Loading...
FPS2023-00051 CITY OF TIGARD FIRE PROTECTION SYSTEM PERMIT IN COMMUNITY DEVELOPMENT Permit#: FPS2023-00051 T I C;A R.i7 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 5/1/2023 Parcel: 1S136CD02200 Jurisdiction: Tigard Site address: 7850 SW DARTMOUTH ST Project: Costco Subdivision: PALMER ACRES Lot: 3 Project Description: Fire alarm.Adding(3)fire alarm devices to locker room remodel and mezzanine addition. Contractor: GB MANCHESTER INC Owner: COSTCO WHOLESALE CORPORATION 6000 NE 88TH ST PROPERTY TAX DEPT 111 VANCOUVER,WA 98665 999 LAKE DR ISSAQUAH,WA 98027 PHONE: 360-816-0484 PHONE: FAX: 360-816-0482 FEES Description Date Amount Specifics: Permit Fee-COM 05/01/2023 $220.56 12%State Surcharge-Building 05/01/2023 $26.47 Type of Use: COM Plan Review-Fire Life Safety-COM 05/01/2023 $88.22 Class of Work: ALT Type of Const: Info Process/Archiving-Lg$2.00(over 05/01/2023 $2.00 Occupancy Grp: Height: ft 11x17) Stories: Commercial Sprinkler System: Sprinkler Required: Sprinkler Type: Standpipe Required: Hazard: Density: 0 Design Area: 0 K Factor: 0 Commercial Fire Alarm System: Fire Alarm Required: Alarm Type: Pull Station Required: Smoke Detectors Req: Battery Calcs Provided: Yes Cut Sheets Required: Yes Total $337.25 Valuations: Required Items and Reports(Conditions) Sprinkler Valuation: $0.00 Residential Square Footage: 0 Fire Alarm Valuation: $13,991.00 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Cente hose rules are s in OAR 952-001-0010 through OAR 952-001-0090. You may obtain py of the rules Issued By: A -d Permittee Signature: • Call 503.639.4175 by 7:00 a.m.for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. Buitdii i Permit Application Fire Protection System FOR OFFICE USE ONLY City of Tigard ECEIE,;, Received Date/B : / _ ` CV 1111 » 13125 SW Hall Blvd.,Tigard,OR 97 A Plan Review / I i L Phone: 503.718.2439 Fax: 503.598.1960 Date/B : i'IG��� "4. . Inspection Line: 503.639.4175 27/ 2023 Date Ready/By: kris: M See Page 2 for 1 1 t�A it APR Internet: www.tigard-or.gov Notified/Method: Supplemental Information OF TIGARD TYPE OF �� • DING DiViSION REQUIRED DATA:1-AND 2-FAMILY DWELLING ❑New construction ❑Demolition Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Addition/alteration/replacement ❑Other: equipment,materials,labor,overhead,and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. El1-and 2-family dwelling PA Commercial/industrial Valuation: $ ElAccessory building El Multi-familyNumber of bedrooms: ❑Master builder ❑Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 7850 SW DARTMOUTH ST New dwelling area: square feet City/State/ZIP: TIGARD OR 97223 Garage/carport area: square feet Suite/bldg./apt.no.: N/A Project name: COSTCO LOCKER RM/MEZZ ADDITION Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet REQUIRED DATA:COMMERCIAL-USE CHECKLIST Subdivision: Lot no.: Permit fees*are based on the value of the work performed. Indicate the value(rounded to the nearest dollar)of all Tax map/parcel no.: equipment,materials,labor,overhead,and the profit for the DESCRIPTION OF WORK work indicated on this application. ADD FIRE ALARM DEVICES TO LOCKER RM REMODEL AND MEZZ ADDITION Valuation: $ 13,991.00 Existing building area: square feet New building area: square feet ❑ PROPERTY OWNER ❑ TENANT Number of stories: Name: Type of construction: Address: Occupancy groups: City/State/ZIP: Existing: Phone:( ) Fax:( ) New: 151 APPLICANT uj CONTACT PERSON NOTICE Business name: GB MANCHESTER I N C All contractors and subcontractors are required to be Contact name: NATHAN BUTZ licensed with the Oregon Construction Contractors Board under ORS 701 and may be required to be licensed in the Address: 6000 NE 88TH ST. SUITE B103 jurisdiction in which work is being performed.If the City/State/ZIP: VANCOUVER WA. 98665 applicant is exempt from licensing,the following reasons apply: Phone:(360 ) 816-0484 Fax::(360 ) 816-0482 E-mail: NATHAN.B@GBMANCHESTER.COM CONTRACTOR BUILDING PERMIT FEES* (Please refer to fee schedule) Business name: GB MANCHESTER INC Permit fee: Address: 6000 NE 88TH ST. SUITE 8103 State surcharge(12%of permit fee): City/State/ZIP: VANCOUVER WA, 98665 FLS plan review(40%of permit fee): Phone:(360 )816-0484 Fax:( 360) 816-0482 (Due upon application submittal.) CCB lic.: 202097 Total permit fees: Amount received: