Loading...
11/13/2024 - Agenda City of Tigard | 13125 SW Hall Blvd., Tigard, OR 97223 | 503-639 -4171 | www.tigard-or.gov | Page 1 of 1 City of Tigard Town Center Advisory Commission Agenda MEETING DATE/TIME: November 13, 2024 – 6:00 to 8:00 p.m. MEETING INFORMATION: Hybrid Meeting In-person: Tigard Town Hall, 13125 SW Hall Blvd. or MS Teams: https://www.tigard-or.gov/home/showpublisheddocument/1949/637770827974830260 1. CALL TO ORDER/INTRODUCTIONS Chair Velasquez 6:00 2. CONSIDER MINUTES Chair Velasquez 6:05 3. CALL FOR NON-AGENDA ITEMS Chair Velasquez 6:10 4. PUBLIC COMMENT Chair Velasquez 6:15 5. FOLLOW UP FROM PREVIOUS MEETING Sean 6:20 6. SW 72NDAVE/TRIANGLE TRANSPORTATION Courtney Furman 6:25 7. IMPROVEMENT GRANT UPDATE Tina Escalera 6:55 8. RED ROCK CREEK TRAIL UPDATE Gary Pagenstecher 7:05 9. REVIEW DRAFT ANNUAL REPORT (ACTION ITEM) Chair and Sean 7:25 10. PROJECT UPDATES Sean 7:35 11. LIAISON REPORTS All 7:45 12. NON-AGENDA ITEMS All 7:55 13. ADJOURN BUSINESS MEETING Chair Velasquez 8:00 *EXECUTIVE SESSION: The Town Center Advisory Commission may go into Executive Session to discuss real property transaction negotiations under ORS 192.660(2) (e). All discussions are confidential and those present may disclose nothing from the Session. Representatives of the news media are allowed to attend Executive Sessions, as provided by ORS 192.660(4), but must not disclose any information discussed. No Executive Session may be held for the purpose of taking any final action or making any final decision. Executive Sessions are closed to the public. Upcoming meetings of note: Tues., December 3, 6:30 p.m. Council parking presentation Wed., Dec. 11, 6:00 p.m., Regular TCAC Meeting Related websites and information: Tigard TIF Districts Tigard Construction Updates The City of Tigard tries to make all reasonable modifications to ensure that people with disabilities have an equal opportunity to participate equally in all city meetings. Upon request, the city will do its best to arrange for the following services/equipment: • Assistive listening devices. • Qualified sign language interpreters. • Qualified bilingual interpreters. Because the city may need to hire outside service providers or arrange for specialized equipment, those requesting services/equipment should do so as far in advance as possible, but no later than 3 city work days prior to the meeting. To make a request, call 503-718-2481 (voice) or 503-684-2772 (TDD- Telecommunications Devices for the Deaf). Page 1 of 2 CITY OF TIGARD TOWN CENTER ADVISORY COMMISSION Meeting Minutes October 9, 2024 Members Present: Alvin Bautista, John Goodhouse (Alternate), Patty Lofgren, Elise Shearer, Bob Tomasovic (Vice Chair), Gabe Velasquez (Chair) and Derrick Wright. Members Absent: JoJo Keating, and Chris Sjolin. Staff Present: Redevelopment Manager Sean Farrelly, Economic Development Manager Danelle Hauther, and Sr. Administrative Specialist Joe Patton. Others Present: TCAC Council Liaison Council President Yi-Kang Hu and Alternate Liaison Councilor Jeanette Shaw. 1. CALL TO ORDER Chair Velasquez called the meeting to order at 6:00 p.m. The meeting was held in Town Hall with a hybrid MS Teams option. 2. CONSIDER MINUTES The September 11, 2024, TCAC Minutes were unanimously approved. 3. CALL FOR NON-AGENDA ITEMS Elise had an item. 4. PUBLIC COMMENT – N/A 5. FOLLOW UP FROM PREVIOUS MEETINGS Sean noted that in response to public comment received at the last meeting from a member of the TTSD School Board (representing herself), CPAH informed him that they already coordinated with the school district and gave an estimate of the number of students that would attend local schools. They also provided a letter of support from the school district. He also noted that Council will consider reappointing Gabe and appointing two new members to TCAC. He encouraged Commissioners to invite others to join or to express their interest in filling the openings. John stated he would like to be considered for a voting position. Sean will forward his request. 6. DOWNTOWN WAYFINDING PLAN Sean said Council will consider the Plan and if accepted it will become an implementation project possibly next fiscal year when funds will be budgeted. Danelle shared a presentation that included the Project Schedule, Public Outreach & Survey Results, Final Preferred Sign Design, Draft Sign Placement Plan, and Next Step. She noted the project is on schedule. 