HomeMy WebLinkAboutKnife River Corporation NW ~ 32500008
CITY OF TIGARD - CONTRACT SUMMARY & ROUTING FORM
Contract Overview
Contract/Amendment Number: 32500008a3
Contract Start Date: 7/24/2024 Contract End Date: 07/31/2025
Contract Title: PMP Pavement Rehabilitation
Contractor Name: Knife River Corporation NW
Contract Manager: Nichole George
Department: PW-ENG
Contract Costs
Original Contract Amount: $2,067,591.91
Total All Previous Amendments: $113,500.00
Total of this Amendment: $11,911.00
Total Contract Amount: $2,193,002.91
Procurement Authority
Contract Type: Public Improvement
Procurement Type: PCR 10.075 Contract Amendments
Solicitation Number: 2024-24
LCRB Date: 07/23/2024
Account String: Fund-Division-Account Work Order – Activity Type Amount
FY 25 4128000-56005 95001-EXTERNAL-CONS $11,911.00
Contracts & Purchasing Approval
Purchasing Signature:
Comments: Extend scope and fee.
DocuSign Routing
Route for Signature Name Email Address
Contractor Austin Cooksey Austin.cooksey@kniferiver.com
City of Tigard Brian Rager brianr@tigard-or.gov
Final Distribution
Contractor Austin Cooksey Austin.cooksey@kniferiver.com
Project Manager Nichole George nicholeg@tigard-or.gov
CIP Manager Laura Barrie laurab@tigard-or.gov
CIP Admin Shauna Large shauna@tigard-or.gov
Buyer Rosie McGown rosie.mcgown@tigard-or.gov
CITY OF TIGARD, OREGON
AMENDMENT TO CONTRACT NUMBER 32500008
FOR
PMP PAVEMENT REHABILITATION
AMENDMENT #3
The Agreement between the City of Tigard, a municipal corporation of the State of Oregon, hereinafter called
City, and Knife River Corporation NW, hereinafter referred to as Contractor, is hereby amended as follows:
1. COMPENSATION
Section 3 of the Agreement is amended to increase the total potential compensation payable under the
Agreement by Eleven Thousand Nine Hundred Eleven and No/100 Dollars ($11,911.00), to a new total
of Two Million One Hundred Ninety-Three Thousand Two and 91/100 Dollars ($2,193,002.91). Total
payments to Contractor for services under this Agreement, including but not limited to Services added by
this amendment number 2, shall not exceed that new total without further amendment of the Agreement.
2. SERVICES TO BE PROVIDED
Additional services to be included per the change order 4.
Except as expressly provided in this contract amendment, all other terms remain unchanged.
IN WITNESS WHEREOF, City has caused this Amendment to be executed by its duly authorized
undersigned officer and Contractor has executed this Amendment upon signature and date listed below.
