Report (5) Bend Office (541)330-9155 Geotechnical Office (503)601-8250 Carlson Testing, Eugene Office (541)345-0289 Inc.Inc• Salem Office (503)589-1252 Tigard Office (503)684-3460 Special Inspection FINAL SUMMARY LETTER June 9,2021 Job#: T1701930.0 City of Tigard 13125 SW Hall Blvd Tigard,OR 97223-8199 Attn: Building Division Re: Project Name: 10BP122-PACTRUST VOLUNTARY SEISMIC UPGRADE-BLDG 4 Address: 16332 SW 72n0 Avenue-Tigard,OR Permit#: BUP2018-00224 b 6 P 12 3 Per Chapter 17,Section 1704.1.2 of the International Building Code(IBC),we have performed special inspection of the following item(s)per our inspection reports only: Adhesive Anchors All requested inspections and tests were performed and reported according to the requirements of project documents and to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship,provisions of the State Building Code and Standards,as well as the structural engineer's design changes,approvals and verbal instructions. Our construction inspection and testing services were provided and intended to help reduce the risk of construction defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or guarantee of any.type. Even with diligent construction monitoring and testing, construction defects, aeflciencies or omissions in the contractors work may exist. II is the contractor's responsibility to perform their work in accordance with the approved construction documents. CTI has provided its professional services with the degree of care and skill currently exercised under similar circumstances by members of its profession in the same locale. Statements made in our reports are based on technical judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material tested/inspected only. CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means, methods. techniques,sequences or procedures of the construction or evaluating or reporting job conditions related to health,safety or welfare. Information contained herein is not to be reproduced. except in full, without prior authorization from this office. If there are further questions regarding this matter please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING NC. Leac Project Manager SUmrm cc: PACTRUST-JOHN WIITALA CITY OF TIGARD BUILDING DIVISION-WALTER'CHIP'BARNETT MARVIN&SONS CONSTRUCTION INC-BOB MARVIN P:1ProjectslGeneraf\20171T17010300106-09-21 Final Letter.doc Updated 11/30/11 Bend Office (541)330-9155 Geotechnical Office (503)601-8250 Carlson Testing, Inc. Eugene Office (541)345-0289 Salem Office (503)589-1252 Tigard Office (503)684-3460 Special Inspection FINAL SUMMARY LETTER June 9,2021 Job#: T1701930.M City of Tigard 13125 SW Hall Blvd Tigard,OR 97223-8199 Attn: Building Division Re: Project Name: 10BP112-PACTRUST VOLUNTARY SEISMIC UPGRADE-BLDG 15 Address: 15870 SW Upper Boones Ferry Road-Tigard,OR Permit#: BUP2018-00019 oby 112. Per Chapter 17, Section 1704.1,2 of the International Building Code(IBC),we have performed special inspection of the following item(s)per our inspection reports only: Adhesive Anchors Structural Steel(Shop Only) All requested inspections and tests were performed and reported according to the requirements of project documents and to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship,provisions of the State Building Code and Standards,as well as the structural engineer's design changes,approvals and verbal instructions. Our construction inspection and testing services were provided and intended to help reduce The risk of construction defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with the approved construction documents. CTI has provided its professional services with the degree of care and skill currently exercised under similar circumstances by members of its profession in the same locale. Statements made in our reports are based on technical judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material tested/inspected only. CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means, methods, techniques,sequences or procedures of the construction or evaluating or reporting job conditions related to health,safety or welfare. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are further questions regarding this matter please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING INC. to a Leach Project Manager SL/mrm cc: PACTRUST-JOHN WIITALA CITY OF TIGARD BUILDING DIVISION-WALTER'CHIP'BARNETT MHP STRUCTURAL ENGINEERS-ERIC SERKES MARVIN&SONS CONSTRUCTION INC -BOB MARVIN P:\Projects\Genera112017\T1701830M\06-09-21 Final Letter.doc Updated 11/30/11 `J t 1 Bend Office (541)330-9155 A1. 