7. Q3 REVIEW OF TCAC GOALS Sean briefly reviewed the goals included with the Agenda. Commissioners did not have any edits. TOWN CENTER ADVISORY COMMISSION October 9, 2024 Page 2 of 2 8. PROJECT UPDATES Sean briefly reviewed the updates included with the Agenda. Derrick asked about the restriping of bike/traffic lanes at the Viewfinder. Sean said it would be included with another project to reduce costs and he will find out from Engineering if there is an estimated date for completion. 9. DOWNTOWN/TRIANGLE PARKING UPDATE Sean shared a presentation that included the Downtown Parking Guiding Principles, available public and private parking spaces, the Near Term Parking Management Strategy Implementation, Parking Ambassadors, Time Enforcement Areas, Downtown Employee Pilot Permit Program, Existing Downtown Time Limits, and Next Steps. He noted that a private contractor will provide parking enforcement services and the initial six months will be warnings only for time overstays. The parking management will provide more data than the limited parking study provided. The small number of time limited spaces in the Triangle will also be enforced. 10. NON-AGENDA ITEMS A. Elise noted that "Trick or Treat Main Street" is on October 31 from 3:30 – 6 p.m. B. Derrick asked about the potential of a new owner that would redevelop the Tigard Plaza. Sean has not heard of any plans, but he has heard the current owner may be interested in selling the property. C. John noted the holiday tree lighting will take place at Universal Plaza on December 6 from 6:30 to 9 p.m. 11. ADJOURN BUSINESS MEETING The meeting adjourned at 8:00 p.m. Joe Patton, TCAC Meeting Secretary Gabe Velasquez, Chair 72ndAvenue Pre-Design ProjectTigard Town Center Advisory CommissionNovember 13, 2024 Agenda•Project Overview, Goals, and Schedule •2020 Corridor Study Review•Preferred Cross Sections•Design Constraints and Opportunities •Next Steps Project Overview•72ndAvenue from Hwy 217 to Hwy 99W –“The Ave” •Advancing preferred alignment and cross sections from the 72ndAvenue Corridor Study completed in 2020 Project Goals•Develop north section (Hwy 99W to Dartmouth Street) to 30% design •Help the City pursue grant funding •Coordinate with upcoming development frontage improvements and Red Rock Creek Trail •Develop south section (Dartmouth Street to Hwy 217) to 10% design •Refine the ultimate cross section and roadway alignment Project Schedule We are here! 2020 Corridor Study Preferred Cross Sections 2020 Corridor Study Preferred Cross Sections 2020 Corridor Study •Assumed future widening of Hwy 217 overcrossing to four lanes •This project is still anticipated, but is a long-term vision that is likely to occur after 72nd Avenue is reconstructed •Considered “flex parking lanes” from Beveland to Dartmouth•The City has decided to not move forward with the “flex parking lanes” and has opted for a 3-lane section with full time parking lanes due to CFEC Rulemaking (see next slide)•Connectivity •Assumed Atlanta Street connection between 68th Avenue and 74th Avenue – still planning for this•74th Avenue from Highway 99 to Beveland – Not likely to be fully connected parallel route in 20-year horizon Impact of CFEC Rulemaking •Climate-Friendly and Equitable Communities Rulemaking (CFEC) passed in 2023 •72nd Avenue is within a “Metro 2040 Center”•CFEC Rules Apply to Metro 2040 Centers•Emphasis on prioritizing multimodal travel•Vehicle volume-to-capacity (V/C) no longer applied to reviewing plan amendments in Metro 2040 Centers Preferred Cross SectionsBeveland to Red Rock CreekRed Rock Creek to Hwy 99WHwy 217 to Gonzaga*The project is considering multiple alternatives from Gonzaga to Beveland to transition from 5-lanes to 3-lanes*assuming Hwy 217 overcrossing widening complete Design Constraints and Opportunities •Red Rock Creek Crossing & Future Trail•Pedestrian Crossings •Transit Stops •Transition From 5 Lanes to 3 Lanes•Intersection Improvements •Right-of-Way Pedestrian Crossings •2020 Corridor Study identified crossings at:•Gonzaga (Pedestrian Signal) •Elmhurst (Traffic Signal or Flashing Beacon)•Between Baylor and Clinton (Flashing Beacon)•Future Atlanta connection (Traffic Signal or Flashing Beacon)•At Red Rock Creek Trail (TBD)•Bridge design will impact pedestrian crossing location Transit Stops •Plan for TriMet Route 76 to service 72nd Avenue in the future•Project to refine bus stop locations (and coordination with TriMet) •Bus stop design •Bus pull out in most of the corridor (utilizing on-street parking area) •Potential for in-lane bus stops at signalized intersections for transit signal priority Transit Stops – Potential Locations 72nd AveBeveland St 72nd AveBaylor St Transition from 5 Lanes to 3 Lanes •Project refining best location to transition from a five-lane to three-lane