within one(1)year from the date of initial operation or eighteen(18)months from date of shipment,whichever is earlier. Carrier does not warrant products not manufactured by Carrier Corporation,but it does pass on to Customer any available manufacturer's warranty for those products. THIS WARRANTY IS GIVEN IN LIEU OF ALL OTHER WARRANTIES,EXPRESS,IMPLIED OR STATUTORY,INCLUDING THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. Carrier's obligation to repair or replace any defective parts during the warranty period shall be Customer's exclusive remedy. Carrier shall not be responsible for labor charges for removal or reinstallation of defective parts,for charges for transportation,handling and shipping or refrigerant loss,or for repairs required as a consequence of faulty installation,misapplication,abuse,improper servicing,unauthorized alteration or improper operation by persons other than Carrier. •PROPRIETARY RIGHTS—During the term of this Agreement and in combination with certain services,CE may elect to install,attach to Customer equipment,or provide portable devices(hardware and/or software)that shall remain the personal proprietary property of CE. No devices installed,attached to real property or portable device(s)shall become a fixture of the Customer locations. Customer shall not acquire any interest,title or equity in any hardware,software,processes,and other intellectual or proprietary rights to devices that are used in connection with providing service on Customer equipment. •DELAYS—Delays caused by conditions beyond the reasonable control of either party shall not be the liability of either party to this Agreement. •CUSTOMER RESPONSIBILITIES—Customer shall: • Provide safe and reasonable equipment access and a safe work environment. • Permit access to Customer's site and use of building services including but not limited to:water,elevators,receiving dock facilities,electrical service and local telephone service. • Keep areas adjacent to equipment free of extraneous material,move any stock,fixtures,walls or partitions that may be necessary to perform the specified service. • Promptly notify CE of any unusual operating conditions. • Upon agreement of a timely mutual schedule,allow CE to stop and start equipment necessary to perform service. • Provide adequate water treatment. • Provide the daily routine equipment operation(if not part of this Agreement)including availability of routine equipment log readings. • Where CE's remote monitoring service is provided,provide internet connection and access as required by CE. • Operate the equipment properly and in accordance with instructions, • Promptly address any issues that arise related to mold,fungi,mildew or bacteria. •EQUIPMENT CONDITION&RECOMMENDED SERVICE—Upon the initial scheduled operating and/or initial annual stop inspection,should CE determine the