HomeMy WebLinkAboutReport (4) /~ "CREEKVIEW AT SOUTH RIVER TERRACE" 8680 514 1691.4 AUe.
LOT 22
HUB AND TACK CERTIFICATION MSt ZO2Z - 00�,I03
NE 1/4 SEC. 7, T 2 S, R 1 W, W.M.
CITY OF TIGARD, WASHINGTON COUNTY, OREGON
SURVEYED MAY 18, 2023
I 1 I
PREPARED FOR:
TAYLOR MORRISON NORTHWEST
SOUTH RIVER 703 BROADWAY ST., SUITE 710
TERRACE VANCOUVER, WA. 98660
LOT I
20
CO 6.00' PUBLIC —
1- UTILITY
a C.) EASEMENT
0 CC
o CC
0 LOT
en 21w I
N w
r o o I
i. CC
>- 32.62 —. N89'30'35"E >� 104.98' 1 ,r1617'
o I I -- 16.50'
r c w w
in _ I I 1.,) .
x O -- 32.48'—� LOT I O
o "1 22 I I M oto
Io
En
c I --16.52'
a 32.62'� N89'30'35"E + 105.00' �ls ��'
1 — TRACTS o L_ I
_ - w
D
g Z
Y Lu
u LOT Q
REGISTERED I 23 1
a PROFESSIONAL I
i LAND SURVEYOR
T
o
Q OREGON
a JULY 9, 2002 LOT
m TRAVIS C. JANSEN 24
D
57751 J
N
o RENEWS: 6/30/2023
N
i I, TRAVIS C. JANSEN, A REGISTERED PROFESSIONAL LAND SCALE
2 SURVEYOR IN THE STATE OF OREGON, HEREBY CERTIFY THAT 30 0 15 30
0 I HAVE ACCURATELY SURVEYED AND STAKED THE
g FOUNDATION ENVELOPE FOR LOT 22 OF "CREEKVIEW AT 1 INCH = 30 FEET
2 SOUTH RIVER TERRACE".
DRAWN BY: MJL DATE:05/19/23
PACIFIC COMMUNITY DESIGN
a REVIEWED BY: T2 DATE:05/19/23
PLANNING - ENGINEERING - SURVEYING
\ PROJECT NO.: 395-103 (503) 941-9484
CT ENGINEERING
NC 180 Nickerson St.
Suite 302
Seattle,WA 98109
(206)285-4512(V)
(206)285-0618(F)
asolomon@cteng ineering.com
BULLETIN
Date: June 20,2022 Number: CT-02 Project#: 21078
Project Name: South River Terrace Attached: CT-02.1
Subject: Cantilever Retaining Wall
Drawings Affected:
Description/Action:
This bulletin provides response to RFI's, design clarifications and/or variation requests for the
`South River Terrace' project located in Tigard, Oregon.
See attached page CT-02.1 for cantilever retaining wall detail and schedule. Per our discussion with
Taylor Morrison, it's our understanding that for several lots, cantilever retaining walls will be required
as shown.
es-c)
�GINFC 9 ; .0,e\
,
►' G 0 N <,\
q� , F12, <,<`G'
03\-
06/20/2022
CALL WITH ANY QUESTIONS
Issued by: Arnold R. Solomon Date: June 20, 2022
Distribution:
Contact Information:
Dennis Gaudreault Taylor Morrison
Frank Sandoval Taylor Morrison
Sam Scott Taylor Morrison
Amy Russell Taylor Morrison
Elizabeth Erlandson Milbrandt Architects
N:\21078 South River Terrace\Bulletins121078—2022.06.20—CT02 Cantilever Retaining Wall.doc
Structural Engineers
4
I
CT-02 BULLETIN CT-02.1
CCNC.S.O.G. \ r7 AT 24.0.C.
ta ' ' ''als'st"a'1 1\
I I1 I I ta7,t
-I 111 ' (2)I5 AT T.O.W.
FREE-DRAINING ..
BACKFILL
RE GEOTECH
VERT.BARS PER
2•CLR. SCHEDULE(LAP I H .