50 M MR I Geotechnical Office (503)60I-8250 Carlson Testing, Inc. 4AZ Eugene Office (541)34s-0289 Salem Office (503)589-1252 Tigard Office (503)684-3460 Special Inspection FINAL SUMMARY LETTER November 6, 2018 Job# T 1701930.J City of Tigard 13125 SW Hall Blvd Tigard, OR 97223-8199 Attn Budding Division Re Project Name PBPA143- Pactrust Voluntary Seismic Upgrade -Building 6 Address 16460 SW 72°'Avenue-Tigard, OR Permit to BUP2018-00146 Per Chapter 17, Section 1704 1 2 cf the International Building Code(IBC).we have performed special inspection of the following item(s) per our inspection reports oily Adhesive Anchors All requested inspections and tests were performed and reported according to the requirements of project documents and to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship, provisions of the State Building Code and Standards as well as the structural engineer's design changes,approvals and verbal instructions Our construction inspection and testing services were provided and intended to help reduce the risk of construction defects, deficiencies or omissions that arose dunng and after construction. Our services do not constitute a warranty or guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with the approved construction documents CTI has provided its professional services with the degree of care and skill currently exercised under similar circumstances by members of its profession in the same locale Statements made in our reports are based on technical judgments and should not be construed to be conclusive representations of fact Our reports pertain to the material tested/inspected only CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means methods. techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to health,safety or welfare. Information contained herein is not to be reproduced, except in full, without prior authorization from this office If there are further questions regarding this matter please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING INC. Steveh W Leach Project Manager SWUks cc Pactrust-John Wiitala MHP Structural Engineers-Eric 8erkes Marvin& sons Construction Inc-Bob Marvin P\ProectsGeneral'F;n.al letter Forms\New Final Letter Tempiates`:City of Tigard doc Updated 11I30111 Bend Office (541)330-9155 Gentechnlcal Office (503)601.8250 Carlson Testing, Inc. Eugene gomee (541)345-0289 (503)589-1252 Tigard Office (503)684-3460 Special Inspection FINAL SUMMARY LETTER June 9,2021 Job#: 71701930.T City of Tigard 13125 SW Hall Blvd Tigard,OR 97223-8199 Attn: Building Division Re: Project Name: OBP3-PACTRUST VOLUNTARY SEISMIC UPGRADE-BUILDING A Address: 15951-15999 SW 724O Avenue-Tigard,OR Permit#: BUP2020-00249 3 o b P 219 Per Chapter 17,Section 1704.1.2 of the International Building Code(IBC),we have performed special inspection of the following item(s)per our inspection reports only: Adhesive Anchors All requested inspections and tests were performed and reported according to the requirements of project documents and to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship,provisions of the State Building Code and Standards,as well as the structural engineer's design changes,approvals and verbal instructions. Our construction inspection and testing services were provided and intended to help reduce the risk of construction defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or omissions in the contractor's work may exist. it is the contractor's responsibility to perform their work in accordance with the approved construction documents. CTI has provided its professional services with the degree of care and skill currently exercised under similar circumstances by members of its profession in the same locale. Statements made in our reports are based on technical judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material tested/inspected only. CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means, methods, techniques,sequences or procedures of the construction or evaluating or reporting job conditions related to health,safety or welfare. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are further questions regarding this matter please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING INC. 7 St lea Project Manager SUmrm cc: PACTRUST-JOHN WIITALA CITY OF TIGARD BUILDING DIVISION-WALTER'CHIP'BARNETT MARVIN&SONS CONSTRUCTION INC-BOB MARVIN P\Projects\Genera1120i71T1701930T\06-09.21 Final Letter.doc Updated 11/30/11 Date April 19, 2018 Job z. T1701930 H Page 2 of 2 CTI s services did not include responsibilities related to determining, supervising, implementing or controlling the means, methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to health. safety or welfare. Information contained herein is riot to be reproduced, except