Authorized signature: Nathan Butz M« == This permit application expires if a permit is not obtained Print name: NATHAN BUTZ Date: 04/25i2023 * within 180 days after it has been accepted as complete. Fee methodology set by Tri-County Building Industry Service Board. I:\Building\PermitsiFPS-PermitApp_031016.doc 440-4613T(11/02/COM/WEB) City of Tigard: Fire Protection Permit Checklist Page 2-Supplemental Information Describe work to be done: 1.) Type of Work: 2.) Addition/alteration only to sprinkler heads: 3.) Addition/alteration only to alarm devices: El New system Number of sprinkler heads: Number of alarm devices: �' ElAddition or El 1-10 heads: Affidavit required and ® 1-5 devices: Affidavit required and Alteration (3) copies of sketch showing area (3) copies of sketch showing area to existing of work within building structure of work within building structure system ❑ 11+heads: Plan review required and ❑ 6+ devices: Plan review required and (3) sets of plans. (3) sets of plans. Additional description of work: Type of System (Complete A,B, C or D as applicable): A.) Commercial Sprinkler Sprinkler Type El Wet El Dry Additional Standpipes Information: Sprinkler Supply Line ❑ Yes ❑ No Hazard Group Density Design Area K.Factor Sprinkler Project Valuation: $ B.) Type I - Hood Fire Suppression System Hood Project Valuation: $ C.) Fire Alarm Submittal shall Battery Calculations ® Yes include: Individual Component ® Yes Cut Sheets Fire Alarm Project Valuation: $ 13,991 00 D.) Residential Sprinkler (Stand Alone System) Square Footage: Permit Fee: 0 to 2,000 $198.75 2,001 to 3,600 $246.45 3,601 to 7,200 $310.05 7,201 and greater $404.39 Sprinkler Project Square Footage: sq.ft. Fire Protection Permit Fees Project valuation subtotal (see A,B&C above): $ Permit fee based on project valuation (see fee schedule): $ Permit fee based on square footage (see D above): $ State Surcharge (12%of permit fee): $ FLS Plan Review(40%of permit fee): $ TOTAL: $ I:\Building\Permits\FPS_PertnitApp_031016.doc 2 City of Tigard 11 Permit No.: F-Pc (ii3-005713125 SW Ha11 B1vd.,Tigard,OR 9 2L� �� = Phone: 503.718.2439 Fax: 503.598.1960 Date Received: j Inspection Line: 503.639.4175 Ai 2 7 2023 T IC,A R D Internet: www.tigard-or.gov By: CITY OF TIGARD FIRE ALARM ViLk-§TE ktARIDAVIT FOR ALTERATIONS OR TENANT IMPROVEMENTS (MAXIMUM OF 5 DEVICES WITHOUT PLANS) Project Name: COSTCO LOCKER RM/ MEZZ ADDITION Occupancy: A Job Address: 7850 SW DARTMOUTH ST, TIGARD, OR 97223 Suite: N/A Contractor: GB MANCHESTER INC Phone: 360-772-2244 Valuation of work: $13,991.00 Type of System: (check one) ❑■Required ❑Non-required (check one) ❑Automatic [Manual ['Both Total number of devices added or moved under this permit process is 5 total per tenant space. Number of Proposed Smoke/Heat Detectors: To be Added( 5) 0 /To be Relocated(.5) 0 Number of Proposed Manual Alarm Stations: To be Added(max 5) 0 /To be Relocated(max 5) 0 Number of Proposed Notification Appliances: To be Added( 5) 3 /To be Relocated(max 5) 0 I, NATHAN BUTZ Oregon Construction Contractors Board No. 202097 certify the following is true and defines the scope of work for this project: a) All work complies with the current state-adopted NFPA-72 and the authority having jurisdiction. b) All notification appliances are located in accordance with the current state-adopted NFPA-72. c) Smoke/Heat detector spacing complies with current state-adopted NFPA-72 and the authority having jurisdiction. d) Exposed wiring will not be covered until inspected. e) Final approval shall be subject to on-site tests and inspections. f) Voltage drop is adequate to operate all appliances. g) Battery supplies are capable of supporting the system modifications. h) Compatibility of appliances and devices are in accordance with the FACP manufacturer's specifications. In addition, I understand the following is required: • Submit(3) copies of a sketch showing the area of work within the building's structure. • Building fire protection system permit. • Electrical permit. • A copy of this document with a copy of the sketch attached shall be available for all inspections. ON �S,E-�som.0-GB MridieaM Yic,W.CO^Wmy, Signature: Nathan Butz Dula 20,,.Buts w2,M,,,�,00 Date: 4/25/2023 Print Name: NATHAN BUTZ I:\Building\Forms\FireAlarmAfidavit 071514.docx Page 1 of 1