Loading...
Permit (7) CITY OF TIGARD it#: BUP2022-00008 BUILDING PERMIT : i a Perm COMMUNITY DEVELOPMENT TIGARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 2/10l2022 Parcel: 1 S126CC00200 Jurisdiction: Tigard Site address: 10065 SW CASCADE AVE Project: Tesla Subdivision: None Lot: None Project Description: TI for new tenant: New offices,breakroom,showroom,and lounges. Contractor: WESTERN CONSTRUCTION SERVICES INC Owner: 10065 SWC LLC 2300 E 3RD LOOP SUITE 110 BY ALSTON &BIRD LLP VANCOUVER, WA 98661 BANK OF AMERICA PLAZA 101 SOUTH TRYON ST STE 4000 CHARLOTTE, NC 28280 PHONE: 360-699-5317 PHONE: FAX: 360-694-7818 Specifics: FEES Description Date Amount Type of Use: COM Class of Work: ALT Type of Const: IIB Permit Fee-Additions,Alterations, 02/10/2022 $6,066.95 Occupancy Grp: B Occupancy Load: 156 Demolition 12%State Surcharge-Building 02/10/2022 $728.03 Dwelling Units: 0 Plan Review 01/19/2022 $3,943.52 Stories: 0 Height: 0 ft DC Provision Review,COM TI-Ping 02/10/2022 $434.00 Bedrooms: 0 Bathrooms: 0 Plan Review-Fire Life Safety 02/10/2022 $2,426.78 Value: $1,000,000 Info Process/Archiving-Lg$2.00(over 02/10/2022 $112.00 11x17) Metro CET 02/10/2022 $1,200.00 Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $14,911.28 Required: Required Items and Reports(Conditions) Fire Sprinkler: Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR" 952-001-0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503 232.1987 or 1.800.332 2344. Issued By: �� Q 1 (I 1 � Permittee Signature: ac)c) c �"L/ �I�JC�Call 503.639.4175 by 7:00 a.m.for the next available inspection date. } 1 tJ This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. a • Building Permit Application / - - Commercial RECEIVE • FoaorricE LSL ONLY Received Permit No.: City of Tigard Date/By: ,/ 'j '- 1 '-- e,?);ka 'jr lige 13125 SW Hall Blvd.,Tigard,OR 97223 DEC 1 5 2021 Plan Review _ g '1 ] Phone: 503-718-2439 Fax: 503-598-1960 Date/By _ -y: 3 Related Permit: Inspection Line: 503-639-4175 /'��/ TI.�� Hate Ready!1?y, rer,s- ® See Page 2 for 1IGAK • Internet: www.ligard-or CITY t OI• N LR1r,1m Supplemental Information Buous DN TYPE OF WORK REQUIRED DATA:I-AND 2-FAMILY DW E1.LING ❑ New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all ®Addition/alteration/replacement 0 Other: equipment,materials,labor,overhead,and the profit for the CA"I'I'CORY OF CONSTRUCTION' work indicated on this application. Valuation: $ El I-and 2-family dwelling ®Commercial/industrial Number of bedrooms: ❑Accessory building El Multi-family 0 Master builder 0 Other: Number of bathrooms: JOB SITE INFORMA'J1ON AND LOCATION Total number of floors: Job site address: 10065 SW Cascade Ave. New dwelling area: square feet City/State/ZIP: Tigard, OR 97223 Garage/carport area: square feet • Suite/bldg./apt.#: Project name: Tesla Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST- Subdivision: Lot#: Permit fees*are based on the value of the work performed. 1 S 1 26CC 002200 Indicate the value(rounded to the nearest dollar)of all Tax map/parcel#: equipment,materials,labor,overhead,and the profit for the •N,,,, DESCRIPI ION OF WORK work indicated on this application, interior renovation of the previous Toys R Us Building. Valuation: $ 1,000,000 Installation of Tesla service equipment and building out of Existing building area: 43,125 square feet offices, breakroom and Showroom, sales and customer lounge New building area: N/A square feet �tN' ❑ PROPERTY OWNER X TENANT Number of stories:Existing single story buildiig Name: Tesla Type of construction: IIB ibh\\\, Address: 901 Page Ave Occupancy groups: VI City/State/ZIP: Fremont, CA 94538 Existing: M Phone:( ) Fax:( ) New: B & S-1 ❑ APPLICANT ❑x .CONTACT PERSON BUILDING PERMIT EELS* (Please refer to fee ached e Business name: ArcVision, Inc Structural deposit .de review fee(or plan Contact name: Joanie Godsey P Ji 3 5 _ FLS plan review fee(if applicable): Address:1950 Craig Road, Suite 300 Total fees due upon application: City/State/ZIP:St. Louis, MO 63146 - Amount received: Phone:(336 )830-1111 Fax::( ) ter, jgodsey@arcv.COm E-mail' P1lOTOVOLTAICSOLARPANELSYSTEMEEES* Commercial and residential prescriptive installation of CONTRACTOR. roof-top mounted PhotoVoltaic Solar Panel System. Business name. TBO Y V m I UwtV a1 se I V I(-1' \Y- . Submit two(2)sets of roof plan with connection details ��^' E I` C and fire department access,along with the 2010 Oregon Address: �-,..