CITY OF TIGARD KNIFE RIVER CORPORATION NW
Signature Signature
Printed Name Printed Name
Date Date
Docusign Envelope ID: 33AB0667-A132-4AAA-AF35-27CCC3E9FAF0
Austin Cooksey
6/30/2025
Brian D. Rager
6/30/2025
Change Order Request #4 - Durham Bridge, Loops, and Tubular Delineators
CCB #2101 QUOTATION
Project Name:Tigard PM 2024 From:Doug Karmowski
Location:Tigard, OR Quotation Date:6/16/2025
Owner:City of Tigard Customer:City of Tigard
Address:Contact/Cell:
ITEM #DESCRIPTION QUANTITY UNIT UNIT PRICE Allowable Markup TOTAL
1 Durham Revised Limits (Loops, Bridge, Delinators)1.00 LS 11,911.00$ 11,911.00$
BID TOTAL 11,911.00$
Knife River Corporation - Northwest 32260 Old Highway 34, Tangent, OR 97389 Phone (541) 918-5100
Docusign Envelope ID: 33AB0667-A132-4AAA-AF35-27CCC3E9FAF0
SDSDSD SD SD SD SD
WW W W W W W WWWXXXFO
FOGGTV
P
SS
FO FO
SD
SD
11+00 12+00 13+00 14+00
SS SS
SSSD SD
SD
SD
SD
SD SD SD SD SD SD SD
SD
SD WW W W W
W W W
WWSD
SS
SS
SS
SS
SS
SS
UGC UGC
W
FO XG G
GG
G G G
PCAB
P
P
P
PCOSSOHPOHPOHP
OHP
OHP OHPFWSDSD
SD
15+00 16+00 17+00 18+00
19+00
20+0
0 SW DURHAM ROAD PLANBEGIN TO STA 20+00C7
7 OFNO.REVISIONBYDATEDRAWN BY:REV:DRAWING NO:DATE:DESIGNED BY:PROJECT NO:06/2024TB/CKTB52 TIG24PMPWMWONE INCHONE INCH AT FULL SCALE.IF NOT ONE INCH ADJUSTSCALE ACCORDINGLY01"CITY OF TIGARD2024 PAVEMENTREHABILITATION PROJECT0
SCALE IN FEET
20 40
SW CAROL ANN CTSW DURHAM RD
SW 79TH AVE1.PLACE INLET SEDIMENT FILTERS OVER ALL CATCH
BASINS IN PROJECT LIMITS. SEE DETAIL, SHEET D12.
2.PLACE INLET SEDIMENT FILTERS OVER ALL DOWNSTREAM
CATCH BASINS TO CONTROL SEDIMENT LEAVING SITE.
SEE DETAIL, SHEET D12.
3.INSTALL BIO-FILTER BAG CHECK DAMS ON ALL ROADSIDE
DITCHES. INSTALL A MINIMUM OF 1 CHECK DAM PRIOR TO
INLET PIPES/STRUCTURES AND AFTER OUTLET
PIPES/STRUCTURES. SEE DETAIL, SHEET D12.
EROSION CONTROL NOTES:
PAVEMENT TREATMENT LEGEND
PAVEMENT REHABILITATION. SEE
TYPICAL SECTIONS SHEETS C5-C6.
FOG SEAL
IMPROVEMENT NOTES
ADJUST EXISTING RIM, COVER OR FRAME TO FINISH
GRADE.
1
INSTALL BI-DIRECTIONAL, BLUE, TYPE 1AR REFLECTIVE
MARKER PERPENDICULAR TO EXISTING HYDRANT.
COORDINATE TRANSVERSE LOCATION WITH ENGINEER.
2
CONSTRUCT CEMENT CONCRETE CURB RAMP. SEE
SHEETS C17-C36 FOR RAMP SPECIFIC INFORMATION.
COORDINATE WITH ENGINEER PRIOR TO
FORMING/POURING CONCRETE.
3
INSTALL "CROSSWALK CLOSED" SIGN PER ODOT
STANDARD DRAWING TM240, SHEET D5. COORDINATE
SIGN PLACEMENT WITH ENGINEER.
4
PROTECT (P) OR REPLACE (R) MONUMENT BOX PER
CITY OF TIGARD STANDARD DRAWING 170, SHEET D2.
MONUMENT PIN TO BE SET BY OTHERS.
5MATCHLINE ~ SEE BELOW FOR CONTINUATIONMATCHLINE ~ SEE SHEET C8FOR CONTINUATIONMATCHLINE ~ SEE ABOVE FOR CONTINUATION8099 8062 8058 8044 8036 8028 8012 8000 7974
8176
795279627966
7882 7864
SW DURHAM RD
8100 8040
8040 7800
7844 7826 7798 7794
4
4
4 4
2
1
3 3
SEE DETAILS FOR STORMWATER
IMPROVEMENTS, SHEET D10
1
1
1
PROTECT EXISTING TRAFFIC
INDUCTIVE DETECTOR LOOPS
1
3
3
3
3
5P
SEE SHEET C9 FOR
STRIPING IMPROVEMENTS
2
5P 5P
1REVISION NO. 1WMW5/14/25HIGH PRESSURE GAS LINE NOTE:
IF POTENTIAL SUBGRADE FAILURES ARE OBSERVED NEAR NW
NATURAL FACILITIES, THE CONTRACTOR SHALL COORDINATE
WITH NW NATURAL TO DETERMINE DEPTHS OF EXISTING
UTILITIES. NO EXCAVATION SHALL TAKE PLACE ADJACENT TO
THE GAS LINES BELOW THE PAVED SECTION WITHOUT DIRECT
OVERSIGHT FROM NW NATURAL.
