Plans (22) BU P2017 - 00067 RECEIVED MAR 2 3 ZU1T IllirEA; lifi Illp CIIS H e • lit lel _ RESPONSIBILITY SCHEDULE cc ,CVS CVs DIV DESCRIPTION M a ' J i a J REMARKS Health z o F 2 a 1 GENERAL REQUIREMENTS - 7358 SW DURHAM ROAD , PORTLAND , OR 97224 1. Permits and Fees X � Includes building permit & tap fees and winter conditions if applicable and approved by CVS Project Construction as an allowance. 9 FINISHES onager anDirectoro 1 STORE NUMBER: . CVS CORAM PORTLAND , TEMPORARY CLEAN ROOM 1. Resilient Flooring X X X I Armstrong 7358 SW DURHAM ROAD 2. Flooring Sealant x X X GC to apply three (3) coats. PORTLAND, OR 97224 12 EQUIPMENT p� 1�T�yp NON p�TA� 1. Cleanroom Carts, tables, X X X PROJECT TYPE: NON-RETAIL zrepeater pumps 13 SPECIAL CONSTRUCTION _ DEAL TYPE: 1. Cleanroom X X X To be relocated from another PI IVVL1/� Nr)UM4L1 i' m Coram site. I 'r co co 15 MECHANICAL 1 1. Hoods X X X To be relocated from another w Coram site. (Quantity 2) u-) r7 cq r cp _ 2. FFU's X X X To be relocated from another z z z z z v) w a Coram site. (Quantity 6) ARCHITECT OF RECORD L L J F-- \ 3. CU/ECU X X X m m m m mLLi m 4. Cleanroom Sink X X X To be relocated from another CC a a a a a` a Coram site with all associated 0 0 0 0 0 � o DRAvvING INDEX TEAM MEMBERS q _ accessories. 0 o p p m o 5. SP-1 Sump Pump X X X To be relocated from another w w w w wL.J w Coram site. co N cncncncncncnv) 16 ELECTRICAL °I. 440'A' I. Clean Room Lighting X X X To be relocated from another ■ CS COVER SHEET CONTRACTOR: TBD MECHANICAL/ GPD ENGINEERING AND ARCHITECTURE , Carom site. (Quantity 5) GPD and Architecture TENANT CVS/HEALTH, INC. PAULA DESMARAIS PLUMBING PROFESSIONAL CORPORATION professional .• ARCHITECTURAL PROJECT 1 CVS DRIVE TEL: (401) 770-5398 ENGINEER: 520 S. MAIN STREET GREG LAVRIHA 520 South Main Street, uite 2531 MANAGER: SUITE 300p Akron,Off 44311 ■ A-1.0 DEMOLITION FLOOR AND REFLECTED CEILING PLANS WOONSOCKET, RI 02895 SUITE 2531 TEL: {216) 927-8657 330.572.2100 Fax:330.572.2102 AKRON, OH 44311 FAX: 330 572-2101 SYMI3OLS ■ A-1.1 FLOOR AND REFLECTED CEILING PLANS { ) ELECTRICAL GPD ENGINEERING AND ARCHITECTURE STRUCTURAL CONSTRUCTION CVS/HEALTH, INC. JASON RODGERS ARCHITECT: GPD ENGINEERING AND ARCHITECTURE ENGINEER: PROFESSIONAL CORPORATION ' IN S-0.1 GENERAL NOTES & TYPICAL DETAILS PROJECT Jason.rodgers@CVScaremark.com PROFESSIONAL CORPORATION 520 S. MAIN STREET JOE ROSS ENLARGED PLAN CONSULTANT: 9 CENTERLINE ■ S-1.1 ROOF FRAMING PLAN MANAGER: (916) 261-5961 520 S. MAIN STREET SHAWN FINLEY SUITE 2531 TEL: (330) 572-3630 1.5 OF COLUMN r - `^ Mr DETAIL MARK SUITE 2531 TEL: (614) 588-8060 AKRON, OH 44311 FAX: (330) 572-2101 I I MECHANICAL/PLUMBING AKRON, OH 44311 FAX: (614) 210-0752 1 SECTION MARK - ■ M-0.1 MECHANICAL SCHEDULES AND DETAIL SHEET STRUCTURAL GPD ENGINEERING AND ARCHITECTURE AI ELEVATION © 'SIM' - SIMILAR _• M-0.2 MECHANICAL SPECIFICATIONS VIIP MARK A-5, V ■ M-1,1 DEMOLITION AND NEW WORK MECHANICAL PLANS ENGINEER: PROFESSIONAL CORPORATION OH - OPPOSITE • ■ P-0.1 PLUMBING SCHEDULES AND SPECIFICATIONS 520 S. MAIN STREET RYAN BLACK HAND ■ P-1.1 PLUMBING FLOOR PLAN SUITE 2531 TEL: (330) 572-2489 AKRON, OH 44311 FAX: (330) 572-2101 PROJECT INFORMATION ELECTRICAL ABBREVIATIONS (ABBREVIATIONS SHOWN ARE NOT ■ E-1.0 PARTIAL ELECTRICAL DEMO PLAN & SYMBOL LEGEND NECESSARILY USED ON THE DRAWINGS) The building shall be in compliance with the: ■ E-1.1 PARTIAL LIGHTING & POWER PLANS2014 Oregon Structural Specialty Code (OSSC) ■ E-2.1 ELECTRICAL DETAILS AND PANEL SCHEDULES A C (CONTINUED) F J N {CONTINUED) R T (CONTINUED) 2014 Oregon Plumbing Specialty Code (OPSC) ■ E-2.2 ELECTRICAL SPECIFICATIONS AB ANCHOR BOLT CJ CONTROL JOINT FA FIRE ALARM J-BOX JUNCTION BOX NFPA NATIONAL FIRE PROTECTION RA RETURN AIR THRU THROUGH A/C AIR CONDITIONING CTR CENTER FACP FIRE ALARM CONTROL PANEL JT JOINT ASSOCIATION RAD RADIUS T THERMOSTAT 2014 Oregon Mechanical Specialty Code (OMSC) DEVELOPER: AC ALTERNATING CURRENT CV CHECK VALVE FCO FLOOR CLEANOUT JST JOIST NIC NOT IN CONTRACT ` RCP REFLECTED CEILING PLAN, TYP TYPICAL 2014 Oregon Electrical Specialty Code OESC ACC ACCESSIBLE CW COLD WATER FD FIRE DAMPER, FLOOR DRAIN NL NIGHT LIGHT RD ROOF DRAIN T THICKNESS ((STRUCT) 9 P y ( ) ACI AMERICAN CONCRETE INSTITUTE FIN FINISH (ED) K NO NUMBER RE: REFERENCE, REFER TS TUBULAR STEEL (STRUCT) 2014 Oregc'1 Energy Efficiency Specialty Code (OEESC) ADA AMERICANS WITH DISABILITIES ACT D FIXT FIXTURE NOM NOMINAL REINF REINFORCING TRS TRUSS (STRUCT) CODE INFORMATION ADJ ADJUSTABLE FDN FOUNDATION k KIPS (1000 LBS) NTS NOT TO SCALE READ REQUIRED ' I AFF ABOVE FINISHED FLOOR DBL DOUBLE FLG FLANGE kV KILOVOLT RO ROUGH OPENING �•J RISC AMERICAN INSTITUTE OF STEEL CONS. DC DIRECT CURRENT FTG FOOTING kVA KILOVOLT-AMPS RPM REVOLUTIONS PER MINUTE ALUM ALUMINUM DEG DEGREES FF FINISHED FLOOR kW KILOWATT RTU ROOFTOP UNIT UL UNDERWRITERS AMP AMPERE, AMPS DEFS DIRECT-APPLIED EXTERIOR FLR FLOOR kWH KILOWATT-HOUR OA OUTSIDE AIR LABORATORIES, INC. ARCH ARCHITECT, ARCHITECTURAL FINISH SYSTEM FR FIRE-RETARDANT OC ON CENTER UON UNLESS OTHERWISE NOTED LOCATION MAP ASHRAE AMERICAN SOCIETY OF HEATING, DIA DIAMETER TREATED MATERIALS L OCC OCCUPANTS S UPS UNINTERRUPTIBLE (BASED ON 2014 OREGON BUILDING CODES) REFRIGERATION AND AIR DIM DIMENSION FRP FIBERGLASS REINFORCED LB POUNDS OF OUTSIDE FACE SCHED SCHEDULED POWER SUPPLY ASTM AMERIICANCONDITIONING SOCIETY ENGINEERS TESTING AND DN DOWN DAD FT FOOT,PANEL FEET LF LINEAR FEET OH OPPOSITED OUTSIDE DHAND�R SD SMOKE RMDAMPER, Y 3 V " LL LIVE LOAD, LANDLORD MATERIALS DS DOWNSPOUT LLH LONG LEG HORIZONTAL OPNG OPENING SECT SECTION V VOLT .;,,0- r •••-•-- ` 1. USE AND OCCUPANCY CLASSIFICATION (302.0) B DTL DETAIL �j 056 ORIENTED STRAND BOARD S SENSOR > 3 ° DWGS DRAWINGS LO LONG LEG VERTICAL OSHA OCCUPATIONAL SAFETY AND VA VOLT-AMPERE BUSINESS GROUP (B) - GA GAUGE LONG LONGITUDINAL HEALTH OCCUPATIONAL SF SQUARE FEET VERT VERTICAL rT,a;:.. u f , l BLDG BUILDING E GALV GALVANIZED LP LOW POINT SHT SHEET NF VERIFY IN FIELD GC GENERAL CONTRACTOR LTG LIGHTING SIM SIMILAR VRC VERTICAL RECIPROCATING SEAL. STORAGE (S2) BM BEAM P SHT MTL SHEET METAL I SEAL: EA EACH GB GRADE BEAM CONVEYOR BTU BOTTOM LWC LIGHT WEIGHT CONCRETE SPEC SPECIFICATION EF EXHAUST FAN GWB GYPSUM WALL BOARD PAR PARALLEL VTR VENT THROUGH ROOF BTU BRITISH THERMAL UNITL LENGTH 2. CONSTRUCTION TYPE: BOF BOTTOM OF FOOTING EXPANSION JOINT GAB GRADED AGGREGATE BASE PC PIECE = SQ SQUAREESS STEEL, F � ��� ELEV ELEVATION GYP GYPSUM WALL BOARD PDU POWER DISTRIBUTION UNIT SANITARY SEWERC *" ff TYPE III-8 CONSTRUCTION (SPRINKLERED) BRG BEARING M EIFS EXTERIOR INSULATION AND PH PHASE FINISH SYSTEM H MAX MAXIMUM PL PLATE STD STANDARD W WIDTH , J� ELEC ELECTRICAL MDP MAIN DISTRIBUTION PANEL PLBG PLUMBING STL STEEL W/ WITH • 1T.ilt.1:::::.)15-1,./:\ .);'I•;[ti 3. BUILDING HEIGHT (503.0) CF CUBIC FEET EMBED EMBEDMENT HGT HEIGHT MECH MECHANICAL PNL PANEL STIFF STIFFENER W/O WITHOUT " CD CONDENSATE MP EMPLOYEE HORIZ HORIZONTAL MEZZ MEZZANINE PIV POST INDICATOR VALVE STIR STIRRUPS WCO WALL CLEANOUT Allowable Height (story/feet) 4 STORY/ 55 -0 CERTS CERTIFICATES A� STRUCT STRUCTURAL WC WATER CLOSET "rc P..r 'h13!I �` S ENERGY MANAGEMENT SYSTEM HP HORSEPOWER OR HIGH POINT MFR MANUFACTURER PSF POUNDS PER SQUARE FOOT CFM CUBIC FEET PER MINUTE ENCL ENCLOSURE HTR HEATER MIN MINIMUM PVC POLYVINYL CHLORIDE SUSP SUSPENDED WD WOOD Actual Height stories/feed 1 STORY CKT CIRCUIT SJ SAW JOINT ; , , `:i). fi];3ii g { / ) EOD EDGE OF DECK HVAC HEATING, VENTILATING AND MLO MAIN LUGS ONLY PWD PLYWOOD WL WIND LOAD a.a a-Mw� KG CENTERLINE EQ EQUAL AIR CONDITIONING MO MASONRY OPENING WP WEATHERPROOF ti a, 4. BUILDING AREA (503.0} LR CLEARGOR CLEARANCE EQUIP EQUIPMENT MSB MON SWITCHBOARD Q T EXGR EXTERIOR GRADE WWF WELL OPENINGFABRIC 3 i0 - I / Allowable Building Area per floor 76,000 SF CMU CONCRETE MASONRY UNIT MTD MOUNTED r" EXH EXHAUST I T&B TOP AND BOTTOM WF WIDE FLANGE (STRUCT) u,ro • CO CLEANOUT EXP EXPANSION ID INSIDE DIAMETER QTY QUANTITY F �� ��"•� BuildingArea 45,036 SF COL COLUMN IE INVERT ELEVATION T/FfiG TOP OF FOOTING EXIST EXISTING TEMP TEMPERATURE 0 CONC CONCRETE, CONCENTRIC EXT EXTERNAL, EXTERIOR INT INTERIOR N/A NOT APPLICABLE , �I Tenant Lease Area 12,417 SFNECTHICK THICKNESS CONT CONTINUOUS, CONTINUATION EW EACH WAY IN INCH, INCHES N NATIONAL ELECTRICAL CODE "`"'"`° v) Area of Work 511.1 SF COORD COORDINATE EWC ELECTRIC WATER COOLER INSUL INSULATION NEMA NATIONAL ELECTRICAL THRESH THRESHOLD XFMR TRANSFORMER j MANUFACTURER'S ASSOC. TOJ TOP OF JOIST TO TOP OF �. v; �';:� * r'�i rn NF NEAR FACE Y "; • �• TOS TOP OF STEEL ,x„,, a G g ';' t:'1;'�Di Ir • ' +�• 5. FIRE-RESISTANCE RATING REQUIREMENTS FOR BUILDING ELEMENTS !• - �'� ' ' '� ul (Table 601): YD YARD ._ . APPi `' � G1 bSe cl 10 15 J4- A. Structural frame (including columns, girders, trusses): 0 Hr(s) 01'Q _ I I B. Bearing walls (interior & exterior) 0/2 Hr(s) pe h Sig. 136 P7--O` -- op,. / U C. Nanbearing walls & partitions (interior & exterior): 0 Hr(s) ' ` r -=7��:iiT'"'t�j��ll�'J� . , i D. Floor construction (including supporting beams & joists): 0 Hr(s) Sui; �, E. Roof construction (including supporting beams & joists): 0 Hr(s) GENERAL NOTES yw ` E :w 1 " 1M11#1=0.11ar•r U 7. FIRE PROTECTION SYSTEMS, CORAM HEALTHCARE SUITE ONLY $ A. Sprinkler System (903.2.7): Required Yes Provided Yes c 1. CONTRACTORS SHALL NOT SCALE THESE DRAWINGS FOR CONSTRUCTION PURPOSES. IN PROTECT.THE INTERIOR WALL COVERING. EXTERIOR OPENINGS SHALL BE FLASHED IN SUCH o B. Standpipe System (905): Required No Provided No THE EVENT OF OMISSION OF NECESSARY DIMENSIONS OR INFORMATION, CONTRACTOR SHALL 7. ALL PLAN DIMENSIONS ARE TO FINISHED FACE OF FINISHED WALLS, FACE OF MASONRY, A MANNER AS TO MAKE THEM WATERPROOF. C. Fire & Smoke Detection (907): Required Yes Provided Yes NOTIFY ARCHITECT. FIGURED AND CALCULATED DIMENSION TAKES PRECEDENCE OVER AND CENTERLINE OF COLUMNS, UNLESS NOTED OTHERWISE. t OFFICE COPY rn D. Fire Alarm (907.2.2): Required No _Provided No SCALED MEASUREMENTS. DETAILED DRAWINGS AND LARGER SCALE DRAWINGS TAKE 19. ALL WOOD BLOCKING TO BE TREATED. d E. Smoke Vents (91O}: Required No Provided No PRECEDENCE OVER SMALLER SCALE DRAWINGS. ALL PLAN DETAILS AND WALL SECTIONS 8. VERIFY ALL ELEVATIONS AND DIMENSIONS OF STRUCTURAL ELEMENTS WITH ARE ASSUMED TO BE TYPICAL CONDITIONS UNLESS DETAILED OR NOTED OTHERWISE. ARCHITECTURAL DRAWINGS. IN CASE OF CONFLICT, NOTIFY ARCHITECT. THE CONTRACTORS 20. DEMOLITION & CONSTRUCTION MUST BE SEQUENCED & COORDINATED TO INSURE THAT ii NORTH 0 F. Portable Fire Extinguisher (906): Required Yes Provided Yes SHALL VERIFY ALL DIMENSIONS AND BE RESPONSIBLE FOR THEM, ALL DIMENSIONAL THE BUILDING BUSINESS OPERATIONS ARE MAINTAINED. COORDINATE ALL WORK WITH a 2. ALL FINISHED FLOOR ELEVATIONS RE: TO ARCHITECTURAL DRAWINGS ONLY. DISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION OF THE ARCHITECT. BUILDING MANAGEMENT PRIOR TO PROCEEDING. cff 8. DESIGN OCCUPANT LOAD (1004.1) 3. VERIFY ALL DIMENSIONS, CONDITIONS, AND GRADES AT JOB SITE. ALL CONTRACTORS 13. COORDINATE WITH MECHANICAL CONTRACTOR FOR LOCATIONS OF ALL FLOOR DRAINS. KEy pLAN Business Areas (100 sf/occ.) 10,317 sf / 104 occ. SHALL COORDINATE THEIR WORK WITH OTHER TRADES AND REPORT DISCREPANCIES, PRIOR DRAWING BY: o Storage Areas (500 sf/occ.) 2,099.6 sf / 5 occ. TO THEIR CONSTRUCTION, TO THE ARCHITECT FOR REVIEW AND CLARIFICATION OR ACTION. 14. ALL PLUMBING WET WALLS (EXCLUDING CHASES) SHALL BE FRAMED WITH 6" METAL TOTAL OCCUPANT LOAD 109 oGa• 4. VERIFY SIZE, LOCATIONS AND CHARACTERISTICS OF ALL EQUIPMENT TO BE FURNISHED STUDS. DATE: MARCH 13, 2017 0 9. EXITS WITH MANUFACTURERS OR SUPPLIERS BEFORE BEGINNING CONSTRUCTION. 15. ALL PRODUCTS UTILIZED IN THIS CONSTRUCTION SHALL BE ASBESTOS FREE. cp qtA. Doors (1005): IIIII 5. VERIFY SIZE AND LOCATION OF ALL OPENINGS FOR MECHANICAL AND ELECTRICAL 16. TRANSITION OF DIFFERENT FLOORING MATERIALS AT DOORWAYS SHALL OCCUR AT JOB NUMBER: 2016285.50 Required 109 x 0.20 = 21.80 EQUIPMENT AND RELATED WORK WITH CONTRACTORS INVOLVED AND EQUIPMENT TO BE CENTERLINE OF DOORS TYPICALLY. a_ v Provided 136" FURNISHED. FOR CONSTRUCTION DETAILS NOT SHOWN, USE THE MANUFACTURER'S TITLE: = B. Min. Door Width (1008.1.1): 32" Clear STANDARD DETAILS OR APPROVED SHOP DRAWINGS DATA SHEETS IN ACCORDANCE WITH 17. PAINT ALL WALL SURFACES, DOOR FRAMES, BULKHEADS AND CEILINGS IN ROOMS WHERE CNi 3 C. Number of Exits (1021.1) THE PROJECT SPECIFICATIONS. INDICATED ON ROOM FINISH SCHEDULE. PAINT BEHIND ALL MOVEABLE ITEMS ADJACENT TO OVER SHEET 4 0 WALLS RECEIVING PAINT AND RELOCATE ITEMS. r• I From each Floor No. Required Na. Provided 6. CEILING HEIGHTS SCHEDULED ON THE ROOM FINISH SCHEDULE OR REFLECTED CEILING . 5 Ground Floor 2 4 PLAN ARE TAKEN FROM THE FINISHED FLOOR ELEVATION. 18. ALL WEATHER - EXPOSED SURFACES SHALL HAVE A WEATHER RESISTIVE BARRIER TO c-4 03 r- D. Travel Distance (1016.1) SHEET NUMBER: r Allowable 300'-0" L.F. o Provided 129'-4" L.F. PROJECT AREA co n i F. Min. Corridor width (1018.2): 44" ilk\\�\�� J S T C o G. Max. Dead End Corridor Distance (1018.4.2): 501-0" LL. o p , u u E NOTE: RE: 3/A-1.D FOR ADDITIONAL INFORMATION. NORTH ' COMMENTS: v a) � c cn ro .c' .. mo rL LEGE\D \OTES 3Y SYv 30L ® GE\E�AL \OTES WALLS / ITEMS TO REMAIN 1. RELOCATE EXISTING RACKS, EQUIPMENT, ETC. AS A. PROVIDE SURFACE MOUNTED FIRE EXTINGUISHERS REQUIRED FOR INSTALLATION OF TEMPORARY AS REQUIRED BY LOCAL CODES. IP CVS LOCATION OF NEW WORK CLEAN ROOM & DEMISING WALL. B. ALL RECEPTACLE DEVICES AND FACE PLATES TO MATCH EXISTING. RE: MEP. 2. SHADED AREA: PREP. EXISTING FLOOR FOR C. ASCERTAIN THE EXTEND OF WORK NECESSARY TO INSTALLATION OF NEW WELDED SHEET VINYL NOT ONLY ACHIEVE THE AESTHETIC INTENT, BUT Health FLOORING ACCORDING TO MANUFACTURER'S ALSO TO COMPLY WITH GOVERNING CODES & RECOMMENDATIONS. RE: A-1.1. REGULATIONS, WHICH MAY REQUIRE ADDITIONAL WORK AND/OR EQUIPMENT. 3. REMOVE AND/OR RELOCATE EXISTING CEILING D. ORDER ALL PARTS NECESSARY FOR INSTALLATION MOUNTED DEVICES AS REQUIRED TO ACCOMMODATE OF FIXTURES SPECIFIED, U.O.N. NEW WORK. SEE MECHANICAL AND ELECTRICAL E. PROVIDE COORDINATING MECHANICAL, ELECTRICAL, DRAWINGS FOR EXTENT OF WORK. AND PLUMBING WORK REQUIRED FOR PROPER STORE NUMBER FUNCTION OF ALL FIXTURES AND EQUIPMENT. RE: • 4. LOCATION OF DEMISING WALL. RE: NEW WORK MEP. 7358 SW DURHAM ROAD PLANS A-1.1. F. CLEAN AND PREPARE SLAB TO ACCEPT FINISHES. PORTLAND, OR 97224 G.C. TO CONFIRM AND REPORT MOISTURE CONTENT 5. REMOVE EXISTING LIGHT FIXTURE, SALVAGE FOR TO ARCHITECT PRIOR TO FINISH WORK. USE IN NEW WORK. RE: 2/A-1.1 & ELECTRICAL G. PROVIDE DETECTION SYSTEM, EMERGENCY LIGHTING PROJECT TYPE: NON-RETAIL DRAWINGS. AND EXIT SIGNS AS REQUIRED BY GOVERNING DEAL TYPE: TBD CODES, RULES, AND REGULATIONS. RE: MEP. 6. EXISTING LIGHT FIXTURE TO REMAIN. H. LOCATION OF EXISTING LIGHT FIXTURES IS LIGHTCS 7. LOCATION OF TEMPORARY CLEAN ROOM IN NEW LOCATION APPROXIMAINEFIELD.FY REMOVEING ONLY THOSETLIGHT URE PROJECT NUMBER: • WORK. FIXTURES THAT INTERFERE WITH NEW WORK. 8. REMOVE EXISTING LIGHT FIXTURE, SALVAGE TO ' ARCHITECT OF RECORD OWNER FOR FUTURE USE. ood01%111Mftk GPD Engineering and Architecture Professional Corporation 520 South Main Street,Suite 2531 Akron,OH 44311 330.572.2100 Fax:330.572.2102 CONSULTANT' $ / / . .