Permit (15) CITY OF TIGARD MECHANICAL PERMIT
1111 2 ,7 COMMUNITY DEVELOPMENT Permit#: MEC2020-00162
I GARD 13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Date Issued: 04/08/2020
-j
Parcel: 2S103DD00400
Jurisdiction: Tigard
Site address: 13727 SW PACIFIC HWY 100
Project: Bull Mountain Bar Subdivision: None Lot: None
Project Description: Replacing(2)5-ton RTU's,(2)thermostats,and adding(2)wireless averaging sensors.
Contractor: OREGON AIRE INC Owner: VPT LLC
7715 NE 33RD DR STE A 610 SW ALDER ST STE 1221
PORTLAND, OR 97211 PORTLAND, OR 97205
PHONE: 503-335-2222 PHONE:
FAX: 360-423-1978
FEES
Specifics: Description Date Amount
Type of Use: COM Permit Fee 04/08/2020 $398.51
Class of Work: ALT Type of Const: VB Plan Review 04/08/2020 $99.63
Occupancy Grp: B Occupancy Load: 12%State Surcharge-Mechanical 04/08/2020 $47.82
Stories: 1 Info Process/Archiving-Sm$0.50(up to 04/08/2020 $10.00
11x17)
Project Valuation: $12,000.00
Fuel Air Handlers
Fuel Types: Natural Gas Units<10000 cfm:
Gas Pressure: Units> 10000 cfm:
Furnaces Boilers&Compressors
Furnaces<100K BTU: 0-3 HP:
Furnaces>= 100K BTU: 3-15 HP:
Floor Furnaces: 15-30 HP:
Unit Heaters: 30-50 HP:
Vents w/o Appliances: 50 or Greater HP:
Air Conditioning:
Heat Pump:
Appliances
Vent Fans: Vent Systems: Total $555.96
Hoods: Comm Incinerators:
Required Items and Reports(Conditions)
Woodstoves: Gas Fireplaces:
Clothes Dryers: Other Mech Units:
Gas Outlets: Other Desc:
Duct Work:
Fire/Smoke Dampers:
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other
applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of
issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon
Utility Notification Center. Those rules are set forth in OAR 952-001-0010 through OAR 952-001-0090. You may obtain a copy of the rules
or direct questions to CCC���C by callir�g 503.232.1987 or 1.800.332.2344.
Issued By: /,.jam //, ,(i��- Permittee Signature: ft, /f-Y- e- / �L
L v � !J/ ' � � � � %%C'itJ
Call 503.639.4175 by 7:00 a.m.for the next available inspection date.
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.
Mechanical Permit A lie FOR OFFICE USE ONLY
I VE D Received
. City Tigard Date/By: ?/ Permit No.: ,..2 _s.7�` /:f
n 13125 SW Hall Blvd.,Tigard,OR 972 p R 7 ?020 / OZ V ' ,•,h-EF-'rC.JOP/ 4'�51
Phone: 503.718.2439 Fax: 503.598.1 b0'' an Review ^
Date/By: A.....3 Q �tr7C.0 Other Permit.
TIGARD Inspection Line: 503.639.4175 1.i -,r� Date Ready/By: leis- BI See Page 2 for
Internet: ww .tigard-or.gov BUILD (^1ci 1�1 Uj JlON w Notified/Method: Supplemental Information
TYPE OF WORK COMMERCIAL FEE* SCHEDULE - USE CHECKLIST
---- --- Mechanical permit fees*are based on the value of the work
LI New construction RX.ddition/alteration/replacement performed.Indicate the value(rounded to the nearest dollar)of all
❑Demolition ❑Other: mechanical materials,equipment,labor,overhead,and profit.
Value:S 1 Z.) 6 6 6
CATEGORY OF CONSTRUCTION '"°)"
- - L' RESIDENTIAL EQUIPMENT/SYSTEMS FEES*
❑ 1-and 2-family dwelling tlp Commercial/indushial ❑Accessory building For special information use checklist.
❑Multi-family ❑Master builder ❑Other: Description Qty. Ea. Total
JOB SITE INFORMATION AND LOCATION Heating/cooling:
Air conditioning 46.75
Job site address: [3'"4-2:9- SW.S( ? 6 ti L. t.6.4 y Furnace 100,000 BTU(ducts/vents) 46.75
City/State/ZIP: TA.c.64 0 el a-Z,Z.3 Furnace 100,000+BTU(ducts/vents) 54.91
1 Heat pump 61.06
Suite/bldg./apt.no.: /j Project name: 5�I}1 til*klikki ri r Duct work 23.32
Cross street/directions to job site: HydroniNthc hot water system 23.32
^���'�' Residential boiler(radiator or
hydronic) 23.32
Unit heaters(fuel-type,not electric),
in-wall,in-duct,suspended,etc. 46.75
Flue/vent for any of above 23.32
Subdivision: Lot no.: Other: 23.32
Other fuel appliances:
Tax map/parcel no.: Water heater 23.32
DESCRIPTION OF WORK Gas fireplace/insert 33.39
----- Flue vent for water heater or gas
1441 a U. (Z) c"hit 1/1 Yn/O t}J D I p�L �,IM{'t.- fireplace 23.32
t.eela(t (t ) -tiAM01QT+11.'I'S • 14(A `Z) wiftless Logd/pelltsto lighter 23.32
Wood/pellet stove 33.39
o Ie.r ( I K( S' &A st Wood fireplace/insert 23.32
0�, Chimney/liner/flue/vent 23.32
PROPERTY�/ OWNER ElTENANT Other: 23.32
IId
-_---- Environmental exhaust and ventilation:
Name: Range hood/other kitchen
S1(�► 14 S ��� l ew4PaU^es equipment 33.39
Address: \3 S b i 010t � 9re122Z \ Clothes dryer exhaust 33.39
City/State/ZIP: Qo lkA d de_ c Ls S Single-duct exhaust(bathrooms,
( toilet compartments,utility rooms) 23.32
Phone:( (t.3) 7.1.3 .--2 Q Fax:(4iI-1) Z 6 d - 1 S Attic/crawlspace fans 23.32
j&PPLICANT ❑ CONTACT PERSON Other: 23.32
Fuel piping:
Business name: d re s dy1///_ Al(e L $14.15 for first four;$4.03 for each additional
re„,,,,
Contact name: ,/ '''���M . .t .(d ���AAA Furnace,etc.