-r-IlImo' `Rra urn a..):,-ve 110 Solar Installation Specialty Code checklist. City/State/ZIP. V rKOLtirel f' V 6�� ` Permit fee(includes plan review $180.00 Y a R t D and administrative fees): Phone:(3 rO Gi -S•St'9. Fax:( ) State surcharge(12%ofpermit fee): $21.60 CCB Lie.: tp3-7 1---i Total fee due upon application: $201.60 Digitally agned by Jeanie Godsey Joanie Dry cn=JeanbG daeY.o This permit application expires if a permit Is not obtained Authorized signature: 7,J,?„lon. �nfIRP�l �e�Jgodaer�a<�4 nsn, within 180 days after it has been accepted as complete. Print name:ARCVISION:JOANIEGODSEY Date: 11/23/21 * Fee methodology set byTri-County Building Industry Service Board. 1:1Building\Permits\BUP_COM_PermitApp.doc Rev.04/21/2014 440-4613T(11/02/COM/WEB) • • City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT Accessibility: Barrier Removal Improvement Plan Commercial & Multi-Family - Additions or Alterations TIGARD 13125 SW Hall Blvd. • Tigard, Oregon 97223 • 503.718.2439 • www.tigard-or.gov REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation,alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five percent(25%). VALUATION: Total of all renovation,alteration or modification being done, 1,000,000 excluding painting and wallpapering: [I] $LL is completing work to bring builanng up to ADA ° compliance -part of Value is MULTIPLIER(25%barrier removal requirement): x incwdPd itr'valuation. TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section,priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ 0 (BY LL) (b) An accessible entrance: $ 5000 (c) An accessible route to the altered area: $ 125000 (d) At least one accessible restroom for each sex or a single unisex restroom: $ 50000 (e) Accessible telephones: $ 0 (f) Accessible drinking fountains:and, $ 10,000 (g) When possible,additional accessible elements such as storage and alarms: $ OTHER:(BREAKROOM/LOCKERS/EMPLOYEE OFFICE 60,000 TOTAL(shall equal line [2] of Valuation Computation): $ I:\Building\Permits\BUP_COM_PcrmitApp.doc Rev.03/05/2019 City of Tigard • COMMUNITY DEVELOPMENT DEPARTMENT 0 T GAR- 1> Building Permit Review — Commercial - No Land Use Building Permit #: etii9oh9..--6 ,ir,K Site Address: 10065 SW Cascade Ave Suite/Bldg#: Project Name: Tesla (Name of commercial business occupying the space. If vacant,enter Spec Space.) Planning Review Proposal: TE Existing Business Activity: Retail Sales Proposed Business Activity: Motor Vehicle Sales and Rental ® Verify site address/suite# exists and active in permit system. ® River Terrace Neighborhood: ❑ Yes $7 No ® Zoning MUC ® Permitted Use: ® Yes 0 No 0 Spec Space E] Confilnr no land use required. ® Business License: Exists: ❑ Yes li] No,applicant was provided a business license application Notes: Lower parking requirement than previous use- land use not required. Approved by Planning: ATM Ofitit4062f Date: 1/13/2022 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved 0 Not Approved Revision 2: 0 Approved 0 Not Approved Revision 3: ❑ Approved 0 Not Approved Building Permit Submittal Original Submittal Date: /DO7/ai Site Plans: # Building Plans: Building Permit#: LYE nter building permit#above. Workflow Routing: ic,1/15f nning rnvt Coordinator ig Workflow Sign-off Jrff for Planning(include notes from planning review) Route Application Documents: 56--fuilding: original permit application,site plans,building plans, engineer and beam calculations and trust details,if applicable,etc. Notes: By Permit Technician: r Date: 03/1,a I:1Buil ding\Forms\BldgPermitRvw_COM_NoLandUse_111819.docx Engineering Review Dr Slope at building pad: E"PFI Permit#: Conditions "Met"prior to issuance of building permit h/a 1E'Easements (encroachments)per engineering conditions of approval and plat(not typical on SDR/CUP) d Water Quality/Quantity Facility: N/a- Assess Water Quality Fee in-lieu: 0 Yes CY No Assess Water Quantity Fee in-lieu: 0 Yes © No I.Tf)A Facility on lot ❑ Yes 2'No Add Fee: 0 Yes 0 No ❑ NOT