DOWELS)
#4AT10'O.C.HOR.
x
r
s CANTILEVER RETAINING WALL SCHEDULE
WALL HEIGHT HEEL TOE BASE DEPTH D08ELS PERT.BARS THICKNESS
{ /.0
Z 0'TO 2'-0' 0'-4' 0-4' 1'-4' 8' /4 0 18' 14 0 18' 8'
d DOWEL BARS TO MATCH
VERT.BARS 2'-1'TO 4'-0' 0'-8' 0'-8' 1'-8' 10' µ 018' µ 018' 8'
c 4'-1'TO 8'-0' 1'-10' 0'-8' 3'-0' 10' µ 0 12' /4 012. 8"
RETAINNC WALL FOOTING F00TING BARS TO MATCH 8'
`�' -� , / VERT.BARS 6'-1'TO -0' 3'-Y 0'-8' 4'-4' 1Y /s o 10' i5 0 10' 8"
PER SCHEDULE - •:•:•:••-•:• 8'-1'T010'-0' 4'-7'- � 0'-8' S'-B' if i5 O 8' /5 0 8' 8'
c�i�:i �i.�•:� 10'-1'TO 17-0' 5'-10' 0'-8' 7'-0' 14' /5 0 5' /5 0 5' 8'
FOUNDATION DRAIN 1:!:!:!:!0I0i
BY OTHERS
:r_ -.
e. \
a
r ,a
"1p_ 4 '��I I I
I—TH I—n . _I i-i I-1 I M\ \
1-1- 1 I_ III; 1I1 II—
#5 0 12•LONGITUDINAL
HEEL 8• / TOE
BASE
/ /
CANTILEVER RETAINING WALL 1
CT ENGINEERING
IN C 180 Nickerson St.
Suite 302
Seattle,WA 98109
(206)285-4512(V)
(206)285-0618(F)
asolomon@ctengineering.com
BULLETIN
Date: August 10, 2022 Number: CT-05 Project#: 21078
Project Name: South River Terrace Attached: CT-05.1
Subject: SOG Dowels to Cantilever Retaining Wall
Drawings Affected:
Description/Action:
This bulletin provides response to RFI's, design clarifications and/or variation requests for the
`South River Terrace' project located in Tigard, Oregon.
Per our discussion with Taylor Morrison, it's our understanding that we will need to provide a rebar
dowel connection for the slab-on-grade to the existing cantilever retaining wall in place of the#3
bars @ 24"o.c. shown at the top of the retaining wall per Bulletin CT-02 (06/20/2022).
See attached page CT-05.1 for the dowel connection. Note that this slab-on-grade dowel
connection may also apply to adjacent foundation walls.
101,fimpm:Fr'cl,1k
F. �G I N F,
CD A
i' GON
Fp p'v\
08/10/2022
CALL WITH ANY QUESTIONS
Issued by: Arnold R. Solomon Date: August 10, 2022
Distribution:
Contact Information:
Dennis Gaudreault Taylor Morrison
Frank Sandoval Taylor Morrison
Sam Scott Taylor Morrison
Amy Russell Taylor Morrison
Elizabeth Erlandson Milbrandt Architects
N:\21078 South River Terrace\Bulletins\21078 2022.08.10 CT05 SOG Dowels to Cantilever Retaining Wall.doc
Structural Engineers
CT•
ENGINEERING 780 Nickercnn St.
Suite 302
N C. Seattle,WA
Project: SOUTH RIVER TERRACE „aCe. 08/10/2022 981°9
1206)285-4512
Client: TAYLOR MORRISON Page Number. CT-05.1 Ax'
X (2(i6)285-06 IS
None: 114e Dowd ComegTluN ,Mown
HAy Ruo RiP.Y To RosTKEnT
Fovnoeiton WW1
So G Pen, Eli j r CrytT. Rtrgtnln(, LA.t.
Pu1N f SEt: CT-o1 BOLIZTi s (0b+10'1021)
FUR kEinF.)
Gt, c
DowQS ' 1140.C.. e< cs'
(DRILL IIEPov.Y Ut►n6 C
t.l(rn100 4 Slttbg6-Tie 6
SET-30 AnCH.oWn6 C. _ •
R01451WP STJTErn Oft —
RPPRovegi Lunt. "
NtN tWt EO Dank ' 8"r
Nt►J L2nMT14 OP Y 3 DDwE.S = 1'-0`)
PETA(L
Structural Engineers