1
Docusign Envelope ID: 33AB0667-A132-4AAA-AF35-27CCC3E9FAF0
SD
SD
SD SD SD SD SD SD SD SDSDSD
SD
SDSD
WWWW W W W W W W WWWWWSS
FO FO FO
UGP
X
X
X X
OHP OHP
SD
20+00
21+00 22+00 23+00 24+00 25+00
SS
SD SD SD SD
SDSDSD
SD
W W W W W W W
26+00 27+00 28+00 SW DURHAM ROAD PLANSTA 20+00 TO 28+70C8
8 OFNO.REVISIONBYDATEDRAWN BY:REV:DRAWING NO:DATE:DESIGNED BY:PROJECT NO:06/2024TB/CKTB52 TIG24PMPWMWONE INCHONE INCH AT FULL SCALE.IF NOT ONE INCH ADJUSTSCALE ACCORDINGLY01"CITY OF TIGARD2024 PAVEMENTREHABILITATION PROJECT0
SCALE IN FEET
20 40
SW DURHAM RD
SW DURHAM RD
1.PLACE INLET SEDIMENT FILTERS OVER ALL CATCH
BASINS IN PROJECT LIMITS. SEE DETAIL, SHEET D12.
2.PLACE INLET SEDIMENT FILTERS OVER ALL DOWNSTREAM
CATCH BASINS TO CONTROL SEDIMENT LEAVING SITE.
SEE DETAIL, SHEET D12.
3.INSTALL BIO-FILTER BAG CHECK DAMS ON ALL ROADSIDE
DITCHES. INSTALL A MINIMUM OF 1 CHECK DAM PRIOR TO
INLET PIPES/STRUCTURES AND AFTER OUTLET
PIPES/STRUCTURES. SEE DETAIL, SHEET D12.
EROSION CONTROL NOTES:
PAVEMENT TREATMENT LEGEND
PAVEMENT REHABILITATION. SEE
TYPICAL SECTIONS SHEETS C5-C6.
FOG SEALSW 76TH
AVEMATCHLINE ~ SEE ABOVE FOR CONTINUATIONMATCHLINE ~ SEE BELOW FOR CONTINUATIONMATCHLINE ~ SEE SHEET C7FOR CONTINUATION7750 7736 7724 7718 7706 7704 160687764
16068
7632
7632 NO SITUS
16135
IMPROVEMENT NOTES
INSTALL BI-DIRECTIONAL, BLUE, TYPE 1AR REFLECTIVE
MARKER PERPENDICULAR TO EXISTING HYDRANT.
COORDINATE TRANSVERSE LOCATION WITH ENGINEER.
2
CONSTRUCT CEMENT CONCRETE CURB RAMP. SEE
SHEETS C17-C36 FOR RAMP SPECIFIC INFORMATION.
COORDINATE WITH ENGINEER PRIOR TO
FORMING/POURING CONCRETE.
3
INSTALL "CROSSWALK CLOSED" SIGN PER ODOT
STANDARD DRAWING TM240, SHEET D5. COORDINATE
SIGN PLACEMENT WITH ENGINEER.
4
PROTECT (P) OR REPLACE (R) MONUMENT BOX PER
CITY OF TIGARD STANDARD DRAWING 170, SHEET D2.
MONUMENT PIN TO BE SET BY OTHERS.