______/ \ / -- -- DEVELOPER' - - - , - p1 ----- --- 0 aii\r 0 ® II / ._ !— SEAL • it � ' C ,� f f - ® � n — ® .s-SAMPEK Cr ,i A . R . 6036 • e 0 2 U t i N N / ,x1 , F • .41141•1; I I CT, -I- - I—I I-1 1..r _ /\ I� 3 (,) II INi c 1" \ _ ... Q REVISIONS:- \f , / 0 ,_ , . \\\ , — — — J O_ / cg U \ '' 1 •U \ ` d 0 \ \1 i , - 3 .� EA 0 \ O O �.. ' ARK o �♦ E — ��; DRAWING BY: DATE: MARCH 13, 2017 o ' JOB NUMBER: 2016285.50 _.- ..__......... TITLE: 75 L — DEMOLITION FLOOR AND " ' 3 L REFLECTED CEILING PLANS N pp CV r7 CCD SHEET NUMBER: - o c s O ca ° M o 4 N a 0 / >-,_,9O ii DEMOLITION PLANii, 2 DEMOLITION CEILING PLAN °1111 3 OVERALL FLOOR PLAN /EXITING /ata.. COMMENTS: / A-1 .DJ SCALE: 1/16 = 1 -0 //��A-1 .0 SCALE: 1 4 = 1 -0L A-1 .0 SCALE: 1 4" = 1'-0" ! / 4///,, ' / %iii., co 0 = — DCL I MIN UM D1 :LU - A(.d.RJD 1 ILAL 1 ILC LCILIN{aD END OF SECTION 09 51 20 HADWAE SCHEDULE CEILI\G PLA\ LEGE\D \OTES 3Y SYV30L ® PART 1 - GENERAL SECTION 09 65 10 - RESILIENT FLOOR TILE • 1.1 SECTION REQUIREMENTS EXTEND PARTITION TO 1. RELOCATED MODULAR TEMPORARY CLEAN ROOM. SEE A. Submittals: Product Data and material Samples. Class A tiles PART I - GENERAL UNDERSIDE OF DECK ABOVE Hardware Group No. I-WD1-264-MECH - (SINGLE WITH CLASSROOM LOCKSET X CLOSER) /'r, RELOCATED LIGHT FIXTURE, RE: MEP DRAWINGS FOR ASSOCIATED CONNECTIONS. AP CVS have a flame-spread index of 25 or less; Class B, 75 or less. Most products are Class A. -' ELECTRICAL DRAWINGS 1.1 SECTION REQUIREMENTS 2. TEMPORARY CLEANROOM FLOORING SHADED AREA S. Surface-Burning Characteristics of Panels: ASTM E 1264, Glass A p Provide each SGL door(s) with the following: ARMSTRONG MEDINTECH OATMEAL #88412. PREP ) materials, tested per ASTM E 84. A. Submittals: Product Data and Samples. B. Fire Test Response: Resilient file has critical radiant flux Qty Description Catalog Number Mfr RELOCATED FAN FILTER UNIT, RE: EXISTING FLOOR FOR INSTALLATION OF NEW WELDED 1.2 NATIONAL ACCOUNT classification of Class I, not less than 0.45 W/sq, cm. 3 EA HINGE 5881 SERIES AS SPECIFIED IVE rr MECHANICAL DRAWINGS SHEET VINYL FLOORING ACCORDING TOHealth A. CVS/Pharmacy has entered into a national account agreement 1.2 NATIONAL ACCOUNT 1 EA CLASSROOM LOCK L9070HD X LEVER AS SPECIFIED SC�H+ MANUFACTURER'S RECOMMENDATIONS. INSTALL NEW with Armstrong World Industries, Inc. for furnishing the acoustical A. CVS/Pharmacyhas entered into a national account agreement 1 EA PERMANENT CORE AS SPECIFIED BES NEW LIGHT FIXTURE, RE: ELECTRICAL WELDED SHEET VINYL PRIOR TO ARRIVAL AND ceiling and grid specified in this section. Complete installation 9 shall be by the Contractor. For pricing quotations, placing orders, with the suppliers below for furnishing and installing the vinyl 1 EA SURFACE CLOSER 4040XP/4040XP EDA AS SPECIFIED LCN -""" 7 DRAWINGS INSTALLATION OF TEMPORARY CLEANROOM. WELDED and further information, call Armstrong at (800) 442-4212. products as specified on the "Interior Finish Schedules.' For SHEET VINYL COVE BASE TO BE INSTALLED DURING pricing quotations, placing orders, and further information, call 1 EA KICK PLATE 8400 10" X 2" LDW B-CS IVE the appropriate supplier for the area the store is located in. INSTALLATION OF TEMPORARY CLEANROOM. PART 2 - PRODUCTS 1. Interface Services at (770) 975-4819. 1 EA STOP WS407/FS436 AS SPECIFIED IVE ////// j RELOCATED LIGHT FIXTURE, RE: 2.1. ARMSTRONG, MEDINTECH, GRAYED BLUE MID STORE NUMBER: 3-5/8 20-GAUGE METAL 1/2 DIAMETER HILTI 1 EA SEALS 488S ZER ELECTRICAL DRAWINGS #H5329 • a. Areas: AL, AZ, CO, CT, DC, DE, GA, ID, IL, IN, INI, LA, ,> A „ 2.1 ACOUSTICAL TILE MA, MD, ME, MN, MS, MT, ND, NI-I, NJ, NM, NY, NV, STUDS ® 16 O.C. KWIK BOLT TZ © 32 2.2. ARMSTRONG, MEDINTECH, OATMEAL #84129. 7358 SW DURHAM ROAD A. Products: ON, OK, OR, PA, RI, SC, SD, TN, TX, UT, VA, VT, WA, 1 EA DOOR SWEEP 39 ZER NV, NY O.C. WITH 3-1/4" EMBED PORTLAND, OR 97224 5/8"GYPSUM BOARD, INTO SLAB. 3. 21"X36" CART. I. Refer to Drawings. 2.Mannington Commercial at (706) 602-6551. OUTSIDE OF TCR ONLY B. Edge Detail: Square. a. Areas: AR, MI, NI C. Thickness: 5/8 inch. 4. RELOCATED HOOD. PROJECT TYPE: NON-RETAIL 3.MATS Inc. at (781) 573-0292. A DEAL TYPE: TBD D. Size: Per Drawings. a. Areas: IA, KS, KY, NC, NE FINISH FLOOR 5. 19"X30" CART. E. NFPA Class: A /410 4 2.2 SUSPENSION SYSTEM PART 2 - PRODUCTS 6. RELOCATED SINK. RE: MECHANICAL DRAWINGS. CS PROJECT NUMBER: A. Ceiling Suspension System: Direct I-lung, ASTM C 635. 1. Products: Al TYPICAL NON-RATED WALL TO DECK 7. REPEATER PUMP. a. Refer to Drawings. ARCHITECT OF RECORD B. Attachment Devices: Size for 5 times the design load indicated in 8. RELOCATED SUMP PUMP. RE: MECHANICAL DRAWINGS ASTM C 635, Table 1, Direct I-lung, unless otherwise indicated. C. Wire Hangers, Braces, and Ties: Zinc-coated carbon-steel wire; 9. NON-BEARING PARTITION TO SEPARATE CLEANROOM ASTM A 641/ (A 641M), Class lzinc coating, soft temper. FROM WAREHOUSE AREA, RE: 3/A1.1. 3-5/8" 1. Size: Provide yield strength at least 3 times the hanger design METAL STUDS WITH 5/8" G.W.B. WAREHOUSE SIDE A load (ASTM C 635, Table 1, Direct lung), but not less than 0.135-inch- (3.5-min-) diameter wire. OF WALL ONLY, TAPED AND FINISHED. EXTEND TO CEILING AND SEAL. SEAL AT INTERSECTIONS WITH PART 3 - EXECUTION 3 TYPICAL PARTITION EXISTING WALLS AND SLAB. _ 3.1 INSTALLATION A-1 .11/ SCALE: 1" = 1'-0" 10. ECU. SEE MECHANICAL DRAWINGS. GPD Engineering and Architecture A. Ceiling Suspension System Installation: Comply with ASTM C 636 / Professional Corporation and CISCA's "Ceiling Systems Handbook." 11. CONDENSING UNIT ABOVE. SEE MECHANICAL AND 520 South Main Street,Suite 2531 STRUCTURAL DRAWINGS. Akron,OH 44311 330.572.2100 Fax:330.572.2102 12. APPLY 3 COATS OF EACH FLOOR SEALANT PER MANUFACTURER'S RECOMMENDATIONS: SUPER GARD, CLEAR & DE-FENCE, CLEAR. (TENANT PROVIDED, CONTRACTOR INSTALLED) 13. LINE OF DEMARCATION FOR SHEET VINYL FLOOR. CONSULTANT' 14. INSTALL (1) 36"X84" H.M. DOOR AND FRAME AS INDICATED. PROVIDE HARDWARE SET I-WD1-264-MECH AS NOTED IN HARDWARE SCHEDULE, THIS SHEET 15. OPEN TO STRUCTURE ABOVE. DECK HEIGHT: 16'-1" A.F.F. 16. EXISTING RTU TO REMAIN, ABOVE. i i - ti -. - / \ / i DEVELOPER: \ \ / r ; I'/////////////1 KZ////////////I 0 o i . .' . .. 0 ' . • O 0 00 • • • • • • • i ' - . • •• • . co0 CLEA\ A\TE ,r I19In : ' ; i CLEAN^ �; r-%r A KII-><::: SEAL.j'� \,i r"��, r j . . 00\A 102 - �. r--' i \ r 00 =� ; C2., �� D. AKRON, 01 1 n , i, ® Net)U. GU3G, oy-• ® °° .. . . .. . .... . , •... . . • . I . ' 49'w ig,...... .. .. . . .. . • .. .. . ..,-,. .... ,, ,.... ....r : .. ...... .: o. CD .•.. , II •., . 0 . -..... .,-H da ..,.. ... ... I, •F • 1441 '114 i go., 0--,-.„- 7 _ _1 0 AREVISIONS: VEST. VEST. 0 101 i 101 U WAS H WA�EHOUSEL - - LE E OUSE �j 100 100 ' 1_ __c I L _ J U CI O 24'-4 1/4" 8'-2" (. 1n C 0 013 CICC I- o I \ DRAWING BY: I DATE: MARCH 13, 2017 I JOB NUMBER: 2016285.50 \ TITLE: U - FLOOR AND REFLECTED " I CEILING PLANS o � N co SHEET NUMBER: ?-- if, up A L m O (n T,.- 4 5;-,53 Q o II (i \ FLOOR PLAN /�� 2 REFLECTED CEILING PLAN /��.� COMMENTS: It ii " - / „ " %��,, , A-1 .1/ SCALE: 1/4 = 1 -0 ,�j��� / A-1 .1 SCALE: 1 4 = 1 -0 CO O = o u #4 © 16" O.C. EA. SIDE, DOWEL INTO EXISTING SLAB GENERAL NOTES: w/HILTI HIT—HY200 SAFESET IP WOOD: (6" MIN. EMBED.) CVS GENERAL PROVISIONS: PROVIDE CERTIFICATION LETTER STATING THE SPECIFIED PRODUCTS LISTED BELOW WILL BE SUPPLIED AS 1. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH THE JOB CONDITIONS SPECIFIED. AND RESTRICTIONS. ./ /v/ / ••'-•.'••=••=••=••7 / / DETAIL, FABRICATE AND ERECT STRUCTURAL WOOD IN ACCORDANCE WITH THE THE 2012 NATIONAL \ /\\ !! ;��!!�!! \' V DESIGN SPECIFICATION FOR WOOD CONSTRUCTION. \ / di= — =�—�=v • \•' Health 2. FOR DIMENSIONS AND DETAILS NOT SHOWN, REFER TO ARCHITECTURAL DRAWINGS. \/�\ �/j / /\�/ lf � EXISTING SLAB 2. IMPLEMENTATION OF JOB SITE SAFETY AND CONSTRUCTION PROCEDURES ARE THE SOLE NEW FRAMING LUMBER 2x4 AND LARGER SHALL BE SPRUCE—PINE—FIR NO. 2 GRADE USED AT A moi; GE\E�AL SHEET \OYES ,CVS '` A. SEE ARCHITECTURAL DRAWINGS FOR AVAILABLE DIMENSIONS. REFER TO ARCHITECTURAL, QO� I O� AO� MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR SIZE AND LOCATIONS OF OPENINGS, `C SLEEVES, CONCRETE HOUSEKEEPING PADS, INSERTS AND DEPRESSIONS. GJ,s B. EXISTING ROOF CONSTRUCTION, JOISTS, & JOIST SPACING IS BASED ON SITE SURVEY PHOTOS AND \ �\ MEASUREMENTS. CONTRACTOR SHALL FIELD VERIFY RI Y ALL THE DIMENSIONS AND ALL EXISTING .CO I �� `� �� CONSTRUCTION CONDITION, SUPPLYING THESE TO ENGINEER OF RECORD, PRIOR TO ORDERINGHealth MATERIALS AND COORDINATE ANY DISCREPANCIES WITH THE ENGINEER. i ` C. WHERE EXISTING CONDITIONS ARE CUT OR DISTURBED TO PERMIT INSTALLATION OF NEW WORK, I MATCH AND PATCH EXISTING DISTURBED CONSTRUCTION TO ORIGINAL CONDITION. CO m m D. SEE GENERAL NOTES AND TYPICAL DETAILS ON SHEET S-0.1. +I STORE NUMBER: I 0 I =_— U - 71 - 0 i L� E. FASTEN BUILT-UP 2X TOGETHER WITH 20d COMMON FACE NAIL AT 32" O.C. AT TOP AND BOTTOM 7358 SW DURHAM ROAD Co Co II Co STAGGERED ON OPPOSITE SIDES / FACE NAIL AT ENDS AND EACH SPLICE. PORTLAND, OR 97224 co x I co II x ' -co� � 3/2"x14/2" GLB EXIST. 31/2"x14/2" II PROJECT TYPE: NON-RETAIL I I ; DEAL TYPE: TM c;„<) - - - - - - - - - - - - - - -I-u - - - CO - - - - - - - - - - - - - - - - +� CS PROJECT NUMBER x x . Lu I w w I o (- n EXIST. 2x4 PURLINS II II ,� ARCHITECT OF RECORD — AT 24"± 0.C.- TYP. I I +� I I jTi L� � �� � �� , u I � �� 1 " II j ' of • EXIST. 3/ x14/ GLB EXIST. 3/ x14/ GLB CO ..] --st- ---+__ _ - -I - I I GPD Engineering and Architecture J / I Professional Corporation 0I ' I I I I I I I I 14 1 I I I I I I I520 South Main Street,Suite 2531 ' I I I I I I I I I I / I I 11 I i i I-I Akron,0H 44311 CIDI I I I I I I I I I N C U-1 N I I 0 I- . 330.572.2100 Fax:330.572.2102 x I I I 1 I I I I I I IV I I I N 360 N I I J I I I I I I I I - - -1- I I I I I n w I lbs 1 -- - _ EXIST. 31/2"x14/2" GLB _ - -- _ _ _ _ _ _ CONSULTANT - - - - - - - - - - - - - - - X J EXIST. RTU EXIST. 3/2"x14/2" GLB _ c +I SEE 2 & 3/S0.1 FOR co o L- ROOF OPENING AND 11 I > CURB SUPPORT DETAILS EXIST. 3%"x14%" GLB EXIST. 2 2 _ _ _ _ EXIST. 32"x14 2" GLB +I C I EXTERIOR I I IiI � DEVELOPE(5 --‘°:------;:-(:).1...jR7?,C,,.,c-::,:.-1.,,,,c,\., . JnWALL SEAL:24'-O"+ 24' "±/ -0 /(v. .F.) (v.I.F.) J -,,,,-. ./. .`A 1 ai c, OREGON !/ (11 OREGON o /,',,, r' 13 LO . J.4.r o a d///%/aim I n �i1 °J EXPIRES: 0 PARTIAL ROOF FRAMING PLAN AT CLEAN ROOIV Li I S—1 .1 SCALE: 1/4" = 1'-0" REVISIONS: v, ,- -,-_,3 U 2 i N U N . C N E .( 0 0 c, C O :- O J i 0 C 0 U 0, c U E- o DRAWING BY: DATE: MARCH 13, 2017 O CD JOB NUMBER: 2016285.50 LO TITLE: ROOF FRAMING PLAN CV U n I o ,n N OD rn" co SHEET NUMBER: 0 N O - O a S(Y T/ -'0 O 0 C 0 0 O II �, COMMENTS: II II 0E 0 Cil 0 C = oE LEGEND ,CVS OH HUMIDITY SENSOR OT THERMOSTAT CONTROL Health SUPPLY DUCT IN SECTION E S G N C 0\ T 3 \ S RETURN OR EXHAUST DUCT IN SECTION STORE NUMBER CONDITION SUMMER WINTER 7358 SW DURHAM ROAD Mr MITERED ELBOW PORTLAND, OR 97224 OUTDOOR 907 DB/67'F WB 227 DB INDOOR - .illiMITERED ELBOW W/ CLEANROOM 65F DB/50% RH 65'F DB/50% RH PROJECT TYPE: NON-RETAIL AREAS TURNING VANES DEAL TYPE: TBD 1. SITE ELEVATION: 39 FEET - :5)__ RADIUS ELBOW CS PROJECT NUMBER: 2. OUTDOOR DESIGN CONDITIONS DETERMINED FROM • ASHRAE 99.6 DATA. 'ElEFI SPLITTER ARCHITECT OF RECORD VOLUME CONTROL DAMPER FT–ir FIRE DAMPER (FD) FD 000OMMI rq CEILING SUPPLY DIFFUSER ._ GPD Engineering and Architecture CEILING RETURN GRILLE Professional Corporation 520 South Main Street,Suite 2531 Akron,OH 44311 330.572.2100 Fax:330.572.2102 0 AIR DEVICE TYPE 0 NOTES BY SYMBOL CFM CUBIC FEET NK NECK CONSULTANT: PER MINUTE AFF ABOVE FINISHED DN. DOWN FLOOR CD CONDENSATE DRAIN EXH. EXHAUST SA SUPPLY AIR REQ'D REQUIRED RA RETURN AIR DMPR DAMPER FD FIRE DAMPER DEVELOPER: 0, 6 O SEAL: c (�0 ` ,moo. tll% V AAA A 1 o ENMAIN EXHAUST RETURN .GQN 41 MAIN SUPPLY DUCT (OR / �� �, •� '� '' SUB-MAIN) DUCT OR SUB-MAIN Gly ';:;, t �, 41) ((I) PROVIDE VOLUME � ? ;.,. DAMPER 1/4 W, 4" MIN. :1 1^ (•r'1j ,,. 1/4 W, 4" - F A\ S �xP REs: � �ti8' • MIN. 0 BRANCH DUCT W AND ESP DRIVE ELECTRICAL DATA PROVIDE DAMPER (OBMVD)VOLUME BRANCH DUCT SERVMODEL NO. S.P. TYPE HP VOLT/PHASE AMP. REVISIONS: II a SF-1MARK OUTSIDEICE AIR LOCATION CFM SONES REMARKS SECURE COOKMFR 100 0.25 DIRECT 80W 120/1/60 Dj O 0 W GN-162 0 0 INLINE CONFIGURATION. EXHAUST/RETURN AIR DUCT 20 FAN SPEED CONTROLLER. SUPPLY AIR DUCT 0 U 0, iniall. m FF-- VOLUME DAMPER /oMAIN SUPPLY S L T SYSTEv A CC \ DT 0\ \ G SYSTEv SCHEIJLE DUCT (OR o SUB-MAIN) lg INDOOR UNIT ELEC. DATA OUTDOOR UNIT ELEC. DATA REFRIG. LINESWEIGHT (Its) HEAT LIEBERT INDOOR/ cp i y ROUND S SIDE RECTANGULAR TO TAG REJECTION VOLT. PHASE MCA/MOCP VOLT. PHASE MCA/MOCP LIQ. SUCTION MODEL # OUTDOOR -.-c DUCT TAKE-OFF = CONICAL TAP ROUND ECU-1 62.4 MBH 480 3 35.6 / 40 208 3 3.8 / 15 1/2 5/8 PX018 700 / 360 BRANCH l� 18 GAUGE VOLUME DAMPER WITH CU-1 MCS028 DRAWING BY: 1°4411 MAIN SUPPLY LOCKING QUADRANT SET (TYP. �, DUCT (OR FOR ALL SUPPLY/RETURN/ 1. ELECTRIC REHEAT COIL FOR DEHUMIDIFICATION. DATE: MARCH 13, 2017 °N° SUB-MAIN) EXHAUST AIR BRANCH DUCT) 0 co 2. REMOTE TEMPERATURE AND HUMIDITY SENSORS. JOB NUMBER: 2016285.50 CV BRANCH TAKE- OFF DETAIL 3. CONDENSATE PUMP. TITLE:N CD Q M—a1 NOT TO SCALE 4. SMOKE DETECTOR. d, 0 5. MERV 13 FILTER. MECHANICAL SCHEDULES N / ,---- 0 6. UPFLOW WITH FRONT RETURN GRILLE. AND DETAIL SHEET O 0 N o 7. 