need for repairs or replacement,CE will provide Customer in writing an'equipment condition'report including recommendations for corrections and the price for repairs in addition to this Agreement. In the event CE recommends certain services(that are not included herein or upon initial inspection)and if Customer does not elect to have such services properly performed in a timely fashion,CE shall not be responsible for any equipment or control failures,operability or any long-term damage that may result. CE at its option will either continue to maintain equipment and/or controls to the best of its ability,without any responsibility,or remove such equipment from this Agreement,adjusting the price accordingly. •CUSTOMER TERMINATION—Customer shall have the right to terminate this Agreement for CE's non-performance provided CE fails to cure such non-performance within 30 days after having been given prior written notice of the non-performance. Upon early termination or expiration of this Agreement,CE shall have free access to enter Customer locations to disconnect and remove any CE personal proprietary property or devices as well as remove any and all CE owned parts,tools and personal property. Additionally,Customer agrees to pay CE for all incurred but unamortized service costs performed by CE including overheads and a reasonable profit. •CE TERMINATION—CE reserves the right to discontinue its service any time payments have not been made as agreed or if alterations,additions or repairs are made to equipment during the term of this Agreement by others without prior agreement between Customer and CE. •LIMITATION OF LIABILITY—Under no circumstances shall CE be held liable for any incidental,special or consequential damages,including loss of revenue,loss of use of equipment or facilities,or economic damages based on strict liability or negligence.CE shall be liable for damage to property,other than the equipment provided under this Agreement,and to persons,to the extent that CE's negligent acts or omissions directly contributed to such injury or property damage. CE's maximum liability for any reason(except for personal injuries)shall consist of the refunding of all moneys paid by Customer to CE under this Agreement. •WASTE DISPOSAL—Customer is wholly responsible for the removal and proper disposal of waste oil,refrigerant and any other material generated during the term of this Agreement. •CLAIMS—Any suits arising from the performance or non-performance of this Agreement,whether based upon contract,negligence,strict liability or otherwise,shall be brought within one(1)year from the date the claim arose. •GOVERNMENT PROCUREMENTS—CE offers standard commercial items that may not comply with Government specifications. CE does not comply with the Cost Accounting Standards(CAS)or with the Federal Acquisition Regulations(FAR). In no