5
FOLLOWING COLD PLANE REMOVAL AND PAVING,
SAWCUT AND FILL JOINT PER BRIDGE END PANEL
DETAIL, SHEET D12. COORDINATE JOINT LOCATION
WITH INSPECTOR.
14
SAWCUT ALONG BOTH EDGES OF EXISTING BRIDGE
PLUG JOINT TO A DEPTH OF 2" PRIOR TO COLD PLANE
REMOVAL. SEE DETAIL, SHEET D12.
15
3 3
4 4
44
SEE SHEET C10 FOR
STRIPING IMPROVEMENTS
2
2
5P
5P
5P
14 14
15
1
1 1REVISION NO. 1WMW5/14/25FANNO CREEK BRIDGE
MATCHLINE ~ SEE SHEET C8.1FOR CONTINUATIONHIGH PRESSURE GAS LINE NOTE:
IF POTENTIAL SUBGRADE FAILURES ARE OBSERVED NEAR NW
NATURAL FACILITIES, THE CONTRACTOR SHALL COORDINATE
WITH NW NATURAL TO DETERMINE DEPTHS OF EXISTING
UTILITIES. NO EXCAVATION SHALL TAKE PLACE ADJACENT TO
THE GAS LINES BELOW THE PAVED SECTION WITHOUT DIRECT
OVERSIGHT FROM NW NATURAL.
1
Docusign Envelope ID: 33AB0667-A132-4AAA-AF35-27CCC3E9FAF0
SS SS SS
SD
SD
SD
W W WSSSSSS
WSD SD SD SD SD SD
SDSDSD
WW W W W W W W W
SDSSSS SS SS SS SS SS
SS
SS
SS
SS
OHP OHP OHP UGCSD
SDSD
G GG
WUGPSS
SD
SS
G
SD
29+00 30+00 31+00 32+00 33+00 34+00
SW DURHAM ROAD PLANSTA 28+70 TO ENDC8.1
8.1 OFNO.REVISIONBYDATEDRAWN BY:REV:DRAWING NO:DATE:DESIGNED BY:PROJECT NO:06/2024TB/CKTB52 TIG24PMPWMWONE INCHONE INCH AT FULL SCALE.IF NOT ONE INCH ADJUSTSCALE ACCORDINGLY01"CITY OF TIGARD2024 PAVEMENTREHABILITATION PROJECTSW 74TH AVE1.PLACE INLET SEDIMENT FILTERS OVER ALL CATCH
BASINS IN PROJECT LIMITS. SEE DETAIL, SHEET D12.
2.PLACE INLET SEDIMENT FILTERS OVER ALL DOWNSTREAM
CATCH BASINS TO CONTROL SEDIMENT LEAVING SITE.
SEE DETAIL, SHEET D12.
3.INSTALL BIO-FILTER BAG CHECK DAMS ON ALL ROADSIDE
DITCHES. INSTALL A MINIMUM OF 1 CHECK DAM PRIOR TO
INLET PIPES/STRUCTURES AND AFTER OUTLET
PIPES/STRUCTURES. SEE DETAIL, SHEET D12.
EROSION CONTROL NOTES:PAVEMENT TREATMENT LEGEND
PAVEMENT REHABILITATION. SEE
TYPICAL SECTIONS SHEETS C5-C6.
FOG SEALMATCHLINE ~ SEE SHEET C8FOR CONTINUATION7520
16135
IMPROVEMENT NOTES
INSTALL BI-DIRECTIONAL, BLUE, TYPE 1AR REFLECTIVE
MARKER PERPENDICULAR TO EXISTING HYDRANT.
COORDINATE TRANSVERSE LOCATION WITH ENGINEER.