in full, without prior authorization from this office. If there are further questions regarding this matter please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING INC vi -Ste n W L eh— Project Manager SWUjng cc Pactrust -John Wiitala IOMNMAPACTRUST,Cc$ Clackamas Co Building Codes Division 6ioSEaVICEPco CLACKAMAS Ok US MHP Structrual Engineers - Eric Berkey E6EBr[Sp$lPSE•CE Marvin & Sons Construction Inc- Bob Marvin MARVINAND50N5a(UNLA51 NET Bend Office (541)330-9155 Geotechnicd Office (503)601-8250 Carlson Testing, Inc. Salem Office (541)345-0209 Salem Office (503)589-1252 Tigard Office (503)684-3460 Special Inspection FINAL SUMMARY LETTER June 9,2021 Job#. T1701930.0 City of Tigard 13125 SW Hall Blvd Tigard, OR 97223-8199 Attn: Building Division Re: Project Name. PBC190- PACTRUST VOLUNTARY SEISMIC UPGRADE- SUITE 900 Address: 7204 SW Durham Road-Tigard,OR Permit#i: 8UP2017-00218 Per Chapter 17,Section 1704,1.2 of the International Building Code(IBC),we have performed special inspection of the following item(s)per our inspection reports only: Adhesive Anchors All requested inspections and tests were performed and reported according to the requirements of project documents and to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship,provisions of the State Building Code and Standards,as well as the structural engineer's design changes,approvals and verbal instructions. Our construction inspection and testing services were provided and intended to help reduce the risk of construction defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with the approved construction documents. CTI has provided its professional services with the degree of care and skill currently exercised under similar circumstances by members of its profession in the same locale. Statements made in our reports are based on technical judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material tested/inspected only CTI's services did not include responsibilities related to determining, supervising implementing or controlling the means, methods, techniques,sequences or procedures of the construction or evaluating or reporting job conditions related to health,safety or welfare. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are further questions regarding this matter please do not hesitate to contact this office, Respectfully submitted, CARLSON TEST NG INC. t eLe h Project Manager SUmrm cc: PACTRUST-JOHN WIITALA CITY OF TIGARD BUILDING DIVISION-WALTER'CHIP'BARNETT MHP STRUCTURAL ENGINEERS -ERIC BERKES P 1ProjectstGenerati2017\T1701930D\06.09-21 Final Letter.doc Updated 11/30/11 trf3P11S J M M � Bend Office (,541)330-9155 Ei r- PA- 5 Geotechnical Office (503)6U1-f1250 Carlson Testing, Inc.Inc � Z Eugene Office (541)345-0289 Salem Office (503)589.1252 Tigard Off-ice (503)684-3460 Special Inspection FINAL SUMMARY LETTER November 6, 2018 Job# T 1701930.J City of Tigard 13125 SW Hall Blvd Tigard, OR 97223-8199 Attn Building Division Re. Project Name. PBPA143- Pactrust Voluntary Seismic Upgrade-Budding 6 Address 16480 SW 72""Avenue-Tigard, OR Permit 4t BUP2018-00146 Per Chapter 17.Section 1704 1.2 of the International Building Code(IBC),we have performed special inspection of the following item(s) per our inspection reports only Adhesive Anchors All requested inspections and tests were performed and reported according to the requirements of project documents and to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders end applicable workmanship, provisions of the State Building Code and Standards as well as the structural engineer's design changes,approvals and verbal instructions Our construction inspection and testing services were provided and intended to help reduce the risk of construction defects. deficiencies or omissions that arose dunng and after construction Our services do not constitute a warranty or guarantee of any type Even with diligent construction monitonng and testing, construction defects. deficiencies or omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with the approved construction documents CTI has provided its professional services with the degree of care and skill currently exercised under similar circumstances by members of its profession in the same locale. Statements made in our reports are based on technical judgments and should not be construed to be conclusive representations of fact Our reports pertain to the material tested/inspected only CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means, methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to health, safety or welfare. Information contained herein is not to be reproduced, except in full, without prior authorization from this