2500 CFM AIRFLOW AND 12kW HEAT. ro 0 SHEET NUMBER: T0, d- Up a) `0 .. V 0 * 1 REFERENCE ONLY L NOT APPROVED WITH THIS PERF II -J M �, COMMENTS: ii ii E 0 0 (I) 0 - oLT HVAC(HEATING,VENTILATION&AIR CONDITIONING) C.DEFECTIVE WORK:IF INSPECTION OR TESTING SHOW DEFECTS,SUCH DEFECTIVE WORK OR MATERIALS SHALL BE 4.ENGINEER DOES NOT CHECK AND WILL NOT BE RESPONSIBLE FOR QUANTITY TAKEOFFS OF ITEMS 2.6 FLEXIBLE AIR DUCT CONNECTIONS 3.5 TESTING,ADJUSTING&BALANCING REPLACED AND INSPECTION AND TEST REPEATED.ALL REPAIRS TO PIPING SHALL BE MADE WITH NEW MATERIAL.NO SUBMITTED. PART 1-GENERAL CAULKING OR SCREWED JOINTS WILL BE ACCEPTABLE. FABRICATE FROM 20 OUNCE CANVAS TREATED TO RETARD MILDEW AND BURNING. RUN AND TESTING:ALL HVAC EQUIPMENT SHALL BE THOROUGHLY RUN AND TESTED BY AN INDEPENDENT, 5.SUBMIT BROCHURES IN SUFFICIENT TIME AND OF PROPER FORMAT SO AS TO AVOID DELAYS OR CHANGES IN NEBBIAABC CERTIFIED TEST AND BALANCE CONTRACTOR PRIOR TO THE BUILDING OCCUPANCY AS PART OF THE 1.1SECTION INCLUDES D.DIELECTRIC CONNECTION:WHERE DISSIMILAR METALS ARE CONNECTED,PROVIDE APPROVED DIELECTRIC CONSTRUCTION.FAILURE TO COMPLY SHALL RENDER CONTRACTOR LIABLE FOR EXPENSES OF DELAYS 2.7 FLEXIBLE INSULATED DUCT WORK OF THIS SECTION.SUBMIT TEST AND BALANCE REPORT,USING NEBB FORMS,TO THE ENGINEER FOR REVIEW. CONNECTOR TO PROJECT AGAINST DIELECTRIC CORROSION. OCCASIONED BY FAILURE TO PROVIDE NECESSARY INFORMATION OR DRAWINGS.ARCHITECT AND ENGINEER REPORT SHALL INCLUDE AT A MINIMUM: IP CVS A.SCOPE OF WORK,DEFINITIONS,CONTRACTOR'S RESPONSIBILITY,ADDITIONAL COMPENSION,SUPERVISION, RESERVE THE RIGHT TO CONTACT MANUFACTURER DIRECTLY TO SECURE PROPER DATA AND DETAIL WHEN FLEXIBLE INSULATED DUCT SHALL HAVE A SEAMLESS INTERIOR ACOUSTICALLY RATED CPE LINER ENCAPSULATING WORKMANSHIP,GENERAL REQUIREMENTS,SUBMITTAL DATA,WARRANTY,CODES AND STANDARDS,PRODUCT E.SURVEYS AND MEASUREMENTS:CAREFULLY SURVEY PROJECT SITE PRIOR TO BIDDING AND INSTALLATION. DEEMED NECESSARY.CONTRACTOR SHALL BE LIABLE FOR COSTS INCURRED BY SUCH ACTION. A SPRING STEEL HELIX.THE INNER AIR CORE SHALL BE COVERED WITH R-8.0 FIBERGLASS INSULATION WRAPPED 1.UNIT MANUFACTURER,MODEL NUMBER,SERIAL NUMBER AND LOCATION WITHIN BUILDING HANDLING,QUALITY CONTROL. DIMENSIONS,BOTH HORIZONTAL AND VERTICAL,SHALL BE DERIVED FROM ARCHITECTURAL,CIVIL,AND WITH A METALLIZED,SPIRALLY REINFORCED VAPOR BARRIER.THE DUCT SHALL BE ATTACHED TO BELL-MOUTH STRUCTURAL PLANS.DO NOT"SCALE"PLANS;THAT IS DO NOT MEASURE PLANS WITH ARCHITECT'S OR ENGINEER'S 6.THE ACT OF SUBMITTING IS AN IMPLICATION THAT PRODUCTS SUBMITTED MEET WITH THE INTENT OF STARTING COLLARS HAVING INTEGRAL BUTTERFLY BALANCING DAMPERS,INSULATION SHIELD AND DIE-FORMED 2.VOLTAGE AND AMPERE DRAW ON ALL MOTORS AND ELECTRIC HEATER B.MECHANICAL EQUIPMENT. SCALE AND BASE INSTALLATION DIMENSIONS ON SUCH MEASUREMENTS.HORIZONTAL AND VERTICALMOUNTING GROOVE,ALL OF GALVANIZED STEEL CONSTRUCTION.THE FLEXIBLE DUCT SHALL BE ATTACHED TO THE MEASUREMENTS SHALL BE BASED ON ESTABLISHED BENCHMARKS.WORK SHALL AGREE WITH ESTABLISHED LINES ENGINEER'S DESIGN AND CONTRACT DOCUMENTS.ENGINEER'S REVIEW OF SHOP DRAWINGS OR PRODUCT STARTING COLLAR AND DIFFUSER NECK WITH Y-STAINLESS STEEL LOCKING BANDS OR MACHINE TIGHTENED 3.ENTERING AND LEAVING AIR TEMPERATURE(HEATING AND COOLING),TOTAL CFM,OUTSIDE AIR CFM,EXTERNAL Health C.MECHANICAL INSTALLATION REQUIREMENTS. AND LEVELS.FIELD VERIFY ALL MEASUREMENTS AT PROJECT SITE.CHECK CORRECTNESS OF SAME AS RELATED TO SUBMITTAL DOES NOT RELIEVE CONTRACTOR OF HIS RESPONSIBILITY TO COMPLY WITH THE CONTRACT PLASTIC BANDS.MANUALLY TIGHTENED PLASTIC BANDS WILL NOT BE ACCEPTED. STATIC PRESSURE FOR EACH AIR HANDLING UNIT WORK PRIOR TO FABRICATION OF SHOP MADE ITEMS AND ORDERING OF FACTORY BUILT ITEMS.NOTIFY ARCHITECT DOCUMENTS EXCEPT WHEN HE HAS CLEARLY INFORMED THE ARCHITECT AND ENGINEER OF DEVIATIONS IN WRITING AND HAS HAD SUCH DEVIATIONS ACKNOWLEDGED IN WRITING BY ARCHITECT AND ENGINEER. 1.2SCOPE OF WORK OR ENGINEER OF DISCREPANCIES BETWEEN PLANS AND ACTUAL FIELD CONDITIONS THAT WILL PREVENT THE ENGINEER'S REVIEW SHALL NOT RELIEVE THE CONTRACTOR OF HIS RESPONSIBILITY TO COMPLY WITH THE 2.8 REGISTER,GRILLES,DIFFUSERS 4.ENTERING AND LEAVING WATER TEMPERATURE,GPM,AND WATER PRESSURE DROP ACROSS EACH COOLING FOLLOWING OF GOOD PRACTICE OR AFFECT THE INTENT OF PLANS AND SPECIFICATIONS.DO NOT PROCEED WITH SUBMITTAL$,QUANTITIES, COIL,IF APPLICABLE. A.IT IS THE INTENT OF THESE SPECIFICATIONS TO PROVIDE COMPLETE AND WORKABLE MECHANICAL SYSTEMS AS INSTALLATION UNTIL INSTRUCTIONS ARE RECEIVED FROM ARCHITECT OR ENGINEER. CONTRACT DOCUMENTS DUE TO ERRORS AND OMISSIONS IN SHOP DRAWINGS, AIR DEVICES,SHALL BE ALL ALUMINUM CONSTRUCTION EXCEPT AS SPECIFICALLY NOTED.SIZE AND TYPES AS SHOWN ON THE ACCOMPANYING PLANS AND AS SPECIFIED HEREIN.PROVIDE ALL NECESSARY SUPERVISION, MEASUREMENTS OR BUILDING CONDITIONS. INDICATED ON THE DRAWINGS. 5.CFM FOR EACH SUPPLY I EXHAUST FANS STORE NUMBER: COORDINATION,LABOR,MATERIALS,EQUIPMENT,ROOF SUPPORTED STEEL FIXTURES,DRYAGE,HOISTING,TOOLS, F.SUBSTITUTION OF MATERIALS,FIXTURES OR EQUIPMENT:IT IS THE INTENT OF THE CONTRACT DOCUMENTS TO MACHINERY AND CONNECTIONS TO UTILITIES FOR THE INSTALLATION OF COMPLETE AND OPERABLE MECHANICAL ESTABLISH A STANDARD OF QUALITY FOR MATERIALS,FIXTURES AND EQUIPMENT INSTALLED ON THIS PROJECT. 7.NO MATERIAL,FIXTURE OR EQUIPMENT SHALL BE INSTALLED UNTIL SUBMITTAL HAS BEEN APPROVED. PART 3-EXECUTION 6.CFM FOR EACH SUPPLY OUTLET AND RETURN INLET. 7358 SW DURHAM ROAD SYSTEMS.IF DETAILS OR SPECIAL CONDITIONS ARE REQUIRED IN ADDITION TO THOSE SHOWN ON DRAWINGS, SUBSTITUTION SHALL BE EQUAL IN QUALITY AND DESIGN TO THE SPECIFIED ITEM IN EVERY RESPECT.OTHER PROVIDE ALL MATERIAL AND EQUIPMENT USUALLY FURNISHED WITH SUCH SYSTEMS OR REQUIRED TO COMPLETE MANUFACTURERS MUST MEET THE QUALITY STANDARD FOR THIS PROJECT AND WILL BE ACCEPTABLE,PROVIDING 1.9 WARRANTY 3.1 REQUIREMENTS 7.CFM FOR EACH DIFFUSER,GRILLE AND REGISTER BY SYSTEM RECORD ACTUAL VALUES ADJACENT TO DESIGN PORTLAND, OR 97224 THEIR INSTALLATION,WHETHER NOTED IN PLANS AND SPECIFICATIONS OR NOT. THEY MEET THE CRITERIA SET FORTH BELOW: VALUES.CORRECT ANY DEFICIENCY IN THE SYSTEM IF RELATED TO INSTALLATION DEFECTS.REPORT ANY A.WARRANT IN WRITING ALL WORK PERFORMED UNDER MECHANICAL DIVISION ON THIS PROJECT FOR A PERIOD OF A.DISCREPANCIES:SHOULD ANY DISCREPANCIES EXIST BETWEEN THE HVAC SPECIFICATIONS AND THE HVAC SUBSTANDARD PERFORMANCE ISSUES TO THE ENGINEER. B.THE INSTRUCTIONS TO BIDDERS,NOTICE TO BIDDERS,GENERAL CONDITIONS,SPECIAL CONDITIONS,ALL OTHER 1.CONTRACTOR IS RESPONSIBLE FOR ALL COORDINATION AND ADDITIONAL COSTS WHICH MAY BE REQUIRED ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE OF THE WORK.PROVIDE ADDITIONAL WARRANTY WHERE DRAWINGS,THE MOST DEMANDING REQUIREMENT SHALL TAKE PRECEDENCE,EXCEPT WHERE WRITTEN PREFACE SECTIONS,ALL TECHNICAL DIVISIONS AND ALL APPENDIXES OF THE SPECIFICATIONS,AND ANY OTHER FOR THE WORK TO BE COMPLETED ON TIME WITH NO ADDITIONAL COST TO THE OWNER. REQUIRED BY SPECIFIC SECTIONS COVERING THOSE PRODUCTS.ARCHITECT WILL ESTABLISH THE DATE OF FINAL INTERPRETATION FROM THE ENGINEER INDICATES OTHERWISE. 3.6 PAINTING PROJECT TYPE: NON_RETAIL PERTINENT DOCUMENTS ISSUED BY ARCHITECT OR ENGINEER SHALL BE CONSIDERED AS PART OF THIS DIVISION ACCEPTANCE,WHICH COMMENCES THE WARRANTY PERIOD UNLESS OTHERWISE AGREED BY THE ARCHITECT, DEAL TYPE: TBD INSOFAR AS THEY MAY BE APPLICABLE. 2.CONTRACTOR TO VERIFY DURING SUBMITTAL THAT THE PRODUCT WORKS DIMENSIONALLY WITHIN THE INTENT ENGINER AND OWNER. B.PROGRESS:THE HVAC WORK SHALL PROGRESS WITH THE OTHER WORK SO THAT NO DELAYS IN CONSTRUCTION "TOUCH UP"ALL EQUIPMENT SCRATCHED OR MARRED IN SHIPMENT AND HANDLING BEFORE FINAL ACCEPTANCE BY OF THE ENGINEER'S DESIGN. ARE INCURRED. ARCHITECT.EQUIPMENT WITHOUT FACTORY FINISH PAINT AND EXPOSED TO WEATHER SHALL BE GIVEN A ZINC C.THE ARCHITECTURAL,CIVIL,STRUCTURAL,PLUMBING,HVAC AND ELECTRICAL PLANS AND ANY OTHER PERTINENT B.CONTRACTOR SHALL REPAIR OR REPLACE ANY MATERIAL,FIXTURE,EQUIPMENT OR WORKMANSHIP FOUND TO BE CHROMATE PRIMER FINISHED WITH TWO COATS OF FINISH PAINT OF A TYPE AND COLOR AS DESIGNATED BY THE CS PROJECT NUMBER: DOCUMENTS ISSUED BY ARCHITECT OR ENGINEER SHALL BE CONSIDERED AS PART OF THIS DIVISION INSOFAR AS 3.THE ABILITY TO SERVICE COMPONENTS SHALL NOT BE COMPROMISED. DEFECTIVE DURING THE WARRANTY PERIOD WITHOUT COST TO THE OWNER. C.WEAKENING STRUCTURES:LOCATE THE HVAC WORK SUCH THAT IT WILL NOT WEAKEN THE STRUCTURE BEYOND ARCHITECT. • THEY MAY BE APPLICABLE. LIMITS ACCEPTABLE TO THE ARCHITECT. 4.ANY ADDITIONAL COORDINATION DUE TO INTERFERENCE WITH OTHER ELEMENTS OF THE PROJECT WILL BE C.DURING THE LAST MONTH OF THE ONE-YEAR WARRANTY PERIOD,RETURN TO PROJECT SITE AND INSPECT 3.7 CLEAN UP D.CHANGES IN PRICE FOR THE HVAC WORK CAN ONLY BE MADE FOR CHANGES IN THE ORIGINAL DESIGN THE RESPONSIBILITY OF THE CONTRACTOR WITH NO ADDITIONAL COST TO THE OWNER. D.WORKMANSHIP:PERFORM ALL WORK IN ACCORDANCE WITH STANDARD APPROVED PRACTICES. ARCHITECT OF RECORD INTENTIONS AND ONLY WITH WRITTEN CONSENT OF THE ARCHITECT. WARRANTED WORK.PERFORM ANY FINAL TESTS AS REQUIRED BY THE CONTRACT DOCUMENTS.SUBMIT WRITTEN REMOVE FROM THE SITE ALL DEBRIS FROM THE WORK OF THIS SECTION. 5.WHENEVER MANUFACTURERS ARE LISTED,PROVIDE EQUIPMENT AND MATERIALS FROM THAT LIST ONLY OR EVIDENCE OF INSPECTION TO ENGINEER. E.LAYOUT:ARRANGE THE HVAC SYSTEM IN CAREFUL COORDINATION WITH THE DRAWINGS.FOLLOW THE GENERAL 1.3DEFINITIONS SUBMIT ALTERNATE MANUFACTURERS TO ENGINEER FOR REVIEW SEVEN CALENDAR DAYS PRIOR TO BID.ON LAYOUT SHOWN ON THE DRAWINGS IN ALL CASES EXCEPT WHERE OTHER WORK MAY INTERFERE.LAYOUT ALL 3.8 INSPECTION OCCASION PROPRIETARY PRODUCTS WILL BE SPECIFIED DUE TO EITHER PREFERENCE OF OWNER,ARCHITECT PIPES TO FALL WITHIN PARTITION,WALLS,OR ROOF CAVITIES AND DO NOT REQUIRE FURRING OTHER THAN AS A.WHERE THE TERM"CONTRACT DOCUMENTS"IS USED IT SHALL REFER TO THE COMPLETE PACKAGE OF PLANS, OR ENGINEER OR TO THE LACK OF A SECOND QUALIFIED MANUFACTURER.ON THESE OCCASIONS CONTRACTOR 1.10 CODES AND STANDARDS SHOWN ON THE DRAWINGS.COORDINATE LOCATIONS OF REGISTERS,GRILLES,AND DIFFUSERS WITH CEILING COMPLETE INSPECTION AND PERFORMANCE TEST OF THE HVAC WORK SHALL BE REQUIRED BY AND DEMONSTRATED SPECIFICATIONS,ADDENDA AND SPECIAL CONDITIONS USED AS A BASIS FOR THE GENERAL CONSTRUCTION SHALL PROVIDE THAT PRODUCT ONLY. LAYOUT AND OTHER BUILDING COMPONENTS. TO THE ENGINEER BEFORE FINAL ACCEPTANCE. COMPLY WITH ALL LOCAL CODES AND STANDARDS INCLUDING BUILDING CODE,MECHANICAL CODE,PLUMBING CONTRACT FOR THIS PROJECT INCLUDING BUT NOT LIMITED TO ALL GENERAL AND SPECIAL CONDITIONS,ALL CODE,GAS CODE,FIRE PREVENTION CODE,ELECTRICAL CODE,APPLICABLE FEDERAL,STATE,COUNTY,CITY AND 3.9 INSTRUCTIONS&O/M MANUALS ARCHITECTURAL AND ENGINEERING DIVISIONS OF SPECIFICATIONS AND ALL ARCHITECTURAL AND ENGINEERING 6.WHEREVER A SINGLE MANUFACTURER AND PRODUCT MODEL NUMBER IS SCHEDULED ON PLANS AND 3.2 CONDITIONS 0111.11111 PLANS. ALTERNATE MANUFACTURERS ARE LISTED AS ACCEPTABLE BY THE SPECIFICATIONS WITHOUT THEIR MUNICIPAL CODES,ORDINANCES AND REGULATIONS. A.PROVIDE THE SERVICES OF A QUALIFIED PERSON TO THOROUGHLY INSTRUCT THE OWNER'S STAFF IN THE PROPER RESPECTIVE MODEL NUMBERS,CONTRACTOR MAY PROVIDE PRODUCTS BY THE ALTERNATE MANUFACTURERS EXAMINE ALL AREAS AND CONDITIONS UNDER WHICH WORK OF THIS SECTION WILL BE INSTALLED.CORRECT OPERATION OF THE SYSTEM.THESE INSTRUCTIONS SHALL INCLUDE EACH PIECE OF MAJOR EQUIPMENT AND SHALL 1.11 PRODUCT HANDLING CONDITIONS DETRIMENTAL TO THE PROPER AND TIMELY COMPLETION OF THE WORK.DO NOT PROCEED UNTIL B.WHERE TERM"CONTRACTOR"IS USED,IT SHALL MEAN THE PRIME CONTRACTOR OR SUBCONTRACTORS WHO ONLY IF THEY ARE SIMILAR IN DESIGN AND EQUAL IN QUALITY TO THE SCHEDULED PRODUCT AND MEET THE INCLUDE INSTRUCTIONS IN THE PROPER MAINTENANCE OF EACH PIECES OF EQUIPMENT. HAVE BEEN CONTRACTED TO PERFORM THE WORK UNDER THIS DIVISION OF THE SPECIFICATIONS. CAPACITY AND PERFORMANCE CHARACTERISTICS SPECIFIED. UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED. GPD Engineering and Architecture A.MATERIALS SHALL BE STORED IN SUCH A MANNER AS TO PROTECT THEM FROM DAMAGE OR DETERIORATION. B.PREPARE A MANUAL FOR THE MECHANICAL SYSTEM THAT INCLUDES A TABULATION OF EACH PIECE OF EQUIPMENT, C.WHERE THE WORD"PROVIDE"IS USED,IT SHALL MEAN"FURNISH AND INSTALL,COMPLETE AND READY FOR 7.WHEREVER TWO OR MORE MANUFACTURERS ARE LISTED ON PLANS OR IN SPECIFICATIONS,PROVIDE 3.3 INSTALLATION BY NAME,MODEL NUMBER AND SERIAL NUMBER.INCLUDE DESCRIPTIVE CATALOG INFORMATION,MAINTENANCE Professional Corporation INTENDED USE." MATERIALS,FIXTURES OR EQUIPMENT FROM THAT LIST ONLY,EXCEPT WHEN ALTERNATE MANUFACTURER IS B.ALL MATERIALS AND EQUIPMENT INJURED OR DAMAGED(IN TRANSIT,STORAGE,INSTALLATION OR TESTING INSTRUCTION BOOKS AND REPAIR PARTS LISTS.INFORMATION SHALL BE FOUND IN A 8 Y,-X 11"HARDBACK BINDER. 520 South Main Street,Suite 2531 APPROVED PRIOR TO BID. BEFORE COMPLETION OF THE CONTRACT)SHALL BE REPAIRED OR REPLACED AT NO ADDITIONAL EXPENSE TO THE A.GENERAL FURNISH THREE(3)COPIES OF THIS BOOK TO THE OWNER. Akron,OH 44311 D.WHERE THE WORD"DIRECTED"IS USED,IT SHALL MEAN"DIRECTED BY ARCHITECT OR ENGINEER OR HIS OWNER PRIOR TO FINAL ACCEPTANCE. 330.572.2100 Fax:330.572.2102 AUTHORIZED REPRESENTATIVE."THIS SHALL NOT IMPLY THAT ARCHITECT'S OR ENGINEER'S RESPONSIBILITY 8.AFTER BIDDING IS COMPLETED,ENGINEER WILL ONLY CONSIDER ALTERNATES THAT SHOW BENEFIT TO THE 1.CUTTING AND PATCHING:DO NOT CUT INTO OR REDUCE THE SIZE OF ANY LOAD-CARRYING MEMBER WITHOUT END OF SECTION EXTENDS INTO THE GENERAL CONTRACTOR'S OR MECHANICAL CONTRACTOR'S AREAS OF CONSTRUCTION OWNER.ENGINEER WILL NOT CONSIDER ALTERNATES THAT BENEFIT ONLY THE CONTRACTOR 1.12 QUALITY CONTROL THE PRIOR APPROVAL OF THE ARCHITECT.PERFORM CUTTING AND PATCHING IN ACCORDANCE WITH THE SUPERVISION. GENERAL CONDITIONS AND WITH ARCHITECT'S APPROVAL.INSTALL ALL HVAC COMPONENTS TO CLEAR ALL 9.ENGINEER RESERVES THE RIGHT TO ACCEPT OR REJECT PROPOSED SUBSTITUTIONS AND IT IS UNDERSTOOD A.CODES AND PERMITS:THE HVAC WORK SHALL COMPLY WITH ALL LOCAL,STATE AND NATIONAL CODES BEAMS AND OBSTRUCTIONS. E.WHERE THE WORDS"SIMILAR"OR"TYPICAL"ARE USED,THEY SHALL BE USED IN THEIR GENERAL SENSE AND THAT HIS JUDGEMENT SHALL BE FINAL. APPLICABLE TO THIS PROJECT.THE CONTRACTOR SHALL OBTAIN ANY MECHANICAL PERMITS REQUIRED FOR THE SHALL NOT BE INTERPRETED AS MEANING IDENTICAL.DETAILS SHALL BE WORKED OUT IN RELATION TO THEIR HVAC WORK. 2.SLEEVE AND ESCUTCHEONS:PROVIDE SLEEVES FOR ALL PIPING AND DUCTS PASSING THROUGH CONCRETE CONSULTANT LOCATION AND CONNECTIONS TO OTHER PARTS OF WORK. G.EQUIPMENT DEVIATION:DESIGN OF THIS PROJECT IS BASED ON PRODUCTS OF MANUFACTURE AS SCHEDULED OR OR MASONRY WALLS,ROOFS AND FLOORS.SLEEVES SHALL BE OF SUFFICIENT SIZE TO CLEAR BY WALL • DETAILED ON THE PLANS.WHERE SPECIFIED ALTERNATES OR APPROVED SUBSTITUTIONS REQUIRE B.LICENSE:THE CONTRACTOR SHALL HAVE A CURRENT STATE LICENSE SUITABLE TO THE SCOPE OF WORK UNDER AROUND,INCLUDING INSULATION WHERE APPLICABLE.SLEEVES SHALL BE CUT OFF FLUSH WITH WALL FACE OR F.WHERE THE TERMS"OR EQUAL"AND"OR APPROVED EQUAL"ARE USED THEY SHALL BE DEFINED AS"APPROVED REARRANGEMENT OF PIPING,DUCTWORK,CONDUIT OR WORK BY ANY OTHER TRADES.IT SHALL BE THE THIS CONTRACT. BELOW FLOORS AND SHALL EXTEND 6"ABOVE THE FLOOR OR ROOF.SLEEVES AROUND PIPE PASSING THROUGH AS EQUAL BY ARCHITECT OR ENGINEER." CONTRACTOR'S RESPONSIBILITY TO SUBMIT DRAWINGS AND OBTAIN ENGINEER'S AND ARCHITECT'S APPROVAL AND GROUND FLOOR OR OUTSIDE WALLS SHALL BE CAULKED WATERTIGHT WITH OAKUM AND PLASTIC CEMENT. TO ASSUME ANY ADDITIONAL COSTS DUE TO SUCH CHANGE. C.SPECIFICATIONS AND DRAWINGS:THE HVAC WORK SHALL BE DONE ACCORDING TO THE HVAC SPECIFICATIONS, CHROME PLATED BRASS ESCUTCHEONS SHALL BE PROVIDED WHEREVER PIPES PASS THROUGH FLOORS, 1.4CONTRACTOR'S RESPONSIBILITY WALLS AND CEILINGS OR FINISHED AREAS. THE HVAC DRAWINGS,THE GENERAL SPECIFICATIONS AND THE GENERAL DRAWINGS.IN CASE OF A CONFLICT,THE H.FOUNDATIONS,PIERS,SUPPORTS,ATTACHMENTS:PROVIDE NECESSARY FOUNDATIONS,SUPPORTS,PADS,BASES SPECIFICATIONS SHALL GOVERN. A.