2
REPLACE EXISTING VEHICLE DETECTOR LOOPS WITH
NEW 6-FT ROUND DETECTOR LOOPS IN APPROVED
LOCATION IMMEDIATELY FOLLOWING WEARING
COURSE CONSTRUCTION PER ODOT STANDARD
DRAWING TM475, SHEET D7. COORDINATE WITH
WASHINGTON COUNTY TRAFFIC STAFF PRIOR TO ALL
DETECTOR LOOP REMOVAL AND REPLACEMENT WORK.
16
SEE SHEET C10 & C10.1 FOR
STRIPING IMPROVEMENTS 1REVISION NO. 1WMW5/14/25SW UPPER BOONES FERRY RD0
SCALE IN FEET
20 40
SW DURHAM RD
22
PROTECT EXISTING CONCRETE
TRAFFIC SEPARATOR CURB (TYP)
PROTECT NEWLY CONSTRUCTED
CONCRETE RAIL PANELS
1
16
HIGH PRESSURE GAS LINE NOTE:
IF POTENTIAL SUBGRADE FAILURES ARE OBSERVED NEAR NW
NATURAL FACILITIES, THE CONTRACTOR SHALL COORDINATE
WITH NW NATURAL TO DETERMINE DEPTHS OF EXISTING
UTILITIES. NO EXCAVATION SHALL TAKE PLACE ADJACENT TO
THE GAS LINES BELOW THE PAVED SECTION WITHOUT DIRECT
OVERSIGHT FROM NW NATURAL.
Docusign Envelope ID: 33AB0667-A132-4AAA-AF35-27CCC3E9FAF0
SD
SS
X
X
X X
SD
20+00
21+00 22+00 23+00 24+00 25+00
SD
SD
OHP WSD
26+00 27+00 28+00 29+00 SW DURHAM ROADSTRIPING PLAN STA20+00 TO 29+50C10
10 OFNO.REVISIONBYDATEDRAWN BY:REV:DRAWING NO:DATE:DESIGNED BY:PROJECT NO:06/2024TB/CKTB52 TIG24PMPWMWONE INCHONE INCH AT FULL SCALE.IF NOT ONE INCH ADJUSTSCALE ACCORDINGLY01"CITY OF TIGARD2024 PAVEMENTREHABILITATION PROJECT0
SCALE IN FEET
20 40
SW DURHAM RD
SW DURHAM RD
STRIPING NOTES
1.INSTALL NEW STRIPING AS CALLED OUT
WITH , WHERE X REFERS TO
PAVEMENT MARKINGS SHOWN ON ODOT
STANDARD DRAWINGS ON SHEET D6-D7.
2.COORDINATE STRIPING LAYOUT WITH
ENGINEER PRIOR TO PLACEMENT. MATCH
EXISTING LAYOUT AT PAVEMENT
RECONSTRUCTION LIMITS. COORDINATE
TRANSITIONS TO EXISTING STRIPING WITH
ENGINEER.
XSW 76TH
AVEMATCHLINE ~ SEE ABOVE FOR CONTINUATIONMATCHLINE ~ SEE BELOW FOR CONTINUATIONMATCHLINE ~ SEE SHEET C9FOR CONTINUATION7750 7736 7724 7718 7706 7704 160687764
16068
R-20L
W-2
BBLSCHXING TWL
R-40
BBL
BS
S
BBL
BS
TWL
R-40
TWL
R-40
ELA
ND
R-40 ELA BS
RRBBL
BBL
5'
2'
11'
12'
11'
2'
5'
5'
2'
11'
12'
11'2'
5'
5'
2'
11'
12'
11'2'
5'
7632
7632 NO SITUS 7520
16135
SEE SHEET C8 & C8.1 FOR
ROADWAY IMPROVEMENTS
ELA
100'
WD-2
WD-2
MATCHLINE ~ SEE SHEET C10.1FOR CONTINUATIONS 1REVISION NO. 1WMW5/14/25Docusign Envelope ID: 33AB0667-A132-4AAA-AF35-27CCC3E9FAF0
SS
SS
SS
SS
OHP OHPUGP
SS
SD
SS
G
SD
30+00 31+00 32+00 33+00 34+00
SW DURHAM ROADSTRIPING PLAN STA29+50 TO ENDC10.1
10.1 OFNO.REVISIONBYDATEDRAWN BY:REV:DRAWING NO:DATE:DESIGNED BY:PROJECT NO:06/2024TB/CKTB52 TIG24PMPWMWONE INCHONE INCH AT FULL SCALE.IF NOT ONE INCH ADJUSTSCALE ACCORDINGLY01"CITY OF TIGARD2024 PAVEMENTREHABILITATION PROJECTSW 74TH AVESTRIPING NOTES
1.INSTALL NEW STRIPING AS CALLED OUT
WITH , WHERE X REFERS TO
PAVEMENT MARKINGS SHOWN ON ODOT
STANDARD DRAWINGS ON SHEET D6-D7.