office If there are further questions regarding this matter please do not hesitate to contact this office. Respectfully submitted. CARLSON TESTING INC. Steven W Leach Project Manager SWUks cc: Pactrust-John Wiitala MHP Structural Engineers-Eric Berkes Marvin& sons Construction Inc-Bob Marvin P\Pro ects\General1Frnat letter FormstNew Final Letter Templates\C iy of Tigard doc Updated 11/30(11 Bend Office (541)330-9155 Geotechnical Office (503)601-8250 Carlson Testing, Inc. Eugene Office (541)345-0189 Salem Office (503)589-1152 Tigard Office (503)684-3460 Special Inspection FINAL SUMMARY LETTER June 9, 2021 Job#: T1701930.P City of Tigard 13125 SW Hat Blvd Tigard,OR 97223-8199 Attn: Building Division Re: Project Name: OBP1 -PACTRUST VOLUNTARY SEISMIC UPGRADE-BLDG 1 Address: 16120 SW 72n4 Avenue-Tigard.OR Permit#: BUP2017-00202 Per Chapter 17,Section 1704.1.2 of the International Building Code(IBC),we have performed special inspection of the following items)per our inspection reports only: Adhesive Anchors All requested inspections and tests were performed and reported according to the requirements of project documents and to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship, provisions of the State Building Code and Standards,as well as the structural engineer's design changes,approvals and verbal instructions. Our construction inspection and testing services were provided and intended to help reduce the risk of construction defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with the approved construction documents. CTI has provided its professional services with the degree of care and skill currently exercised under similar circumstances by members of its profession in the same locale. Statements made in our reports are based on technical judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material tested/inspected only CTl's services did not include responsibilities related to determining, supervising, implementing or controlling the means, methods, techniques,sequences or procedures of the construction or evaluating or reporting job conditions related to health,safety or welfare. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are further questions regarding this matter please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING INC. eLe reject Manager SLimrrn cc: PACTRUST-JOHN WIITALA CITY OF TIGARD BUILDING DIVISION-WALTER'CHIP'BARNETT MARVIN&SONS CONSTRUCTION INC -BOB MARVIN P.Projects\Generalt20171T1701930Pi06-09-21 Final Letter.cuc Updated 11/30/11 Bend Office (541)330-9155 c:eotechnical Office (503)601-8250 Carlson Testing, Inc. Salem Office (541)345-0289 Salem UlTiee (503)589-1252 Tigard Office (503)684-3460 Special Inspection FINAL SUMMARY LETTER June 9,2021 Job#: T1701930 City of Tigard 13125 SW Hall Blvd Tigard, OR 97223-8199 Attn: Building Division Re; Project Name: 1OBP128-PACTRUST VOLUNTARY SEISMIC UPGRADE- BUILDING 18 Address: 16100 SW 72nd Avenue-Tigard, OR Permit#: BUP2017-00122 Per Chapter 17,Section 1704.1.2 of the International Building Code(IBC),we have performed special inspection of the following item(s)per our inspection reports only; Adhesive Anchors Structural Steel(Shop Only) All requested inspections and tests were performed and reported according to the requirements of project documents and to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship, provisions of the State Building Code and Standards,as well as the structural engineers design changes.approvals and verbal instructions. :Our construction inspection and testing services were provided and intended to help reduce the risk of construction defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with the approved construction documents. CTI has provided its professional services with the degree of care and skill currently exercised under similar circumstances by members of its profession in the same locale. Statements made in our reports are based on technical judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material tested/inspected only. CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means, methods, techniques,sequences or procedures of the construction or evaluating or reporting job conditions related to health, safety or welfare, Information contained herein is not to be reproduced, except in full, without prior authonzation from this office. If there are further questions regaroing this matter please Do not hesitate to contact tnls ofce. Respectfully submitted, CARLSON TESTI G INC. eac Project Manager SL/mrm cc: PACTRUST-JOHN W IITALA CITY OF TIGARD BUILDING DIVISION-WALTER'CHIP'BARNETT MHP STRUCTURAL ENGINEERS -ERIC BERKES P:1Projects\Genera112017\T1 70 1 930106-09.21 Final Letter.doc Updated 11/30/11 Bend Office (541)330-9155 Geetechnical Office (503)6014250 Carlson Testing, ugene Office (541)345-0284 Inc.