event shall CE provide any Cost or Pricing Data in connection with this Agreement or subsequent modifications. •SUPERSEDURE,ASSIGNMENT and MODIFICATION—This Agreement contains the complete and exclusive statement of the agreement between the parties and supersedes all previous or contemporaneous,oral or written,statements. Customer may assign this Agreement only with CE's prior written consent. No modification to this Agreement shall be binding unless in writing and signed by both parties. ➢ THIS ORDER CANNOT BE CANCELLED. ➢ THE ITEM(S) CANNOT BE RETURNED FOR CREDIT. ➢ FREIGHT PRE-PAID IF A FACTORY DIRECT SHIPMENT. Accepted By: Proposal Date: 11/09/2021 Name: Proposal Number: 1121MMUE1639 Title: PO Number: Company: Project Name: Tesla Date: Internal Use Only:0045593706 Unit Report For RTU Project: Tesla 11/09/2021 Prepared By: 08:39AM Unit Parameters Dimensions(ft. in.)&Weight(lb.)""" Unit Model- 48GCDM04A2A6-6W0F0 Unit Length. 6'2.375" Unit Size. 04(3 Tons) Unit Width• 3'10.625" Volts-Phase-Hertz. 460-3-60 Unit Height. 2'9.375" Heating Type* Gas .., Total Operating Weight' 668 lb Duct Cfg. Vertical Supply/Vertical Return Low Heat "" Weights and Dimensions are approximate. Weight does Two Stage Cooling Models not include unit packaging. Approximate dimensions are provided primarily for shipping purposes.For exact dimensions and weights,refer to appropriate product data catalog. Lines and Filters Gas Line Size 1/2 Condensate Drain Line Size' 3/4 Return Air Filter Type. Throwaway Return Air Filter Quantity' 2 Return Air Filter Size. 16 x 25 x 2 Unit Configuration Direct Drive-EcoBlue-Medium Static Al/Cu-Al/Cu Electromechanical Controls w/W7220 Econo Controller Enthalpy Ultra Low Leak Econo w/Baro Relief Non-Fused Disconnect and Thru-The-Base Connections Standard Packaging Warranty Information 1-Year parts(std.) 5-Year compressor parts(std.) 10-Year heat exchanger-Aluminized(std.) No optional warranties were selected. NOTE: Please see Warranty Catalog 500-089 for explanation of policies and ordering methods. Ordering Information Part Number Description Quantity 48GCDM04A2A6-6W0F0 Rooftop Unit 1 Base Unit Direct Drive-EcoBlue-Medium Static Non-Fused Disconnect and Thru-The-Base Connections Ultra Low leak Enty Econo X with baro relief, W7220 control. Meets Calf.Title 24 FDD&Leak Rates Accessories 33CS2PP2S-03 Thermostat 1 CRRFCURB001A01 14-inch Tall Roof Curb 1 --HH-57AC-081 Enthalpy Control for W7220 Controller 1 Packaged Rooftop Builder 1.60 Page 1 of 8 • Certified Drawing for RTU Project: Tesla 11/09/2021 Prepared By: 08:39AM //zt r/ THIS DOCONENI IS THE PROPERTY O(UTC CLIA1TE,CONTROLS SUDNISSTOX OF THESE DRAWIXSS MA DOCUMENTS NOTES: \{.(i�1{ET S SECURITY AND IS DELI VEA(O VHS rut ESPRE 55 CONDIS ION S XO1 COXSiI iUIF PAR)P(1(gI1NAtE OR THAT THE CONTENTS WILL NOT at DISCLOSED OW USED ACCEPTANCE OF CORTRACT. 