2.COORDINATE STRIPING LAYOUT WITH
ENGINEER PRIOR TO PLACEMENT. MATCH
EXISTING LAYOUT AT PAVEMENT
RECONSTRUCTION LIMITS. COORDINATE
TRANSITIONS TO EXISTING STRIPING WITH
ENGINEER.
XMATCHLINE ~ SEE SHEET C10 FOR CONTINUATION7520
SEE SHEET C8.1 FOR
ROADWAY IMPROVEMENTSSW UPPER BOONES FERRY RDSW DURHAM RD
0
SCALE IN FEET
20 40
R-20L
W-2
ELA
BSRRD
R-20
W-2
ESA
ERA
R-20R
W-2
5'
13'
13.5'
12'
5'
12.5'
211'
ELABS
ERABS ESAWD-2BBLBS
WD-2 W-2
D
R-20
5'
12'
13.5'
12.5'
5'
16325
16255
REPLACE SIX (6) TUBULAR
MARKERS IN EXISTING LOCATION.
SEE WASHINGTON COUNTY
STANDARD DETAIL 2300, SHEET D9.
TERMINATE LONGITUDINAL
STRIPING IMPROVEMENTS 10'
WEST OF NEAREST CROSSWALK
BAR
17.5'
17.5'
1 1REVISION NO. 1WMW5/14/25Docusign Envelope ID: 33AB0667-A132-4AAA-AF35-27CCC3E9FAF0
DETAILS VIIID8
44 OFNO.REVISIONBYDATEDRAWN BY:REV:DRAWING NO:DATE:DESIGNED BY:PROJECT NO:06/2024TB/CKTB52 TIG24PMPWMWONE INCHONE INCH AT FULL SCALE.IF NOT ONE INCH ADJUSTSCALE ACCORDINGLY01"CITY OF TIGARD2024 PAVEMENTREHABILITATION PROJECT1REVISION NO. 1WMW5/14/251
Docusign Envelope ID: 33AB0667-A132-4AAA-AF35-27CCC3E9FAF0
DETAILS IXD9
45 OFNO.REVISIONBYDATEDRAWN BY:REV:DRAWING NO:DATE:DESIGNED BY:PROJECT NO:06/2024TB/CKTB52 TIG24PMPWMWONE INCHONE INCH AT FULL SCALE.IF NOT ONE INCH ADJUSTSCALE ACCORDINGLY01"CITY OF TIGARD2024 PAVEMENTREHABILITATION PROJECT1 1REVISION NO. 1WMW5/14/25Docusign Envelope ID: 33AB0667-A132-4AAA-AF35-27CCC3E9FAF0
DETAILS XIID12
48 OFNO.REVISIONBYDATEDRAWN BY:REV:DRAWING NO:DATE:DESIGNED BY:PROJECT NO:06/2024TB/CKTB52 TIG24PMPWMWONE INCHONE INCH AT FULL SCALE.IF NOT ONE INCH ADJUSTSCALE ACCORDINGLY01"CITY OF TIGARD2024 PAVEMENTREHABILITATION PROJECTEXISTING ASPHALTIC PLUG
JOINT. SEE DETAIL THIS SHEET
FOR PAVEMENT REMOVAL
ADJACENT TO JOINT
BRIDGE END PANEL DETAIL
NTS
SAWCUT 2" DEEP X 12"
WIDE. FILL WITH TRAFFIC
LOOP SEALANT.
