Specifications (12) aQvute
Form 5a Project Name: TIGARD TRIANGLE BUILDING 1 Page: 1
LIGHTING - GENERAL
1. Interior Exceptions (Section 1313.1)
❑ No Interior Lighting. The building plans and specifications do not call for new or altered interior lighting.
Skip to item 5, Exterior building Lighting - General, below.
Exceptions ❑ Exceptions. 1. The building or part of the building qualifies for an exception from code lighting
Discussion of qualifying requirements. Applicable code exception is number:
exceptions in instructions
section. 2. Lighting equipment that qualifies for an exception - in addition to general lighting and is separately
controlled. Applicable code exception is number:
Areas of the building and equipment that qualify for any exceptions:
Plans/ Specs
Show compliance by including a NONE
drawing sheet, detail number,
and/or specification section and
subparagraph. 2. Local Shut -off controls (Section 1313.3.1.1)
o Complies. At least one local shut -off lighting control for every 2,000 square feet of
lighted floor area and for all spaces enclosed by walls or ceiling height partitions.
This control(s) is detailed in the building plans on drawing number: DRAWINGS E2.1, E2.2
❑ Exception. The building or part of the building qualifies for an exception.
Applicable code exception is Section 1313.3.1.1, Exception:
Portions of the building that qualify:
3. Automatic Shutoff Controls (Section 1313.3.1.2)
❑ Not Applicable. Office floor area is not over 2,000 square feet of contiguous office floor area or
permitted space is not over 5,000 square feet. No offices less than 300 square feet, meeting
or conference rooms, or school classrooms.
• Complies. All interior lighting systems are equipped with a separate automatic control to shut off lighting
during unoccupied periods. Offices less than 300 square feet, meeting and conference rooms, and school
classrooms shall be equipped with occupancy sensors that comply with Section 1313.3.1.2.1.
Compliance details in plans /specs: DRAWINGS E2.1, E2.2
❑ Exception. The building or part of the building qualifies for an exception. The
applicable code exception is Section 1313.3.1,2, Exception:
Portions of the building that qualify:
4. Daylighting Controls (1313.3.1.3)
❑ No classrooms or atriums with skylights or window to wall ratio greater than 50 %.
O Complies. All classrooms and atriums with window to wall ratio greater than 50% and /or skylights are
equipped with automatic daylight sensing controls, as required by Section 1313.3.1.3.1 and Section
1313.3.1.3.2. The daylight sensors specified comply with Section 1313.3.1.3.3.
Compliance details in plans /specs:
Exterior Build 5. Exterior Lighting (Section 1313.5)
ing Lighting O Complies. The plans do not call for use of incandescent or mercury vapor lamps for use on building exterior.
is lighting directed to illuminate ❑ Exception. The building plans indicate luminaires with incandescent or mercury vapor lamps, but are
the exterior of the building and specified for use in or around swimming pools, water features, or other locations subject to requirements
adjacent walkways and of Article 680 of the 2002 National Electrical Code.
loading areas with or without
canopies.
Clock Switches 6. Exterior and Canopy Lighting Controls (Section 1313.3.2)
shall be astronomic (seasonal 9 Complies. The building plans and specifications include photoelectric and /or clock switches on all exterior
correcting) type with separate lighting systems which are designed and programmed to extinguish lights when daylight is present, as
programs for each day of the required by Section 1313.3.2.
week and shall store energy to
maintain timekeeping during
power outages.
7. Interior Connected Lighting Power (Section 1313.4)
YES Complies. The interior lighting power does not exceed the interior power allowance established
f in either the Tenant Space Method (Form 5b) or the Space-by -Space Method (Form 5c).
Tenant Space Method (Form 5b) r Space- by-Space Method (Form 5c)
„ s
5 -1
Compliance with OSSC. effective 01/01/05
Work; Project Name: TIGARD TRIANGLE BUILDING 1 Page: 3
LIGHTING SCHEDULE •
(a) (b) (c) (d) (e) (()
Lum Luminaire Is Luminaire
ID Luminaire Lamp Ballasts Power From
Type Description u= �� No. Description No. Description (watts) Table 5c
A Fluorescent Linear Lamps T5 2- F28T5- ELECT -60W J f 2 F28T5 1 Elect. Program Start 60 YES
B Fluorescent Linear Lamps T5 , 2- F14T5- ELECT -34W 2 F14T5 1 Elect: Program Start 34 YES
Compact Fluorescent Triple 1-CFM 18W/GX24q -2- ELECT -21 W d 1 CFM 18W /GX24q -2 1 Electronic 21 YES
t —
C1 Compact Fluorescent Triple J 2- CFTR26W /GX24q -3- ELECT -55W 2 CFTR26W /GX24q -3 1 Electronic 55 YES
C2 12 Volt Tungsten Halogen Lamps F 1-75 watt lamp-MT-81W 1 75 watt lamp 1 Magnetic Transformer 81 YES
D Fluorescent Linear Lamps T5 = 1-F28T5-ELECT-30W
1 F28T5 1 Elect. Program Start 30 YES
F Compact Fluorescent Triple 1-CFTR26W/GX24q-3-ELECT-28W Y', 1 CFTR26W /GX24q -3 1 Electronic 28 YES
Lon Compact 40W 1 G 9 P ( ) ? 1 FT40W /2G11 1 Electronic 41 YES
IE Fluorescent Linear Lamps T5 = 2- F28T5 - ELECT -60W 2 F28T5 1 Elect. Program Start 60 YES
z. X User Defined ,:,, LED EX ET SIGN t__ 1 NA 1.7 NO
H User Defined ""
J CFU4/27 J 4 27W 1 Elect. Program Start 160 NO
J Compact Fluorescent Quad 2- CFQ26W /G24d -3 -ELECT 277V -54W A 2 CFQ26W /G24d -3 2 277 V Electronic 54 YES
--1 ':!= .
