Loading...
Report I City of Tigard MAY I, 8 22 Deferral Until Occupancy CITY( Dz TI+GARD Washington County Transportation Development Tax(TDT),Transporta� on aftcla System Development Charges (SDCs) This form is to be signed and submitted prior building permit issuance or,if no building permit is required,then upon land use approval(TMC 3.24,as amended by Ordinance No.21-09). Date: �//Q1/ z023 Site Address: 15632 SW EVERGLADE AVE Project River Terrace Crossing Land Use Case or MST2023-00223 Name: Ichijo Building Permit#: Tax Lot 2S108DC31100 Total Parks $11,830.00 I #: Lot 166 Amount*: of 6 ... I TDT N/A Total TSDC Amount: Amount*: $12,004.00 I n *The total TSDC amount shown above is the sum of$ 7.760.00 for TSDC-Improvement,$ ,448.00 for TSDC- Reimbursement,and$ 3.796.00 for TSDC-River Terrace,if applicable.. *The total Parks SDC amount shown above is the sum of$ 6,812.00 for Parks-Improvement,$ 1,887.00 for Parks- Reimbursement,and either$ N/A for Parks-Neighborhood or$ 3,131.00 for Parks-Neighborhood River Terrace. This constitutes my request to defer payment of the TDT,TSDC, and Parks SDCs, as provided above, to prior to final inspection. Payment of the TDT,TSDC,and Parks SDCs may be deferred until issuance of the occupancy permit. In requesting this option,I understand that any deferred TDT,TSDC,and Parks SDCs must be paid prior to final inspection. TDT may only be deferred if the TDT is greater than the amount for a single-family residence. I further understand that the amount of'MT due on deferred obligations shall be the amount in effect at the time of issuance of the building permit. For a deferral request to be accepted both the Property Owner and the Developer must sign this request. ea(CiAZg. Property Owner: Date: 5/16/2023 Developer: kW�lfer Natfon May 16,2023 lniMalA oteby 16,KM f,Vlikm-, Date: OfAl/lebfb 5/31/2023 Permit Coordinator: Date: