CITY OF TIGA D October 18, 2017
Attn:
City of Tigard Perm it Center BUILDING DIVISION
13125 SW Hall Blvd.
Tigard,OR 97223
Tel:503-218-2436
RE:Lids-Store#5665—9461 SW Washington Square Rd.Ste.Al 3 Portland,OR 97223
To Whom This May Concern,
Please see the listof changes we have made below since your initial review of the above - mentioned project.
Sheet T1.0:
• Revised project address
• Revised Drawing Index
• Revised Responsibility Schedule
• Updated Vendor List
Sheet D1.0:
• Removed columns from plan that are not in field and revised associated notes
Sheet A1.0:
• Revised cashwrap location
• Added note for data ports
• Removed columns from plan that are not in field
• Revised soffit heights
• Removed outlets @ 18"AFF in Sales Area
Sheet A1.1:
A • Revised column detail
• Added column elevations
• Revised ceiling height on section
Sheet A2.0:
• Removed columns from plan that are not in field
• Revised angles on fixtures
• Added perimeter fixture
• Revised counts
• Revised Fixture Schedule perplanchanges
• Sheet A3.0:
• Removed columns from plan that are not in field
• Revised ceiling and soffit heights and associated notes
• Revised soffit at storefront
• Revised lighting and Light Fixture Schedule per plan change
Sheet A3.1:
• Revised dimensions on the mill work fixture above the cashwrap
• Revised ceiling heights
SARGENTI ARCHITECTS Pagel
10/18/2017
SA
461 FROM ROAD
SECOND FLOOR
PARAMUS, r,..! 07652
S Aft Ci E:- del T I 97:3.<'S >'�l T
CS
7
ARCHITET3.25_0 tC? �:
\VVPIS.4GARCH.COM
October 18, 2017
• Added Landlord required notes
Sheet A4.0:
• Removed columns from plan that are not in field
• Removed striped paint on walls
• Condensed Sheets A4.O and A4.1(Finish Schedules and Details)into one sheet
• Added Comments to the Finish Schedule for ACT, Brake Metal and fixture finishes
Sheet A4.1:
• Condensed with A4.0 sheet
Sheet A5.0:
• Revised interior elevations to show updated fixtures
• Revised to show new ceiling heights per plan changes
• Added mirror at storefront
Sheet A6.0:
• Revised storefront glazing height
• Revised reveal location and updated detail 4/A6.0
• Revised Enlarged Storefront Entry Pier Detail
• Added vinyl signageon glazing
• Added required Landlord notes
• Revised storefront finish
Sheet A7.0:
• Revised storefront finish
• Revised heights per plan/elevation changes
• Revised soffitcondition on sections
Sheet A7.1:
• Revised storefront finishes
• Revised storefront heights per plan/elevation changes
• Revised details per soffit conditions
Sheet A8.0:
• Revised cashwrap size
• Revised customization fixture plan/elevations to be 2'-10" high
Sheet A8.1:
• Revised perimeter fixture heights/angles
Sheet M1.0:
• Revised diffuser location per lighting change
• Revised thermostat note on Thermostat Schedule
• Revised ductwork
• Revised VAV location
SARGENTI ARCHITECTS Paget
10/18/2017
A
i£`1 , ROM ROAD
SEL-OND ELOGR
PAP AMUS, Nl 07S52
S A R C [ N T I 973.253 T
ARC HITE( TS 9315-,ARG r
October 18, 2017
Sheet E1.0:
• Revised lighting plan
• Revised Light Fixture Schedule per plan changes
Sheet E1.1:
• Removed outlets @ 18"AFF in Sales Area
Sheet E1.2:
• Revised PanleboardScheduleper plan changes
Sheet S1.0:
• Removed columns from plan that are not in field and updated box column locations
Sheet TC1.0:
• Revised fixtures on plan
• Added notes 6 and 7
Sheet SP1.0:
• Updated per lighting changes
FA1.0:
• Revised plan per fixturechanges
If there are any questions please feel free to contact the Senior Project Manager:Wesley L. Short(973)859-9367,or at
ws hortt7a.sargarch.com.
Sincerely, `<<,` D ARC4 f'
W ROB.- •
Cr /
/
1US,NJ
Robert J. Sargenti, AIA OF 0'
SARGENTI ARCHITECTS Page3
10/18/2017