• Salem Office (503)589-1252 Tigard Office (503)684-3460 Special Inspection FINAL SUMMARY LETTER Date: August 31,2017 Job#: T1701930.A City of Tigard 13125 SW Hall Blvd Tigard, OR 97223-8199 Attn: Building Division Re: Project Name: 10BP126-PacTrust Voluntary Seismic Upgrade-Building 14 Address: 16100 SW 72id Ave-Tigard, OR Permit#: BUP2017-00222& BUP2017-00197 Per Chapter 17, Section 1704.1.2 of the International Building Code(IBC), we have performed special inspection of the following item(s)per our inspection reports only: Adhesive Anchors The non-compliance (NC) items recorded for each of the above inspection categories, as listed on the non-compliance report, have been either repaired and re-inspected by CTI for compliance or reviewed and accepted by the engineer of record for the project in the"As-Built Condition'or through an RFI The issuance of this final report is based on the engineer's acceptance of the NC items not specifically re-inspected by CTI. CTI did not provide any additional review or re-inspection of those items beyond the inspections that initially generated each of these individual items on the non-compliance list. The engineer of record has provided the acceptance of the non-compliance items and as-built conditions. All requested inspections and tests were performed and reported according to the requirements of project documents and to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our construction inspection and testing services were provided and intended to help reduce the risk of construction defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with the approved construction documents. CTI has provided its professional services with the degree of care and skill currently exercised under similar circumstances by members of its profession in the same locale. Statements made in our reports are based on technical judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material tested/inspected only. ens services did not include responsibilities related to determining,supervising, implementing or controlling the means, methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to health,safety or welfare. Information contained herein is not to be reproduced. except in full, without prior authorization from this office. If there are further questions regarding this matter please do not hesitate to contact this office. Respectfully submitted,)) CARLSON-+STING INC erbn W. lAchi Project Manager SWL/jng cc: PacTrust-John Wiitala JosivvapAc.TRUST cow City of Tigard Building Division-Walter'Chip' Barnett EMAIY.ED MNP Structural Engineers-Eric Berkes ERFRKFStAMHPSE.COM Marvin&Sons Construction Inc-Bob Marvin MARVINANDSONS@COMCAST.NET P:\Projects\Genera112017\T1701930A10H-31.17 Final letter rioc Updated 11/30/11 Bend Office (541)330-9155 Geatechnical Office (503)601-8250 Carlson Testing Inc. Eugene Of (541)345-0289 Salem Office (503)589-1252 Tigard Office (503)684-3460 Special Inspection FINAL SUMMARY LETTER Date: June 19, 2018 Job#: T1701930,G City of Tigard 13125 SW Hall Blvd Tigard, OR 97223-8199 Attn: Building Division Re: Project Name: 10BP126-PacTrust Voluntary Seismic Upgrade- Building 7 Address: 16500 SW 72nd Ave-Tigard, OR Permit#: BUP2017-00316 Per Chapter 17, Section 1704.1.2 of the International Building Code(IBC), we have performed special inspection of the following item(s)per our inspection reports only: Adhesive Anchors The non-compliance (NC) items recorded for each of the above inspection categories, as listed on the non-compliance report, have been either repaired and re-inspected by CTI for compliance or reviewed and accepted by the engineer of record for the project in the'As-Built Condition' or through an RFI The issuance of this final report is based on the engineer's acceptance of the NC items not specifically re-inspected by CTI. CTI did not provide any additional review or re-inspection of those items beyond the inspections that initially generated each of these individual items on the non-compliance list. The engineer of record has provided the acceptance of the non-Compliance items and as-built conditions. All requested inspections and tests were performed and reported according to the requirements of project documents and to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our construction inspection and testing services were provided and intended to help reduce the risk of construction defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with the approved construction documents. CTI has provided its professional services with