1. DIMENSIONS ARE IN INCHES. DIMENSIONS OMIr*+MNr..WITHOUT WRITTEN CEMENT. IN I ]ARE IN MILLIMETERS. UNIT 1 A 2. S CENTER OF GRAVITY 48GC NX04 33 3/8 18 5 CONNECTION SIZES (847] (A72]/8 184818 A 1 3/8' [351 DIA FIELD POWER SUPPLY HOLE 3,NO,.DIRECTION OF AIR FLOW 48GC4405 33 3/8 1/7/8 [847] [377] 8 2"[501 DIA POWER SUPPLY KNOCKOUT 4/ 3/8 18 5/8 18GCNN06 `• 32-1/8 ' ECONOMIZER HOOD ' C 1 3/4• [51]DIA GAUGE ACCESS PLUG 4. iD `� ALL VIEW DRAWN USING 3RD ANGLE [1051] [4721 [8171 (OPTIONAL) D 7/8'[221 DIA FIELD CONTROL WIRING NOTE 16 1407] E 3/4'-14 NPT CONDENSATE DRAIN �-25-5/8 (6521 F 1/2"-14 NPT GAS CONNECTION RETURN AIR i G 2 1/2 ' [641 DIA POWER SUPPLY KNOCK-OUT • /j. \ THRU-THE-BASE CHART /%jj oC THESE HOLES REQUIRED FOR USE II�/,/Z��111`1�,� �� 10-1/B RETURN RADD008A00,WIRE 00 :� „/ i \ E2„] 11��,�,1"�Iill; ////// AIR THREADED REO'D HOLE .I IIIIIII CONDUIT SIZE USE SIZES IMAY.1 \`11\\\`\ =_%J'�� f W 1/2' nsv 7/e Izz.n \\�\�� p-X % „2• 24V 7/8• 122.21 f 1121e \\ J t I 3/4' POWER 1-1/8' 128.61 E ALT. 29-1/2 ZU (009A00)I/1' FP7 GAS 1-I/8' [18.6] CONDENSATE 17-3/4 [7181 DRAIN OPENING (All] FOR'TNRU-THE-RASEPAN'FACTORY OPTION, I SUPPLY N FOR FOR ONLY X, Y. i Z ARE PROVIDED 11 IN BASEPAN AIR [6-5/8 SUPPLY 1 [6751 1008A001 PROVIDES 3/4'FPT TARO CURB 1369] 12-1/2 1 SEE TNRU THEN AIR FLANGE d FITTING. /-1/2 1318] I BASE CHART ...I . .6 • 11-112- 10-1/8- 3-1/4 6-1// [2931 12561 181] F (158] q t-1 f8 1101I 1307] 2%23-3/4 FLUE A (6031 HOOD 18-3/8—4-I 21 25 [166] All 2%4-5/8 [6351 TOP11181 E STD. 10-7/8 CONDENSATE 12751 1 ELECTRICAL DRAIN I25] DISCONNECT _ LOCATION - FILTER i OFAITORY rCONDENSER I A,B,6 FA[tORY CONTROL BO% _ I) INSTALLED ACCESS PANEL5-3//• 1 COILDISCONNECT 17-3/B [6531 OPTIONAL WI ® INDOOR BLOWER SUPPLE AIR I AIRN FACTORY U q} ACCESS PANEL INSTALLED I CONVENIENCE , Iiiir D TIl. • 11 I/O 111111111111111111111111 I,,I ' ld (302] I�.__ OUTLET _ — -- All �14149412 110. '�-.0 L�—J 153914 AIRSIDE y �_6-5/8 Ij11 y�rNNE/i I i 68] + l 1 ��I \_ 0°L Nr—�____ 3-3/4 I J HANDLE 5-3/4 6-3/8 7 5-3/4 [95] �^ 46-5/8 a-3/e HANDLE [1461 11611 [177] [116] 11186] 30-1/8 12141i 11/ 26-7/8 1766] (682) 31 LEFT IA-i/I1 [7861 BAROMETRIC All RETURN RELIEF FRONTSUPPLY AIR FLOW AIR RIGHT ITC CLASSIFICATION SHEET DATE SUPERCEOES 48GC 04-06 SINGLE PACKAGE ELECTRICAL REV U.S. ECCN:NSR 1 OF 3 09/07/18 08,03/18 COOLING WITH GAS NEAT 48TC003099 B Packaged Rooftop Builder 1.60 Page 2 of 8 Certified Drawing for RTU Project: Tesla 11/09/2021 Prepared By: 08:39AM 1x14 DDEDr 14 11 tram a Bic aga cDam....w a rN6sE DUNENBs DD D eN. 51D. UNIT CORNER CORNER CORNER CORNEA Ca m 8NAT'SNE CONTENTS t Lt1NCO BE DIALOSEDrONDU6EDDDtir� �s wr cwsmutE uu DurawKE BD UNIT WEIGHT D WEIGHT(Al WEIGHT(81 WEIGHT(C) WEIGHT IDI C.G. HEIGHT Cur,WDWD.rlixOUr MITTEN CONSENT. 