Approved by Engineering: Date Notes: Approved by Engineering: T�-l�y2 j1 Date: 1/24/ZII2-Z Revisions (after Building Submittal only) Reviewer Date Revision 1: 0 Approved 0 Not Approved Revision 2: 0 Approved 0 Not Approved Revision 3: 0 Approved 0 Not Approved UMW Permit Coordinator Review Conditions "Met"prior to issuance of building permit ❑ Approved,NOT Released: Date: Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: SDC Fees Entered: Wash Co Trans Dev Tax: 0 Yes �N/A �Ye iyous Ubc 15 Tigard Trans SDC: ❑ Yes )2/N/A Parks SDC: ❑ Yes A N/A LIDA Fee: 0 Yes 4 N/A f�J OK to Issue Permit Approved by Permit Coordinator: Date: 2 ( I�22 I:1Building\Forms\BidgPermitRvw_COM_WithLandU se_111819.docx Branden Taggart From: #Building Permit Technicians Sent: Tuesday, December 14, 2021 10:30 AM To: jgodsey@arcv.com Cc: #Building Permit Technicians; Nikki Tuason; Sean Vermilya;Agnes Lindor Subject: RE:Tesla Service Center- 10065 SW Cascade Attachments: Application.pdf Hi Joanie, We received the Tesla Building permit submittal in the mail today. However,we are missing a valuation and description of work on the Building Permit Application. Please include this information on the attached application and return it to us by email. Once received, I will route this submittal to our Planning Department for review. Also,would you like to receive your original Building permit submittal back? If so, I can place it in our open Permit Center conference room to be picked up at your convenience. Thank you, Branden Taggart City of Tigard s ., Senior Permit Technician Community Development C r4#tt) 13125 SW Hall Blvd Tigard,OR 97223 (5031718-2449 brandent@tigard-or.gov From:Agnes Lindor<agnesl@tigard-or.gov> Sent:Tuesday, November 30, 2021 1:26 PM To:jgodsey@arcv.com Cc:#Building Permit Technicians<TigardBuildingPermits@tigard-or.gov>; Nikki Tuason <nikkit@tigard-or.gov>; Sean Vermilya<sean.vermilya@tigard-or.gov> Subject:Tesla Service Center- 10065 SW Cascade Hi Joanie- This permit cannot be approved by planning as a stand-alone service center because is not allowed in this zone. I understand that Tesla will be constructing another building at the corner for sales. However, until that is approved and built a stand-alone service center cannot be approved. We had previously told the applicant team for the land use application that they need to show the sales area within the existing building until the other building is constructed if they want to occupy the existing building now. I can place the permit package and plans in the conference room located in the lobby for you to pick up if you'd like, please let me know. Thanks, Agnes Lindor I Associate Planner City of Tigard I Community Development 1 4315 SW Hall Boulevard Tigard, Oregon 97223 Phone: 503.718.2429 Email:AgnesL@tgard-or.gov DISCLAIMER: E-mails sent or received by City of Tigard employees are subject to public record laws. If requested, e-mail may be disclosed to another party unless exempt from disclosure under Oregon Public Records Law. E-mails are retained by the City of Tigard in compliance with the Oregon Administrative Rules"City General Records Retention Schedule." 2 Agnes Lindor From: Agnes Lindor Sent: Tuesday, November 30, 2021 1:26 PM To: jgodsey@arcv.com Cc: #Building Permit Technicians; Nikki Tuason; Sean Vermilya Subject: Tesla Service Center- 10065 SW Cascade Hi Joanie- This permit cannot be approved by planning as a stand-alone service center because is not allowed in this zone. I understand that Tesla will be constructing another building at the corner for sales. However, until that is approved and built a stand-alone service center cannot be approved. We had previously told the applicant team for the land use application that they need to show the sales area within the existing building until the other building is constructed if they want to occupy the existing building now. I can place the permit package and plans in the conference room located in the lobby for you to pick up if you'd like, please let me know. Thanks, Agnes Lindor I Associate Planner City of Tigard I Community Development 13125 SW Hall Boulevard Tigard,Oregon 97223 Phone: 503.718.2429 Email: AgnesL( tigard-or.gov 1