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CAREFULLY EXAMINE ALL OF THE CONTRACT AND PIERS,AS REQUIRED AND SHOWN ON DRAWINGS FOR EQUIPMENT FURNISHED OR AS REQURIED BY 3.ROOF PENETRATIONS:PASS THROUGH ROOF CURBS OR JACKS WHICH ARE DETAILED OR SPECIFIED ON THE DOCUMENTS AND TO COMPLY WITH THEM IN EVERY RESPECT.SHOULD THERE BE OMISSIONS OR DISCREPANCIES IN MANUFACTURER.MATERIALS,FIXTURES AND EQUIPMENT SHALL BE SECURELY ATTACHED TO THE BUILDING DRAWINGS.FLASH WITH 4 LB.LEAD SHEET,APPROVED PVC FLASHING,OR OTHER APPROVED METHODS THE DOCUMENTS NOTIFY THE ARCHITECT OR ENGINEER IN WRITING PRIOR TO THE BID DATE SO A WRITTEN STRUCTURE.ATTACHMENTS SHALL BE STRONG,DURABLE AND SUITABLE FOR THEIR INTENDED APPLICATION.PIPING D.JOB SITE:ANY JOB SITE CONDITIONS AFFECTING THE HVAC WORK SHALL BE THE RESPONSIBILITY OF THE HVAC COMPATIBLE WITH ROOFING AND ROOF ACCESSORIES TO PROVIDE A WATERTIGHT SYSTEM,APPROVED BY THE CLARIFIATION CAN BE ISSUED. SYSTEMS SHALL BE INSTALLED SO AS TO BE FREELY FLOATING.THEY SHALL BE SECURELY SUPPORTED FROM CONTRACTOR UNLESS INDICATED OTHERWISE. ARCHITECT. STRUCTURE,BUT SHALL BE ABLE TO EXPAND AND CONTRACT INDEPENDENTLY OF STRUCTURE WITHOUT CAUSING E.SUBMITTAL$:PROVIDE 8 COPIES OF A COMPLETE BROCHURE OF MATERIAL,EQUIPMENT,APPURTENANCES,AND B.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL DIVISIONS OF THE CONTRACT UNDUE STRESS OR DAMAGE TO THE PIPING SYSTEM.PIPING SHALL NOT SUPPORT ITSELF.PIPING SYSTEMS SHALL 4.VIBRATION ISOLATORS HAVE BEEN SPECIFIED FOR ALL MECHANICAL EQUIPMENT.CONTRACTOR SHALL BE DOCUMENTS WITH RESPECT TO MECHANICAL WORK THAT WILL BE REQUIRED BY OTHER DIVISIONS.CONTRACTOR BE RIGIDLY ATTACHED TO STRUCTURE ONLY WHERE SHOWN ON PLANS,AS REQUIRED BY SPECIFICATIONS AND ACCESSORIES PROPOSED FOR USE MUST BE SUBMITTED ACCOMPANIED BY COMPLETE DESCRIPITIVE LITERATURE, RESPONSIBLE FOR ALL NOISE AND VIBRATION PRODUCED BY THE EQUIPMENT HE FURNISHES AND WILL SHALL THOROUGHLY REVIEW ALL ASPECTS OF MECHANICAL BID PROPOSAL PRIOR TO BIDDING FOR THE PURPOSE CODES,OR AS REQUIRED FOR PROPER INSTALLATION OF EQUIPMENT OR FIXTURES.PROVIDE SLEEVES,ROLLERS, DRAWINGS,RATING TABLES OR CURVES NECESSARY TO GIVE FULL AND COMPLETE DETAILS.NO CONSIDERATION CORRECT CONDITIONS DETRIMENTAL TO THE OWNER'S OCCUPANCY.EQUIPMENT AND OUTLET LOCATION: OF CLEARLY DEFINING THE SCOPE OF MECHANICAL BID PROPOSAL WITH THAT OF ALL OTHER TRADES. EXPANSION FITTINGS,EXPANSION LOOPS,OR SPECIAL FITTINGS AS REQUIRED TO PREVENT TRANSMISSION OR WILL BE GIVEN TO PARTIAL LISTS SUBMITTED FROM TIME TO TIME.ANY ITEM ON THIS LIST,WHICH IS REJECTED EXACT LOCATIONS FOR EQUIPMENT AND OUTLETS FOR THE HVAC WORK SHALL BE DETERMINED BY THE CONTRACTOR SHALL PAY SPECIAL ATTENTION TO THE INTEGRATION WITH OTHER DIVISIONS SUCH AS BUT NOT VIBRATION TO THE STRUCTURE FOR THE PROPER OPERATION OF SYSTEMS WHETHER SPECIFICALLY SHOWN ON BECAUSE OF UNSUITABILITY OR INFERIOR QUALITY MUST BE REPLACED BY ACCEPTABLE ITEMS WITHIN TWO ARCHITECT.INSTALL IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. LIMITED TO THE FOLLOWING: PLANS OR NOT. WEEKS.AFTER THAT TIME THE ARCHITECT RESERVES THE RIGHT TO NOTIFY THE CONTRACTOR AS TO TYPE OF MATERIALS HE WILL BE REQUIRED TO FURNISH.APPROVAL OF MATERIALS OR EQUIPMENT SHALL NOT BE B.PIPING: 1.COORDINATION BETWEEN MECHANICAL AND ELECTRICAL DIVISIONS.EQUIPMENT DELIVERED TO SITE THAT IS I.SITE OBSERVATIONS AND PUNCHLIST:ENGINEER WILL VISIT PROJECT SITE ON OCCASION FOR THE PURPOSE OF CONSTRUED AS RELEASING THIS CONTRACTOR FROM FURTHER RESPONSIBILITY FOR FULL COMPLIANCE WITH ALL NOT COMPATIBLE WITH THE ELECTRICAL SYSTEM SHALL BE REPLACED OR MODIFIED AS NECESSARY AT NO REVIEWING THE WORK FOR GENERAL COMPLIANCE WITH PLANS AND SPECIFICATIONS.THESE REVIEWS SHALL NOT PROVISIONS OF THESE CONTRACT DOCUMENTS,BUT RATHER AS A MEANS TO COORDINATE THE EQUIPMENT 1.SUPPORTS:PROVIDE ALL PIPE SUPPORTS REQUIRED.HORIZONTAL RUNS OF PIPE IN THE BUILDING SHALL BE ADDITIONAL COST TO THE OWNER. EXTEND ENGINEER'S RESPONSIBILITY INTO THE AREA OF GENERAL CONTRACTOR'S OR MECHANICAL INSTALLATION. RIGIDLY ATIACHED TO BUILDING STRUCTURE WITH ADJUSTABLE SWIVEL COUPLINGS AND ROD TYPE HANGERS DEVELOPER. • CONTRACTOR'S SUPERVISION OR RESPONSIBILITY,NOR SHALL THEY RELIEVE CONTRACTOR'S RESPONSIBILITY TO FOR SIZES 4"AND SMALLER.PERFORATED STRAP HANGERS WILL NOT BE PERMITTED IN ANY PART OF THE 2.COORDINATION BETWEEN MECHANICAL AND ARCHITECTURAL DIVISIONS. COMPLY WITH THE CONTRACT DOCUMENTS.AFTER SUCH A VISIT,ENGINEER WILL PROVIDE A LISTING OF ITEMS PART 2-PRODUCTS WORK.PIPE HANGERS SHALL BE LOCATED NEAR CHANGES OF DIRECTION AND AT POINTS REQUIRED TO THAT HE HAS OBSERVED THAT REQUIRE MODIFICATION OR CORRECTION.SUCH A LISTING SHALL BE CALLED A PROPERLY SUPPORT PIPING AND ACCESSORIES.SPACING OF HANGERS AND SUPPORTS SHALL BE INSTALLED AS 3.COORDINATION BETWEEN MECHANICAL AND STRUCTURAL DIVISIONS. "PUNCHLIST."TAKE APPROPRIATE ACTION TO CORRECT ALL PUNCHLIST ITEMS.INFORM ARCHITECT AND ENGINEER 2.1 MATERIALS REQUIRED BY 2009 INTERNATIONAL MECHANICAL CODE.PROVIDE DIELECTRIC SEPARATION BETWEEN ALL IN WRITING OF THE TYPE OF CORRECTIVE ACTION TAKEN. DISSIMILAR METAL CONTACTS. C.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE ALL EQUIPMENT,MATERIALS AND LABOR, A.USE NEW MATERIALS OF THE MANUFACTURER'S CURRENT PRODUCTION UNLESS INDICATED OTHERWISE.THE WHETHER SPECIFICALLY INDICATED ON PLANS OR CALLED FOR IN SPECIFICATIONS OR NOT,WHICH ARE J.INSPECTION AND CERTIFICATE OF OCCUPANCY:CONTRACTOR SHALL ARRANGE FOR ALL INSPECTIONS REQUIRED EQUIPMENT AND MATERIALS SPECIFIED INDICATE A MINIMUM GRADE AND DESIGN.ANY FEATURE INCLUDED AS 2.INSULATION SADDLES:PROVIDE 24 GA.GALV.'SADDLES"AT 12"LONG,AT EACH PIPE HANGER OR SUPPORT NECESSARY FOR THE PROPER INSTALLATION AND FUNCTION OF THE MECHANICAL SYSTEMS FOR THIS PROJECT. BY LOCAL BUILDING OFFICIALS AND STATE AGANCIES.CORRECT DEFICIENCIES REQUIRED TO COMPLY WITH CODES STANDARD WITH THE MATERIALS LISTED SHALL BE INCLUDED IN ANY SUBSTITUTION.SUBSTITUTES OF EQUAL FOR INSULATED PIPING TO PREVENT DAMAGE TO INSULATION. AND STANDARDS AND TO RECEIVE CERTIFICATE OF OCCUPANCY.UPON COMPLETION OF THIS PROJECT,SUBMIT GRADE AND DESIGN MAY BE PERMITTED AND MUST BE SUBMITTED FOR APPROVAL IN ACCORDANCE TO THESE D.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CAREFULLY EXAMINE CONDITIONS OF THE PROJECT WRITTEN EVIDENCE OF COMPLIANCE WITH THE ABOVE TO ARCHITECT.FINAL ACCEPTANCE WILL NOT BE ISSUED3.COPPER PIPING:REAM ALL PIPING BEFORE JOINING.CLEAN THE PIPE ENDS AND FITTINGS BY SWABBING WITH SITE AND TO CHECK THE PLANS AND SPECIFICATIONS OF OTHER DIVISIONS THAT MIGHT AFFECT HIS WORK.VISIT AND THE WARRANTY DATE WILL NOT BE ESTABLISHED UNTIL SUCH COMPLIANCE IS DEMONSTRATED. SPECIFICATIONS.ALL MATERIALS AND EQUIPMENT SHALL BE SUBJECT TO FINAL ACCEPTANCE BY THE ARCHITECT A DRY,LINTLESS CLOTH FOLLOWED BY A CLOTH SOAKED IN REFRIGERANT OIL,VARSOL OR OTHER SOLVENT TO THE PROPOSED PROJECT SITE PRIOR TO BID AND CAREFULLY INVESTIGATE EXISTING STREETS,PARKING LOTS, AT COMPLETION OF THE PROJECT. REMOVE EXCESS OIL.ALL JOINTS SHALL BE MADE WITH SILVER SOLDER AND A NON-CORROSIVE FLUX. PAVED AREAS,SIDEWALKS BUILDINGS AND STRUCTURES. K.SYSTEMS START-UP:UPON COMPLETION OF THE INSTALLATION OF THE WORK,START-UP ALL SYSTEMS AND TEST, REFRIGERANT LINES SHALL BE FILLED WITH DRY NITROGEN DURING BRAZING OPERATION.CAP AND SEAL ALL BALANCE AND ADJUST SYSTEMS UNTIL THEY ARE FULLY OPERATIONAL AND FUNCTIONING AS INTENDED BY B.ALL OTHER MATERIALS,NOT SPECIFICALLY DESCRIBED BUT REQUIRED FOR A COMPLETE AND PROPER OPENINGS DURING CONSTRUCTION TO PREVENT DIRT AND MOISTURE FROM ENTERING PIPING AND EQUIPMENT. E.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE WORK PERFORMED UNDER THE ENGINEER.CONTRACTOR SHALL PREPARE A START-UP REPORT WITH CHECKLIST FOR CLEANROOM ROOFTOP UNIT INSTALLATION OF THE WORK OF THIS SECTION,SHALL BE NEW,FIRST QUALITY OF THEIR RESPECTIVE KINDS,AND ALL PIPE SIZES AND SPECIAL REQUIREMENTS(DOUBLE SUCTION RISERS,TRAPS,ETC)SHALL BE AS DESIGNED MECHANICAL DIVISION OF THE CONTRACT DOCUMENTS WITH WORK PREFORMED UNDER OTHER DIVISIONS SO AS AND ALL REMAINING UNITS.SUBMIT START-UP REPORT 1 CHECKLIST TO ENGINEER FOR REVIEW. AS SELECTED BY THE CONTRACTOR SUBJECT TO THE APPROVAL OF THE ARCHITECT. AND RECOMMENDED BY THE EQUIPMENT MANUFACTURER. NOTTO DELAY OR DAMAGE ANY PART OF THIS INSTALLATION. Q �.- - 06 L.RECORD DRAWINGS:DURING THE COURSE 2.2 AIR CONDITIONING UNITS C.AIR DUCT WORK: SEAL' co F.IT SHALL BE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO INFORM THE PRIME CONTRACTOR OF CALLED"RECORD DRAWINGS",CONTINUALLY UUPDATED TON THEE PROJECT SATE..DRAWINGS SHALL INDICATE EXACT �0-�.. P""'-� h`,�� `+ ▪' THE LOCATION OF CHASES,OPENINGS,SLEEVES,FLASHINGS,TRENCHES,AND THE LIKE REQUIRED FOR THE WORK LOCATIONS AND DEPTHS OF UNDERGROUND PIPING AND CHANGES IN PIPE ROUTING OR FIXTURE AND EQUIPMENT A.UNITS SHALL BE FACTORY FABRICATED AND COMPLETE WITH FANS,MOTORS,INSULATED CASINGS,COILS AND 1.AIR DUCTS SHALL BE INSTALLED AS INDICATED ON THE DRAWINGS AND COORDINATED WITH THE WORK OF •� \ ✓`V i;V- s"`?� O o COVERED BY THE MECHANICAL DIVISION OF THE CONTRACT DOCUMENTS.DO SO IN SUFFICIENT TIME FOR PROPER LOCATIONS.UPON COMPLETION OF PROJECT,TURN RECORD DRAWINGS OVER TO OWNER.SUBMIT WRITTEN FILTERS.MOTORS SHALL BE GENERAL PURPOSE,OPEN SQUIRREL CAGE TYPE FOR CONTINUOUS DUTY.FANS SHALL OTHER TRADES.CHECK ALL DRAWINGS FOR EXACT LOCATIONS TO PREVENT INTERFERENCES. f/,�? <,''' ���) `'y 5 COORDINATION WITH GENERAL CONSTRUCTION,OR ASSUME THE RESPONSIBILITY FOR REQUIRED CUTTING AND EVIDENCE OF COMPLIANCE TO ENGINEER.FINAL ACCEPTANCE WILL NOT BE ISSUED AND THE WARRANTY DATE WILL BE OF THE FORWARD-CURVED TYPE.FANS SHALL BE V-BELT OR MULTI-SPEED DIRECT DRIVE.COILS SHALL BE ` > „ ?E � ' cn PATCHING.NO CUTTING OF STRUCTURAL MEMBERS SHALL BE PERFORMED WITHOUT APPROVAL OF THE ARCHITECT NOT BE ESTABLISHED UNTIL SUCH COMPLIANCE IS DEMONSTRATED. ALUMINUM FIN WITH COPPER TUBES AND HEADERS.CAPACITY,ACCESSORIES,AND OPERA TING CONDITIONS SHALL 2.TURNING VANES SHALL BE FURNISHED AND INSTALLED WHERE INDICATED ON THE DRAWINGS AND AS C�EQ AND STRUCTURAL ENGINEER. BE AS INDICATED IN SCHEDULE. REQUIRED AT EACH ELBOW.PROVIDE CHROME PLATED DAMPER REGULATORS FOR INACCESSIBLE DUCTS M . 'A q N ABOVE CEILING AND SELF-LOCKING TYPE REGULATORS FOR ACCESSIBLE OR EXPOSED DUCTS.A SHEET METAL OREGON, M.OWNER INSTRUCTION AND OPERATION AND MAINTENANCE MANUALS:UPON COMPLETION OF THIS PROJECT, 21,4 1 m G.IT SHALL BE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO INCLUDE MINOR DETAILS NECESSARY THOROUGHLY INSTRUCT OWNER'S REPRESENTATIVE IN THE OPERATION AND CARE OF THE ALL SYSTEMS, B.UNITS SHALL BE PROVIDED WITH INTEGRAL HEAT STRIPS AND SINGLE POINT ELECTRICAL CONNECTION. WEAR PLATE SHALL BE ATTACHED AT THE TOP AND BOTTOM OF THE DUCT TO PREVENT THE DAMPER TEARING n` �)C' �J{ cn FOR PROPER INSTALLATION AND OPERATION OF MATERIALS,EQUIPMENT OR FIXTURES AS IF SPECIFIED OR SHOWN FIXTURES,AND EQUIPMENT.INSTRUCTION MAY BE PROVIDED ON MORE THAN ONE DAY,BUT SHALL NOT BE LESS DUCT LINER.PROVIDE END BEARINGS ON ALL DAMPERS. S'c' �.` IN CONTRACT DOCUMENTS. THAN FOUR HOURS FOR PLUMBING SYSTEMS AND EIGHT HOURS FOR HVAC SYSTEMS.DRIVING TIME TO AND FROM 2.3 PIPING �: .-1.1.../., -c PROJECT SHALL NOT BE CREDITED TO INSTRUCTION TIME.FURNISH THE OWNER A MANUAL IN THE FORM OF A 3.FLASHINGS AND COUNTER FLASHINGS SHALL BE FURNISHED AND INSTALLED AT ALL DUCTS PASSING ...--'01\1 M. 1\P�V H.IT SHALL BE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO INSTALL MATERIALS,EQUIPMENT AND THREE-RING BINDER CONTAINING OPERATING INSTRUCTIONS,COPY OF APPROVED SUBMITTAL,SPARE PARTS LISTS, A.CONDENSATE DRAIN PIPING SHALL BE SCHEDULE 40 PVC PIPING AND FITTINGS.SIZES SHALL BE AS INDICATED ON THROUGH ROOF AND EXTERIOR WALLS TO THE SATISFACTION OF THE ARCHITECT. 0 FIXTURES ACCORDING TO CODE REQUIREMENTS,MANUFACTURER'S RECOMMENDATIONS OR AS REQUIRED IN WARRANTIES AND OTHER PERTINENT DATA FOR EACH PIECE OF EQUIPMENT OR FIXTURE.COVER SHEET SHALL THE DRAWINGS. o CONTRACT DOCUMENTS,WHICHEVER IS MORE STRINGENT. IDENTIFY THE PROJECT,ARCHITECT,ENGINEER AND CONTRACTORS.SUBMIT WRITTEN EVIDENCE OF COMPLIANCE 4.FLEXIBLE AIR DUCT CONNECTIONS SHALL BE FURNISHED AND INSTALLED AS INDICATED ON THE DRAWINGS. EXPIRES:`r�1hq Y s WITH ABOVE TO ENGINEER.FINAL ACCEPTANCE WILL NOT BE ISSUED AND THE WARRANTY DATE WILL NOT BE 2.4 INSULATION 0 1.5ADDITIONAL COMPENSATION ESTABLISHED UNTIL SUCH COMPLIANCE IS DEMONSTRATED. 5.SEAL ALL JOINTS TO MINIMIZE AIR LOSS WITH LATEX DUCT SEALANT. A.DUCTWORK SHALL BE INSULATED WITH 2"THICK,1 PCF DENSITY,FIBERGLASS DUCTWRAP INSULATION;MINIMUM 6.PROVIDE BALANCING DAMPERS AS NECESSARY TO PROPERLY BALANCED THE AIR SYSTEM. A.FAILURE TO EXAMINE OR TO COMPLY WITH CONTRACT DOCUMENTS SHALL NOT RELIEVE CONTRACTOR OF 1.8SUBMITTAL DATA R-6.0. RESPONSIBILITY FOR THE WORK OR BE USED AS A BASIS FOR ADDITIONAL COMPENSATION. 7.PROTECT DIFFUSERS,REGISTERS,GRILLES,AND OPEN ENDS OF DUCTWORK WITH PLASTIC WRAP OR OTHER REVISIONS: 2.5 AIR DUCT WORK A.SUBMIT IN TIMELY MANNER FOR ENGINEER'S REVIEW,BROCHURES DESCRIBING ALL MATERIALS,EQUIPMENT, FORM OF PROTECTION TO MAINTAIN DIRT AND DUST FREE AND TO PREVENT ENTRY OF DIRT,DUST,OR FOREIGN 0 B.NO ADDITIONAL COMPENSATION WILL BE AWARDED FOR CONFLICT WITH ARCHITECTURAL,STRUCTURAL, FIXTURES AND SPECIALLY FABRICATED STRUCTURES PROPOSED FOR USE IN THE PERFORMANCE OF THE WORK ON MATERIAL INTO THE DUCTWORK. o ELECTRICAL OR MECHANICAL COMPONENTS IN INSTALLATION OF PREFABRICATED MATERIALS OR EQUIPMENT. THIS PROJECT. c A.ALL DUCTWORK SHALL BE CONSTRUCTED OF G90 GALVANIZED SHEET METAL.CONFORM TO THE o DUCTWORK AND PIPING SHALL BE FABRICATED FROM FIELD MEASUREMENTS.ADJUST DUCT SIZES AS NECESSARY RECOMMENDATIONS OF THE LATEST EDITION OF THE SMACNA DUCT CONSTRUCTION STANDARD AS TO GAUGES, O TO FIT SPACE AVAILABLE.ADVISE ENGINEER OF ANY DISCREPANCIES PRIOR TO FABRICATION. 1.ITEMS TO BE SUBMITTED SHALL INCLUDE BUT SHALL NOT BE LIMITED TO DUCTOWRK,PIPE,VALVES,FITTINGS, 8.CLEANING:REMOVE ALL DIRT AND FOREIGN MA TIER FROM THE ENTIRE DUCT SYSTEM AND CLEAN DIFFUSERS, MATERIALS,HANGERS,SPECIAL SUPPORTS,INSULATION,FIXTURES,EQUIPMENT CONTROLS AND MECHANICAL BRACING,ETC.EXCEPT AS NOTED HEREIN AND ON THE DRAWINGS.PRESSURE CLASS SHALL BE AS FOLLOWS: REGISTERS,GRILLES AND THE INSIDE OR AIR-HANDLING UNITS BEFORE OPERATING FANS. cn C.NO COMPENSATION WILL BE AWARDED TO THE CONTRACTOR FOR MINOR RELOCATIONS OR DEVIATIONS FROM ROOM LAYOUTS. oPLANS.CHANGES IN CONTRACT PRICE WILL BE ALLOWED ONLY FOR ADDITIONS TO OR CHANGES TO ORIGINAL GENERAL SUPPLY AIR+2" 9.LEAKAGE RATE SHALL NOT EXCEED MORE THAN 5%OF THE SYSTEM AIR QUANTITY,DETERMINED IN DESIGN INTENT AND THEN ONLY WITH WRITTEN APPROVAL OF THE ARCHITECT OR OWNER. 