Loading...
HomeMy WebLinkAboutReport (2) Sup 201-7-oozg8' I g461 sw wa-v-ttiv -vi SA sau 5 RD 461 t- ,.20\1 kOAD SECOND t LOOP, =AP.ARIJS; N! orE 2 S A R G F N l i :773.253.9, , T A(�CHSTE�.TS 973.23.i3?D 6= N�JVba%.SA GiAFCF'.C. NOV 2 2017 CITY OF TIGA D October 18, 2017 Attn: City of Tigard Perm it Center BUILDING DIVISION 13125 SW Hall Blvd. Tigard,OR 97223 Tel:503-218-2436 RE:Lids-Store#5665—9461 SW Washington Square Rd.Ste.Al 3 Portland,OR 97223 To Whom This May Concern, Please see the listof changes we have made below since your initial review of the above - mentioned project. Sheet T1.0: • Revised project address • Revised Drawing Index • Revised Responsibility Schedule • Updated Vendor List Sheet D1.0: • Removed columns from plan that are not in field and revised associated notes Sheet A1.0: • Revised cashwrap location • Added note for data ports • Removed columns from plan that are not in field • Revised soffit heights • Removed outlets @ 18"AFF in Sales Area Sheet A1.1: A • Revised column detail • Added column elevations • Revised ceiling height on section Sheet A2.0: • Removed columns from plan that are not in field • Revised angles on fixtures • Added perimeter fixture • Revised counts • Revised Fixture Schedule perplanchanges • Sheet A3.0: • Removed columns from plan that are not in field • Revised ceiling and soffit heights and associated notes • Revised soffit at storefront • Revised lighting and Light Fixture Schedule per plan change Sheet A3.1: • Revised dimensions on the mill work fixture above the cashwrap • Revised ceiling heights SARGENTI ARCHITECTS Pagel 10/18/2017 SA 461 FROM ROAD SECOND FLOOR PARAMUS, r,..! 07652 S Aft Ci E:- del T I 97:3.<'S >'�l T CS 7 ARCHITET3.25_0 tC? �: \VVPIS.4GARCH.COM October 18, 2017 • Added Landlord required notes Sheet A4.0: • Removed columns from plan that are not in field • Removed striped paint on walls • Condensed Sheets A4.O and A4.1(Finish Schedules and Details)into one sheet • Added Comments to the Finish Schedule for ACT, Brake Metal and fixture finishes Sheet A4.1: • Condensed with A4.0 sheet Sheet A5.0: • Revised interior elevations to show updated fixtures • Revised to show new ceiling heights per plan changes • Added mirror at storefront Sheet A6.0: • Revised storefront glazing height • Revised reveal location and updated detail 4/A6.0 • Revised Enlarged Storefront Entry Pier Detail • Added vinyl signageon glazing • Added required Landlord notes • Revised storefront finish Sheet A7.0: • Revised storefront finish • Revised heights per plan/elevation changes • Revised soffitcondition on sections Sheet A7.1: • Revised storefront finishes • Revised storefront heights per plan/elevation changes • Revised details per soffit conditions Sheet A8.0: • Revised cashwrap size • Revised customization fixture plan/elevations to be 2'-10" high Sheet A8.1: • Revised perimeter fixture heights/angles Sheet M1.0: • Revised diffuser location per lighting change • Revised thermostat note on Thermostat Schedule • Revised ductwork • Revised VAV location SARGENTI ARCHITECTS Paget 10/18/2017 A i£`1 , ROM ROAD SEL-OND ELOGR PAP AMUS, Nl 07S52 S A R C [ N T I 973.253 T ARC HITE( TS 9315-,ARG r October 18, 2017 Sheet E1.0: • Revised lighting plan • Revised Light Fixture Schedule per plan changes Sheet E1.1: • Removed outlets @ 18"AFF in Sales Area Sheet E1.2: • Revised PanleboardScheduleper plan changes Sheet S1.0: • Removed columns from plan that are not in field and updated box column locations Sheet TC1.0: • Revised fixtures on plan • Added notes 6 and 7 Sheet SP1.0: • Updated per lighting changes FA1.0: • Revised plan per fixturechanges If there are any questions please feel free to contact the Senior Project Manager:Wesley L. Short(973)859-9367,or at ws hortt7a.sargarch.com. Sincerely, `<<,` D ARC4 f' W ROB.- • Cr / / 1US,NJ Robert J. Sargenti, AIA OF 0' SARGENTI ARCHITECTS Page3 10/18/2017