-
77 7
bR ■
i
1
M
0 .,-,
f
e+
J
p
d
LightingCompliance FormV3.3.xls
Form 5b Project Name: TIGARD TRIANGLE BUILDING 1 Page: 1
INTERIOR LIGHTING POWER - Tenant Space Method
Lighting
Budget (a) (b) (c) (d)
Occupancy/ Tenant or Building Type Max Power
n9 YPe Floor Area Lighting Power
Use Types
(Table -13G) (sq ft) Density (W1ft Budget (W)
See instructions for desc- o ffi ce
ription of occupancy types 39,518 1.0 39,518
Lighting Power 1. Total Interior Lighting Power Budget (Watts) for Building. 39,518
Budget
Track Lighting 2. Total length of track lighting (ft) _
Power 3. Line 2 multiplied by 37.5 Watts/ft
4. Total amperage of circuit breaker(s) serving track lighting (amps)
5. Voltage of circuit breaker serving track lighting (volts)
6. Maximum wattage of track lighting (multiply line 4 by line 5)
7. Track Lighting Power (lesser value of line 3 or line 6)
8. Track Lighting Power (line 7)
9. Total Interior Lighting Power from Worksheet 5b -1 (Sum of Column (m)) + 34,009
Building's 10. Total Adjusted Lighting Power (line 8 + line 9) = 34,009
Lighting Power
11. Does design meet budget? Line 10 must be no greater than line 1. YES
to0 , h
5 -2
Compliance with OSSC, effective 01/01/05
Worksheet 5b -1 Proje -et Name: TIGARD TRIANGLE BUILDING 1 Page: 4
INTERIOR LIGHTING POWER
Space -by -Space Method Only
Skip to column (f) if using the Tenant Space Method
(a) (b) (c) (d) (e) Lu m ID (9) (h) f) G) (k)
from Quantity of
Room ID (do Space Type Space Lighting Power Worksheet Luminaires (or Luminaire Lighting Room
not leave any Area (Table 13-H) Type Budget 5a Column lineal ft. , for track Power Exempt Power Total Ltg.
blanks) (ft (enter space type only once per room) LPD (b) x (d) I' lighting) g g) (Watts) Fixtures (g) x (h) Power
Each room 1ST FLOOR 19363 — — A zi 235 60 ❑ 14,100 16,408
must be 1ST FLOOR — — B 21 34 ❑ 714 —
identified. 1ST FLOOR — — C 34 21 ❑ 714
Describe
luminaires for each 1ST FLOOR — — C2 2 81 ❑ 162 —
Individual room In 1ST FLOOR — — F 8 28 ❑ 224
plans. —
1ST FLOOR — — D 5 30
❑ 150 —
1ST FLOOR — — G • 4 41 ❑ 164 —
1ST FLOOR - — — IE 3 60 ❑ 180 —
For track lighting 1ST FLOOR — — 60 ❑ —
enter lineal feet in 1ST FLOOR
column column (9) . — — 30 ❑ - —
2ND FLOOR 20155 — — A 3 245 60 ❑ 14,700 17.601
2N0 FLOOR — 25 34 ❑ 850
Column (k), enter — — —
sum of column (I) 2ND FLOOR — — C 37 21
- ❑ 777 —
for each room Dray 2ND FLOOR C 1 • 8 55 ❑ 440
once at first entry — — —
for the room . See 2ND FLOOR — — C2 2 81 ❑ 162 —
example in 2ND FLOOR — 2 30 ❑ 60
instructions. — — —
2ND FLOOR — -- G 4 41 ❑ 164 --
2ND FLOOR — — E 3 60 ❑ 180 —
2ND FLOOR — — H J 1 160 ❑ 160 --
2ND FLOOR — — J . 2 54 ❑ 108 -
-- - - ❑ -
- - d - ❑ - -
- - - ❑ - —
-- — J - ❑ - —
— — 71 - ❑ - —
— — - ❑ - -
- - ❑ - -
- — � - ❑ - —
❑
— — - - —
— — .J - ❑ - —
. — . ❑ —
— — - ❑ - --
— — - ❑ - —
— — :::11 - ❑ - -
- -1 - ❑ - --
- — - ❑ - -
- — - ❑ - -
- — - ❑ - -
- - ❑ - —
39,518 - _ _ Worksheet - 1 Total Budget Wks b-1 Total.Lighting Power (excluding exempt/track fixtures) 34,009
Other Pages Total Number of Additional Worksheet 5b I 0 J
List the additional _ - - --
worksheets nece-
ssary to catalog all
luminaires in (I) (m) (n)
building Lighting Power Budget: Space Proposed Buiding Lighting
by -Space only (Total of Power (Total of column (k), Area Sqft. (not required
. Worksheet Number column (e)) excluding exempt/track) for Tenant Method)
.. . 5b-1 - 34,009 39,518
•
5b -2
5b -3
Sum of additional 5b worksheets
. {� - 34,009 39,518
Total Budget (of all worksheets)
el.
5-5
• Compliance with OSSC. effective 01 /01/05