2.DESCRIPTIVE MATERIAL SHALL BE ACCOMPANIED BY SHOP DRAWINGS OR CATALOG DATA SHEETS,CLEARLY RETURN-2" ACCORDANCE WITH APPENDIX C OF THE SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL. 01 SHOWING RATINGS,CAPACITIES AND DIMENSIONS OF MATERIALS,FIXTURES AND EQUIPMENT.SPECIFIC ITEMS EXHAUST-4" D.OMISSION OF ARCHITECTURAL,CIVIL,STRUCTURAL,ELECTRICAL OR OTHER PERTINENT DETAILS FROM PROPOSED SHALL BE CLEARLY DEFINED AND DESCRIBED WITH PERTINENT DATA.INFORMATION SHALL BE E.CONTROL SYSTEM:THE HVAC CONTRACTOR SHALL FURNISH AND INSTALL ALL THE CONTROLS,WIRING AND v MECHANICAL CONTRACT DOCUMENTS SHALL NOT BE USED AS BASIS FOR ADDITIONAL COMPENSATION. PRESENTED SO THAT LINE-BY-LINE COMPARISON MAY BE MADE WITH CONTRACT DOCUMENTS.DEVIATION FROM B.DUCT SIZES SHALL BE AS INDICATED ON THE DRAWINGS.SIZES ARE INSIDE CLEAR DIMENSIONS. CONNECTIONS AND SHALL MAKE FINAL CALIBRATION AND ADJUSTMENT OF THE CONTROL SYSTEM TO THE 1- CONTRACT DOCUMENTS SHALL BE ENUMERATED ON SEPARATE SHEET AND SO ENTITLED.DATA OF GENERAL SATISFACTION OF THE ARCHITECT.THERMOSTAT SHALL BE SEVEN DAY PROGRAMMABLE THERMOSTAT, c 1.6 SUPERVISION,LABOR AND WORKMANSHIP NATURE WILL NOT BE ACCEPTABLE. HONEYWELL TK735F2010 OR EQUAL. 0 � PROVIDE PROPER SUPERVISION OF MECHANICS AND SUBCONTRACTORS PERFORMING WORK UNDER THIS DIVISION. 3.EACH BROCHURE SHALL BE NEATLY ORGANIZED INTO A SINGLE BINDER.IN EACH BROCHURE PROVIDE COVER 3.4 GUARANTEE 0 LABOR SHALL BE PERFORMED BY SKILLED MECHANICS EXPERIENCED IN THEIR PARTICULAR TRADE.PIPING AND SHEET IDENTIFYING PROJECT NAME AND LOCATION,ARCHITECT,ENGINEER,GENERAL CONTRACTOR,AND L EQUIPMENT SHALL BE INSTALLED SQUARE AND PLUMB,WITH ACCESSIBILITY FOR PROPER OPERATION AND MECHANICAL CONTRACTOR.INCLUDE CONTRACTOR'S ADDRESSES AND PHONE NUMBERS.PROVIDE ADEQUATE CONTRACTOR SHALL GUARANTEE THAT ANY DEFECTS IN EQUIPMENT OR WORKMANSHIP ARISING IN THE HVAC 0. SERVICE.ANY ITEM THAT DOES NOT PRESENT A NEAT AND WORKMANLIKE APPEARANCE SHALL BE REPLACED OR SPACE FOR ARCHTIECT'S AND ENGINEER'S STAMPS.MECHANICAL CONTRACTOR SHALL INCLUDE AND SIGN THE WORK WITHIN A PERIOD OF ONE YEAR FROM DATE OF ACCEPTANCE SHALL BE CORRECTED AT NO COST TO THE Lc) CORRECTED AT THE DIRECTION OF THE ARCHITECT OR ENGINEER AND WITHOUT ADDITIONAL COST TO THE OWNER. FOLLOWING STATEMENT ON THE COVER SHEET: OWNER.THIS SHALL ALSO INCLUDE THE REPLACEMENT OF REFRIGERANT AND LABOR INCIDENTAL THERETO. / SUBMIT WELDER'S CERTIFICATES AND RESUME OF EXPERIENCE FOR ALL MECHANICS ON THIS PROJECT WHEN PROVIDE THE OWNER WITH ANY ADDITIONAL GUARANTEES PROVIDED BY THE MATERIALS OR EQUIPMENT DIRECTED TO DO SO BY ARCHITECT OR ENGINEER. I HEREBY CERTIFY THAT THIS SHOP DRAWING AND/OR BROCHURE HAS BEEN CHECKED PRIOR TO SUBMITTAL MANUFACTURERS WHETHER SPECIFICALLY MENTIONED OR NOT. aoi AND THAT IT COMPLIES IN ALL RESPECTS WITH THE REQUIREMENTS OF THE CONTRACT DOCUMENTS FOR THIS = 1.7GENERAL REQUIREMENTS PROJECT. DRAWING BY: U A.PROTECTION OF ROUGH WORK:ALL OPENINGS OF EVERY DESCRIPTION SHALL BE SECURELY CAPPED OR COMPANY NAME I OTHERWISE PROTECTED AGAINST DEBRIS OR OTHER FOREIGN MATERIAL ENTERING THE SYSTEM UNTIL SUCH TIME SIGNED L0 AS THE EQUIPMENT OR FIXTURE IS PERMANENTLY ATTACHED. DATED DATE: MARCH 13, 2017 CON CO B.CLEANING AND ADJUSTING:AT THE COMPLETION OF THE WORK ALL PARTS OF THE INSTALLATION SHALL BE SUBMITTALS FORWARDED WITHOUT THIS STATEMENT AND SIGNATURE IN EACH BROCHURE WILL NOT BE o THOROUGHLY CLEANED.ALL VALVES AND CONTROLS SHALL BE ADJUSTED FOR PROPER OPERATION.UPON REVIEWED. JOB NUMBER: 2016 285.50 COMPLETION OF THE WORK,THE CONTRACTOR SHALL LEAVE THE BUILDING AND PROJECT SITE IN A NEAT `� CONDITION. TITLE: N Q ro MECHANICAL SPECIFICATIONS (N - 3o N 0 o r- a SHEET NUMBER: 0, s -4: REFERENCE ONLY � 0 � � V Y 2 s NOT APPROVED WITH THIS PERMIT 0 ` ' oII M a COMMENTS: ii ii E 0 • a> c a) -.-. a) O 0 - I I GE\E�AL \OTES J -r `' ` 1 1. THE GENERAL NOTES LISTED HERE APPLY TO ALL HVAC DRAWINGS IN ADDITION TO ANY ADDITIONAL DRAWING NOTES ON THE INDIVIDUAL DRAWINGS. I ,CVS 1� � I 2. SEE CODED NOTES ON INDIVIDUAL DRAWING SHEETS FOR SPECIFIC I INSTRUCTIONAL NOTES. / 1 \ i I \ _._......_.__._..................._ I. 3. FIELD VERIFY EXISTING CONDITIONS. Health I 4. DO NOT ROUTE DUCTWORK OR PIPING OVER ELECTRICAL EQUIPMENT. II I r / -- ... - - -...._._... - -- - ..__. _ - - - - - -._...__.._..-m - --.._.._.__._.-._..... _ 5. PERFORM WORK IN ACCORDANCE WITH _.......__...._._.._.._................_.._... THE LATEST EDITIONS 1 +• REVISIONS, AMENDMENTS, OR SUPPLEMENTS OF APPLICABLE STATUTES, I \ m ORDINANCES, CODES OR REGULATIONS OF FEDERAL, STATE, AND LOCAL 1 r , HERLATEST EDHAVING JURISDICTION IN EFFECT ON THE DATE BIDS ARE EIVED. STORE NUMBER • ' - -� 7358 SW DURHAM ROAD 6. WHERE APPROVED STANDARDS HAVE BEEN ESTABLISHED BY OSHA, PORTLAND, OR 97224 I UNDERWRITERS LABORATORIES, AMERICAN CODES, ASA, ASHRAE, ARI, - NEC, STATE FIRE INSURANCE REGULATION BODY, NFPA OR OTHERS. THESE STANDARDS SHALL BE FOLLOWED WHETHER OR NOT INDICATED PROJECT TYPE: NON-RETAIL ON THE DRAWING AND SPECIFICATIONS. -_ - -- - DEAL TYPE: TBD - O 7. ALL DUCT TO BE OF 2" PRESSURE CLASS, UNLESS NOTED OTHERWISE. I I fl C_[ , v �' � CS PROJECT NUMBER 8. REFER TO STRUCTURAL DRAWINGS FOR EXACT LOCATION OF ROOF-TOP • JV n 0i . ; - EQUIPMENT. - Ii ' '_, _ ' 9. PROVIDE TURNING VANES IN SUPPLY DUCT ELBOWS. PROVIDE TURNING ARCHITECT OF RECORD ' VANES IN RETURN AND EXHAUST ELBOWS ONLY WHERE INDICATED ON I -� -.....-.--....�� -J t PLANS. - 14"0 - 14"O 1 .- 14"x22" 010. DUCT SIZES SHOWN ARE NET FREE AREA. A I O ro)l SERVICE CLEARANCE 11. ALL PIPING, DUCTS VENTS, EXTENDING THROUGH WALLS & ROOF SHALL BE FLASHED, COUNTER FLASHED INA WATERPROOF MANNER. ECU-1 - S ' 12. PROVIDE SEISMIC RESTRAINT ON ALL NEW DUCTWORK, PIPING AND . A0111A EQUIPMENT GPD Engineering and Architecture © ' Professional Co ration NN\\i : X 520 South Main•S Street,Suite 2531 © CU-1 - wr T \OYES BY SYMBOL Akron,OH 44311 4 - 330.572.2100 Fax.330.572.2102 / X i S / X I ,.. - - `i...I^._. 1. REMOVE AND RELOCATE EXISTING SUPPLY GRILLE. 0 I `Ain i i C z 0 _ _J II2. 14"x22" SUPPLY AIR DUCT UP FROM ECU-1 ON FLOOR. TRANSITION AS 1 \., i 1 J�� I O ® ® REQUIRED. CONSULTANT: r. SERVICE CLEARANCE \ 1 3. FAN FILTER UNIT (FFU) RELOCATED WITH CLEAN ROOM. CONNECT PRIMARY I _ 7 \ 1 AIR TO 14" COLLARS ON FFU. TRANSITION AS REQUIRED. FFU TO BE - - I ` it BALANCED TO 250 CFM. BALANCE PRIMARY AIR (FROM ECU-1) TO 250 CFM. . 4. FAN FILTER UNIT (FFU) RELOCATED WITH CLEAN ROOM. CONNECT PRIMARY AIR TO 14" COLLARS ON FFU. TRANSITION AS REQUIRED. FFU TO BE BALANCED TO 600 CFM. BALANCE PRIMARY AIR (FROM ECU-1) TO 450 CFM. TYPICAL FOR FIVE. 5. MOUNT THERMOSTAT AND HUMIDITY SENSOR ON WALL. FURNISHED BY ECU-1 MANUFACTURER. 6. EXISTING ROOFTOP UNIT TO REMAIN. 7. CONTRACTOR TO INSTALL NEW ECU ON A NEOPRENE PAD. ROUTE REFRIGERANT PIPING TO CU-1 PER MANUFACTURER'S RECOMMENDATIONS. DEVELOPER: 8. EXISTING 12" SUPPLY DUCT TO REMAIN. .._._..__._.._.__T 1__ I1 - _.......__.........._._. ._..._.....__._._.._...I I........I I - -- -- ..__... - . ._.. ..._.................._..............._.. ..._j 9. SHUTTERED VENT IN DOOR. 10. SF-1 SUSPENDED FROM STRUCTURE ABOVE WITH THREADED RODS AND VIBRATION ISOLATORS. PROVIDE 8"0 INTAKE DUCT THROUGH ROOF WITH GOOSENECK AND BIRD SCREEN. SEAL ROOF PENETRATIONS WEATHER TIGHT AND MAINTAIN 25'-0" BETWEEN INTAKE AND BUILDING EXHAUST/PLUMBING VENTS. SF AIRFLOW SHALL BE DIRECTED TOWARD ECU-1 RETURN AIR GRILLE. 3 11. 3/4" CONDENSATE DRAIN FROM ECU-1 CONDENSATE PUMP TO HUB DRAIN AT n SUMP PUMP. SEE P1.1 FOR EXACT LOCATION. oi 1 FIRST FLOOR PLAN - DEM 0 L I TI 0 N """"" 2 ENLARGED CLEAN ROOM & ANTE R O O IV PLAN - NEW WORK """" 12. CU-1 ON ROOF. INSTALL ON PREFABRICATED EQUIPMENT RAILS. • SEALPROP , / ���i / ���/ F�u - / _ - `' G I N `s�p m M 1 .1 SCALE: 1/4 = 1 -0 ////i�,,� M-1 . I� SCALE: 1/4 = 1 -0 ///�,,� 13. REFRIGERANT PIPING BETWEEN CU 1 AND ECU 1. PIPING THROUGH ROOF ��. ,,-„,i, \z,o, SHALL BE THROUGH CURB WITH PREFABRICATED CAP. �� 0 w J /�. i • OREGON 1/41117 c :7,M. cr) J__ > > > > > > EXPIRES: 1213�I 1k 0 U C oi. . U U FIDE SPI \ KLE; \ OTES CLEA\ SOON SUITE - VE\ TILATIO\ O.A. °' REVISIONS: 1. A LICENSED FIRE SPRINKLER CONTRACTOR IS REQUIRED TO PREPARE SPRINKLER PLANS, SUBMIT CLEAN ROOM: (250 SF x 0.18 CFM/SF) + (3 PPL x 10 CFM/PERSON) - 75 CFM o FOR PERMIT, AND PAY FOR ALL FEES AND INSPECTIONS. 0 1.1. CONTRACTOR SHALL CONTACT ARCHITECT/ENGINEER OF RECORD FOR CAD REFLECTIVE CEILING ANTE ROOM: (100 SF x 0.18 CFM/SF) + (0 PPL x 10 CFM/PERSON) = 18 CFM 0 PLANS. V 450 V 450 V 450 V 450 V 450 V 250 N TOTAL VENTILATION REQUIRED = 93 CFM 1--t CFM CFM r CFM CFM CFM r CFM 0 2. THE FOLLOWING SHALL APPLY: 2.1. PROVIDE COVERAGE PER NFPA 13 REQUIREMENTS. 3 2.2. CONTRACTOR SHALL REWORK EXISTING SPRINKLER SYSTEM TO MEET CODE REQUIREMENTS. TOTAL VENTILATION PROVIDED = 100 CFM o PREPARE HYDRAULIC CALCULATIONS AND DESIGN DRAWINGS. OBTAIN ALL PERMITS, INSPECTIONS 'i .i AND APPROVALS. 2.3. PROVIDE FIRE STOPPING AT WALL PENETRATIONS, REFER TO ARCHITECTURAL PLANS FOR 450 CFM 450 CFM 450 CFM 450 CFM 450 CFM 250 CFM o LOCATIONS. ^' -0 2.4. PROVIDE AND INSTALL CONCEALED SPRINKLER TYPE WITH GASKETED COVER IN CLEAN ROOM. CLEA\ . O 0 IV SUITE - S E Q U E\ C E OF OPE A TI O\S 2.5. PROVIDE AND INSTALL RECESSED SPRINKLER TYPES IN ALL AREAS WITH FINISHED CEILINGS AND a UPRIGHT SPRINKLER HEADS FOR AREAS WITHOUT CEILINGS. 0 2.6. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS, MECHANICAL PLANS, LIGHTING PLANS, 1. ECU-1 AND SF-1 SHALL RUN CONTINUOUSLY. ETC. FOR COORDINATION AND PLACEMENT OF SPRINKLER HEADS AND PIPING. LIGHTING WILL SF o HAVE HIGHEST PRIORITY. 2. UPON A CALL FOR COOLING (BY THE SPACE THERMOSTAT), UNIT CONTROLLER WILL STAGE THE CLEA\E A\ A\ T = 2.7. SPRINKLER HEADS THAT ARE LOCATED IN THE ACOUSTICAL PANELS OF THE CEILING GRID UNITS MECHANICAL COOLING TO MAINTAIN ROOM TEMPERATURE SHALL BE IN THE CENTER OF THE PANEL. THE EXACT LOCATION OF THE SPRINKLER HEADS SETPOINT.cn /00V 0 \v, O 0 1 V, >� SHALL BE DETERMINED AFTER CEILING GRID IS INSTALLED. DO NOT USE THE CEILING GRID DRAWING BY: i PLANS TO DETERMINE THE LOCATION OF THE SPRINKLER HEADS. 3. UPON A CALL FOR HEATING (BY THE SPACE THERMOSTAT), UNIT CONTROLLER WILL MODULATE ,r, 2.8. THE COMPLETE INSTALLATION SHALL BE IN STRICT ACCORDANCE WITH ALL STATE, LOCAL AND THE UNIT'S ELECTRIC HEATING TO MAINTAIN ROOM TEMPERATURE SETPOINT. 100 CFM 0.A. co NATIONAL CODES, ALL APPLICABLE SECTIONS OF THE NATIONAL FIRE PROTECTION ASSOCIATION, DATE: MARCH 13, 2017 AND DIVISION 13 SPECIAL CONSTRUCTION. NOTE: THE MOST STRINGENT SPECIFICATION 4. UPON A CALL FOR DEHUMIDIFICATION WHEN THE SPACE RELATIVE HUMIDITY EXCEEDS 50% (AS --- REQUIREMENTS APPLY. MEASURED BY THE CLEAN ROOM SPACE HUMIDITY SENSOR), THE UNIT CONTROLLER WILL RUN ECU-1 JOB NUMBER: 2016285.50 to 2.9. ALL ELECTRICAL CIRCUITS REQUIRED FOR EACH FIRE DETECTION SYSTEM, WATER FLOW ALARM THE UNIT IN DEHUMIDIFICATION MODE (UTILIZING THE ELECTRIC HEAT COIL) TO MAINTAIN ° AND VALVE SUPERVISION WIRING SHALL BE CHECKED BY THE FIRE PROTECTION CONTRACTOR SPACE HUMIDITY BELOW SETPOINT. 2,500 CFM - TITLE: o / SHUTTERED VENT-V> �> 4 ¢ TO ENSURE PROPER OPERATION. SPRINKLER SUPERVISORY DEVICES WILL BE COMPATIBLE WITH --�> I > DEMOLITION AND NEW Q THE ALARM EQUIPMENT PANEL. COORDINATE WITH FIRE ALARM CONTRACTOR. v i c 2.10. CONTRACTOR SHALL FIELD VERIFY EXISTING SPRINKLER SYSTEM AND LOCATION OF EXISTING I I r` o BACKFLOW PREVENTION DEVICE. VERIFY THAT A SPRINKLER FLOW SWITCH AND DEDICATED WORK MECHANICAL PLANS cy ao SPRINKLER TAMPER SWITCH EXIST PER EACH RISER ON SPRINKLER SYSTEM AND INSTALL IF �; - NOT CURRENTLY PROVIDED.. SHUTTERED VENT SHEET NUMBER: U p C5m s c, 3 CLEAN ROOIV AIRFLOW DIAGRAM REFERENCE ONLY ii M-1 .1 NTSJ . NOT APPROVED WITH THIS PERMIT COMMENTS: ii ii g CD � U 0 _N = o PLUMBING SPECIFICATIONS P L U V 31 \ G \ O T E S LEGE\ D APCVS 2.PLUMBING REQUIREMENTS 1.GENERAL REQUIREMENTS 2.01 PIPE AND FITTINGS: 1. GENERAL NOTES ARE APPLICABLE TO ALL PLUMBING WORKING DRAWINGS. SS SANITARY SEWER 1.01 GENERAL REQUIREMENTS A.DOMESTIC WATER:HARD COPPER TUBE,ASTM B 88,TYPE L,DRAWN TEMPER,ASME B16.22 WROUGHT COPPER A.COMPLY WITH APPLICABLE PROVISIONS OF DIVISION 1,GENERAL REQUIREMENTS,OF THE SPECIFICATIONS. FITTINGS WITH SOLDERED JOINTS. 2. THE WORK SHALL BE EXECUTED IN STRICT CONFORMITY WITH BASE BUILDING SPECIFICATION AND WITH THE LATEST EDITION OF THE PREVAILING LOCAL Health PLUMBING AND BUILDING CODES AND ALL LOCAL REGULATIONS THAT MAY APPLY. IN CASE OF CONFLICT BETWEEN THE CONTRACT DOCUMENTS AND A SD STORM DRAIN B.WORK SHALL CONSIST OF PROVIDING ALL MATERIALS,LABOR,EQUIPMENT AND SERVICES NECESSARY FOR A B.DISINFECT ALL DOMESTIC WATER PIPING PER LOCAL CODES,OR WITH FOLLOWING PROCEDURE,WHICHEVER GOVERNING CODE OR ORDINANCE, THE MORE STRINGENT STANDARD SHALL APPLY. COMPLETE INSTALLATION AS SPECIFIED HEREIN OR SHOWN ON THE DRAWINGS. IS MORE STRINGENT: - DOMESTIC COLD WATER C.THE WORK IS INTENDED TO BE COMPLETE IN EVERY DETAIL AND ALL ITEMS NECESSARY FOR A COMPLETE FILL ENTIRE DOMESTIC WATER SYSTEM WITH CHLORINE LIQUID OR POWDER UNTIL SYSTEM OBTAINS RESIDUAL 3. ALL PLUMBING WORK SHALL BE COORDINATED WITH ALL OTHER TRADES BEFORE PROCEEDING WITH INSTALLATION. AND OPERABLE INSTALLATION SHALL BE FURNISHED WHETHER OR NOT SPECIFIED OR SHOWN ON DRAWINGS. CONCENTRATION OF 50 TO 80MG/L.MAINTAIN DISINFECTANT IN SYSTEM FOR 24 HOURS.FLUSH SYSTEM AND - - DOMESTIC HOT WATER SAMPLE AT3LOCATIONS.ANALYZEINACCORDANCEWITHAWWAC651. 4. NO CHANGES ARE TO BE MADE IN PLUMBING LAYOUT WITHOUT WRITTEN PERMISSION BY THE ARCHITECT. STORE NUMBER: D.ALL WORK SHALL BE IN COMPLIANCE WITH ALL APPLICABLE CODES,REGULATIONS,ORDINANCES AND STANDARDS.VVHERE LOCAL CODE REQUIREMENTS EXCEED THE STANDARDS AND REQUIREMENTS LISTED IN C.SANITARY WASTE AND VENT:SCHEDULE 40PVC,ASTM O.1785WITHSOLVENT WELDED JOINTS. 5. PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS AND FOR PAYING RELATED FEES. CD CONDENSATE DRAIN 7358 SW DURHAM ROAD THESE SPECIFICATIONS,CONTRACTOR SHALL INCLUDE IN THEIR PRICE ALL COSTS TO INSTALL SYSTEM PER LOCAL CODE REQUIREMENTS. 2.02 JOINT CONSTRUCTION: 6. INSTALL BALL VALVES ON ALL BRANCH SUPPLY LINES. PORTLAND, OR 97224 - - PLUMBING VENT 1.02 PERMITS,LICENSES,FEES AND TAXES: A.SOLDERED JOINTS:ASTM B 813 WATER-SOLUABLE,LEAD•FREE FLUX,ASTM B32 LEAD.fREE ALLOY SOLDER AND ASTM B 828 PROCEDURE. 7. A.OBTAIN AND PAY FOR ALL APPLICABLE PERMITS,LICENSES AND FEES REQUIRED BY ALL WORK INDICATED ON OF FINAL INSPECTION ON ALLTESTED, BALANCEDAND CLEANED. PROVIDE A ONE YEAR WARRANTY FROM DATE PARTS AND LABOR. G GAS PIPING PROJECT TYPE: NON-RETAIL THE DRAWINGS AND SPECIFICATIONS. 2.03 PIPE INSULATION: . SINK, FAUCET, EYEWASH AND SUMP PUMP ARE RELOCATED FROM ANOTHER FACILITY. CONTRACTOR SHALL TAKE POSSESSION AND INSTALL. DEAL TYPE: TBD 1.03 EQUIPMENT AND MATERIAL SPECIFICATIONS: A.DOMESTIC COLD WATER AND HOT WATER:PIPING SHALL BE COMPLETELY INSULATED W 8 WITH ARMAFLEX,ASTM �I F UNION C 534,CELLULAR ELASTOMERIC OR APPROVED EQUAL,1"THICKNESS.POLYETHYLENE OR POLYOLEFIN CS PROJECT NUMBER' A.MANUFACTURER NAMES AND MODEL NUMBERS SPECIFIED ARE INTENDED TO ESTABLISH STYLE,QUALITY AND MATERIALS ARE NOT ACCEPTABLE.PROVIDE CEMENTS/ADHESIVES AS RECOMMENDED BY INSULATION TYPE REQUIRED BY THE INSTALLATION.IT IS NOT INTENDED TO LIMIT OR RESTRICT PRODUCT OR MANUFACTURER. -IR7I-- PLUG COCK ' MANUFACTURER SELECTION. 