section•Likely at Beveland•Assumes future widening of Hwy 217 overcrossing to four lanes•Will need interim condition prior to Hwy 217 widening (long term project) Transition from 5 Lanes to 3 Lanes – Long Term Transition from 5 Lanes to 3 Lanes – Interim Beveland Intersection Alternatives•Northbound right turn “trap lane” with transit stop•Single westbound left turn lane•Higher vehicle delay and queuing•Northbound right turn “trap lane” with transit stop•Dual westbound left turn lanes •Northbound merge with far side transit stop•Dual westbound left turn lanes •Single southbound through lane•Northbound merge with far side transit stop•Dual westbound left turn lanes •Two southbound through lane•Highest intersection capacity Beveland to Dartmouth Dartmouth Intersection •“Protected intersection” design at Dartmouth •Roundabout considered, ruled out due to size and existing development Dartmouth to Future Atlanta Connection Future Atlanta Connection and Red Rock Creek Bridge Red Rock Creek Bridge Design•Preliminary bridge design underway •Analyzing impacts of an at-grade trail crossing and trail undercrossing•At-grade: bridge ~35.5’ wide and minor impacts to existing roadway elevation•Undercrossing: bridge ~75’ wide and likely major impacts to existing roadway elevation Connection to Hwy 99W Right-of-Way •Proposed design is anticipating long term redevelopment within the Tigard Triangle •Design will minimize impacts to buildings that are likely to stay with redevelopment•Concepts currently show ultimate cross sections with no modifications, but there may be opportunities to narrow cross section elements (to be refined during further in design) Next Steps •Neighborhood Meetings – November •Refine and document 10% design – December •30% design of north section (Hwy 99W to Dartmouth Street) – Winter/Spring 2025 DRAFT 2024 Annual Report of the Town Center Advisory Commission To the Board of the Town Center Development Agency December 1, 2024 The Town Center Advisory Commission (TCAC) updated the strategic plan for 2023-2024 at their February 14, 2024 meeting. The plan includes a vision, and three areas of emphasis, with Key Performance Indicators (KPI’s). Vision: As a commission and through our TIF districts, we will enable, encourage and support redevelopment in the goal of becoming the most walkable community in the Pacific Northwest where people of all ages and abilities enjoy healthy and interconnected lives. Aspirational Goal: Continue to facilitate and promote opportunities for the development of affordable housing, provide support for equitable business development, and advance efforts toward improved walkability, equity, and connectivity within and between both TIF districts. A. Equitable Business Development Strategies: Advocate for stakeholders in all TIF districts using data collection, analysis and summary in the focus areas of: parking, safety, unconventional business opportunities, program and service awareness and possible locations for business development. Action Plans: (1) Advocacy and Support for Business Owners in TIF Districts (2) Analysis and Summary of the Parking Survey (3) Planning for Unconventional Business Opportunities Accomplishments: • Improvement grants committee (2 TCAC members) awarded seven grants in 2024 • Downtown and Triangle parking implementation getting ready to launch. Downtown Parking Committee had TCAC representation • Parking enforcement contract will include regular parking utilization data gathering • Harvest Moon graduated from Launch Pod to a Main Street storefront • Two new food carts at Universal Plaza • Coordination with TDA on filling vacancies and marketing grants DRAFT B. Connectivity and Access Strategies: Advocate for funding in all TIF districts through intentional, strategic support in the form of letters of support, position statements and advisory recommendations to decision-makers. Active support for acquisition of Hall Blvd. by City of Tigard. Perform ad- hoc research to identify walkability issues and potential solutions. Document and report on pertinent studies, such as the Red Rock Creek Trail Study, and legislative actions that may impact safety, pedestrian projects, walkability and wayfinding. Action Plans: (1) Advocacy and Support for adequate connectivity, access, mobility and safety related funding: Hall Blvd and 72nd Ave Improvement projects (2) Active support for ownership of Hall Blvd. by the City of Tigard (3) Ad-hoc (personal) research on walkability issues within and between two TIF districts (4) Planning for wayfinding, signage and technology solutions to encourage