Permit CITY OF TIGARDIN BUILDING PERMIT
I COMMUNITY DEVELOPMENT Permit#: BUP2023-00158
E_visED�"•
T I Gy S / Date Issued: 10/3/2023
13125 SW Hall Blvd.,Tigard OR 97223 503.718.2439 Parcel: 1 S127DD01200
3h)- / r 1 Jurisdiction: Tigard
Site address: 10035 SW CASCADE AVE
Project: BMW of Tigard Subdivision: None Lot: None
Project Description: (5)new wall signs,(1)freestanding sign,and(2)directional signs.
Contractor: MEYER SIGN CO OF OREGON Owner: HOLMAN TIGARD REAL ESTATE LLC
15205 SW 74TH AVE 17800 SE MILL PLAIN BLVD#190
TIGARD, OR 97224 VANCOUVER,WA 98683
PHONE: 503-620-8200 PHONE:
FAX: 503-620-7074
FEES
Specifics: Date Amount
Description
Type of Use: COM 09/29/2023 $674.35
Permit Fee-Additions,Alterations,
Class of Work: OTR Type of Const: IIIA Demolition
Occupancy Grp: U Occupancy Load: 0 12%State Surcharge-Building 09/29/2023 $80.92
Dwelling Units: 0 Info Process/Archiving-Sm$0.50(up to 09/29/2023 $64.50
Stories: 0 Height: 0 ft 11x17)
Bedrooms: 0 Bathrooms: 0 Plan Review 09/29/2023 $438.33
Value: $45,000
Floor Areas:
Total Area: 0
Accessory Struct: 0
Basement: 0
Carport: 0
Covered Porch: 0
Deck: 0
Garage: 0
Mezzanine: 0
Total $1,258.10
Required Items and Reports(Conditions)
Required:
Fire Sprinkler: Parapet:
Fire Alarm: Protected Corridors:
Smoke Detectors: Manual Pull Stations:
Accessible Parking: 0
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work
will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more
the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
952-001-0010 through OAR 952-001-0090. YouY may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344.
Issued By: fan...e..L....„,<, / Permittee Signature: ` �"" n�
✓' all 503.639.4175 by 7:00 a.m.for the next available inspection date.
74
This permit card shall be kept in a conspicuous place on the job site until completion of the project.
Approved plans are required on the job site at the time of each inspection.