2.04 VALVES: C ELBOW - TURNED DOWN B.CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MODIFICATIONS REQUIRED TO ACCOMMODATE MATERIAL OR ARCHI'f ECT OF RECORD EQUIPMENT SUBSTITUTION AND SHALL BEAR ANY AND ALL INCREASE IN COST TO THEMSELVES AND TO ALL A.COPPER ALLOY BALL VALVES,MSS SP-110,TWO-PIECE BODY WITH FULL PORT,STAINLESS STEEL BALL,TFE OTHER TRADES AFFECTED BY SUCH SUBSTITUTION. SEATS,400 PSIG MINIMUM CWP RATING,BLOWOUT-PROOF STAINLESS STEEL TRIM AND VINYL-COVERED STEEL 0 ELBOW - TURNED UP HANDLE.MANUFACTURER:NIBCO,INC.MODEL NUMBER T/S-585.70-66,CRANE CO.,WATTS INDUSTRIES,OR 1.04 VENDOR DRAWINGS: APPROVED EQUAL. TEE - TURNED DOWN A.FINAL EQUIPMENT ORDERS SHALL NOT BE PLACED UNTIL MATERIALS OR EQUIPMENT ARE SUBMITTED FOR B.STOPS AND SUPPLIES:FURNISH CHROME-PLATED,BRASS BODY STOPS WITH CHROME-PLATED SUPPLIES FOR REVIEW AND ARE RETURNED APPROVED OR APPROVED AS NOTED. EACH FIXTURE.ALL EXPOSED PIPING SHALL BE CHROME-PLATED. 0 TEE - TURNED UP 1.05 MATERIALS AND WORKMANSHIP: 2.05 PIPE SUPPORTS: A.ALL MATERIALS AND EQUIPMENT FURNISHED SHALL BE NEW,OR THE BEST QUALITY,FREE FROM DEFECTS A.ALL PIPE SHALL BE RIGIDLY SUPPORTED WITH HANGERS AND SUPPORTS SECURED TO THE STRUCTURAL vv GATE VALVE AND IMPERFECTIONS AND OF RECENT MANUFACTURE. FRAMING.HANGERS SHALL BE SPLIT RING FOR UP TO 2"AND CLEVIS TYPE WITH ADJUSTABLE SWIVEL GPD Engineering and Architecture COUPLINGS FOR LARGER.VERTICAL PIPING SHALL BE SUPPORTED BY RISER CLAMPS AT EACH FLOOR FOR Professional Corporation B.ALL TRADE WORK SHALL BE PERFORMED IN ACCORDANCE WITH INDUSTRY STANDARDS AND NO MAKESHIFTS SANITARY AND WATER PIPING LESS THAN 2",AND EVERY OTHER FLOOR FOR WATER PIPING OVER 2".HANGER ij I BALL VALVE SHALL BE PERMITTED.ALL PORTIONS OF THE INSTALLATION SHALL BE SO LAID OUT AND INSTALLED THAT WORK RODS SHALL BE IN ACCORDANCE WITH LOCAL CODES,OR AS RECOMMENDED BY THE MANUFACTURER, 520 South Main Street,Suite 2531 AS A WHOLE IS OF UNIFORM QUALITY AND APPEARANCE.DAMAGED OR OTHERWISE DEFECTIVE MATERIAL SHALL WHICHEVER IS MORE STRINGENT. Akron,OH 44311 NOT BE INSTALLED. CHECK VALVE 330.572.2100 Fax:330.572.2102 B.PIPE HANGERS AND SUPPORTS SHALL BE LOCATED AT EACH VALVE AND NEAR CHANGES OF DIRECTION. 1.06 COORDINATION: SPACING OF HANGERS AND SUPPORTS SHALL NOT EXCEED THE FOLLOWING: q T & P RELIEF VALVE A.ALL WORK SHALL BE COORDINATED WITH OTHER TRADES AND WITH EXISTING CONDITIONS. 1)PVC ALL SIZES: 4-0" B.CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER AND OBTAIN APPROVAL OF ANY SYSTEM 2)COPPER PIPE 3/4"AND SMALLER: 6'-0" o FCO FLOOR CLEANOUT CONSULTANT' SHUTDOWN OR BEFORE CONNECTING TO ANY EXISTING SERVICE.SEQUENCE OF INSTALLATION SHALL BE 1" -1-W: 7-0" COORDINATED TO MINIMIZE SYSTEM EQUIPMENT SHUTDOWN. 1-1/2"AND LARGER: 8'-0" A3 3 E V A T 0\ S 1.07 EQUIPMENT SUPPORTS AND ATTACHMENTS: 2.07 PLUMBING FIXTURES AND EQUIPMENT: A.STRUCTURAL SUPPORTS SHALL INCLUDE ALL LABOR,SUPPLEMENTAL STEEL,OR OTHER MATERIALS, A.REFER TO SCHEDULES ON DRAWINGS FOR FIXTURE AND EQUIPMENT INFORMATION. CD CONDENSATE I.E. INVERT NECESSARY FOR SUPPORT OF EQUIPMENT AND PIPING FURNISHED BY CONTRACTOR. DRAIN ELEVATION B.CLEAN FIXTURES UPON COMPLETION OF PROJECT.INSTALL ALL COMPONENTS PLUMB,LEVEL AND SQUARE. CONT. CONTINUATION PCO PLUG CLEANOUT 1.08 GUARANTEE: 2.08 ADDITIONAL PLUMBING REQUIREMENTS: CW COLD WATER PF PLUMBING A.ALL WORK,EQUIPMENT,ACCESSORIES AND MATERIAL FURNISHED BY THIS CONTRACTOR SHALL BE DN DOWN FIXTURE GUARANTEED FOR A PERIOD OF NOT LESS THAN ONE YEAR FROM DATE OF FINAL ACCEPTANCE,AGAINST ALL A.ALL TESTING OF NEW AND EXISTING PIPING SHALL BE IN CONFORMANCE WITH LOCAL PLUMBING CODES. FD FLOOR DRAIN SS SANITARY SEWER DEFECTS IN MATERIAL AND WORKMANSHIP. B.INSTALLATION OF ALL PIPING AND FIXTURES SHALL BE IN CONFORMANCE WITH LOCAL PLUMBING CODES, U F UNDER FLOOR FCO FLUSH CLEAN � B.WARRANTY PERIOD SHALL BEGIN AFTER FINAL ACCEPTANCE BY THE OWNER.MANUFACTURER'S STANDARD INCLUDING,BUT NOT LIMITED TO,EXCAVATION AND BACKFILL,HANGER SUPPORT,AND LABELING. OUT V PLUMBING VENT WARRANTY ON EQUIPMENT AND MATERIALS GREATER THAN ONE YEAR SHALL TAKE PRECEDENCE. C.RECORD DRAWINGS:DURING THE COURSE OF CONSTRUCTION,CONTRACTOR SHALL KEEP AS-BUILT G GAS PIPING VTR VENT THRU ROOF 1.09 PROTECTION OF EXISTING EQUIPMENT: DRAWINGS,CALLED"RECORD DRAWINGS",CONTINUALLY UPDATED ON THE PROJECT SITE.DRAWINGS SHALL HW HOT WATER WCO WALL CLEAN OUT INDICATE EXACT LOCATIONS AND DEPTHS OF UNDERGROUND PIPING AND CHANGES IN PIPE ROUTING OR A.CONTRACTOR SHALL PROVIDE SHIELDS OR COVERS TO PROTECT ALL EXISTING EQUIPMENT IN THE AREA OF FIXTURE AND EQUIPMENT LOCATIONS.UPON COMPLETION OF PROJECT,TURN RECORD DRAWINGS OVER TO WORK.DAMAGE TO EXISTING SYSTEMS AND EQUIPMENT SHALL BE REPAIRED OR REPLACE BY THIS OWNER AND SUBMIT WRITTEN EVIDENCE OF COMPLIANCE TO ENGINEER.FINAL ACCEPTANCE WILL NOT BE DEVELOPER: CONTRACTOR AT THEIR OWN EXPENSE. ISSUED AND THE WARRANTY DATE WILL NOT BE ESTABLISHED UNTIL SUCH COMPLIANCE IS DEMONSTRATED. 1.10 CLEANING: END OF SECTION A.CONTRACTOR SHALL BE RESPONSIBLE FOR PERIODICALLY REMOVING RUBBISH AND DEBRIS CAUSED BY THE INSTALLATION OF THEIR WORK. B.UPON COMPLETION AND BEFORE LEAVING THE PREMISES,THE CONTRACTOR SHALL CLEAN THEIR WORK AREA SO AS TO BE READY FOR USE BY THE OWNER. 1.11 CUTTING AND PATCHING: A.CONTRACTOR SHALL DO ALL NECESSARY CUTTING AND PATCHING AS REQUIRED FOR THE INSTALLATION OF THEIR WORK. a) -o B.UNDER NO CIRCUMSTANCES SHALL ANY STRUCTURAL MEMBERS OR LOAD BEARING WALLS BE CUT WITHOUT 6 FIRST OBTAINING WRITTEN PERMISSION FROM THE STRUCTURAL ENGINEER. o a) ISEAL' �-,✓'- °FSM, -o �;J s. ai G L Y . n^ o O oRGc�! CD a-) ,,V� ��I 7 NI s a) 7.T 4 2 0 ,'', /oma, EXPIRES:1S(ID LEE 0 / cn C REVISIONS: 0 0 0 CI C O 0 7 L. CI) C 0 U / 0� 01 / CC U 1- CC 0 C 0 0 0 CL p In ..---- _c O N S N DRAWING BY: I co DATE: MARCH 13, 2017 N co --- JOB NUMBER: 2016285.50 m a- o TITLE: a) / - Q ro o PLUMBING SCHEDULES N / 0 v AND SPECIFICATIONS O N 0 U r‘-i. $ SHEET NUMBER: _c ,i-: U p ami `0 .. p m REFERENCE ONLY 6' ,,,'-',-- 0 . 1 , _. ...,-J u NOT APPROVED WITH THIS PERMIT �, COMMENTS: u ii E 0 CO0 a) � o GE\ERAL \ OTES 1. THE GENERAL NOTES LISTED HERE APPLY TO ALL PLUMBING DRAWINGS IN ADDITION TO ANY ADDITIONAL DRAWING NOTES ON THE INDIVIDUAL DRAWINGS. 2. SEE CODED NOTES ON INDIVIDUAL DRAWING SHEETS FOR SPECIFIC INSTRUCTIONAL AP CVS NOTES 3. FIELD VERIFY EXISTING CONDITIONS PRIOR TO THE START OF CONSTRUCTION. 4. IF DURING CONSTRUCTION OPERATIONS, THE PLUMBING CONTRACTOR ENCOUNTERS Health UTILITIES OTHER THAN THOSE LOCATIONS SHOW IN THE PLANS, HE SHALL IMMEDIATELY NOTIFY ENGINEER AND TAKE THE NECESSARY STEPS TO PROTECT THE FACILITY AND ASSURE THE CONTINUANCE OF SERVICE. 5. COORDINATE WITH ELECTRICAL WORK ANNERAL OTHER TRADES WORK , HVAC WORK, FIRE PROTECTION WORK, STORE NUMBER: , 7358 SW DURHAM ROAD 6. THE PLUMBING DESIGN DRAWINGS ARE DIAGRAMMATIC AND ARE NOT INTENDED TO PORTLAND, OR 97224 SHOW EXACT LOCATION OF EQUIPMENT AND PIPING UNLESS DIMENSIONS ARE GIVEN OR OTHERWISE IMPLIED FOR CLEARANCES, ETC. PIPING AND PLUMBING EQUIPMENT ARE TO BE INSTALLED ALONG THE GENERAL PLANS SHOWN ON THE DRAWINGS, BUT PROJECT TYPE NON-RETAIL KEEPING IN MIND ACTUAL BUILDING CONDITIONS WHICH MUST BE CONFORMED WITHIN THE ACTUAL WORK. CONTRACTORS IN THEIR BIDS ARE REQUIRED TO INCLUDE ALL DEAL TYPE: TBD LABOR AND MATERIALS AND OTHER RELATED WORK NECESSARY TO PROVIDE MINOR OFFSETS IN PLUMBING WORK AS REQUIRED TO AVOID CONFLICT WITH OTHER WORK CS PROJECT NUMBER: ON THIS PROJECT OR AS REQUIRED IN ORDER TO OBTAIN MAXIMUM HEAD ROOM OR • EQUIPMENT ACCESS IN SPACES. 7. THE PLUMBING CONTRACTOR IS TO COORDINATE ALL PIPING WITH OTHER TRADES ARCHITECT OF RECORD PRIOR TO ROUTING PIPING AND SHALL MAKE OFFSETS AND ADJUST PIPE ROUTING AS REQUIRED TO HANDLE CONFLICTS IN THE FIELD. THE PLUMBING CONTRACTORS SHALL ALSO BE REQUIRED TO OFFSET VERTICAL SANITARY AND VENT LINES AROUND STRUCTURAL MEMBERS AS REQUIRED AND SHALL INCLUDE IN THEIR BID THE ASSOCIATED COST FOR ADDITIONAL FITTINGS, PIPING, AND MAN HOURS TO ACCOMMODATE CONFLICTS. 8. SEE ARCHITECTURAL PLANS FOR EXACT LOCATION AND ELEVATION OF PLUMBING FIXTURES. GPD Engineering and Architecture _ i t_ i1 I �' 9. ALL COLD WATER AND HOT WATER PIPING TO INDIVIDUAL SINKS AND INDIVIDUAL Professional Corporation \ LAVATORIES TO BE 1/2° UNLESS OTHERWISE INDICATED. 520 South Main Street,Suite 2531 \ `�^✓ J �i - Akron,OH44311 10. 330.572.2100 Fax x:330.572.2102 PROVIDE SEISMIC RESTRAINT FOR ALL NEW PIPING AND EQUIPMENT. / ____.__ ----- \0 TE S ---2,Y S YV 3 0 L 0 (...._, \ 1. SUMP PUMP SYSTEM TO BE LOCATED ON FLOOR BEHIND TEMPORARY CLEAN ROOM. CONSULTANT' 2. ROUTE 1-1/2" SUMP PUMP DISCHARGE PIPING TO 2" SAN IN WALL BEHIND / WAREHOUSE SINK. %"--- 3. EXTEND 1-1/2" VENT FROM SUMP PUMP SYSTEM AND TERMINATE THROUGH 1 \I EXTERIOR WALL ABOVE CEILING ELEVATION. r \ 4. ROUTE 1-1/2" DRAIN FROM SINK TO SUMP PUMP SYSTEM. COOLER. PREP. I CLEAN , ROOM. 5. TIE NEW 1/2" CW, 1/2" HW AND 1/2" HW RECIRC. (IF AVAILABLE) INTO NEAREST � � ��� \ EXISTING MAINS. \ / CGRR.. / CIRC. I I 6. ROUTE 1/2" HW & CW DOWN ALONG OUTSIDE OF CLEAN ROOM WALL AND CONNECT TO SINK. 7. ROUTE 1/2" HW & CW DOWN ALONG OUTSIDE OF CLEAN ROOM WALL AND CONNECT / i / TO EYE WASH, CONTRACTOR SHALL PROVIDE AND INSTALL ANSI 2358.0 COMPLIANT — \ / THERMOSTATIC MIXING VALVE AND SET TO 60' F. EYEWASH TO BE LOCATED ABOVE DEVELOPER' SINK, AND INSTALLED PER MANUFACTURERS RECOMMENDATIONS, TO DISCHARGE INTO OFFICE I — SINK WHEN IN OPERATION. 0 OPEN Ir_Q OFFICE 8. PROVIDE HUB DRAIN AT SUMP PUMP FOR AC CONDENSATE SHIPPING __.:__ _ \ / _ ___. _ * / \ / BREAK 0 — I / 1SEAL cn p. .: Q �� �si0 1141 e o O I �� 7 ' r ,,, , ,, 0 OREGON — ° ti, ONM.MNYA T DD1V1 N EXPIRES: 121311 if il CLEAN IA\ TE ...-- \ , IR00v 102 I REVISIONS: �; T T. / 103I WMIHODS / 101 = U - c 100cn O cn3 m / n . F J O C \i„........ �\ / VEST. O WARE— OLS- 0 .11 100 / .L U DRAWING BY: DATE: MARCH 13, 2017 N c --- — / / JOB NUMBER: 2016285.50 0_ a / / TITLE: ..,-- ,r- Q N / PLUMBING FLOOR PLAN / RE ERENCE ONLY CV ci NOT AP'ROVED WITH THIS PERMIT / SHEET NUMBER: U d'O a) p O 1 FLU VBING FLOOR PLAN 2 ENLARGED PLUMBING FLOOR PLAN 1 <, 1 ` �, » r '-0" %� COMMENTS: ii ii P-1 .1 SCALE: 1/8 = 1 -0 ���/���� P-1 .1/ SCALE: 1/4 = 1 ��%��� 0 Doi GENERAL NOTES A. REFER TO DRAWING E-2.1 FOR ALL GENERAL NOTES. B. CONTRACTOR SHALL REMOVE AND REINSTALL ALL CEILING ,CVS MATERIAL AS REQUIRED FOR ELECTRICAL WORK SHOWN. REPLACE ALL MATERIAL DAMAGED BY THIS CONTRACTOR. I Health I I - A. �/ C. POWER FEEDER PULL BOXES NOT SHOWN. PROVIDE PULLBOXES ____.-_.-___._._........__._........_..._............_._._._.__. I /I/II���II�II����������������.aE 1......._..._..__._._._ry►yfird®►��A.w FOR NEW FEEDERS AT LOCATIONS REQUIRED BY NEC. IN NO CASE SHALL A FEEDER CONDUIT HAVE BENDS OF MORE THAN , 270' WITHOUT THE INSTALLATION OF A PULLBOX. D. ALLEXISTING ELECTRICAL ITEMSWITHINHATCHED AREAS TOBP — - - -i - ---._----._.._.__...__...._-- - ----.....- ....::_:_)::/l- _:::_.- _,:rte-_=--...--- -..__ : REMAIN IN OPERATION UNLESS OTHERWISE SHOWN./OF — '- -� n ANY ITEM WHOSE WIRING MAY BE INTERRUPTED DUE TO WORK i I 4 i fO TC.I IN ADJACENT AREAS. STORE NUMBER --- -- -------.. :.._.....---._._..................._..._...._..--� ------- - --------._. .........._ .__.._...._. _._.._..._.._..........................._...---_....J I S W DURHAM ROAD I I i i E. RECEPTACLES SHALL BE HOSPITAL GRADE, BLACK WITH i -- - / I i 1 wII PORTLAND, OR 97224 i.., R L 11 STAINLESS STEEL COVERS. 1 I _....._................................. ..... --.._..........._......... �\ I 'j ' ' PROJECT TYPE NON-RETAIL ; �w iiiiiiiiiii�• w F. X ADJACENT TO DEVICE INDICATES ITEM IS EXISTING TO I REMAIN. 8 DEAL TYPE TBD. �. I ., L I / i_ L �.,_ j G. THIS LOCATION REQUIRES LATERAL BRACING FOR HANGING w _„ I L. I __....... _.__. / 0 • O • TCR-1 LOADS INCLUDING CEILING GRID, FIXTURES, CONDUITS, ETC. CS PROJECT NUMBER 1 -- — — I B BP I j COORDINATE WITH STRUCTURAL. PORTLAND IS IN SEISMIC ZONE • L2 1.1 I \I 1 I 0I. III ? I 7 I / ----11 NOTES BY S YM 0 L 0 ARCHITECT OF RECORD 1 6li I •4 1. ELECTRICAL PANELBOARD TO REMAIN. 2. TEMPORARY CLEANROOM PANELBOARD BY EC. COORDINATE I , ' MOUNTING LOCATION IN FIELD. REFER TO PANELBOARD K7) ��A "i � SCHEDULE FOR FURTHER INFORMATION. .- _ "-� 1' 3. NEW TEMPORARY CLEANROOM PANELBOARD FEEDER. REFER TO GP� nee<ill$alldre SHEET E-2.1 FOR FEEDER DETAILS. / BP Professional Corporation 4. NEW LOCATION OF EXISTING LIGHT FIXTURE REMOVED DURING 520 South Main Street,Suite 2531 1 I DEMOLITION. Akron,OH 44311 330.572.2100 Fax:330.572.2102 / \ - --- - - 5. EXISTING LIGHT FIXTURE TO REMAIN. _._._.._......_........._.____ �____..___ __ _..._........... _._._...._....__..__....-_____._._..... /4)(TYP; 6 AND CONDUITSWITCH FOR LI SH PING ROVDONDTBOL•CLEANROOMED 3x2x2.5”MANUFACTURERXPr EC TO WIRE FROM PANELBOARD TO LIGHTING THROUGH CONSULTANT• - \ / ci - 14 / SWITCH. 3) I7. CLEANROOM LIGHTING FIXTURE RELOCATED WITHIN CLEANROOM. liCOORDINATE EXACT LOCATION OF LIGHTING FIXTURE CONNECTION WITH CLEANROOM INSTALLER. EC TO WIRE FIXTURESIN THEIR ENTIRETY. (TYP. OF SIX (6) FIXTURES). I8. ALLCIRCUITSFORTEMPORARYCLEANROOMTOBECONNECTED TO TEMPORARY CLEANROOM PANEL 'TCR'. REFER - / \ TO PANEL SCHEDULE. ---- - --�----------------/ 9. HEPA FILTER. (3A,120V/10). FILTERS PROVIDED WITH SWITCH BOX. EC TO WIRE BACK TO PANELBOARD. COORDINATE EXACTI CONNECTIONSAND LOCATIONS WITH CLEANROOM MANUFACTURER.(TYP)\ 1/44/AAI 10 ORECEPTACLE. WIRING VSHALL BE 2-#1o, 1 #10G, 03/4"C. DEVELOPER: .--_- -- - - 11. DUPLEX RECEPTACLE. COORDINATE EXACT LOCATION WITH i ii CLEANROOM INSTALLER. REUSE EXISTING RECEPTACLES 1 >. RELOCATED WITH UNIT IF APPLICABLE. EC SHALL PROVIDE L ,% 2 PARTIAL LIGHTING PLAN 4 RECEPTACLE AND EXTEND CONDUIT TO PANELBOARD AND E-1 1 SCALE: 1/4" = 1'-0" '/j�� ,% PROVIDE ALL WIRING AND CONNECTIONS. (TYPICAL FOR ALL RECEPTACLES SHOWN). I , / 12. LOCATION OF DEDICATED GFCI RECEPTACLE FOR SUMP PUMP. 13. NEW FEEDER FOR EXTERIOR CONDENSING UNIT. REFER TO I � FIIIIIIIIIIII�/ SHEET E-2.1 FOR FEEDER DETAILS. .......-----..._ - / \_ / . \ L1-13 14. NEW FEEDER FOR INTERIOR CONDITIONING UNIT. REFER TO • 12 2 SHEET E-2.1 FOR FEEDER SEAL' `'"`` -- / ��� ED DETAILS. _ _ _ _ - 1 1 0 1 CC))- 15. LOCATION OF NEW LIGHT FIXTURE. SEE LIGHT FIXTURE I Filoo...„ C____...__.__-- ; _. T__.___._.._._.......__..—__________._..____.__.____—.____. SCHEDULE 0N SHEET E-2.1 FOR MORE INFORMATION. �-" I 1 1 H(11) 1di I H Q� ill [........61® l 7,17 I ; I L____ `.-----J TC ORE O`J 1 - ................._...._._._........_._._.._. _... TCR- TCR-1 rc 11 N , 3 �;� 11141 1 TC. 2 - _w�- TCR 1 �� TCR-6 i J II ;i y F i �1 TCR-9 Al Al \ CI EXPIRES: DM' I �� 2 F e TCR-10 -.;. '...._.._._ II HFA1 (CD HF HF 1-(79 _ (TYP) REVISIONS: ...................._.....................................................TCR_¢...__1 ! TCR-11 t - cn TCR-5 v i1 8 I - \�w1y] 0 l ii► 11 l i LI __MP) iii t-1� I ._......_........--- -- -......_...--- -----._....._._ % AL v 4 / /1 \\\ ,,_,,,._ 10 U 1 v NW v WP GFI1 U \ LIGHTING FIXTURE SCHEDULE �"" I TYPE DESCRIPTION CATALOG F-- TCR-13 o I ,\ BP THERMOPLASTIC EMERGENCY WITH (2) HEADS LIGHT LITHONIA: ELM2-LED-SD DRAWING BY: i o FIXTURE 1 DATE: MARCH 13, 2017 0 o EX THERMOPLASTIC EXIT SIGN LITH ONIA: JOB NUMBER: 2016285.50 j ® LQM-S-W-R-120/277-ELN-SD -4- TITLE: o = ai > J 4' LONG STRIP LIGHT WITHIN VESTIBULE AREA LITHONIA: WL4-30L-EZ1-LP835K PARTIAL LIGHTING 8c ` A - POWER PLANS r , a .,N pp CV SHEET NUMBER: o'- 0 \ A A REFERENCE ONLY L o aNOT APPROVED WITH THIS PERMIT CD-00 (1.