2 1/2" GRIND AND INLAY. SEE
TYPICAL SECTIONS, SHEET C5.
EXISTING BRIDGE
END PANEL
EXISTING
BRIDGE
EXISTING AC PAVEMENT
BRIDGE DECK
SAWCUT 2 1/2" DEPTH AT EDGE
OF EXISTING PLUG JOINT.
ACP REMOVAL NEAR PLUG JOINT
NTS
1
2 1/2" GRIND AND INLAY, SEE
TYPICAL SECTIONS, SHEET C5
PROTECT EXISTING ASPHALTIC
PLUG JOINT 1REVISION NO. 1WMW5/14/25Docusign Envelope ID: 33AB0667-A132-4AAA-AF35-27CCC3E9FAF0
CITY OF TIGARD - CONTRACT SUMMARY & ROUTING FORM
Contract Overview
Contract/Amendment Number: 32500008a2
Contract Start Date: 7/24/2024 Contract End Date: 07/31/2025
Contract Title: PMP Pavement Rehabilitation
Contractor Name: Knife River Corporation NW
Contract Manager: Nichole George
Department: PW-ENG
Contract Costs
Original Contract Amount: $2,067,591.91
Total All Previous Amendments: $33,500.00
Total of this Amendment: $80,000.00
Total Contract Amount: $2,181,091.91
Procurement Authority
Contract Type: Public Improvement
Procurement Type: Formal ITB >$150K
Solicitation Number: 2024-24
LCRB Date: 07/23/2024
Account String: Fund-Division-Account Work Order – Activity Type Amount
FY 25 4128000 56005 95001-CONS $80,000.00
Contracts & Purchasing Approval
Purchasing Signature:
Comments: Extend end date, add additional bid items 20 & 30
DocuSign Routing
Route for Signature Name Email Address
Contractor Austin Cooksey Austin.cooksey@kniferiver.com
City of Tigard Brian Rager brianr@tigard-or.gov
Final Distribution
Contractor Austin Cooksey Austin.cooksey@kniferiver.com
Project Manager Nichole George nicholeg@tigard-or.gov
Project Manager Shauna Large shaunal@tigard-or.gov
Buyer Toni Riccardi tonir@tigard-or.gov
CITY OF TIGARD - CONTRACT SUMMARY & ROUTING FORM
Contract Overview
Contract/Amendment Number: 32500008a1
Contract Start Date: 7/24/2024 Contract End Date: 07/31/2025
Contract Title: PMP Pavement Rehabilitation
Contractor Name: Knife River Corporation NW
Contract Manager: Nichole George
Department: PW-ENG
Contract Costs
Original Contract Amount: $2,067,591.91
Total All Previous Amendments: 0
Total of this Amendment: $33,500.00
Total Contract Amount: $2,101,091.91
Procurement Authority
Contract Type: Public Improvement
Procurement Type: Formal ITB >$150K
Solicitation Number: 2024-24
LCRB Date: 07/23/2024
Account String: Fund-Division-Account Work Order – Activity Type Amount
FY 25 4128000 56005 95001-CONS $33,500.00
Contracts & Purchasing Approval
Purchasing Signature:
Comments: Extend end date, add funds
DocuSign Routing
Route for Signature Name Email Address
Contractor Austin Cooksey Austin.cooksey@kniferiver.com
City of Tigard Brian Rager brianr@tigard-or.gov
Final Distribution
Contractor Austin Cooksey Austin.cooksey@kniferiver.com
Project Manager Nichole George nicholeg@tigard-or.gov
Project Manager Shauna Large shaunal@tigard-or.gov
Buyer Toni Riccardi tonir@tigard-or.gov