the degree of care and skill currently exercised under similar circumstances by members of its profession in the same locale. Statements made in our reports are based on technical judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material tested/inspected only. ctra services did not include responsibilities related to determining, supervising, implementing or controlling the means, methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to health,safety or welfare, Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are further questions regarding this matter please do not hesitate to contact this office. Respectfully submitted, C9RLSON. INGzC, W. Lea Project Manager SW L/jng cc: PacTrust- John Wiitala )oi,NWOPACTRUST.004 City of Tigard Building Division-Walter'Chip' Barnett MAILED MHP Structural Engineers -Eric Berkes EBERKESAMHPSE.COM Marvin& Sons Construction Inc- Bob Marvin MARV1NANOS0NSSCOMCAST.NET P\Projects1Genera1120171T1701930G\06-19-18 Final Leiter doc Updated 11/30/11 Bend Office (541)330-9155 Geotechnical Office (503)601-8250 Carlson Testing Inc SalOffice Eugene Office (541)345-0289 • Salem Office (503)589-1252 Tigard Office (503)684-3460 Special Inspection FINAL SUMMARY LETTER Date: June 19, 2018 Job#: T1701930.1 City of Tigard 13125 SW Hail Blvd Tigard, OR 97223-8199 Attn: Building Division Re: Project Name: 10BP126- PacTrust Voluntary Seismic Upgrade-Building 3 Address: 16300 SW 72n0 Ave-Tigard,OR Permit#: BUP2018-00018 Per Chapter 17, Section 1704.1.2 of the International Building Code(IBC),we have performed special inspection of the following item(s)per our inspection reports only: Adhesive Anchors The non-compliance (NC) items recorded for each of the above inspection categories, as listed on the non-compliance report, have been either repaired and re-inspected by CTI for compliance or reviewed and accepted by the engineer of record for the project in the`As-Built Condition'or through an RFI. The issuance of this final report is based on the engineer's acceptance of the NC items not specifically re-inspected by CTI. CTI did not provide any additional review or re-inspection of those items beyond the inspections that initially generated each of these individual items on the non-compliance list. The engineer of record has provided the acceptance of the non-compliance items and as-built conditions. All requested inspections and tests were performed and reported according to the requirements of project documents and to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our construction inspection and testing services were provided and intended to help reduce the risk of construction defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or guarantee of any type. Even with diligent construction monitoring and testing, construction defects. deficiencies or omissions in the contractors work may exist. It is the contractor's responsibility to perform their work in accordance with the approved construction documents. CTI has provided its professional services with the degree of care and skill currently exercised under similar circumstances by members of Its profession in the same locale. Statements made in our reports are based on technical judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material tested/inspected only. CTrs services did not include responsibilities related to determining, supervising, implementing or controlling the means, methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to health, safety or welfare. Information contained herein is not to be reproduced, except in full,without prior authorization from this office. If there are further questions regarding this matter please do not hesitate to contact this office. Respectfully submitted - STIN NC. nW. L chi Project Manager SW L/jng cc: PacTrust-John Wiitala )OHNWePACTRUST.COM City of Tigard Building Division-Walter 'Chip' Barnett MAILED MHP Structural Engineers-Eric Berkes EBERKES@MHPSE.00M Marvin& Sons Construction Inc-Bob Marvin MARVTNANOSONSaCOMCAST.NET P 1ProjectslGeneral120171T17019301\06-19-18 Final letter.doc Updated 11/30/11 Bend Office (541)330-9155 Ceotechnical Office (503)601-8250 Carlson Testing, Inc. Eugene Office (541)345-0289 Salem Office (503)589-1252 Tigard Office (503)684-3460 Special Inspection FINAL SUMMARY LETTER Date. January 10, 2019 Job#: T1701930.K City of Tigard 13125 SW Hall Blvd Tigard, OR 97223-8199 Attn: Building Division Re: Project Name: PBPA143—Pactrust Voluntary Seismic, Upgrade— Building 2 Address: 16200 SW 72nd Avenue—Tigard, OR Permit#: BUP2018-00161 Per Chapter 17, Section 1704.1.2 of the International Building Code(IBC), we have performed special inspection of the following