- OVERALL FEEDER PLAN 3 PARTIAL POWER FLOOR PLANS , ;; ;; 1� SCALE: 3/32" = 1'-0"cu ',�. ;� E-1� SCALE: 1 4" = 1'-O" %/�, COMMENTS: L N � o GENERAL NOTES RISER DIAGRAM CODED NOTES ,CVS A. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE THE LOCAL 1. EXISTING 100A, 208/120V, 30, 4W PANELBOARD TO REMAIN. BUILDING CODES WITH LOCAL AMENDMENTS. 2. EXISTING 400A, 480/277V, 30, 4W PANELBOARD TO REMAIN. B. ALL CONDUIT PENETRATIONS THROUGH FIRE RATED WALLS, FLOORS, OR SHAFTS SHALL BE SEALED IN ACCORDANCE WITH SPECIFICATIONS. 3. NEW OUTDOOR HVAC UNIT. REFER TO MECHANICAL DRAWINGS FOR MORE INFORMATION Health C. ROUTING OF ALL SURFACE MOUNTED/EXPOSED CONDUIT IN UNFINISHED AREAS (OR WHERE NOTED ON THE DRAWINGS) SHALL BE COORDINATED 4. NEW 40A, 208/120V, 30, 4W TEMPORARY PANELBOARD. WITH, AND SHALL BE APPROVED BY THE ARCHITECT PRIOR TO INSTALLATION. 5. NEW INDOOR HVAC UNIT. REFER TO MECHANICAL DRAWINGS FOR MORE D. THE PHRASE "PROVIDED BY"USED WITHIN THESE DOCUMENTS SHALL INFORMATION EXPLICITLY REPRESENT "FURNISHED AND INSTALLED BY". E. ALL WIRING SHALL BE INSTALLED IN CONDUIT. ALL INTERIOR CONDUIT STORE NUMBER SHALL BE A MINIMUM OF 3/4" EMT UNLESS OTHERWISE NOTED. FED FROM FED FROM FED FROM NEW 15/3 L1 NEW 40/3 H NEW 40/3 7358 SW DURHAM ROAD • F. CIRCUITS SHALL BE REARRANGED AS REQUIRED TO MAINTAIN THE MOST BALANCED LOADS ON EACH PHASE WITHIN EACH PANEL. E.C. SHALL PORTLAND, OR 97224 PROVIDE A TYPED PANELBOARD SCHEDULE AND INSTALL IT ON INSIDE III COVER OF EACH PANEL. 0 G. DRAWINGS ARE DIAGRAMATIC AND INDICATE GENERAL ARRANGEMENT ONLY. PROJECT TYPE: NON-RETAIL COORDINATE INSTALLATION WITH OTHER TRADES TO VERIFY THE ACTUAL DEAL TBD SPACE CONDITIONS, HEADROOM, ETC. THAT IS TO BE MAINTAINED. NO ADDITIONAL PAYMENT WILL BE APPROVED FOR FAILURE TO COMPLY. H. WIRE SIZE OF BRANCH CIRCUITS SHALL BE ADJUSTED TO COMPENSATE FOR 3-#12,1-#12G, 3/4"C -- -- 4-#8,1-#10G, 3/4"C 3-#8,1-#10G, 3/4"C CS PROJECT NUMBER. VOLTAGE DROP BASED UPON ACTUAL CONDUIT ROUTING. E.C. SHALL EQU I P V1 EN T ELECTRICAL CONNECTION SCHEDULE • MAINTAIN VOLTAGE DROP AS RECOMMENDED BY NEC (NOT TO EXCEED 3%). I. ALL BRANCH CIRCUITS SHALL BE PROVIDED WITH A SEPARATE NEUTRAL CU-1 TCR CIRCUIT ARCHITECT OF RECORD � CONDUCTOR. NEUTRALS SHALL NOT BE SHARED PER 2014 NEC. ECU-1 EQUIP. EQUIPMENTAPPARENT DISCONNECT CONDUIT AND WIRING HP POWER VOLTS PH PANEL CIRCUIT BREAKER/ SWITCH STARTER INFORMATION REMARKS J. PROVIDE UPDATED, TYPED PANELBOARD SCHEDULES FOR INSIDE FRONT © 4 © NAME DESCRIPTION FUSE SIZE COVER OF ALL EXISTING PANELS AFFECTED DUE TO MODIFICATIONS ASSOCIATED WITH THIS PROJECT. ECU-1 INDOOR ENVIRONMENT -- 23.6 KW 480 3 H 19,21,23 40 60A/600V/3P/ ___ 3-#8, 1-#10G, 3/4"C 3 CONDITIONING UNIT 3-40AF/NEMA 1 K. EXISTING CONDITIONS ARE SHOWN FROM FIELD DATA AND EXISTING . DOCUMENTS AND ARE NOT NECESSARILY COMPLETE OR ACCURATE. ALL 30A/240V/3P/ FIELD CONDITIONS SHALL BE VERIFIED BY CONTRACTOR BEFORE START OF CU-1 CONDENSING UNIT -- 0.5 KW 208 3 L1 15,17,19 15 3-15AF/NEMA 3R ___ 3-#12, 1-#120, 3/4"C 1,2 CONSTRUCTION. L. THE CONTRACTOR SHALL NOTIFY THE OWNER OF ANY CONFLICTS OR GPD Engineering and Architecture DISCREPANCIES IN THE CONTRACT DOCUMENTS OR FIELD CONDITIONS PRIOR Professional Corporation TO EXECUTING THE WORK IN QUESTION. THE CONTRACTOR SHALL NOTIFY EXISTING PARTIAL POWER RISER DIAGRAM 'St° THE CONSTRUCTION MANAGER IF DETAILS ARE CONSIDERED UNSOUND, 520 South Main Street,Suite 2531 UNSAFE, NOT WATERPROOF, OR NOT WITHIN CUSTOMARY TRADE PRACTICE. IF Akron,OH 44311 WORK IS PERFORMED, IT WILL BE ASSUMED THAT THERE IS NO OBJECTION N.T.S. MECHANICAL CONNECTION SCHEDULE CODED REMARKS: 330.572.2100 Fax:330.572.2102 TO THE DETAIL. DETAILS ARE INTENDED TO SHOW THE END RESULT OF THE 1. EQUIPMENT MOUNTED ON ROOF. DESIGN. MINOR MODIFICATIONS MAY BE REQUIRED TO SUIT JOB CONDITIONS, AND SHALL BE INCLUDED AS PART OF THE WORK. M. SITE VISIT - CONTRACTOR SHALL VISIT THE SITE AND FAMILIARIZE HIMSELF 2. MOUNT DISCONNECT ADJACENT TO UNIT ON UNI-STRUT SUPPORT ON WITH ALL CONDITIONS AFFECTING HIS WORK. NO EXTRAS WILL BE ROOF. CONSULTANT' PERMITTED FOR LACK OF KNOWLEDGE OF EXISTING CONDITIONS. QUANTITIES OF MATERIALS SHALL BE PER CONTRACTOR'S MEASUREMENTS. 3. MOUNT DISCONNECT ADJACENT TO UNIT. N. THE E.C. SHALL VISIT AND EXAMINE CAREFULLY THE AREAS AFFECTED BY THIS WORK TO BECOME FAMILIAR WITH EXISTING CONDITIONS AND WITH THE DIFFICULTIES THAT WILL AFFECT THE EXECUTION OF THIS WORK. NO ADDITIONAL PAYMENTS WILL BE APPROVED REGARDING ADDITIONAL WORK REQUIRED BECAUSE OF EXISTING CONDITIONS. SUBMITTAL OF A BID WILL ACKNOWLEDGE THE ACCEPTANCE OF THIS RESPONSIBILITY. 0. WHERE STRUCTURAL OPENINGS ARE NOT AVAILABLE, THE E.C. SHALL CORE DRILL OR CUT AND CHASE WALLS AND FLOORS AS REQUIRED TO PERMIT PASSAGE OF CONDUITS AND RACEWAYS. AT COMPLETION OF INSTALLATIONS, E.C. SHALL FILL IN AND WATERPROOF OR FIREPROOF, TO RATING OF STRUCTURE PENETRATED. FILL ALL OPENINGS WITH MATERIALS AS DIRECTED BY THE ARCHITECT AND FINISH TO MATCH SURROUNDING AREAS. ALL OPENINGS REQUIRED SHALL BE APPROVED BY THE ARCHITECT PRIOR TO LOAD SUMMARY: DEMOLITION OR CORE DRILLING. A. EXISTING CLEANROOM WILL BE TAKEN OFFLINE FOR ► RENOVATION ONCE NEW CLEANROOM IS OPERATIONAL - AND CERTIFIED. B. TOTAL NEW LOAD ADDED TO PANEL L1 IS . DEVELOPER. APPROXIMATELY 10.8 kVA/30 AMPS, 208V. C. TOTAL NEW LOAD ADDED TO PANEL H IS APPROXIMATELY 23.7 kVA/28 AMPS, 480V . D. VERIFY MAXIMUM DEMAND LOADING ON PANELS AND FEEDERS, VERIFY NO OVERLOADS. CONTACT ENGINEER IF OVERLOAD IS POSSIBLE BEFORE START OF WORK. PANELBOARD NOTES: SEAL 0 P �� A. EXISTING PANELBOARDS AND ASSOCIATED CIRCUIT 1.,,, c- BREAKERS ARE SHOWN DASHED AND ARE EXISTING TO REMAIN, UNLESS DIRECTED OTHERWISE. n J 1>�r ! : i fir? B. NEW BREAKERS AND CIRCUITS ARE INDICATED BOLD. OREGON NEW CIRCUIT BREAKERS SHALL MATCH EXISTING IN r,\:';. MANUFACTURER, TYPE, AND AIC RATINGS. ', EXISTING PANEL SCHEDULE EXISTING PANEL SCHEDULE I NEW TEMPORARY CLEAN ROOM PANEL SCHEDULE EXPIREs:�I ` Panel: H Location: STORAGE I Voltage: 480 /277 Panel: L1 Location: 1 Voltage: 208 /120 Panel: TCR Location: i Voltage: 208 /120 Seance: ' ' I Phase: 3 1 1 Seance Phase: 3 Service: 40 • Phase: 3 Main Breaker: Lugs 400 Wires: 4 Main Breaker: Lugs 100 1.µ�r Wires: 4 Main Breaker: 40/3 Lugs Wires: 4 Fed from: Full Capacity, Neutral, Separate Grounding Fed from: Full Capacity, Neutral,-Separate Groundin Fed from: L1 Full Capacity, Neutral, Separate Grounding ' N _ ___ __ _. _ __ REVISIONS. i 'Bus Bus Bus CKT Description LTG REC HTG KCH MISC C/B P C/B LTG REC HTG KCH MIS Description CKT CKT Description LTG REC HTG KCH MISC C/B P C/B LTG REC HTG KCH MISC Description CKT CKT Description LTG REC HTG KCH MISC C/B P C/B LTG REC HTG KCH MISC Description CKT • N 1 11.1 A 20/1 9.5 OUTSIDE LTS 2 1 FREEZERS 1.0 20/1 A SPARE 2 1 HOOD 1.6 20/1 A 20/1 0.4 HEPA FILTER 2 a 3 PANELS L& L1 11.1 70/3 B 20/1 9.5 MAIN LTS 4 3 FREEZERS 1.0 20/1 B 20/1 1.0 RR RECEPT 4 3 HOOD 1.6 20/1 B 20/1 0.4 HEPA FILTER 4 5 11.1 C 20/1 9.5 WAREHOUSE LTS 6 5 COPIER 1.0 20/1 C 20/1 1.0 - WR RECEPT 6 5 HOOD 1.6 20/1 C 20/1 0.4 HEPA FILTER 6 7 3.2 A 20/1 9.5 OFFIDE LTS 87 1.4 A 20/1 1.0 INFUSION RECPT 8 7 CR RECEPT 1.2 20/1 A 20/1 0.4 HEPA FILTER 8 9 HVAC 3.2 B 20/1 9.5 WATER HEATER 10 9 RTU 1.4 20/2 B 20/1 1.0 WAREHOUSE 10 9 CR RECEPT 0.8 20/1 B 20/1 0.4 HEPA FILTER 10 g 11 3.2 20/3 C 20/1 9.5 HEPA FILTERS 12 11 RTU RECEPT 1.0 20/1 C 20/1 1.0 WAREHOUSE 12 11 HEPA FILTER 0.4 20/1 C 20/1 1.0 _ LIGHTING 12 13 3.2 A 3.2 14 13 SUMP PUMP 0.7 20/1 A 0.5 14 13 RTU RECEPT 0.8 20/1 A 20/1 SPARE 14 0 15 HVAC 3-2 B HVAC UNIT 16 15 0.2 B 20/2 0.5 CONF RM RECPT 16 15 SPARE 20/1 B 20/1 SPARE 16 0 17 3.2 20/3 C 20/3 3.2 18 17 CU-1 0.2 15/3 C 0.3 0.9 0.6 0.0 1.6 18 17 SPARE 20/1 C 20/1 SPARE 18 0 19 7.9 A 6.3 20 19 0.2 A 40/3 0.3 0.9 0.6 0.0 1.6 TCR 20 TOTALS: 0.0 "2.8 0.0 0.0 4.7 1.0 0.0 [ 1.8 0.0 0.0 21 ECU-1 7.9 40/3 B HVAC UNIT 22 21 SPARE B 0.3 0.9 0.6 0.0 1.6 22 'LOAD SUMMARY 0 23 7.9 C 40/3 6.3 24 23 SPARE C SPARE 24 KWC 1'OF KWD NOTES. _ I 25 14.3 A 4.8 26 25 SPARE A SPARE 26 - f ����01 1' _ I p10 0 27 PANEL L2 14.3 B LAB HVAC UNIT 28 27 SPARE B SPARE 28 LTG 1.0 10o 1A e 222,000 AIC: 29 14.3 90/3 C 30/3 4.8 30 29 SPARE C SPARE 30 REG 2 8 NEc ' r 2.8 TOTALS: 0.0 0.0 42.7 0.0 76-0 57.0 0-0 42.8 0.0 0.0 TOTALS: 0.0 4.7 3.4 0.0 0.0 1.0 8.8 1.8 0.0 4.7 HTG 18 8.0 1.5 T 1 o LOAD SUMMARY ? LOAD SUMMARY ` I E - ---- I DRAWING BY. _.� ... .. ...mow..,,,, .,,,..y.u.,...,.. ..m.......8 ,. .... -.!_ ........j -y»,�»...,.. /*[� /► �+ /� d 1 KCH Q.� 65 Q.Q ' .K LC DF KWD° ,,NOTES ....� . - .. MISC 4.7 50 2 3 ! I 3 _ KWG DF KuuQ' NOTES; - o _ ___ /� i 1. SPACE 1315 A NEW 20/1 BREAKER ( TOTALS: 10:3: 7:6 X125%. 9.5: I 1 DATE: MARCH 13, 2017 to 1. PAGE '19.,21;23 IS A NEW 40/3 BREAKER = } _ z ... .�. o LTG 1..0. - 100 1.0 2. SPACE 15,17,19 IS A NEW 15/3 BREAKER AMPS: 29 21 26 ` 1 o_ LTG 57,0 100 57.:0 _ w i o REC 0.0 NEC0 0 i _ ;REC • 13:5 NEC'L� 11.8 1 3. SPACE 18,20,22 ISA NEW 40/3 BREAKER JOB NUMBER. 2016285.50 Lr) .__ _ TGA w.. s HTG ! $5.5': 80 68.4 '-'1HTG 5i 2 8D ry, 4,2 . ., ., . KCH tl Q 65 0 0 i K i ; TITLE: 65 4 1J o = ;.... 3 MISC 4.7 M 50 2.3 NELECTICAL DETAILS I M ISC 76.0 50 38.0 i % ,, TOTALS.-._... .._................... 24 4...._........:.......................... . 19 3 X 125% 1241 I N � _ TOTALS. 21$.5 . 163.4 X25 2Q4.2 __ l _.......... ....................... r` i AMPS: 263 496 ._. 2461 . ;AMPS: 68 t I 53 .F...... € 67 ........................_......_............_.._......._._..................... ..._......_..-............_. I AND PANEL SCHEDULES CN co rri up SHEET NUMBER: .> 0 CD REFERENCE ONLY U m O 0 1 o- NOT APPROVED WITH THIS PERMIT a .• , _. ov N a) i i �, COMMENTS: ii ii o CD ELECTRICAL SPECIFICATIONS APCVS GENERAL SPECIFICATIONS EXISTING CONDITIONS AND DEMOLITION ELECTRICAL EQUIPMENT RACEWAY AND BOXES 1. THE FOLLOWING ARE ABBREVIATED SPECIFICATIONS. ALL ITEMS NECESSARY FOR A 1. ALL EQUIPMENT SHALL BE DESIGNED TO OPERATE ON VOLTAGE AND PANELBOARDS 1. ALL ELECTRICAL DEMOLITION WORK, INCLUDING MATERIAL REMOVAL FROM 1. RACEWAYS INTERIOR - UNLESS NOTED OTHERWISE, (EXCEPT FOR COMPLETE AND OPERABLE JOB (TO THE SATISFACTION OF OWNER) WHETHER THE SITE, SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR. PHASE SPECIFIED. CONTRACTOR FURNISHING EQUIPMENT OTHER THAN ALL INTERIOR CONDUIT SHALL BE EMT. ALL 1. PANELBOARDS SHALL BE FULLY RATED WITH BOLT-ON BREAKERS, SHOWN OR IMPLIED SHALL BE HELD AS THE RESPONSIBILITY OF THIS BEFORE PROCEEDING WITH THE DEMOLITION WORK, THE CONTRACTOR INDICATED SHALL BE RESPONSIBLE FOR ANY CHANGES IN CONDUCTORS, GROUNDING CONDUCTORS) COPPER BUS, AND AIC RATED TO WITHSTAND AVAILABLE FAULT CURRENT. CONTRACTOR SHALL OBTAIN FROM THE BUILDING OWNER A LIST OF ANY REMOVED RACEWAYS, SWITCHES, MAIN FEEDERS, AND APPURTENANCES AND PAY EMT CONDUIT FITTINGS SHALL BE ZINC PLATED STEEL SET-SCREW TYPE. Health ITEMS TO BE SALVAGED. ALL OTHER REMOVED MATERIALS AND ALL ASSOCIATED COSTS. REQUIREMENTS FOR ANY INCREASE IN CONDUITS SHALL BE INSTALLED IN WALLS AND CEILING SPACES IN REFER TO FAULT CURRENT AND COORDINATION STUDY SPECIFICATION 2. IMPORTANT NOTE: "CONTRACTOR" REFERENCED IN THESE SPECIFICATIONS SHALL EQUIPMENT SHALL BE PROPERLY DISCARDED OFF THE PREMISES. CAPACITIES SHALL BE REVIEWED BY ENGINEER. FINISHED ROOMS, AND MOUNTED EXPOSED IN UNFINISHED SPACES. ANY SECTION FOR REQUIREMENTS. LOAD CENTER CONSTRUCTION IS NOT INDICATE WORK BY ELECTRICAL CONTRACTOR OR ANY OF HIS SUBCONTRACTORS AFTER DEMOLITION IS COMPLETE, ANY RECESSED ABANDONED BACKBOX CONDUIT EXPOSED TO POSSIBLE DAMAGE SHALL BE R.G.S. THE ROUTING ACCEPTABLE. A TYPED PANELBOARD SCHEDULE SHALL BE INSTALLED IN UNLESS NOTED OTHERWISE. MAY BE REUSED FOR NEW DEVICE INSTALLATION AS APPLICATION OF ANY/ALL EXPOSED CONDUITS SHALL BE VERIFIED BY THE ARCHITECT THE FRONT COVER OF THE PANEL. APPROVED MANUFACTURERS: PRIOR TO ROUGH-IN. THE USE OF MC CABLE SHALL NOT BE SQUARE D, GENERAL ELECTRIC, CUTLER-HAMMER, AND SIEMENS. PERMITS. PROVIDE A NEW COVERPLATE THAT MATCHES THE SIZE OF FIRESTOPPING AND SEALING ELECTRICALSURFACE MOUNT OR RECESS MOUNT PER DRAWINGS. 3. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT ONLY. PERMITTED (EXCEPT FOR 6' LIGHTING FIXTURE WHIPS). WHERE SIZE IS THE BACKBOXIN. AND THE ES, WICONFIGURATION OF THE DEVICE(S) INSTALLED STORE NUMBER COORDINATE INSTALLATION WITH OTHER TRADES TO VERIFY THE ACTUAL SPACE PENETRATIONS SPECIFIED, IT SHALL BE USED. WHERE NOT SPECIFIED ON THE THEREIN. EXISTING DEVICES, WIRING, OR COVERPLATES WILL NOT BE 2. CIRCUITS SHALL BE REARRANGED AS REQUIRED TO MAINTAIN THE MOST CONDITIONS, HEADROOM, ETC. THAT IS TO BE MAINTAINED. NO ADDITIONAL DRAWINGS, CONTRACTOR SHALL SIZE CONDUIT PER N.E.C. BASED ON PERMITTED TO BE REUSED. PROVIDE A NEW BLANK COVERPLATE OVER BALANCED LOADS ON EACH PHASE WITHIN EACH PANEL. PAYMENT WILL BE APPROVED FOR FAILURE TO COMPLY. ALL UNUSED BACKBOXES ABANDONED IN PLACE. 1. CONTRACTOR SHALL FURNISH AND INSTALL FIRESTOPPING FOR SEALING WIRING REQUIREMENTS. THE CONTRACTOR SHALL PROVIDE JUNCTION 7358 SW DURHAM ROAD AROUND ELECTRICAL PENETRATIONS THROUGH FIRE OR SMOKE BARRIERS, AND/OR PULL BOXES WHERE SHOWN ON THE DRAWINGS, OR AS 3. PROVIDE A TYPED PANELBOARD SCHEDULE AND INSTALL IT ON INSIDE PORTLAND, OR 97224 4. ALL SYMBOLS AND ABBREVIATIONS USED ON THE DRAWINGS ARE CONSIDERED 2. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO EXISTING AND FLOORS. REQUIRED, WHETHER, SHOWN ON THE DRAWINGS OR NOT. EXPANSION COVER OF EACH PANEL. HANDWRITTEN PANELBOARDNST SCHEDULES ARE CONSTRUCTION STANDARDS. IF THE CONTRACTOR HAS QUESTIONS REGARDING JOINTS SHALL BE PROVIDED AS REQUIRED. PROPERTY RESULTING FROM THE CONSTRUCTION ACTIVITIES. NOT ACCEPTABLE. THEIR EXACT MEANING, THE OWNER SHALL BE NOTIFIED FOR CLARIFICATION 2.CONTRACTORPROVIDE A FIRESTOPPING WORKSHEET TO ANY/ALL AGENCIES WHICH BEFORE PROCEEDING WITH THE WORK. SHALL REMOVE ALL DEBRIS FROM THE SITE AT THE GOVERN THE PROJECT. 