�F�1'1
Address: S NE 3; Dr . yy Gas heat pump
1 Wall/suspended/unit heater
City/State/ZIP: R 104 6 R q 32 II Water heater
Phone:(I/6, ) ?�3S-2 L2 i. l Fax::(yl3 ) 335-Gg a-} (tIoH) Raeplace
E-mail: _ ?e.RTti-St)Ot/e(eA-&V C • (0 yt.j Barbecue
CU15,,.TTRACTOR Clothes dryer(gas)
Other:
Business name. D ve MECHANICAL PERMIT FEES*
Address: 3.q. t.3;...j o y . s- P Subtotal
City/State/ZIP: Pc,1g-10.t4 1 d l q-Z 1 an review mum
25per%iofee rmit fee)
� Plan review(25/o of permit fee)
Phone:(5"03) T;5--*LL2 2. Fax:46 j) 755- 15 1 - State surcharge(12%of permit fee)
CCB lie.: (44 3 S TOTAL PERMIT FEE
This permit application expires if a permit is not obtained within 180
• days after it has been accepted as complete.
Authorized signature: * Fee methodology set by Tri-County Building Industry Service Board
Print name:..3.0111 MC" Date: f 3, ' ,zo24
1:\Building\Permits\MEC_PermitApp_040113.doe 440.4617T(I l/02/COM/WEB)
Mechanical Permit Application - City of Tigard
Page 2 -Supplemental Information
Commercial& Multi-Family Fee Schedule:
Total Valuation: Permit Fee:
$0.00 to$500.00 Minimum fee$69.06
$500.01 to$5,000.00 $69.06 for the first$500.00 and
$3.07 for each additional$100.00 or
fraction thereof,to and including
$5,000.00.
$5,000.01 to$10,000.00 $207.21 for the first$5,000.00 and
$2.81 for each additional$100.00 or
fraction thereof,to and including
$10,000.00.
$10,000.01 to$50,000.00 $347.71 for the first$10,000.00 and
$2.54 for each additional$100.00 or
fraction thereof,to and including
$50,000.00.
$50,000.01 to$100,000.00 $1,363.71 for the first$50,000.00 and
$2.49 for each additional$100.00 or
fraction thereof,to and including
$100,000.00.
$100,000.01 and up $2,608.71 for the first$100,000.00 and
$2.92 for each additional$100.00 or
fraction thereof.
Note: All new commercial buildings require 2 sets of plans.
I:\Building\Permits\MEC_PetnutApp_040113.doc 2
City of Tigard
IIICOMMUNITY DEVELOPMENT DEPARTMENT
■
T I G A R D Building Permit Review — Commercial - No Land U s e
Building Permit #:
Site Address: / 7-- 'SW iec/ r; Suite/Bldg#:
Project Name: &Iii JhWO4,in
(Name of commercial business occupying the space. If vacant,enter Spec Space.)
Planning Review
�f
Proposal: IC.('1110✓eI/Pp.6 U I27®l L �I PC/ 2YI/ go/ Loy
Existing Business Activity: Erhiy sail I ali7k!,k p �J,
Pro sed Business Activity: 1i v /1
Verify site address/suite# exists and active in permit sys
f R jiver Terrace Nei hborhood: D Yes No
VJ og.ermitted Use: Yes ❑ No 0 Spec Space
Confirm no land use required.
OcKu
sines License:
Exists: 0 Yes 0 No,applicant was provided a business license application
Notes:
Approved by Planning: "' Date: 19/Z{.)
Revisions (after Building Submittal only) Reviewer Date
Revision 1: ❑ Approved 0 Not Approved
Revision 2: ❑ Approved ❑ Not Approved
Revision 3: 0 Approved ❑ Not Approved
Building Permit Submittal
Original Submittal Date: 47/
Site Plans: #�d'J�
Building Plans: #
Building Permit#: nn er building permit#above.
Workflow Routing: a Planning 0 Permit Coordinator k - ilding
Workflow Sign-off: off for Planning(include notes from planning review)
Route Application Documents: itlif Building: original permit application, site plans,building plans,engineer and
beam calculations and trust details,if applicable,etc.
Notes:
By Permit Technician: Date: 3A S/i7 7
I:1Building\Forms\BldgPermitRvw_COM_NoLandUse_111819.docx
Permit Coordinator Review
❑ Conditions "Met"prior to issuance of building permit
❑ Approved,NOT Released: Date:
Notes:
Revisions (after Building Submittal only)
Revision Notice 1: Date Sent to Applicant:
Revision Notice 2: Date Sent to Applicant:
Revision Notice 3: Date Sent to Applicant:
❑ SDC Fees Entered: Wash Co Trans Dev Tax: ❑ Yes ❑ N/A
Tigard Trans SDC: 0 Yes ❑ N/A
Parks SDC: ❑ Yes ❑ N/A
❑ OK to Issue Permit
Approved by Penn it Coordinator: Date:
I:1Building\Forms\BldgPemritRvw_COM_NoLandUse_111819.docx