4C«rTBNCE w cortNBci. LBS. K6. LBS. KG. LBS. KG. LBS. NG. LBS. KG. X T Z 48GC4104 513 233 131 59 127 58 125 51 130 59 36 1/2 19271 23 1/4 (591] 18 1/4(4641 486C4+05 555 252 142 64 131 62 135 61 141 64 36 1/2 19271 23 1/4[591] 18 14571 486C4406 600 272 161 73 151 68 140 64 149 68 36 19141 22 1/2 [5121 19 3/8 14921 •- STANDARD UNIT WEIGHT IS WITH LOW GAS HEAT AND WITHOUT PACKAGING. BACK FOR OTHER OPTINS AND ACCESSORIES REFER TO THE PRODUCT DATA CATALOG. WITH ECONOMIZER R12 1/2 f • • BACK [318] CORNER A WITHOUT ECONOMIZER HOOD CORNER B ECONOMIZER (OPTIONAL) OPTIONAL DOOR 0 SWING Cbir. ' ;I�lllllllll►11 _� : RIGHT • --- LEFT CORNER D 4 CORNER C X — TOP • 14-5/8 — FRONT • 118961 1 • - --'7 = i • NOTES: • 1 1. FOR ALL MINIMUM CLEARANCES LOCAL CODES OR JURISDICTIONS MAY PREVAIL. [ [ D, ` Z CLEARANCE li SERVICE VIRFk SERVICE W171+ OPERATNG —I SURFACE CONDUCTIVE BARRER NONCOBDUCTNE BARRER CLEARANCE (Js • L.( • • FRONT 48 [1219mm1 36 [914mm1 18 [451mm] •I`• 00 •r-1• 1.1..."...1 .MUM 0OM E LEFT 4B [1219mm] 42 [1067mm( 18 [457mm] BACK 48 [1219mm) 42 11067mm) 18 [457mm] FRONT BACK W/HOOD 36 [914mm) 36 [914mn] 18 [457mm) RIGHT 36 [914mm) 36 [914mm1 18 [457mm] 7. TOP 72 11829mm] 72 11829mm1 72 11829mm1 ITC CLASSIFICATION SHEET DATE SUPERCESES 48GC 04-06 SINGLE PACKAGE ELECTRICAL REV 48T0003099 COOLING WITH GAS HEAT U.S. ECCN:NSR 2 OF 3 09/07/18 08/03/18 B Packaged Rooftop Builder 1.60 Page 3 of 8 Certified Drawing for RTU Project: Tesla 11/09/2021 Prepared By: 08:39AM Ca�..Y4 TN56 DOCIY[XI 11 iXE F10FCYTT M 0TC CLINATE.CgN10C6 R01Y133E01 01 TR[s[0000016s 00 00C0YEIT6 .IRATCi1KTCOXICYT3 NSENT U1°0 D S0005C0 OIf6U000 1i0M 0tti Y01 CCEPTANCEC FACT TRACT 01 O AArwYw�YIiN001 YIIi1EY CONSENT ACCEPTANCE 0(C0ITRACT. 71-1/8 118051 (INSIDE THE BASE RAIL 8 SHIRT) \ M .... 1 es (1`L1IIi r;: .. F itll,, 41-1/4 \ '. 0 O.. It01ll (INSIDE THE BASE RAILS) III' .' 0 INSIDE BASERAIL DINENSIONS2X 1-7/e /�I 2X��ee`' 0 BOTTOM 4B1 •ie artcol F2x 1-3/8 2%1 382//,.._ C361 [25] DCAT]L C 1821 2X 3/4 TYP 4 PLCS 1181 3-7/8 I997 CONTROL BOX FILTER l T00LCESS LESS)ANEL C�ESS ACCESS PANEL • lACCOOR E SS PANEL R CONDENSER 4 PANEL COIL - _. . _ ! i { ii. rye. INDOOR COIL li IIE ACCESS PANEL • �l SEE DETAIL C IB] 3 Io 1 t "i 1 1 '1LJ' 1 od 1 I D'1 1 f 0 1 3,,L� . bl u'1 1 Co 3 BACK LEFT 1821 2-3/8 1621 TIP CURB 59-3/8 .-7-1/8.— WI DTN 115091 11811 FRONT ITC CLASSIFICATION SHEET DATE SUPERCEDES 48GC 04-06 SINGLE PACKAGE ELECTRICAL 48TC003099 REV U.S. ECCN:NSR 3 OF 3 09/07/18 08/03/18 COOLING WITH GAS HEAT B Packaged Rooftop Builder 1.60 Page 4 of 8 C • Certified Drawing for RTU Project: Tesla 11/09/2021 Prepared By: 08:39AM 8I 76 5 1 4 I 3 2 j 1 ROCFCLIR ACCES90RYk A NOTES COTRECTCFEKGACG GPSOS6 ECTIDN YPE GASFITTNG POY FITTING TTING C FITTING ' AGGESSCRYCONVENENCE 2.91SL4A1 DPN/ELS:25.4[l1TH(.POLYU7ETH EFO4N,445[13LL]MDENSRY. CR GURE0011001 114 3.DIMENSpNSN[)ARENMIWAETERS. 01311A ARRIAO1 1/RlTFEOURS 3/R'119]NPT 490260U818G4 Si_ SAT ACHDUCMpd(TOCUS(RPNG60FDUCf1E TONCUB). 