Loading...
Permit Support Document (2) City of Tigard COMMUNITY DEVELOPMENT DEPARTMENT T aF A R o Building Permit Review — Commercial - With Land Use Building Permit #: o 6(ji - ' SS 7 Site Address: C 217 ,1 - �:�IC1Coa VkRSe 2 Suite/Bldg#: Project Name: // ,9 /71:41/ 6-W (Nan e o n mercial business occupying the space. If vacant,enter Spec Space.) Planning Review C . �1 Proposal: (� :vo 'S Y`9 crlVviv r . ,c% ( bM11cikl/1, fjY' S`C IT S -t,)YC4 3e AQ Verify site address/suite# exists and active in permit system. n River Terrace Neighborhood: ❑ Yes IX No 11/Land Use Case#: CA 17 20 CO00©� V Plans Match Approved Land Use: tL> Site Plan Vriandscape Plan ❑ Other: Urban Forestry Plan ❑ Elevation Plan ❑ Building Height: Maximum Height Ac al Height AConditions Met: ❑ Prior to Submittal IV/Prior to Permit Issuance Business License: ,_/Exists: es ❑ No, applicant notified tor obtain business license LfY Public Facilities mprovement(PFI) Permit: G.CJ 1? '"OO( ( ) —/ Required: PYes, applicant was notified LI No Applied For: LI' Yes ❑ No, stop intake Notes: Ai, ,e sk. 11 `r rl~ ' • . IMMIPAIIMISSWERVI iiih, - R [ MILIaMCIL" Approved by Planning: I , '# t/ 0A, ate: Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Building Permit Submittal Original Submittal Date: '")/: /i 7 Site Plans: # 3 Building Plans: # � Building Permit#: nter b-u—ilding permit# above. Workflow Routing: [ ing gineering mit Coordinator C-Burring Workflow Sign-off: sign-off for Planning(include notes from planning review) Route Application Documents: ding: original permit application, site plans,building plans, engineer and beam calculations and trust details,if applicable, etc. Notes: By Permit Technician: «��p .+ Date: -41/7 riV/7 1:\Building\Forms\B1dgPennitRvw_COM_WithLandUse 070915.docx j - Engineering Review ❑ Slope at building pad: ❑ PFI Permit#: o2p 0 do 73 ❑ Conditions "Met"prior to issuance of building permit /1/a:AteM .sea A i J I4QNCL ❑ Easements (encroachments) per engineering conditions of approval and plat (not typical on SDR/CUP) ❑ Water Quality/Quantity Facility: Assess Water Quality Fee in-lieu: ❑ Yes ❑ No Assess Water Quantity Fee in-lieu: ❑ Yes ❑ No LIDA Facility on lot: ❑ Yes ❑ No ❑ NOT Approved by Engineering: Date Notes: Approved by Engineering: Date: 7%02 7//7 Revisions (after Building Submittal only) Reviewer Date Revision 1: ❑ Approved ❑ Not Approved Revision 2: ❑ Approved ❑ Not Approved Revision 3: ❑ Approved ❑ Not Approved Permit Coordinator Review ❑ Conditions "Met"prior to issuance of building permit Approved,NOT Released: C D'/v,�-, UGC Gccc Date: (/ji/ Notes: Revisions (after Building Submittal only) Revision Notice 1: Date Sent to Applicant: Revision Notice 2: Date Sent to Applicant: Revision Notice 3: Date Sent to Applicant: pSDC Fees Entered: Wash Co Trans Dev Tax: Yes ❑ N/A Tigard Trans SDC: ❑ Yes , N/A Parks SDC: ❑ Yes 15(N/A ❑ OK to Issue Permit Approved by Permit Coordinator: Date: I:\Building\Forms\B1dgPennitRvw_COM WithlandUse 070915.docx Albert Shields From: Albert Shields Sent: Monday,August 14, 2017 11:47 AM To: 'dbrown@wentprop.com' Cc: Gary Pagenstecher Subject: BUP2017-00187, 217 Self-Storage David, on reviewing your plans and application for the above permit we find that only 4 of the 39 Conditions of Approval for the underlying Land Use Case have been met. Accordingly, I will code this application as "Approved but Not Released" and keep it on Hold until the requisite conditions have been met. Meanwhile, Plan Review will continue. Please let me know if you have any question. Albert Shields 1