item(s)per our inspection reports only: Adhesive Anchors Structural Steel(Shop Only) All requested inspections and tests were performed and reported according to the requirements of project documents and to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our construction inspection and testing services were provided and intended to help reduce the risk of construction defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with the approved construction documents. CTI has provided its professional services with the degree of care and skill currently exercised under similar circumstances by members of its profession in the same locale. Statements made in our reports are based on technical judgments and should not be construed to be conclusive representations of fact. Our reports pertain to the material tested/inspected only. CTI's services did not include responsibilities related to determining, supervising, implementing or controlling the means, methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to health, safety or welfare. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are further questions regarding this matter please do not hesitate to contact this office, Respectfully submitted, CARD TESTI INC. 7 ven W. each Project Manager SWUjng cc: PACTRUST-JOHN WIITALA CITY OF TIGARD BUILDING DIVISION-WALTER 'CHIP'BARNETT MHP STRUCTURAL ENGINEERS -ERIC BERKES MARVIN&SONS CONSTRUCTION INC -BOB MARVIN P.iProjects\Genera1120171T1701930K101-10-19 Final Letter.doc Updated 11/30/11 August 2, 2018 Job#: T1803886 Page 2 of 2 CTI's services did not include responsibilities related to determining supervising, implementing or controlling the means, methods, techniques, sequences or procedures of the construction or evaluating or reporting job conditions related to health. safety or welfare Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are further questions regarding this matter please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING INC. Jd Stev4n W Lech Project Manager SLlks cc. Columbia Tech Center LLC c!o Pactrust-Leslie Louis Abbott Construction -Jason Bragg MHP Structural Engineers - Eric Berkes Rend Office (541)330-9155 Geotcchnicat Office (503)601-8250 Carlson Testing, Inc. Eugene Office (541)345-0289 Salem Office (503)5,89-1252 Tigard Office (503)684-3460 Special Inspection FINAL SUMMARY LETTER August 2, 2018 Job# T1803886 City of Tigard 13125 SW Hail Blvd Tigard. OR 97223-8199 Attn Building Division Re Project Name PCC211 -Pactrust Voluntary Seismic Upgrade Address 15755 SW Sequoia Parkway-Tigard, OR Permit# BUP2017-00201 Per Chapter 17, Section 1704.1.2 of the International Building Code (IBC), we have performed special inspection of the following item(s) per our inspection reports only' Installation of Adhesive Anchors Any non-compliance (NC) items recorded for each of the above inspection categories. as listed on the non-compliance report, have been either repaired and re-inspected by CTI for compliance or reviewed and accepted by the engineer of record for the project in the"As-Built Condition' or through an RFI. The issuance of this final report is based on the engineer's acceptance of the NC items not specifically re-inspected by CTI If CTI did not provide additional review or re-inspection of those items beyond the inspections that initially generated each of the non-compliance items, then the engineer of record has provided acceptance of the non-compliance items and as-built conditions All requested inspections and tests were performed and reported according to the requirements of project documents and to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship, provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions Our construction inspection and testing services were provided and intended to help reduce the risk of construction defects, deficiencies or omissions that arose during and after construction. Our services do not constitute a warranty or guarantee of any type. Even with diligent construction monitoring and testing, construction defects, deficiencies or omissions in the contractor's work may exist. It is the contractor's responsibility to perform their work in accordance with the approved construction documents CTI has provided its professional services with the degree of care and skill currently exercised under similar circumstances by members of its profession in the same locale. Statements made in our reports are based on technical judgments and should not be construed to be conclusive representations of fact Our reports pertain to the material tested/inspected only P 1Proiects\Generai\Final Letter Forms\Ne*Final Letter Templates\City of Tigard doc Updated 11/30111