34']19)NPT 1/2 112.7)NPT 172]12.7)NPf (16FECUFRXRA01 [610] 6� ONEA E' BI CFWPAR:03A01 1HLIIFESOTOM 12[12.7]NPT 7.T CI1ONOFARFLOW. 8WNEC CRPAC}CM CRSIT/PAROO1/01SFORT1fUll1EGU BGAST EE ' PPCKAGECRBTIE AmQVO1SFOR1-RalTREEOTICARTFEGVSGCNECIgN$. D 134, 144.51 `1.65.4P [2 ] 5A7 —.--A- 8' �— 1131412965)WIDE 11.9 [137.7] [MA] NSIMTEDDECKPANHS III II .A. 21.74. 221 89/16•[217.5]WIDE [ PLSULATfDOECKPMEL 1 N4j `• 114-13/16" '1 SEEJQfEl2 SECTION C 496• i G4SS VIGEE(ATE [427]INSIDE 70b7' SCNE0250 2 „ [128.0] [1800.2] I, OPJLLHOLE 0 I [61] �1ASSENECNF /� itEI ! 1 , CREWS . REQUIRED) 411011 20.4P �3.00' UNT 3. d [350.0) (FIBDSUIPLIm) 573/8' 033.5] CUCT TYP (4)SIDES I1711.3) N'N (F ELDSUPRm) 7/16' [71] FLASHING 3'-,3H6 — (FELDSLPPLED) �9N 61 T SEEVEIN'8• (RELDSUPPU®) CERT12 1M (19 (PEIDSUPFUED) 4�y. 111�6.9� 11 INGM6TEDRI ) ' 0 C'"" O _ (RFLDSUPPLED) 1Fta+•.T;ty u4»7"aa`6ra't37ED u+rvey.e..• sv.Aass,... yp� I _ EC MAID./ A. A- A- 48 041IE 2AATCNaIABER 1mB 1 \ INSULATION - 1041738 CLFEASYFCCF (FHDSUPPLED) 8EN33443 Awi(JCNi4G (004-0071 /j \\\ - 9E 1MAN ER OVERALLDIM S-739'WA55-77I6'18GA T S - � -- O 48T0 j A MATERNLWA16G4;NAILFIELDSUPPLEDWAS OY22913 AMG 1067898 BMW: - MC ON17/11 - - D SEEMS B WRIACURS SANCFREN MTiRRH LCCB iNIBINPLUEECAL11 PECIDRYYIG MBE MBE FEV REASCASECCFC CAE 9Y CNCO /PPD ECHO. - RICH - WA NW Packaged Rooftop Builder 1.60 Page 5 of 8 Performance Summary For RTU Project: Tesla 11/09/2021 Prepared By: 08:39AM Part Number:48GCDMO4A2A6-6W0FO ARI SEER:____ 16.10 Base Unit Dimensions Unit Length- 74.4 in Unit Width. 46.6 in Unit Height. 33.4 in Operating Weight Base Unit Weight. 513 lb Enthalpy Ultra Low Leak Econo w/Baro Relief: 35 lb Non-Fused Disconnect and Thru-The-Base Connections- 5 lb Accessories 14-inch Tall Roof Curb. 115 lb Total Operating Weight 668 lb Unit Unit Voltage-Phase-Hertz' 460-3-60 Air Discharge. Vertical Fan Drive Type. Direct Actual Airflow- 1200 CFM Site Altitude: 0 ft Cooling Performance Condenser Entering Air DB. 95.0 F Evaporator Entering Air DB. 80.0 F Evaporator Entering Air WB• 67.0 F Entering Air Enthalpy- 31.44 BTU/lb Evaporator Leaving Air DB• 60.3 F Evaporator Leaving Air WB• 57.8 F Evaporator Leaving Air Enthalpy- 24.93 BTU/lb Gross Cooling Capacity: 35.14 MBH Gross Sensible Capacity: 25.59 MBH Compressor Power Input 2.47 kW Coil Bypass Factor 0.123 Heating Performance Heating Airflow: 1200 CFM Entering Air Temp• 70.0 F Leaving Air Temp- 111.7 F Gas Heating Input Capacity. 50 0/67.0 MBH Gas Heating Output Capacity* 40.0/54.0 MBH Temperature Rise 41.7 F Thermal Efficiency(%)- 81.0 Supply Fan External Static Pressure- 0.50 in wg Options/Accessories Static Pressure Economizer 0.04 in wg Total Application Static(ESP+Unit Opts/Acc.). 0.54 in wg Fan RPM: 1627 Fan Power 0.31 BHP NOTE- Selected IFM RPM Range: 1129-2190 Electrical Data Voltage Range. 