multi- modal connectivity between and within TIF districts Accomplishments: • Downtown Wayfinding Design Advisory Committee (TCAC representation) selected preferred design. Final plan will start to be implemented next FY. • TCAC was briefed on the Downtown Reimagined project with recommendations for Hall Blvd and other street improvements, and a new Downtown connectivity plan. City Council adopted related Comprehensive Plan amendments, but not final report. • Design and engineering of 72nd Ave is underway. • Hall Blvd jurisdictional transfer (with funding) under consideration at legislature C. Affordable Housing and Houselessness Attend, update, monitor, report and present with new and pertinent information from housing and houseless stakeholder groups. Coordinate and share information acting as liaisons to TCAC with local organizations to ensure information flow and coordination to improve efficiency. Develop suggested strategies and policies to address housing issues within the purview/scope of TCAC to City officials and decision makers. Support funding needs and development assistance available for shelter, transitional and affordable housing. DRAFT Action Plans: (1) Identify liaisons to attend regular housing and houseless stakeholder meetings. (2) Active participation and information sharing from stakeholder organizations (in item 1 above) to TCAC (3) Monitor data obtained by City pursuant to desired outcome: “Grow Collaborative Partnerships” (4) Consider providing development assistance Accomplishments: • TCAC recommended $500K Development Assistance grant to Community Partners for Affordable Housing Woodland Hearth project, later approved by TCDA Board • TCAC recommended $200K Development Assistance for Just Compassion (TCDA Board will re-consider in December) • Family Promise renovation project underway (partially Development Assistance funded) • TCAC member attends CHART meetings On Behalf of the Town Center Advisory Commission, ____________________________________________ ___________________________________________ Gabriel Velásquez, TCAC Chair Robert Tomasovic, TCAC Vice Chair 11/6/24 TIF District Project Updates City Center TIF District 1. Universal Plaza • Punch list items 2. Main Street at Fanno (AVA) project • Apartments being leased • Commercial space improvements should be complete in winter 3. City Center Building Improvement Grants • No update 4. Nick Wilson Memorial Plaza (Fanno Creek Overlook) • Cost estimate being reviewed • Meeting with Tualatin Riverkeepers 5. City Facilities Consolidation (only parking structure is TIF funded) • New Public Works/Police facility being planned • Future of PW building site TBD 6. Downtown Reimagined • Development code amendments will be worked in 2025 7. Downtown Parking Strategy • Downtown parking forum held on October 21 and comments being compiled • Planning for implementation in early 2025 • Council briefing on Dec 3 8. Hall Blvd • The City received approval from the State Jurisdictional Transfer Committee to advance the transfer ask to the Joint Committee on Transportation • The total cost of transfer of Hall Blvd is currently estimated at $81M, and includes a $50M ask from the state legislature, $18.5M of work currently programed by ODOT, and a $12.5M local match by City of Tigard. 9. Just Compassion Access Center • The Board of the TCDA will reconsider $200K development assistance on December 17 Tigard Triangle TIF District 1. A Bridge to Home (FPTV) • Construction of kitchen renovations has started with development assistance - $565K 2. Red Rock Creek Trail Planning • Investigating grants for construction • TCAC briefing in November 3. Parks • Agency investigating properties • REACH pocket park will be delayed for a few months due to environmental review 4. Opportunity Fund (matching grants) • 2 new grants awarded in Triangle • 2 new grant applications for eating & drinking establishments in Triangle under review 5. 72nd Avenue • Preliminary design work underway • Stakeholder focus groups held in October • Engineering staff and consultant will attend November TCAC meeting 6. DIG Hampton Street Project • Building completed and had ribbon-cutting 7. Mixed Use Path over Highway 217 • No Update 8. REACH/Dartmouth Crossing North • Building construction underway. Spring lease up anticipated • Offsite pedestrian improvements will be done with Phase 2 9. Tigard Cinemas Property • PacTrust working on concept plan 10. CPAH Woodland Hearth • TCDA Board approved $500K in development assistance agreement on October 15 • Construction scheduled to start December 2024 with lease-up in 2026