2. ALL CONDUIT SHALL BE A MINIMUM OF 3 " PROJECT TYPE: NON-RETAIL COMPLETION4 . OF WORK. / 4. PROVIDE AN UPDATED, TYPED PANELBOARD SCHEDULE FOR INSIDE OF 5. CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY PARKING 3. FIRESTOPPING MATERIALS SHALL BE INTUMESCENT SAFETY BARRIERS 3. PROVIDE METAL CONDUIT AND TUBING MANUFACTURED BY ONE OF THE FRONT COVER TO REPLACE EXISTING SCHEDULE FOR ANY PANELBOARD DEAL TYPE: TBD 3. EXISTING UTILITIES AND CONDITIONS ARE SHOWN FROM FIELD DATA AND THAT HAS BEEN MODIFIED DUE TO WORK ASSOCIATED WITH THIS FOR PERSONNEL AROUND BUILDING. EXISTING DOCUMENTS N AND RNOT ES NECESSARILY COMPLETE BY CONTACTOR DESIGNED TO BLOCK THE SPREAD OF FIRE AND SMOKE THROUGH FOLLOWING: ALFLEX CORPORATION; ANAMET INCORPORATED, ANACONDA PROJECT. ACCURATE. PENETRATIONS CREATED BY ELECTRICAL INSTALLATIONS IN FIRE RATED METAL HOSE; ANIXTER BROTHERS INCORPORATED; CAROL CABLE CS PROJECT NUMBER: 6. CONTRACTOR'S SCOPE OF WORK SHALL INCLUDE ALL ITEMS DEFINED IN THE BEFORE START OF CONSTRUCTION. WALLS AND FLOORS. MATERIALS SHALL BE FLAME, TOXIC FUME, AND COMPANY INCORPORATED; ELECTRI-FLEX COMPANY; GRINNELL COMPANY, • CONTRACT DOCUMENTS. THE CONTRACT DOCUMENTS INCLUDE, BUT ARE NOT WATER RESISTANT AND SHALL HAVE A MINIMUM 3 HOUR FIRE RATING. ALLIED TUBE AND CONDUIT DIVISION; MONOGRAM COMPANY, AFC; LIMITED TO, THE FOLLOWING: THE CONTRACT, SPECIFICATIONS, AND 4. CONTRACTOR SHALL BE RESPONSIBLE TO LOCATE, EXPOSE, AND FIRE RATING SHALL BE DEFINED BY TESTS CONDUCTED BY ASTM, UL OR REPUBLIC CONDUIT; OR WHEATLAND TUBE COMPANY. CONSTRUCTION DRAWINGS. CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIAL, DETERMINE IF CONFLICTS EXIST WITH THE PROPOSED IMPROVEMENTS. OTHER TESTING AND INSPECTION AGENCIES ACCEPTABLE TO AUTHORITIES ARCHITECT OF RECORD AND EQUIPMENT NECESSARY TO INSTALL ALL ELECTRICAL DEVICES, FIXTURES, CONTRACTOR SHALL NOTIFY THE OWNER IN ORDER TO RESOLVE ANY HAVING JURISDICTION. 4. PROVIDE NONMETALLIC CONDUIT AND TUBING MANUFACTURED BY ONE OF LAMPS, EQUIPMENT, SPECIAL SYSTEMS, CONDUIT, WIRING ETC. AS SHOWN OR CONFLICTS. EXISTING ELECTRICAL CONDUIT, WIRING, ETC. DAMAGED THE FOLLOWING: ANAMET INCORPORATED, ANACONDA METAL HOSE; IMPLIED ON THE DRAWINGS AND PROVIDE A COMPLETE OPERATIVE SYSTEM TO DURING RENOVATION SHALL BE REPLACED IN LIKE KIND AND CANTEX INDUSTRIES, HARSCO CORPORATION; CONDUX INTERNATIONAL, THE SATISFACTION OF OWNER. CHARACTER, AND AT THE EXISTING UTILITY LINES, DRAIN OR FIELD TILE GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS ELECTRICAL PRODUCTS; HUBBELL INCORPORATED, RACO, INCORPORATED; DAMAGED SHALL BE REPAIRED OR REPLACED, AS NEEDED, IN LIKE KIND THOMAS & BETTS CORPORATION, CARLON ELECTRICAL PRODUCTS; OR 7. CONTRACTOR SHALL PROVIDE ON-SITE SUPERVISION AT ALL TIMES WHILE THE AND CHARACTER. IT SHALL BE THE RESPONSIBILITY OF THE 1. ALL RACEWAYS AND EQUIPMENT SHALL BE GROUNDED IN ACCORDANCE O-Z/GEDNEY, UNIT OF GENERAL SIGNAL. WORK IS BEING PERFORMED AND SHALL DIRECT ALL WORK, USING HIS BEST CONTRACTOR TO LOCATE ALL EXISTING CONDUITS, CONTROL WIRING, WITH THE N.E.C. AND ANY LOCAL CODES. SKILL AND ATTENTION. HE SHALL BE SOLELY RESPONSIBLE FOR ALL ETC., WHETHER SHOWN HEREON OR NOT, AND TO PROTECT THEM FROM 5. PROVIDE CONDUIT BODIES AND FITTINGS MANUFACTURED BY ONE OF THE CONSTRUCTION MEANS, METHODS, TECHNIQUES, PROCEDURES AND SEQUENCES DAMAGE. THE CONTRACTOR SHALL BEAR ALL EXPENSES FOR REPAIR 2. ALL CONDUITS SHALL CONTAIN A CODE SIZE GROUNDING CONDUCTOR. FOLLOWING: CROUSE-HINDS, DIVISION OF COOPER INDUSTRIES; FOR COORDINATING ALL PORTIONS OF THE WORK UNDER THE CONTRACT. OR REPLACEMENT OF PROPERTY DAMAGED IN CONJUNCTION WITH THE EMERSON ELECTRIC COMPANY, APPLETON ELECTRIC COMPANY; HUBBELL 8. CONTRACTOR SHALL PROVIDE TEMPORARY WATER, POWER AND TOILET FACILITIES EXECUTION OF WORK. 3. EQUIPMENT GROUNDING CONDUCTORS SHALL BE INSULATED WITH INCORPORATED, KILLARK ELECTRIC MANUFACTURING COMPANY; THOMAS & GPD Engineering and Architecture AS REQUIRED BY THE CITY OR GOVERNING AGENCY. 5. THE CONTRACTOR SHALL NOTIFY THE OWNER OF ANY CONFLICTS OR GREEN-COLORED INSULATION. UUNITS IT OFOGENERALOSIGNARLON ELECTRICAL PRODUCTS; OR 0-Z/GEDNEY,L. Professional Corporation DISCREPANCIES IN THE CONTRACT DOCUMENTS OR FIELD CONDITIONS 4. GROUNDING ELECTRODE CONDUCTORS SHALL BE STRANDED CABLE. 520 South Main Street,Suite 2531 9. INSTALLATION OF ALL ELECTRICAL EQUIPMENT, DEVICES, CONDUITS, ETC. MUST PRIOR TO EXECUTING THE WORK IN QUESTION. THE CONTRACTOR Akron,OH 44311 BE COORDINATED WITH ALL OTHER TRADES. COORDINATE SHUTDOWN TIMES AND 330.572.2100 Fax:330.572.2102 WORKING HOURS WITH BUILDING OWNER, INCLUDING OFF HOURS, WEEKEND, AND SHALL NOTIFY THE CONSTRUCTION MANAGER IF DETAILS ARE 5. MATERIALS AND CONNECTION COMPONENTS FOR GROUNDING AND WIRING DEVICES HOLIDAYIN WORK AS REQUIRED. CONSIDERED UNSOUND, UNSAFE, NOT WATERPROOF, OR NOT WITHIN BONDING SHALL BE MANUFACTURED BY ERICO, THOMAS & BETTS, OR CUSTOMARY TRADE PRACTICE. IF WORK IS PERFORMED, IT WILL BE BURNDY. 1. COLOR OF WIRING DEVICES SHALL BE AS SELECTED BY ARCHITECT. 10. ANY DISCREPANCIES FOUND WITHIN THE CONTRACT DOCUMENTS SHALL BE ASSUMED THAT THERE IS NO OBJECTION TO THE DETAIL. DETAILS ARE INTENDED TO SHOW THE END RESULT OF THE DESIGN. MINOR REPORTED TO THE OWNER IN WRITING PRIOR TO THE AWARD OF THE CONTRACT MODIFICATIONS MAY BE REQUIRED TO SUIT JOB CONDITIONS, AND SHALL ELECTRICAL IDENTIFICATION 2 COVIERPLATENGED TOGETHER SHALL BE PROVIDED WITH A COMMON • AND AN ADDENDUM WILL BE ISSUED TO COVER SAME. BE INCLUDED AS PART OF THE WORK. CONSULTANT' 11. GUARANTEE - CONTRACTOR SHALL FURNISH OWNER WITH A WRITTEN GUARANTEE 1. PROVIDE NAMEPLATES FOR ALL MAJOR ELECTRICAL EQUIPMENT. REFER 3. PROVIDE WIRING DEVICES MANUFACTURED BY ONE OF THE FOLLOWING: TO PROMPTLY REMEDY ALL DEFECTS WITHOUT CHARGE FOR A PERIOD OF ONE 6. FROMCONTRACTOR SHALL PROVIDEINTO MEANS C CONTROL DUST TRANSMISSIONTIONEATO NAMEPLATE DETAIL FOR REQUIREMENTS. HUBBELL, INCORPORATED, WIRING DEVICES DIVISION; PASS & SEYMOUR YEAR AFTER FINAL ACCEPTANCE AND INSPECTION. SHALL BE MAINTAININGAN AREA ADJACENT NON-CONSTRUCTION AREAS (P&S)/LEGRAND, WIRING DEVICES DIVISION; LEVITON. THAT BE THEIR DAILY WORK OPERATIONS. 2. PROVIDE ALL FEEDERS AND BRANCH CIRCUIT WIRING WITH COLOR CODED 12. MATERIALS - ALL MATERIALS AND EQUIPMENT SHALL BE NEW IN ORIGINAL 7. SITE VISIT - CONTRACTOR SHALL VISIT THE SITE AND FAMILIARIZE VINYL TAPE WRAPPED A MINIMUM OF 1.5 TIMES AROUND 4. ALL RECEPTACLES SHALL BE HOSPITAL GRADE. RECEPTACLES WITHIN CONTAINERS/WRAPPINGS, SHALL BE SPECIFICATION GRADE AND LABELED OR HIMSELF WITH ALL CONDITIONS AFFECTING HIS WORK. NO EXTRAS WILL CIRCUMFERENCE OF JACKET/SHIELDING TO DESIGNATE PHASE. CLEAN ROOM SHALL BE PROVIDED WITH STAINLESS STEEL COVERPLATES. LISTED BY U.L. OR AN ACCREDITED TESTING ORGANIZATION AS REQUIRED BY BE PERMITTED FOR LACK OF KNOWLEDGE OF EXISTING CONDITIONS. LOCAL INSPECTORS. QUANTITIES OF MATERIALS SHALL BE PER CONTRACTOR'S 3. COLOR CODING OF CONDUCTORS FOR 208/120V, 3 PHASE, 4 WIRE 5. RECEPTACLES SHALL BE INSTALLED WITH THE GROUND PRONG UP WHEN MEASUREMENTS. SHALL BE AS FOLLOWS: PHASE A--BLACK; PHASE B--RED; PHASE MOUNTED VERTICALLY OR MOUNTED WITH THE GROUND PRONG TO THE 13. ALL EQUIPMENT SHALL BE DESIGNED TO OPERATE ON VOLTAGE AND PHASE C--BLUE; NEUTRAL--WHITE; GROUND--GREEN; ISOLATED RIGHT WHEN MOUNTED HORIZONTALLY. SPECIFIED. CONTRACTOR FURNISHING EQUIPMENT OTHER THAN INDICATED SHALL GROUND--GREEN WITH YELLOW STRIPE. BE RESPONSIBLE FOR ANY CHANGES IN CONDUCTORS, RACEWAYS, SWITCHES, BASIC ELECTRICAL MATERIALS AND METHODS MAIN FEEDERS, AND APPURTENANCES AND PAY ALL ASSOCIATED COSTS. 4. COLOR CODING OF CONDUCTORS FOR 480/277V, 3 PHASE, 4 WIRE REQUIREMENTS FOR ANY INCREASE IN CAPACITIES SHALL BE REVIEWED BY SHALL BE AS FOLLOWS: PHASE A--BROWN; PHASE B--YELLOW; ENGINEER. 1. WHERE STRUCTURAL OPENINGS ARE NOT AVAILABLE, THE CONTRACTOR PHASE C--ORANGE; NEUTRAL--GRAY; GROUND--GREEN. SHALL CORE DRILL OR CUT CHASES IN WALLS AND FLOORS AS SCHEDULING OF WORK REQUIRED. ALL NEW OPENINGS SHALL BE COORDINATED WITH THE ARCHITECT. ALL PENETRATIONS OF THE BUILDING WALLS, CEILING AND CONDUCTORS AND CABLES 1. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION AND SCHEDULING OF FLOORS, THE CONTRACTOR SHALL SEAL WITH QUALITY CAULK, FIRE DEVELOPER' ALL ASSOCIATED ELECTRICAL WORK WITH BUILDING MANAGEMENT ENGINEERING PANED AND WATERTIGHT, HALLWAY SUBMITTED FOR APPROVAL BY THEFIOWNER.T1. WIRING - ALL CONDUCTORS SHALL BE EQUAL TO OR BETTER THAN DEPARTMENT. NOTIFY OWNER AT LEAST 72 HOURS PRIOR TO COMMENCING ANY PENETRATIONS INTO THE HALLWAY SHALL BE ONE HOUR EIRE RATED, MINIMUM #12 AWG FOR POWER, #14 AWG FOR CONTROL, STRANDED ASSOCIATED WORK. PENETRATIONS INTO STAIRWELL SHALL BE TWO HOUR RATED. PENETRATIONS BETWEEN FLOORS SHALL BE TWO HOUR RATED. CORE COPPER 600V AC THHN/THWN, XHHW, SPECIFICATION. PROVIDE 75*C DRILL AND ROTARY HAMMER OPERATIONS SHALL BE PERFORMED RATED CONDUCTORS FOR AMPACITIES ABOVE 100A AND 60'C RATED LICENSES, CERTIFICATIONS OF INSPECTION BETWEEN THE HOURS SPECIFIED BY THE BUILDING OWNER (OFF HOURS CONDUCTORS FOR AMPACITIES OF 100 AMPS OR LESS. PROVIDE SOLID OR OVERTIME AS REQUIRED.). CONTRACTOR SHALL VERIFY LOCATION OF OR STRANDED FOR #10 AWG AND SMALLER, STRANDED FOR #8 AWG 1. CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFICATION OF ALL GOVERNING REBARS (AND EMBEDDED STEEL CABLES), AND AVOID SAME DURING AND LARGER. AGENCIES THAT REQUIRE SITE INSPECTION OF THE WORK AND/OR SIMPLY CORE DRILLING. / 2. ALL WIRING SHALL BE INSTALLED IN CONDUIT. NOTIFICATION. THE CONTRACTOR SHALL OBTAIN AND PAY FOR PERMITS, 2. TRASH REMOVAL: CONTRACTOR SHALL REMOVE ALL TRASH CREATED BY LICENSES AND INSPECTIONS NECESSARY FOR PERFORMANCE OF THE WORK. HIMSELF OR HIS SUBCONTRACTORS DUE TO DEMOLITION OR 3. WIRE SIZE OF BRANCH CIRCUITS SHALL BE ADJUSTED TO COMPENSATE 2. AND OF HIS SUBCONTRACTORS THAT DO ON THIS CONSTRUCTION. THE CONTRACTOR SHALL ALSO REMOVE TRASH FOR VOLTAGE DROP BASED UPON ACTUAL CONDUIT ROUTING. CONTRACTORABE ALLISLICENSEDONTR T ALL AGENCIESDOANY WORKH GOVERNOCREATED BY OTHER SUBCONTRACTORS INCLUDING CABLE REELS, CONTRACTOR SHALL MAINTAIN VOLTAGE DROP AS RECOMMENDED BY PROJECTOVER THE SHALLALD(B) CURRENTLYOWHICH CONSTRUCTION TIBY IS TO BE PERFORMED. CARDBOARD BOXES AND PACKING. PROMPTLY CLEAN-UP ALL SOILING, N.E.C. (NOT TO EXCEED 3%). .------ CONTRACTOR SHALL SECURE ALL PERMITS AND INSPECTIONS AS REQUIRED, ALL DEBRIS AND OTHER UNSIGHTLY OR HAZARDOUS CONDITIONS, CAUSED BY WORK OR DELIVERIES UNDER THIS CONTRACT, FROM THE BUILDING 4. PROVIDE A SEPARATE NEUTRAL FOR EACH BRANCH CIRCUIT, FEEDER, SEAL: a_ COSTS SHALL BE BORNE BY CONTRACTOR. �c -w""'" '�� 'S GROUNDS, ENTRIES, CORRIDORS, STAIRWAYS, ELEVATORS OR OTHER ETC. NEUTRALS ARE NOT PERMITTED TO BE SHARED. �, r",� i hd`;;\ /� 3. THE SHALL AND PAY FOR ALL PERMITS, LICENSES AND PUBLIC AREAS OF THE BUILDING. ALL SHALL BE REMOVED FROM THE �^ ' T INSPECTIONS CONTRACTORSHA INCIDENTAL SECURETWOEK UNDERD THIS CONTRACT.LLEM WHEN THE WORK IS SITE IN A TIMELY FASHION TO A LEGAL DISPOSAL FACILITY. 5. BRANCH CIRCUITS SERVING ISOLATED GROUND RECEPTACLES SHALL & _ COMPLETED, THE REQUIRED CERTIFICATES OF APPROVAL SHALL BE FURNISHED INCLUDE AN ADDITIONAL ISOLATED GROUNDING CONDUCTOR FROM THE CO THE BUILDINGHEOWNER. CONTRACTORICATEMUST BE LICENSED IN THE STAS , 3. SIGNAGE: CONTRACTOR SHALL MAINTAIN SECURITY AROUND PERIMETER RECEPTACLE AND WILL TERMINATE ON THE ISOLATED/INSULATED GROUND 1 17 COUNTY AND CITY OF THE PROJECT SITE. OF CONSTRUCTION SITE DURING ALL HOURS BY INSTALLING A BAR IN PANEL SERVING THEM. OREGONTEMPORARY RIBBON FOR INTERIOR WORK TO IDENTIFY CONSTRUCTION AREAS AS REQUIRED. SIGNAGE SHALL BE POSTED WITH NOTIFICATIONS 6. PROVIDE WIRE AND CABLE AND ASSOCIATED CONNECTORS WHICH COMPLY """ ...� �' ./ 4. CITY APPROVED PLANS SHALL BE KEPT IN A PLAN BOX AND SHALL NOT BE OF "NO TRESPASSING" AND "CONSTRUCTION AREA". <`''>`. 10• ✓ \; USED BY WORKMEN. ALL CONSTRUCTION SETS SHALL REFLECT SAMEWITH REQUIREMENTS NOTED IN THE CONTRACT DOCUMENTS. ✓ -et'� INFORMATION. AT ALL TIMES THESE ARE TO BE UNDER THE CARE OF THE 4. CHECK ACCURACY OF ALL DIMENSIONS IN THE FIELD. UNLESS J F CONSTRUCTION MANAGER. 7. PROVIDE WIRE AND CABLE MANUFACTURED BY ONE OF THE FOLLOWING: �-d-- SPECIFICALLY NOTED, DO NOT FABRICATE ANY MATERIALS OFF SITE, NOR AMERICAN INSULATED WIRE CORPORATION; NEXANS; CERROWIRE; EXPIRES:0130a DO ANY CONSTRUCTION UNTIL THE ACCURACY OF DRAWING DIMENSIONS SOUTHWIRE; OR ENCORE WIRE. E 0 CODES AND ORDINANCES HAVE BEEN VERIFIED AGAINST ACTUAL FIELD DIMENSIONS. . ... _ 8. PROVIDE CONNECTORS MANUFACTURED BY ONE OF THE FOLLOWING: 3 1. ALL WORK SHALL BE DONE IN STRICT ACCORDANCE WITH APPLICABLE CODES 5. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL NECESSARY CUTTING, AMP INCORPORATED; GENERAL SIGNAL, O-Z/GEDNEY UNIT; SQUARE D -0 SUBSEQUENT PATCHING, AND REQUIRED FLASHING FOR ALL ITEMS COMPANY, ANDERSON; ILSCO; OR BURNDY. cNi AND ORDINANCES, INCLUDING SUCH AS PERTAIN TO THE SAFETY AND HEALTH NECESSARY FOR ELECTRICAL PART OF THE CONTRACT. PATCH, PAINT, w RELATIONS. CODES AND ORDINANCES SHALL TAKE PRECEDENCE OVER THE AND REPAIR ANY AREA DAMAGED TO THE SATISFACTION OF THE REVISIONS: DRAWINGS AND SPECIFICATIONS ONLY IN CASE OF CONFLICT. BUILDING OWNER. U, a) s FIELD REPORTS AND CONSTRUCTION 6. THE EXACT LOCATIONS OF ALL ELECTRICAL DEVICES, EQUIPMENT AND i CONDUIT, AS SHOWN ON THE DRAWING, IS APPROXIMATE. WHEN NOT PROGRESS MEETINGS SHOWN IN DETAIL, THE EXACT LOCATION OR ROUTING SHALL BE DETERMINED BY THE CONTRACTOR, SUBJECT TO THE APPROVAL OF a) w 1. PROVIDE WRITTEN PROGRESS REPORTS TO THE OWNER AS DIRECTED OWNER. U) DURING PRE-BID MEETING. 7. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY BLOCKING, BACKING, o FRAMING, HANGERS OR OTHER SUPPORT FOR THE MOUNTING AND SHOP DRAWING SUBMITTALS SUPPORT OF ALL ITEMS REQUIRING THE SAME. 0 0 o 1. CONTRACTOR SHALL SUBMIT SIX (6) SETS OF SHOP DRAWINGS AND CATALOG 0 DATA FOR ALL MATERIAL AND EQUIPMENT USED FOR ACCEPTANCE BEFORE SUCH ITEMS ARE ORDERED OR FABRICATED FOR THE JOB. SHOP DRAWINGS NOT Q' STAMPED WITH CONTRACTOR APPROVAL WILL BE RETURNED FOR REPROCESSING. 0 U cn POST CONSTRUCTION AND PROJECT CLOSEOUT DOCUMENTATION F- 0 1. AS-BUILT REQUIREMENTS: DO NOT USE RECORD DOCUMENTS FOR DRAWING BY: -o CONSTRUCTION PURPOSES. TO PROTECT RECORD DOCUMENTS FROM o DETERIORATION AND LOSS, STORE IN A SECURE, FIRE-RESISTANT LOCATION. DATE: MARCH 13, 2017 PROVIDE ACCESS TO RECORD DOCUMENTS FOR THE OWNER'S REFERENCE a DURING NORMAL WORKING HOURS. MAINTAIN A CLEAN, UNDAMAGED SET OF o BLUE OR BLACK LINE PRINTS OF CONTRACT DRAWINGS AND SHOP DRAWINGS. JOB NUMBER: 2016285.50 s MARK THE SET TO SHOW THE ACTUAL INSTALLATION WHERE THE INSTALLATION o_ VARIES SUBSTANTIALLY FROM THE WORK AS ORIGINALLY SHOWN. MARK N. ao, DRAWINGS THAT ARE MOST CAPABLE OF SHOWING CONDITIONS FULLY AND TITLE: `" = ACCURATELY. WHERE SHOP DRAWINGS ARE USED, RECORD A Cy; > CROSS-REFERENCE AT THE CORRESPONDING LOCATION ON THE CONTRACT ELECTRICAL N DRAWINGS. GIVE PARTICULAR ATTENTION TO CONCEALED ELEMENTS THAT WOULD N. I BE DIFFICULT TO MEASURE AND RECORD AT A LATER DATE. MARK RECORD SPECIFICATIONS Lo SETS WITH RED ERASABLE PENCIL. USE OTHER COLORS TO DISTINGUISH ES N BETWEEN VARIATIONS IN SEPARATE CATEGORIES OF THE WORK. MARK NEW o INFORMATION THAT IS IMPORTANT TO THE OWNER BUT WAS NOT SHOWN ON THE SHEET NUMBER: s N CONTRACT DRAWINGS, DETAILS OR SHOP DRAWINGS. NOTE RELATED CHANGE REFERENCE ONLY o - ORDER NUMBERS WHERE APPLICABLE. NOTE RELATED RECORD DRAWING o M o INFORMATION AND PRODUCT DATA. UPON COMPLETION OF THE WORK, SUBMIT2 . 2 cm >;% ONE (1) COMPLETE SET OF RECORD DOCUMENTS TO THE CONSTRUCTION NOT APPROVED WITH THIS PERMIT 0 -00 o MANAGER FOR THE OWNER'S RECORDS. CONTRACTOR SHALL SUBMIT AS-BUILT No ii SET OF PLANS TO THE ENGINEER WITHIN 7 DAYS OF COMPLETION OF m a, CONSTRUCTION. COMMENTS: ii II o 0 � v) 0 .� = o u