414-506 Compressor#1 RLA: _ ____ 5.7 Compressor#1 LRA: 38 Indoor Fan Motor Type: MED Packaged Rooftop Builder 1.60 Page 6 of 8 Performance Summary For RTU Project: Tesla 11/09/2021 Prepared By: 08:39AM Indoor Fan Motor FLA• 1.2 Combustion Fan Motor FLA(ea)• 0.25 Power Supply MCA. 10 Power Supply MOCP(Fuse or HACR) 15 Disconnect Size FLA- 9 Disconnect Size LRA• 42 Electrical Convenience Outlet- None Outdoor Fan [Qty/FLA(ea)]. 1 10.8 Control Panel SCCR: 5kA RMS at Rated Symmetrical Voltage Acoustics Sound Power Levels, db re 10E-12 Watts Discharge Inlet Outdoor 63 Hz 87.7 82.1 85.6 125 Hz 80.0 74.0 84.7 250 Hz 72.5 65.6 80.5 500 Hz 64.3 57.7 76.0 1000 Hz 61.4 59.5 72.4 2000 Hz 58.3 50.8 68.0 4000 Hz 54.7 44.7 62.8 8000 Hz 55.2 40.5 59.3 A-Weighted 70.2 64.6 79.0 Advanced Acoustics ttl Advanced Accoustics Parameters 1. Unit height above ground- 30.0 ft 2. Horizontal distance from unit to receiver 50.0 ft 3. Receiver height above ground- 5.7 ft 4. Height of obstruction 0.0 ft 5. Horizontal distance from obstruction to receiver 0.0 ft 6. Horizontal distance from unit to obstruction. 0.0 ft Detailed Acoustics Information Octave Band Center Freq.Hz 63 125 250 500 1k 2k 4k 8k Overall A 85.6 84.7 80.5 76.0 72.4 68.0 62.8 59.3 89.2 Lw B 59.4 68.6 71.9 72.8 72.4 69.2 63.8 58.2 78.5 LwA C 53.2 52.3 48.1 43.6 40.0 35.6 30.4 26.9 56.8 Lp D 27.0 36.2 39.5 40.4 40.0 36.8 31.4 25.8 46.1 LpA Packaged Rooftop Builder 1.60 Page 7 of 8 Performance Summary For RTU Project: Tesla 11/09/2021 Prepared By: 08:39AM Legend A Sound Power Levels at Unit's Acoustic Center, Lw B A-Weighted Sound Power Levels at Unit's Acoustic Center, LwA C Sound Pressure Levels at Specific Distance from Unit, Lp D A-Weighted Sound Pressure Levels at Specific Distance from Unit, LpA Calculation methods used in this program are patterned after the ASHRAE Guide;other ASHRAE Publications and the AHRI Acoustical Standards. While a very significant effort has been made to insure the technical accuracy of this program, it is assumed that the user is knowledgeable in the art of system sound estimation and is aware of the tolerances involved in real world acoustical estimation. This program makes certain assumptions as to the dominant sound sources and sound paths which may not always be appropriate to the real system being estimated. Because of this, no assurances can be offered that this software will always generate an accurate sound prediction from user supplied input data. If in doubt about the estimation of expected sound levels in a space, an Acoustical Engineer or a person with sound prediction expertise should be consulted. Fan Curve 2D 18 \ \ _ 17UlRPM 16 \ \ 1SOBHP1 14 16O0RPM12 \ \ a) \ (n 10 30CRPM U 0 11OOFPM \ 900FFM 1. BHP 04 02 m I I 0) 02 04 a6 03 1D 12 14 16 16 20 Airflow(CFM-thousands) RPM=1627BHP=0.31 MaximumRPM=2490MaximumBHP=5.00 SC-SystemCurve RP-RatedPoint Packaged Rooftop Builder 1.60 Page 8 of 8